summaryrefslogtreecommitdiff
path: root/old/56113-h
diff options
context:
space:
mode:
Diffstat (limited to 'old/56113-h')
-rw-r--r--old/56113-h/56113-h.htm10665
-rw-r--r--old/56113-h/images/cover.jpgbin202116 -> 0 bytes
-rw-r--r--old/56113-h/images/cover_sm.jpgbin70379 -> 0 bytes
-rw-r--r--old/56113-h/images/illo004.jpgbin59109 -> 0 bytes
-rw-r--r--old/56113-h/images/illo013.pngbin25592 -> 0 bytes
-rw-r--r--old/56113-h/images/illo015.pngbin4625 -> 0 bytes
-rw-r--r--old/56113-h/images/illo026.pngbin13330 -> 0 bytes
-rw-r--r--old/56113-h/images/illo027.pngbin6431 -> 0 bytes
-rw-r--r--old/56113-h/images/illo041.pngbin14308 -> 0 bytes
-rw-r--r--old/56113-h/images/illo044.pngbin37549 -> 0 bytes
-rw-r--r--old/56113-h/images/illo045.pngbin10754 -> 0 bytes
-rw-r--r--old/56113-h/images/illo052.jpgbin53274 -> 0 bytes
-rw-r--r--old/56113-h/images/illo055.pngbin5434 -> 0 bytes
-rw-r--r--old/56113-h/images/illo065a.pngbin4067 -> 0 bytes
-rw-r--r--old/56113-h/images/illo065b.pngbin4546 -> 0 bytes
-rw-r--r--old/56113-h/images/illo067.pngbin7320 -> 0 bytes
-rw-r--r--old/56113-h/images/illo074.jpgbin53257 -> 0 bytes
-rw-r--r--old/56113-h/images/illo075.pngbin20812 -> 0 bytes
-rw-r--r--old/56113-h/images/illo078.pngbin34265 -> 0 bytes
-rw-r--r--old/56113-h/images/illo082.pngbin8139 -> 0 bytes
-rw-r--r--old/56113-h/images/illo086.pngbin39841 -> 0 bytes
-rw-r--r--old/56113-h/images/illo086lg.pngbin83386 -> 0 bytes
-rw-r--r--old/56113-h/images/illo087.pngbin15353 -> 0 bytes
-rw-r--r--old/56113-h/images/illo097.pngbin6212 -> 0 bytes
-rw-r--r--old/56113-h/images/illo099.pngbin36667 -> 0 bytes
-rw-r--r--old/56113-h/images/illo100.pngbin20850 -> 0 bytes
-rw-r--r--old/56113-h/images/illo102.jpgbin64240 -> 0 bytes
-rw-r--r--old/56113-h/images/illo106.jpgbin87376 -> 0 bytes
-rw-r--r--old/56113-h/images/illo107.pngbin14911 -> 0 bytes
-rw-r--r--old/56113-h/images/illo110.pngbin27166 -> 0 bytes
-rw-r--r--old/56113-h/images/illo111a.pngbin14110 -> 0 bytes
-rw-r--r--old/56113-h/images/illo111b.pngbin14394 -> 0 bytes
-rw-r--r--old/56113-h/images/illo112a.pngbin22853 -> 0 bytes
-rw-r--r--old/56113-h/images/illo112b.pngbin11563 -> 0 bytes
-rw-r--r--old/56113-h/images/illo113.pngbin7591 -> 0 bytes
-rw-r--r--old/56113-h/images/illo119.pngbin26038 -> 0 bytes
-rw-r--r--old/56113-h/images/illo119lg.pngbin59916 -> 0 bytes
-rw-r--r--old/56113-h/images/illo145.pngbin6544 -> 0 bytes
-rw-r--r--old/56113-h/images/illo164.pngbin30318 -> 0 bytes
-rw-r--r--old/56113-h/images/illo164lg.pngbin98897 -> 0 bytes
-rw-r--r--old/56113-h/images/illo189.pngbin9125 -> 0 bytes
-rw-r--r--old/56113-h/images/illo201.pngbin24546 -> 0 bytes
-rw-r--r--old/56113-h/images/illo210a.pngbin53441 -> 0 bytes
-rw-r--r--old/56113-h/images/illo210alg.pngbin156050 -> 0 bytes
-rw-r--r--old/56113-h/images/illo210b.pngbin40363 -> 0 bytes
-rw-r--r--old/56113-h/images/illo210blg.pngbin116217 -> 0 bytes
-rw-r--r--old/56113-h/images/illo210c.jpgbin79894 -> 0 bytes
-rw-r--r--old/56113-h/images/illo210clg.jpgbin234176 -> 0 bytes
-rw-r--r--old/56113-h/images/illo211.jpgbin73810 -> 0 bytes
-rw-r--r--old/56113-h/images/illo213.pngbin19231 -> 0 bytes
-rw-r--r--old/56113-h/images/spon.jpgbin3808 -> 0 bytes
-rw-r--r--old/56113-h/images/titpag.pngbin25625 -> 0 bytes
52 files changed, 0 insertions, 10665 deletions
diff --git a/old/56113-h/56113-h.htm b/old/56113-h/56113-h.htm
deleted file mode 100644
index efeb9ea..0000000
--- a/old/56113-h/56113-h.htm
+++ /dev/null
@@ -1,10665 +0,0 @@
-<!DOCTYPE html PUBLIC "-//W3C//DTD XHTML 1.0 Strict//EN"
- "http://www.w3.org/TR/xhtml1/DTD/xhtml1-strict.dtd">
-<html xmlns="http://www.w3.org/1999/xhtml" xml:lang="en" lang="en">
- <head>
- <meta http-equiv="Content-Type" content="text/html;charset=iso-8859-1" />
- <meta http-equiv="Content-Style-Type" content="text/css" />
- <title>
- The Project Gutenberg eBook of Irrigation Works, by E. S. Bellasis.
- </title>
- <link rel="coverpage" href="images/cover.jpg" />
- <style type="text/css">
-
- a
- {text-decoration: none;}
- a:hover
- {text-decoration: underline;}
- .allclear
- {clear: both;}
- .bb
- {border-bottom: solid thin;}
- .bb2
- {border-bottom: solid medium;}
- .bl
- {border-left: solid thin;}
- body
- {margin-left: 10%; margin-right: 10%;}
- .bot
- {vertical-align: bottom;}
- .br
- {border-right: solid thin;}
- .bt
- {border-top: solid thin;}
- .bt2
- {border-top: solid medium;}
- .caption
- {font-size: .9em; text-align: center; text-indent: 0; margin-top: .5em;}
- .center
- {text-align: center; text-indent: 0;}
- div.gibb
- {margin-left: 5%;}
- div.gibb p
- {text-indent:-1em; margin-left: 1em;}
- div.split5050
- {clear: both;}
- @media handheld {div.split5050 {clear: both;}}
- div.split5050 .caption
- {margin-top: 0; margin-bottom: 0;}
- div.split5050 div.leftsplit
- {float: left; clear: left; width: 49%;}
- @media handheld {div.split5050 div.leftsplit {float: left; clear: left;}}
- div.split5050 div.rightsplit
- {float: right; clear: right; width: 49%;}
- @media handheld {div.split5050 div.rightsplit {float: right; clear: right;}}
- .dontwrap
- {white-space: nowrap;}
- .figcenter
- {margin: 1.5em auto; text-align: center;}
- .fnanchor
- {vertical-align: top; font-size: .7em; text-decoration: none; white-space: nowrap;}
- .footnote
- {margin: .75em 5% .75em 3em; font-size: .9em;}
- .footnote .label
- {font-size: .8em; padding-right: 1em; vertical-align: top; text-indent: 0;}
- .footnote p
- {margin-top: .5em; margin-bottom: 0; margin-left: 0; text-indent: 0; line-height: .95em;}
- .fsize70
- {font-size: .7em;}
- .fsize80
- {font-size: .8em;}
- .fsize90
- {font-size: .9em;}
- .fsize125
- {font-size: 1.25em;}
- .fsize150
- {font-size: 1.5em;}
- .fsize200
- {font-size: 2em;}
- .gesp1
- {letter-spacing: .1em; margin-right: -.1em;}
- h1,
- h2,
- h3,
- h4,
- h5
- {text-align: center; margin-top: 1.5em; margin-bottom: 1.5em; page-break-after: avoid; font-size: 1em; font-weight: normal;}
- h1
- {font-size: 2em; font-weight: bold; line-height: 2em;}
- h2
- {font-size: 1.25em; line-height: 1.5em;}
- h2 .chapname
- {font-size: .7em;}
- h3
- {margin-top: .5em; margin-bottom: .5em;}
- h3 .chapname
- {font-size: 1.1em; line-height: 2.5em;}
- h3 .fnanchor
- {vertical-align: 25%;}
- h3.inline
- {float: left; margin: 0; padding: 0; text-indent: 1em;}
- @media handheld {h3.inline {float: left;}}
- h4
- {margin-top: .75em; margin-bottom: .75em;}
- h4.inline
- {float: left; margin: 0; padding: 0; text-indent: 1em;}
- @media handheld {h4.inline {float: left;}}
- h5.inline
- {float: left; margin: 0; padding: 0; text-indent: 1em;}
- @media handheld {h5.inline {float: left;}}
- .horsplit
- {display: inline-block; vertical-align: middle; text-align: center; white-space: nowrap; padding: 0; text-indent: 0;}
- .horsplit .bot
- {padding: 0 .25em; display: block; vertical-align: top; text-indent: 0;}
- .horsplit .top
- {border-bottom: solid thin; padding: 0 .25em; display: block; vertical-align: bottom; text-indent: 0;}
- hr
- {width: 34%; margin: 2em 33%; color: black; clear: none;}
- hr.capt
- {width: 6%; margin: .25em 47%;}
- hr.chap
- {width: 26%; margin: 1em 37%; page-break-after: avoid; clear: both;}
- hr.full
- {width: 100%; margin: 0; clear: both;}
- hr.sec
- {width: 6%; margin: 1em 47%; clear: both;}
- .imagelocation
- {text-align: left; margin-top: 0; margin-bottom: 0; font-size: .7em; text-indent: 0;}
- @media handheld {.imagelocation {display: none;}}
- .left
- {text-align: left;}
- .needleplanks p
- {margin: .5em 0 .5em 2em;}
- .nowrap
- {white-space: nowrap; display: inline-block; text-indent: 0;}
- .oldtype
- {font-family: "Old English Text MT",sans-serif;}
- p
- {margin-top: 0; text-align: justify; margin-bottom: 0; text-indent: 1em;}
- p.appref
- {text-align: center; text-indent: 0; margin-bottom: 1.5em; font-size: .8em;}
- p.blankbefore1
- {margin-top: 1em;}
- p.blankbefore15
- {margin-top: 1.5em;}
- p.blankbefore2
- {margin-top: 2em;}
- p.blankbefore4
- {margin-top: 4em;}
- p.center
- {text-align: center; text-indent: 0;}
- p.formula
- {text-align: center; text-indent: 0; margin: 1em auto;}
- p.formula sup
- {font-size: .8em;}
- p.gregotti
- {font-size: .9em;}
- p.gregotti.hind
- {margin-left: 4em; text-indent: -3em;}
- p.highline125
- {line-height: 1.25em;}
- p.highline2
- {line-height: 2em;}
- p.highline4
- {line-height: 4em;}
- p.highline15
- {line-height: 1.5em;}
- p.hind03
- {text-indent: -1.5em; margin-left: 1.5em;}
- p.hind23
- {margin-left: 3em; text-indent: -1em;}
- p.hind48
- {text-indent: -1.5em; margin-left: 4em;}
- p.inlineh
- {text-indent: 0;}
- p.largeillo
- {text-align: right; font-size: .8em; margin-top: -1.25em; margin-bottom: .75em;}
- @media handheld {p.largeillo {display: none;}}
- p.noindent
- {text-indent: 0;}
- p.thinline
- {line-height: .001em;}
- p.tbstars
- {text-align: center; text-indent: 0; line-height: 4em; white-space: nowrap;}
- .padl0
- {padding-left: 0;}
- .padl1
- {padding-left: .5em;}
- .padl2
- {padding-left: 1em;}
- .padl4
- {padding-left: 2em;}
- .padl8
- {padding-left: 4em;}
- .padl10
- {padding-left: 5em;}
- .padr0
- {padding-right: 0;}
- .padr1
- {padding-right: .5em;}
- .padr2
- {padding-right: 1em;}
- .padr4
- {padding-right: 2em;}
- .padr8
- {padding-right: 4em;}
- .padr10
- {padding-right: 5em;}
- .pagenum
- {position: absolute; right: 2%; font-size: .75em; text-align: right; color: gray; text-decoration: none; font-weight: normal;
- font-style: normal; text-indent: 0;}
- @media handheld {.pagenum {display: none;}}
- .photograph
- {margin: 1.5em auto; padding: .5em; border: solid thin;}
- @media handheld {.photograph {border: none;}}
- .right
- {text-align: right;}
- .righttext
- {float: right; padding-left: 1em; display: inline-block;}
- @media handheld {.righttext {float: right; display: block;}}
- .scr
- {display: block;}
- @media handheld {.scr {display: none;}}
- .smcap
- {font-variant: small-caps;}
- .smcapall
- {font-size: .75em;}
- .sponbox
- {text-align: center; margin: 2em auto; padding: 1em; max-width: 16em; border: solid thin;}
- .sponbox hr
- {margin-top: .5em; margin-bottom: .5em; width: 6em;}
- .sponbox hr.full
- {width: 100%;}
- sup
- {font-size: .6em; vertical-align: 30%;}
- .tabhead
- {line-height: 3em; text-align: center; text-indent: 0;}
- table
- {margin-left: auto; margin-right: auto; margin-bottom: 1.5em; margin-top: 1.5em; border-collapse: collapse;}
- @media handheld {table {font-size: .8em;}}
- table.abstract
- {margin-top: 0; white-space: nowrap;}
- table.abstract td.total
- {line-height: 4em;}
- table.application
- {border-top: solid thin; border-bottom: solid thin; white-space: nowrap;}
- table.application td.descr
- {text-align: left; padding-left: 1em; text-indent: -1em; padding-right: .25em; border-right: solid thin;}
- table.application td.high
- {padding-top: 2em; padding-bottom: 2em;}
- table.calculation
- {margin-top: 0;}
- table.calculation td
- {padding-top: .5em; padding-bottom: .5em; vertical-align: top;}
- table.calculation td.highline8
- {line-height: 8em;}
- table.canals
- {margin-top: 0;}
- table.canals td
- {vertical-align: bottom; padding-top: .75em; padding-bottom: .75em;}
- table.canals td.partic
- {text-align: left; text-indent: -1em; padding-left: 1em; padding-right: 2em; border-right: solid thin;}
- table.canals td.number
- {text-align: right; padding-right: .5em;}
- table.comparison td
- {padding-top: .25em; padding-bottom: .25em;}
- table.comparison td.number
- {text-align: right; padding-right: .5em;}
- table.comparison td.partic
- {text-align: left; text-indent: -1em; padding-left: 1em; padding-right: 2em; border-right: solid thin;}
- table.comparison td.thinline
- {padding-top: 0; padding-bottom: 0; line-height: .1em;}
- table.differences
- {margin-top: 0; margin-bottom: 0; white-space: nowrap;}
- table.dimensions td.discharge
- {text-align: right; padding-right: 1em; border-right: solid thin;}
- table.dimensions td.frac
- {text-align: left; padding-left: 0;}
- table.dimensions td.int
- {text-align: right; padding-right: 0;}
- table.dimensions td.width
- {text-align: right; padding-right: 2em; border-right: solid thin;}
- table.discharges .righttext
- {float: right; padding-left: .5em; display: inline-block;}
- @media handheld {.righttext {float: right; display: block;}}
- table.discharges td.descr
- {text-align: left; vertical-align: top;}
- table.discharges td.estimate
- {text-align: right;; vertical-align: bottom; padding-right: 1em;}
- table.duties
- {border: solid medium;}
- table.duties td
- {padding-top: .5em; padding-bottom: .5em;}
- table.duties td.acres
- {text-align: right; vertical-align: top; padding-left: 0; padding-right: 0;}
- table.duties td.acres.from
- {padding-left: .25em;}
- table.duties td.acres.to
- {padding-right: .25em;}
- table.duties td.footn
- {text-align: left; padding-left: 0; padding-right: .25em; border-right: solid thin; vertical-align: top;}
- table.duties td.place
- {text-align: left; vertical-align: top; padding-left: .25em; padding-right: .25em; border-right: solid thin;}
- table.gibb
- {text-align: left; margin: 0.001em 0 0 0;}
- table.gibb td.text
- {text-align: left; padding-left: 1em; text-indent: -1em; vertical-align: middle;}
- table.horlines
- {margin-top: .5em; margin-bottom: .5em; border-bottom: solid thin;}
- table.horlines td.descr
- {text-align: left; padding-left: 1.25em; text-indent: -1em; padding-right: .25em; vertical-align: top; width: 5em;}
- table.horlines td.no
- {text-align: right; padding-right: .25em; padding-left: .25em; vertical-align: top; width: 1.25em;}
- table.losses1
- {border: solid medium;}
- table.losses1 td.day
- {text-align: right; padding-left: 1em; padding-right: 1em; border-right: solid thin;}
- table.losses1 td.fraction
- {text-align: left; padding-left: 0; padding-right: 1em; border-right: solid thin;}
- table.losses1 td.integer
- {text-align: right; padding-left: 1em; padding-right: 0;}
- table.losses2
- {border-top: solid medium; border-bottom: solid medium; margin-bottom: 0;}
- table.losses2 td.canal
- {text-align: center; padding-right: .25em; border-right: solid thin;}
- table.losses2 td.category
- {text-align: center; white-space: nowrap;}
- table.losses2 td.cvalue
- {text-align: right; padding-left: .25em; padding-right: 0;}
- table.losses2 td.footn
- {text-align: left; padding-left: 0; padding-right: .25em; border-right: solid thin;}
- table.losses2 td.loss
- {text-align: center; padding-left: .25em; padding-right: .25em;}
- table.losses2 td.soil
- {text-align: center; padding-left: .25em; padding-right: .25em; border-right: solid thin;}
- table.register1
- {margin-top: 0;}
- table.register1 td.date
- {text-align: right; padding-left: .25em; padding-right: .25em; border-right: solid thin;}
- table.register1 td.dvalue
- {text-align: right; padding-right: .25em; border-right: solid thin;}
- table.register1 td.fracpartg
- {text-align: left; padding-left: 0; padding-right: .25em; border-right: solid thin;}
- table.register1 td.highline4
- {line-height: 4em;}
- table.register1 td.intpartg
- {text-align: right; padding-right: 0;}
- table.register2
- {margin-top: 0;}
- table.register2 th
- {font-size: .8em; line-height: .9em; white-space: normal;}
- table.register2 th.largefont
- {font-size: 1em; padding-top: .5em; padding-bottom: .5em;}
- table.roadwidths
- {border-top: solid thin; border-bottom: solid thin;}
- table.roadwidths td.descr
- {text-align: left; padding-right: 2em; border-right: solid thin;}
- table.roadwidths td.frac
- {text-align: left; padding-left: 0; padding-right: .5em;}
- table.roadwidths td.int
- {text-align: right; padding-right: 0;}
- table.tab5and6
- {white-space: nowrap; margin-top: 0;}
- table.tab5and6 td.no
- {text-align: right; padding-right: 2em; border-right: solid thin;}
- table.tab5and6 td.number
- {text-align: right; padding-left: 1em; padding-right: 1em;}
- table.toc
- {max-width: 25em; margin-top: 1em; margin-bottom: 1em;}
- table.toc .chapname
- {font-size: .8em;}
- table.toc td.chapter
- {text-align: center; line-height: 2em; padding-top: 1em; padding-bottom: 1em;}
- table.toc td.index
- {padding-top: 1em;}
- table.toc td.pageno
- {text-align: right; padding-left: 0; padding-right: 0; text-indent: 0; vertical-align: bottom;}
- table.toc td.secname
- {text-align: left; padding-left: 1em; padding-right: 1em; text-indent: -1em; vertical-align: top;}
- table.toc td.secno
- {text-align: right; padding-left: 0; padding-right: 1em; text-indent: 0; vertical-align: top;}
- td.brace
- {width: .25em;}
- td.thinline
- {line-height: .001em;}
- th
- {font-weight: normal; padding-left: .25em; padding-right: .25em; white-space: nowrap;}
- th.w2mplus
- {width: 2.25em;}
- .titlepage
- {text-align: center; margin: 2em auto; padding: 1em; max-width: 25em; border: solid thin;}
- .tnbot
- {border: dashed thin; margin: 1em 10%; padding: .5em;}
- .tnbot h2
- {font-size: 1em;}
- .tnbot p
- {text-indent: -1em; margin-left: 1em;}
- .tnbox
- {border: dashed thin; margin: 1em 20%; padding: 1em;}
- .top
- {vertical-align: top;}
- ul.index
- {list-style: none; margin: 1em 0;}
- ul.index li
- {text-align: justify; margin-left: 2em; text-indent: -2em;}
- ul.index li.first
- {margin-top: .75em;}
- ul.rules1
- {margin: .5em 0; list-style: none;}
- ul.rules1 li
- {text-align: justify; text-indent: -1.25em; margin: .5em 0 .5em 1em;}
- .w15m
- {width: 1.5em;}
- .w450
- {width: 450px;}
- .w600
- {width: 600px;}
-
- </style>
- </head>
-<body>
-
-
-<pre>
-
-The Project Gutenberg EBook of Irrigation Works, by E. S. Bellasis
-
-This eBook is for the use of anyone anywhere in the United States and most
-other parts of the world at no cost and with almost no restrictions
-whatsoever. You may copy it, give it away or re-use it under the terms of
-the Project Gutenberg License included with this eBook or online at
-www.gutenberg.org. If you are not located in the United States, you'll have
-to check the laws of the country where you are located before using this ebook.
-
-
-
-Title: Irrigation Works
- The Principles on which their Design and Working should be Based...
-
-Author: E. S. Bellasis
-
-Release Date: December 3, 2017 [EBook #56113]
-
-Language: English
-
-Character set encoding: ISO-8859-1
-
-*** START OF THIS PROJECT GUTENBERG EBOOK IRRIGATION WORKS ***
-
-
-
-
-Produced by Chris Curnow, Harry Lame
-and the Online Distributed Proofreading Team at
-http://www.pgdp.net (This file was produced from images
-generously made available by The Internet Archive)
-
-
-
-
-
-
-</pre>
-
-
-<div class="tnbox">
-
-<p class="center">Please see the <a href="#TN">Transcriber&#8217;s Notes</a> at the end of this text.</p>
-
-<p class="center blankbefore15">The cover image has been created for this e-text, and is placed in the public domain.</p>
-
-</div>
-
-<hr class="chap" />
-
-<div class="scr">
-
-<div class="figcenter">
-<img src="images/cover_sm.jpg" alt="cover" width="405" height="600" />
-</div>
-
-<hr class="chap" />
-
-</div><!--scr-->
-
-<h1>IRRIGATION WORKS</h1>
-
-<hr class="chap" />
-
-<div class="sponbox">
-
-<p class="center fsize150 highline2"><i><span class="bb">By the Same Author</span></i></p>
-
-<p class="hind03 blankbefore15">RIVER AND CANAL ENGINEERING.
-The Characteristics of Open
-Flowing Streams, and the principles
-and methods to be followed in dealing
-with them. 72 illustrations, x + 220
-pp., 8vo (1913).</p>
-
-<p class="center highline15"><b>8/6</b> net.</p>
-
-<hr />
-
-<p class="hind03 blankbefore15">PUNJAB RIVERS AND WORKS.
-Second Edition. 47 illustrations, viii
-+ 64 pp., folio (1912).</p>
-
-<p class="center highline15"><b>8/-</b> net.</p>
-
-<hr />
-
-<p class="hind03 blankbefore15">HYDRAULICS WITH WORKING
-TABLES. Second Edition. 160
-illustrations, xii + 311 pp., 8vo (1911).</p>
-
-<p class="center highline15"><b>12/-</b> net.</p>
-
-<hr />
-
-<p class="hind03 blankbefore15">THE SUCTION CAUSED BY SHIPS.
-Explained in Popular Language. 2
-plates, 26 pp., 8vo, sewed (1912).</p>
-
-<p class="center highline15"><b>1/-</b> net.</p>
-
-<hr class="full" />
-
-<p class="center highline15">E. &amp; F. N. SPON, LTD., LONDON</p>
-
-</div><!--sponbox-->
-
-<hr class="chap" />
-
-<div class="photograph w600">
-
-<img src="images/illo004.jpg" alt="" width="600" height="334" />
-<p class="caption">BRIDGE ON AN INDIAN CANAL.</p>
-<p class="imagelocation"><i>Frontispiece.</i></p>
-
-</div><!--figcenter-->
-
-<hr class="chap" />
-
-<div class="figcenter">
-<img src="images/titpag.png" alt="Title page" width="349" height="600" />
-</div>
-
-<div class="titlepage">
-
-<p class="center fsize200 gesp1"><b>IRRIGATION WORKS</b></p>
-
-<p class="center fsize125 highline125">THE PRINCIPLES ON WHICH THEIR DESIGN
-AND WORKING SHOULD BE BASED, WITH
-SPECIAL DETAILS RELATING TO<br />
-<span class="fsize150">INDIAN CANALS</span><br />
-AND SOME PROPOSED IMPROVEMENTS</p>
-
-<p class="center blankbefore4 fsize70">BY</p>
-
-<p class="center fsize125"><span class="smcap"><b>E. S. BELLASIS, M.Inst.C.E.</b></span></p>
-
-<p class="center fsize80">RECENTLY SUPERINTENDING ENGINEER IN THE IRRIGATION BRANCH OF
-THE PUBLIC WORKS DEPARTMENT OF INDIA</p>
-
-<p class="center highline4 oldtype">37 Illustrations</p>
-
-<div class="figcenter">
-<img src="images/spon.jpg" alt="Spon logo" width="75" height="86" />
-</div>
-
-<p class="center highline15"><span class="oldtype">London</span><br />
-E. &amp; F. N. SPON, <span class="smcap">Ltd.</span>, 57 HAYMARKET, S.W.<br />
-<span class="fsize80"><span class="oldtype">New York</span><br />
-SPON &amp; CHAMBERLAIN, 123 LIBERTY STREET<br />
-1913</span></p>
-
-</div><!--titlepage-->
-
-<hr class="chap" />
-
-<p><span class="pagenum" id="Pagev">[v]</span></p>
-
-<h2>CONTENTS</h2>
-
-<table class="toc" summary="ToC">
-
-<tr>
-<th colspan="3" class="right padl1 fsize70">PAGE</th>
-</tr>
-
-<tr>
-<td colspan="2" class="secname"><span class="smcap">Preface</span></td>
-<td class="pageno"><a href="#Pagevii">vii</a></td>
-</tr>
-
-<tr>
-<td colspan="3" class="chapter">CHAPTER I<br /><span class="chapname">INTRODUCTION</span></td>
-</tr>
-
-<tr>
-<td colspan="3" class="left fsize70">ARTICLE</td>
-</tr>
-
-<tr>
-<td class="secno">1.</td>
-<td class="secname">Preliminary Remarks</td>
-<td class="pageno"><a href="#Page1">1</a></td>
-</tr>
-
-<tr>
-<td class="secno">2.</td>
-<td class="secname">General Principles of Canal Design</td>
-<td class="pageno"><a href="#Page2">2</a></td>
-</tr>
-
-<tr>
-<td class="secno">3.</td>
-<td class="secname">Information concerning Canals</td>
-<td class="pageno"><a href="#Page11">11</a></td>
-</tr>
-
-<tr>
-<td class="secno">4.</td>
-<td class="secname">Losses of Water</td>
-<td class="pageno"><a href="#Page16">16</a></td>
-</tr>
-
-<tr>
-<td class="secno">5.</td>
-<td class="secname">Duty of Water</td>
-<td class="pageno"><a href="#Page21">21</a></td>
-</tr>
-
-<tr>
-<td class="secno">6.</td>
-<td class="secname">Sketch of a Project</td>
-<td class="pageno"><a href="#Page26">26</a></td>
-</tr>
-
-<tr>
-<td colspan="3" class="chapter">CHAPTER II<br /><span class="chapname">THE DESIGNING OF A CANAL</span></td>
-</tr>
-
-<tr>
-<td class="secno">1.</td>
-<td class="secname">Headworks</td>
-<td class="pageno"><a href="#Page30">30</a></td>
-</tr>
-
-<tr>
-<td class="secno">2.</td>
-<td class="secname">The Contour Map</td>
-<td class="pageno"><a href="#Page36">36</a></td>
-</tr>
-
-<tr>
-<td class="secno">3.</td>
-<td class="secname">Alignments and Discharges</td>
-<td class="pageno"><a href="#Page37">37</a></td>
-</tr>
-
-<tr>
-<td class="secno">4.</td>
-<td class="secname">Remarks on Distributaries</td>
-<td class="pageno"><a href="#Page45">45</a></td>
-</tr>
-
-<tr>
-<td class="secno">5.</td>
-<td class="secname">Design of Canal and Branches</td>
-<td class="pageno"><a href="#Page47">47</a></td>
-</tr>
-
-<tr>
-<td class="secno">6.</td>
-<td class="secname">Banks and Roads</td>
-<td class="pageno"><a href="#Page53">53</a></td>
-</tr>
-
-<tr>
-<td class="secno">7.</td>
-<td class="secname">Trial Lines</td>
-<td class="pageno"><a href="#Page58">58</a></td>
-</tr>
-
-<tr>
-<td class="secno">8.</td>
-<td class="secname">Final Line and Estimate</td>
-<td class="pageno"><a href="#Page59">59</a></td>
-</tr>
-
-<tr>
-<td class="secno">9.</td>
-<td class="secname">Design of a Distributary</td>
-<td class="pageno"><a href="#Page60">60</a></td>
-</tr>
-
-<tr>
-<td class="secno">10.</td>
-<td class="secname">Best System of Distributaries</td>
-<td class="pageno"><a href="#Page71">71</a></td>
-</tr>
-
-<tr>
-<td class="secno">11.</td>
-<td class="secname">Outlets</td>
-<td class="pageno"><a href="#Page76">76</a></td>
-</tr>
-
-<tr>
-<td class="secno">12.</td>
-<td class="secname">Masonry Works</td>
-<td class="pageno"><a href="#Page80">80</a></td>
-</tr>
-
-<tr>
-<td class="secno">13.</td>
-<td class="secname">Pitching</td>
-<td class="pageno"><a href="#Page90">90</a></td>
-</tr>
-
-<tr>
-<td class="secno">14.</td>
-<td class="secname">Miscellaneous Items</td>
-<td class="pageno"><a href="#Page93">93</a></td>
-</tr>
-
-<tr>
-<td colspan="3" class="chapter"><span class="pagenum" id="Pagevi">[vi]</span>CHAPTER III<br /><span class="chapname">THE
-WORKING OF A CANAL</span></td>
-</tr>
-
-<tr>
-<td class="secno">1.</td>
-<td class="secname">Preliminary Remarks</td>
-<td class="pageno"><a href="#Page96">96</a></td>
-</tr>
-
-<tr>
-<td class="secno">2.</td>
-<td class="secname">Gauges and Regulators</td>
-<td class="pageno"><a href="#Page103">103</a></td>
-</tr>
-
-<tr>
-<td class="secno">3.</td>
-<td class="secname">Gauge Readings and Discharges</td>
-<td class="pageno"><a href="#Page106">106</a></td>
-</tr>
-
-<tr>
-<td class="secno">4.</td>
-<td class="secname">Registers of Irrigation and Outlets</td>
-<td class="pageno"><a href="#Page113">113</a></td>
-</tr>
-
-<tr>
-<td class="secno">5.</td>
-<td class="secname">Distribution of Supply</td>
-<td class="pageno"><a href="#Page118">118</a></td>
-</tr>
-
-<tr>
-<td class="secno">6.</td>
-<td class="secname">Extensions and Remodellings</td>
-<td class="pageno"><a href="#Page127">127</a></td>
-</tr>
-
-<tr>
-<td class="secno">7.</td>
-<td class="secname">Remodelling of Outlets</td>
-<td class="pageno"><a href="#Page131">131</a></td>
-</tr>
-
-<tr>
-<td class="secno">8.</td>
-<td class="secname">Miscellaneous Items</td>
-<td class="pageno"><a href="#Page137">137</a></td>
-</tr>
-
-<tr>
-<td colspan="3" class="chapter">CHAPTER IV<br /><span class="chapname">THE PUNJAB TRIPLE CANAL PROJECT</span></td>
-</tr>
-
-<tr>
-<td class="secno">1.</td>
-<td class="secname">General Description</td>
-<td class="pageno"><a href="#Page144">144</a></td>
-</tr>
-
-<tr>
-<td class="secno">2.</td>
-<td class="secname">Areas and Discharges</td>
-<td class="pageno"><a href="#Page147">147</a></td>
-</tr>
-
-<tr>
-<td class="secno">3.</td>
-<td class="secname">Remarks</td>
-<td class="pageno"><a href="#Page156">156</a></td>
-</tr>
-
-<tr>
-<td colspan="3" class="chapter">CHAPTER V<br /><span class="chapname">PROPOSED IMPROVEMENTS IN IRRIGATION CANALS</span></td>
-</tr>
-
-<tr>
-<td class="secno">1.</td>
-<td class="secname">Preliminary Remarks</td>
-<td class="pageno"><a href="#Page158">158</a></td>
-</tr>
-
-<tr>
-<td class="secno">2.</td>
-<td class="secname">Reduction of Losses in the Channels</td>
-<td class="pageno"><a href="#Page159">159</a></td>
-</tr>
-
-<tr>
-<td class="secno">3.</td>
-<td class="secname">Modules</td>
-<td class="pageno"><a href="#Page162">162</a></td>
-</tr>
-
-<tr>
-<td colspan="3" class="chapter">APPENDICES</td>
-</tr>
-
-<tr>
-<td class="secno">A.</td>
-<td class="secname">Divide Wall on Lower Chenab Canal</td>
-<td class="pageno"><a href="#Page169">169</a></td>
-</tr>
-
-<tr>
-<td class="secno">B.</td>
-<td class="secname">Specification for Maintenance of Channels</td>
-<td class="pageno"><a href="#Page171">171</a></td>
-</tr>
-
-<tr>
-<td class="secno">C.</td>
-<td class="secname">Specification for Maintenance of Masonry Works</td>
-<td class="pageno"><a href="#Page174">174</a></td>
-</tr>
-
-<tr>
-<td class="secno">D.</td>
-<td class="secname">Watching and Protecting Banks and Embankments</td>
-<td class="pageno"><a href="#Page175">175</a></td>
-</tr>
-
-<tr>
-<td class="secno">E.</td>
-<td class="secname">Specification for Bushing</td>
-<td class="pageno"><a href="#Page178">178</a></td>
-</tr>
-
-<tr>
-<td class="secno">F.</td>
-<td class="secname">Escapes</td>
-<td class="pageno"><a href="#Page180">180</a></td>
-</tr>
-
-<tr>
-<td class="secno">G.</td>
-<td class="secname">Gauges</td>
-<td class="pageno"><a href="#Page183">183</a></td>
-</tr>
-
-<tr>
-<td class="secno">H.</td>
-<td class="secname">Gibb&#8217;s Module</td>
-<td class="pageno"><a href="#Page186">186</a></td>
-</tr>
-
-<tr>
-<td class="secno">K.</td>
-<td class="secname">Kennedy&#8217;s Gauge Outlet</td>
-<td class="pageno"><a href="#Page193">193</a></td>
-</tr>
-
-<tr>
-<td colspan="2" class="secname index"><span class="smcap">Index</span></td>
-<td class="pageno index"><a href="#Page196">196</a></td>
-</tr>
-
-</table>
-
-<hr class="chap" />
-
-<p><span class="pagenum" id="Pagevii">[vii]</span></p>
-
-<h2>PREFACE</h2>
-
-<p class="noindent">When <i>River and Canal Engineering</i> was written it was
-decided to omit Irrigation works and to deal with them
-separately because the subject interests chiefly specialists.</p>
-
-<p>The present book deals with the principles which govern
-the design and management of Irrigation works, and it
-discusses the Canals of Northern India&mdash;the largest and
-best in the world&mdash;in detail.</p>
-
-<p>Some years ago a number of rules for designing distributaries
-were framed, at the request of the Punjab
-Government, by the late Colonel S. L. Jacob, C.I.E., R.E.,
-and comments on these rules were obtained from many
-experienced engineers and recorded. The author has had
-the advantage of reading all these opinions. Generally
-the weight of opinion on any point agrees with what most
-experienced engineers would suggest, and direct conflicts
-of opinion scarcely occur. Important papers have been
-printed by the Punjab Irrigation Branch on Losses of
-Water and the Design of Distributaries, on the great
-Triple Canal Project, on Gibb&#8217;s Module, on Kennedy&#8217;s
-Gauge Outlet, and on the Lining of Watercourses.
-These papers are not always accessible to engineers, and
-the chief points of interest in them are not, in most cases,
-discernible at a glance. Such points have been extracted
-and are given in this book.</p>
-
-<p class="right padr2">E. S. B.</p>
-
-<p class="fsize80"><span class="smcap">Cheltenham</span>, <i>May</i> 20<i>th</i>, 1913.</p>
-
-<hr class="chap" />
-
-<p><span class="pagenum" id="Page1">[1]</span></p>
-
-<p class="center fsize200 blankbefore2"><b>IRRIGATION WORKS.</b></p>
-
-<h2>CHAPTER I.<br />
-<span class="chapname">INTRODUCTION</span></h2>
-
-<h3 class="inline">1. <b>Preliminary Remarks.</b></h3>
-
-<p class="inlineh">&mdash;The largest irrigation
-canals are fed from perennial rivers. When the canal
-flows throughout the year it is called a &#8220;Perennial
-Canal.&#8221; Chief among these are the canals of India
-and particularly those of Northern India, some of which
-have bed widths ranging up to 300 feet, depths of water
-up to 11 feet and discharges up to 10,000 c. ft. per
-second. Other large canals as for instance many of
-those in Scinde, Egypt and the Punjab, though fed
-from perennial rivers, flow only when the rivers are
-high. These are called &#8220;Inundation Canals.&#8221; Many
-canals, generally of moderate or small size, in other
-countries and notably in the Western States of America,
-in Italy, Spain, France and South Africa, are fed from
-rivers and great numbers of small canals from reservoirs
-in which streams or rain-water have been impounded.
-Sometimes water for irrigation is pumped from wells
-and conveyed in small canals. In Australia a good deal
-of irrigation is effected from artesian wells. Irrigation
-works on a considerable scale are being undertaken in
-Mexico and the Argentine. In this book, irrigation
-works of various countries are referred to and to some
-extent described, but the perennial canal of Northern
-India, with its distributaries, is the type taken as a
-basis for the description of the principles and methods
-which should be adopted in the design, working and
-improvement of irrigation channels and it is to be<span class="pagenum" id="Page2">[2]</span>
-understood that such a canal is being referred to where
-the context does not indicate the contrary. Any reader
-who is concerned with irrigation in some other part of
-the world will be able to judge for himself how far these
-principles and methods require modification. The
-branches and distributaries&mdash;all of which are dealt with&mdash;of
-a large perennial canal cover all possible sizes.</p>
-
-<p><a href="#Page30"><span class="smcap">Chapter</span> II.</a> of this book deals with the design of
-canals and <a href="#Page96"><span class="smcap">Chapter</span> III.</a> with the working of canals but
-as the two subjects are to some extent interdependent,
-they will both be dealt with in a preliminary manner
-in the remaining articles of the present Chapter.
-<a href="#Page144"><span class="smcap">Chapter</span> IV.</a> describes the Punjab Triple Canal
-<span class="nowrap">Project.<a id="FNanchor1" href="#Footnote1" class="fnanchor">[1]</a></span>
-<a href="#Page158"><span class="smcap">Chapter</span> V.</a> deals with certain proposed improvements
-in the working of canals.</p>
-
-<div class="footnote">
-
-<p id="Footnote1"><a href="#FNanchor1"><span class="label">[1]</span></a> The latest example of canal design.</p>
-
-</div><!--footnote-->
-
-<h3 class="inline" id="Ref6">2. <b>General Principles of Canal Design.</b></h3>
-
-<p class="inlineh">&mdash;The head
-of a canal has to be so high up the river that, when the
-canal is suitably graded, the water level will come out
-high enough to irrigate the tract of land concerned. If
-a river has a general slope of a foot per mile and if the
-adjoining country has the same slope and is a foot
-higher than the water level of the river, and if a canal
-is made at a very acute angle with the river, with a
-slope of half a foot per mile, the water level about two
-miles from the canal head will be level with the ground.</p>
-
-<p>The headworks of the canal consist of a weir&mdash;which
-may be provided with sluices&mdash;across the river, and a
-head &#8220;regulator,&#8221; provided with gates, for the canal.
-There are however many canals, those for instance of
-the inundation canal class, which have no works in the
-river and these may go dry when the river is low.<span class="pagenum" id="Page3">[3]</span>
-They usually have a regulator to prevent too much
-water from going down the canal during floods. If a
-canal is fed from a reservoir the headworks consist simply
-of a sluice or sluices.</p>
-
-<p>A canal must be so designed as to bring the water to
-within reasonable distance of every part of the area to
-be irrigated. Unless the area is small or narrow the
-canal must have &#8220;branches&#8221; and &#8220;distributaries.&#8221; A
-general sketch of a large canal is given in <a href="#Fig1">Fig. 1</a>. On a
-large canal, irrigation is not usually done directly from
-the canal and branches. It is all done from the
-distributaries.</p>
-
-<div class="figcenter" id="Fig1">
-<img src="images/illo013.png" alt="Map" width="350" height="582" />
-<p class="caption"><span class="smcap">Fig.</span> 1.</p>
-</div>
-
-<p><span class="pagenum" id="Page4">[4]</span></p>
-
-<p>From each distributary &#8220;watercourses&#8221; take off at
-intervals and convey the water to the fields. A small
-canal, say one whose length is not more than 15 miles
-or whose discharge is not more than 100 c. feet per
-second, may be regarded as a distributary and the word
-distributary will be used with this extended meaning.</p>
-
-<p>It is not always the case that the whole tract covered
-by a system of canal channels is irrigated. In the case
-of a canal fed from a river, the land near the river is
-often high or broken and the main canal runs for some
-distance before it reaches the tract to be irrigated.
-Again, within this tract there are usually portions of
-land too high to be irrigated. Those portions of the
-tract which can be irrigated are called the &#8220;commanded
-area.&#8221;</p>
-
-<p>The channels of a large irrigation system should run
-on high ground. In the case of a distributary, this is
-necessary in order that the water-courses may run
-downhill, and since the water in the canal and branches
-has to flow into the distributaries, the canal and
-branches must also be in high ground. Another reason
-for adopting high ground is that all the channels should,
-as far as possible, keep away from the natural drainage
-lines of the country and not obstruct them. Also a
-channel in high ground is cheapest and safest. When a
-channel is in low ground it must have high banks which
-are expensive to make and liable to breach. Every tract
-of country possesses more or less defined ridges and
-valleys. When the ridges are well defined, the irrigation
-channels, especially the distributaries, follow them approximately,
-deviating slightly on one side or the other
-from the very top of the ridge in order to secure a more<span class="pagenum" id="Page5">[5]</span>
-direct course. If any part of a ridge is so high as to
-necessitate deep digging the channel does not necessarily
-go through it. It may skirt it and return to the crest of
-the ridge further on, especially if this arrangement
-shortens the channel or at least does not lengthen it
-much. A channel also goes off the ridge sometimes
-when adherence to it would give a crooked line. Of
-course all the channels&mdash;canals, branches and distributaries&mdash;have
-to flow more or less in the direction of
-the general slope of the tract being dealt with.</p>
-
-<div class="figcenter" id="Fig2">
-<img src="images/illo015.png" alt="Example" width="250" height="316" />
-<p class="caption"><span class="smcap">Fig.</span> 2.</p>
-</div>
-
-<p>The alignments of the channels do not, however,
-depend exclusively on the physical features of the
-country. Centrality in the alignment is desirable. It
-will be shown (<a href="#Ref1"><span class="smcap">Chap.</span> II. Art. 10</a>) that a distributary
-works most economically when it runs down the centre
-of the tract which it has to irrigate. It is better to have
-short watercourses running off from both sides of a
-distributary than long watercourses from only one side.
-The same is true of a branch; it should run down the
-centre of its tract of country. Again the angles at which
-the channels branch off have to be considered. If
-branches were taken off very high up the canal and ran
-parallel to and not far from it, there would be an
-excessive length of channel. But neither should the
-branches be so arranged as to form a series of right
-angles. In the case shown in <a href="#Fig2">Fig. 2</a> the size of the main<span class="pagenum" id="Page6">[6]</span>
-or central canal would of course be reduced at the point
-A. By altering the branches to the positions shown in
-dotted lines their length is not appreciably increased
-while the length A B is made of the reduced instead of
-the full size. Moreover the course B C is more direct
-than BAC and this may be of the greatest importance
-as regards gaining the necessary command. When a
-channel bifurcates, the total wet border always increases
-and there is then a greater loss from absorption. The
-water is always kept in bulk as long as possible. If the
-alignment of a branch is somewhat crooked it does not
-follow that straightening it&mdash;supposing the features of
-the country admit of this&mdash;will be desirable. It may
-increase the length of distributaries taken off near the
-bends. It will be shown (<a href="#Ref1"><span class="smcap">Chap.</span> II. Art. 10</a>) that a
-distributary ought, when matters can be so arranged, to
-irrigate the country for two miles on either side of it,
-and watercourses should be two or three miles long.
-A distributary need not therefore extend right up to the
-boundary of the commanded area but stop two or three
-miles from it. Generally it is not desirable to prolong
-a distributary and make it &#8220;tail&#8221; into another channel
-(<a href="#Ref2"><span class="smcap">Chap.</span> II. Art. 3</a>). A distributary, like a canal, may
-give off branches.</p>
-
-<p>None of the rules mentioned in the preceding paragraph
-are intended to be other than general guides, to be
-followed as far as the physical features of the country
-permit, or to assist in deciding between alternative
-schemes. It may for instance be a question whether to
-construct one distributary or two, between two nearly
-parallel branches. The two-mile rule may enable the
-matter to be decided or it may influence the decision
-arrived at as to the exact alignments of the branches.<span class="pagenum" id="Page7">[7]</span>
-The flatter the country and the less marked the ridges
-the more the alignment can be based on the above rules.
-Sometimes, as in the low land adjoining a river, the
-ridges are ill defined or non-existent and the alignment
-is based entirely on the above rules. The rule as to
-following high ground need not be adhered to at the
-tail of any distributary if all the land to be irrigated at
-the tail is low and if there is a deep drainage line or
-other feature of the country such as to preclude the
-possibility of an extension of the distributary. Possible
-extensions should always be considered. In hilly districts
-an irrigation canal may have to run in sidelong
-ground along the side of a valley.</p>
-
-<p>In flat valleys, owing to the land nearest the river
-having received successive deposits of silt in floods, the
-ground generally slopes away from the river and a canal
-can irrigate the low land even if taken off at right
-angles to the river. But to irrigate the high land near
-the river and the land where it rises again towards the
-hills or watershed, a canal taking off higher up the river
-is necessary. Of course much depends on whether the
-canal is to irrigate when the river is low or only when
-it is high, and whether or not there is to be a weir in the
-river. In Upper Egypt, it is common for a high level
-canal taking off far upstream, to divide into two
-branches, one for the land near the river and one for the
-land towards the watershed, and for both branches to be
-crossed&mdash;by means of syphons&mdash;by a low-level canal
-which irrigates the low ground. Similar arrangements
-sometimes occur on Indian inundation canals.</p>
-
-<p>Regulators are usually provided at all off-takes of
-branches. In the case of a channel taking off from<span class="pagenum" id="Page8">[8]</span>
-another channel many times its own size there is
-generally only the head regulator of the smaller channel
-but in other cases there is a regulator in each channel
-below the bifurcation. Thus, when the number of
-bifurcating channels is two it is called a double regulator.
-Regulators, with the &#8220;falls&#8221;&mdash;introduced to flatten
-the gradients when the slope of the country is
-too steep&mdash;and drainage crossings and the bridges,
-provided at the principal roads, constitute the chief
-masonry works on a canal. At a fall, mills are
-often constructed or the fall may be used for electric
-power.</p>
-
-<p>Regarding curves and bends in channels, it is explained
-in <i>River and Canal Engineering</i> that, as regards increased
-resistance to flow and consequent tendency to
-silt deposit, curves of fair radius have very little effect,
-that a curve of a given angle may perhaps have the
-same effect whether the radius is great or small but that
-if the radius is large a succession of curves cannot be
-got into a short length, that a succession of sharp curves
-in a short length may have great effect, amounting to
-an increase of N in Kutter&#8217;s co-efficient, that a single
-sharp curve has not much effect, that the chief objection
-to such a curve is the tendency to erosion of the bank,
-that at a place where the channel has, in any case, to
-be protected, as for instance just below a weir or fall,
-there is no objection to the introduction of a sharp bend
-and that such bends, in fact right-angled elbows, exist
-without any evil effects at many regulators when the
-whole supply is being turned into a branch. It is
-remarkable that on perennial canals no advantage is
-ever taken of the last mentioned fact. Cases undoubtedly
-occur, though somewhat infrequently, in which the<span class="pagenum" id="Page9">[9]</span>
-most suitable and cheapest arrangement would be to
-give a canal an abrupt bend at a fall. In order to reduce
-eddying, the bend need not be an absolute elbow but
-can be made within the length of the pitching which
-would be curved instead of straight. This is frequently
-done on inundation canals, without the slightest drawback,
-even when there is no fall, the pitching at bridges
-being utilised. A pitched bend can be made anywhere.</p>
-
-<p>When a river floods the country along its banks as in
-parts of Egypt and of the Punjab, it is generally
-necessary to construct marginal embankments before
-irrigation can be introduced. The canal may take off
-at a point where flooding does not occur or it may pass
-through the <span class="nowrap">embankment.<a id="FNanchor2" href="#Footnote2" class="fnanchor">[2]</a></span> If it passes through at a
-point where flooding occurs, a masonry regulator is constructed
-to prevent the floods from enlarging the gap
-and breaking into the country.</p>
-
-<div class="footnote">
-
-<p id="Footnote2"><a href="#FNanchor2"><span class="label">[2]</span></a>
-For detailed accounts of such embankments and canals see <i>Punjab
-Rivers and Works</i> (Spon) 1912.</p>
-
-</div><!--footnote-->
-
-<p>A large canal is provided, so far as is practicable, with
-&#8220;escapes&#8221; by means of which surplus water may be let
-out. Surplus water occurs chiefly after rain. At such
-times the demand for water may suddenly be reduced
-and if there were no escapes there would probably be
-serious breaches of the banks before there was time for
-the reduction of water, effected at the head of the
-canal, to take effect lower down. There is usually an
-escape at some point in the main line, preferably at a
-point where it divides into branches, and this escape
-runs back to the river. There may also be escapes near
-the tails of the longest branches. These escapes may
-discharge into drainages or into reservoirs formed by
-running a low embankment round a large area of waste
-land.</p>
-
-<p><span class="pagenum" id="Page10">[10]</span></p>
-
-<p>The drainage of the whole tract irrigated by a canal
-must be carefully seen to. The subsoil water level of a
-tract of country is nearly always raised by an irrigation
-canal. The rise near to a canal or distributary is due
-to percolation from the channel and is <span class="nowrap">inevitable.<a id="FNanchor3"
-href="#Footnote3" class="fnanchor">[3]</a></span> The
-rise at places further away, if it occurs, is due to over-watering
-or to neglect of drainage. Immense damage
-has been done by &#8220;water-logging&#8221; of the soil when
-irrigation water has been supplied to a tract of flat
-country and the clearance and improvement of the
-natural drainages has not been attended to. Any
-drainages crossed by the banks of the irrigation channels
-should be provided with syphons or aqueducts or else
-the drainage diverted into another channel. Very frequently
-the main line of a canal&mdash;whether great or
-small&mdash;in the upper reaches near the hills, has to cross
-heavy drainage channels or torrents and large and
-expensive works are required for this.</p>
-
-<div class="footnote">
-
-<p id="Footnote3"><a href="#FNanchor3"><span class="label">[3]</span></a>
-But see <a href="#Page158">Chap. V.</a> as to reduction of percolation.</p>
-
-</div><!--footnote-->
-
-<p>Near the head of a canal and of every branch and
-distributary, there is an ordinary gauge which shows the
-depth of water and is read daily. The gauge near the
-head of a main canal is generally self-registering.</p>
-
-<p>The principles sketched out in this article are those
-generally followed in the designs of modern canals.
-They have by no means been followed in all cases. In
-some of the older Indian canals both the canal and
-the distributaries ran in low ground. Water-courses
-took off direct from the canals, and the irrigation did
-not generally extend far from the canal. In fact long
-distributaries were impracticable because they would
-have run into high ground. The banks of the channels
-obstructed drainages and caused pestilential swamps.<span class="pagenum" id="Page11">[11]</span>
-Most canals of this type have been abolished since the
-advent of British rule and replaced by others properly
-designed. Some badly designed canals however, mostly
-of the inundation class, still exist but in very dry tracts
-where drainages are of little consequence.</p>
-
-<h3 class="inline">3. <b>Information Concerning Canals.</b></h3>
-
-<p class="inlineh">&mdash;Nearly all canal
-irrigation is done by &#8220;flow,&#8221; the water running from the
-water-courses onto the fields, but a small proportion is
-done by &#8220;lift.&#8221; This is done in the case of high pieces
-of land, the lifting being usually done by pumps or, in
-the east, by bullocks or by manual labour.</p>
-
-<p>Irrigation generally consists in giving the land a succession
-of waterings, one previous to ploughing and
-others after the crop is sown, each watering being of
-quite moderate depth. On inundation canals in India
-the waterings for the summer crop are thus effected but
-for the winter crop the land is deeply soaked during the
-flood season and is afterwards ploughed and sown. In
-Upper Egypt this system is emphasised, the water
-flowing into vast basins, formed by dykes, where it
-stands for some time and, after depositing its silt, is
-drained off.</p>
-
-<p>Until recent times the whole of the irrigation of
-Egypt was basin irrigation. In Lower Egypt the construction
-of the Nile barrage led to the introduction of
-canals which take off at a proper level and their working
-is not restricted to the period when the river is in flood.
-In Upper Egypt most of the irrigation is still basin
-irrigation but the canals taking off above the Assiut
-barrage form a notable exception. By means of the
-Assouan dam which crosses the Nile, the water during<span class="pagenum" id="Page12">[12]</span>
-the latter part of the flood season and after the floods
-are over, i.e. from November to March, is ponded up
-and a vast reservoir formed and the impounded water is
-let down the river in May and June.</p>
-
-<p>In some of the older irrigation canals of India the
-velocity was too high and the channels have since had
-to be remodelled and the crests of weirs raised or new
-weirs built. The more recent canals are free from grave
-defects of this kind but every canal undergoes changes
-of some kind and finality has never yet been quite
-attained.</p>
-
-<p>On some Indian irrigation canals made about 30
-years ago, great sums of money were wasted in making
-the canals navigable. There is nothing like enough
-navigation to pay for the extra cost. The idea has now
-been quite given up except as regards timber rafting
-from upstream. This requires no curtailment of
-the velocity in the channels. The requirements
-of the irrigation and navigation were always in conflict.
-The mere fact that branches have to be worked in turns
-is enough to prevent navigation succeeding.</p>
-
-<p>In India the water used for irrigation is paid for, not
-according to the volume used but according to the area
-irrigated. The volume used in any particular watercourse
-is not known. The areas sown are measured.
-Certain kinds of crops use up more water than others and
-the charges are fixed accordingly.</p>
-
-<p>In the canals which have their headworks among the
-mountains of Western America there are frequent tunnels
-and syphons and the canals often run in steep
-sidelong ground. There are great lengths of tunnel and<span class="pagenum" id="Page13">[13]</span>
-syphon in the Marseilles and Verdun Canals and there
-are long tunnels in the Periyar Canal in Madras and in
-the Upper Swat Canal in the North West Frontier
-Province of India.</p>
-
-<p>The Tieton Canal, Washington, U.S.A., traverses
-steep sidelong ground which would be liable to slip if
-a large cutting were made. The cross-section of the
-channel is a circle, 8-ft. 3&sup1;&#8260;&#8322;-ins. in diameter, with the
-upper part removed, so that the depth is 6 feet. It is
-made of reinforced concrete 4 inches thick and the sides
-are tied together by iron bars which run across the
-channel above the water. In the Santa Ana Canal the
-channel consists for 2&sup1;&#8260;&#8322; miles of a flume made of wooden
-&#8220;staves.&#8221;</p>
-
-<p>A canal constructed in Wyoming, U.S.A., after taking
-off from a river, passes through a tunnel into another
-valley and is turned into another stream which thus
-becomes the canal. This is said to save loss of water
-by percolation. The stream is winding while a canal
-could have been made straighter. There may, owing to
-the ground near the stream being saturated, have been
-less loss of water at first than there would have been in
-the artificial channel but, owing to the smaller wetted
-area, there would probably have been an eventual saving
-in adopting the latter. The real advantage of adopting
-the natural stream was probably a saving in the cost of
-construction. (<i>Min. Proc. Inst. C.E.</i> Vol. CLXII.)</p>
-
-<p>Irrigation from canals which are supplied from reservoirs
-differs in no respect from that from other canals.
-The principles on which reservoir capacities should be
-calculated and earthen and masonry dams constructed
-are given in <i>River and Canal Engineering</i>. Sometimes,<span class="pagenum" id="Page14">[14]</span>
-as for instance when a reservoir becomes seriously
-reduced in size owing to silt deposit, the water is run
-off after the bed of the reservoir has been soaked, and
-crops are grown on the soaked soil.</p>
-
-<p>The distribution of the water of a canal as between
-the main channel and the branches, is effected by means
-of the regulators at the bifurcations. When the supply
-is ample and the demand great, the channels may all
-be running nearly full. When the demand exceeds the
-supply, the water may be reduced proportionately in each
-branch but this may result in the water of a branch
-being too low to give proper supplies to the distributaries
-or some of them, and in the water of a distributary not
-commanding the higher ground. Moreover it violates
-the principle of keeping the water in bulk as far as
-possible. It is more usual to give each branch full
-supply, or a certain large fraction of the full supply, in
-turn, and similarly with the distributaries.</p>
-
-<p>The method of distribution from a distributary to the
-watercourses varies. In many modern canals there is,
-at each watercourse head, a sluice which is adjusted at
-frequent intervals according to the supply and the
-demand. One method, which is excellent because it
-fulfils in the highest degree the principle of keeping the
-water in bulk, is to have very large watercourses and,
-by means of regulators which are built at frequent
-intervals, to turn the whole of the water of the distributary
-into a few watercourses at a time, beginning with
-those nearest the head of the distributary and working
-downstream. But a system which seems eminently
-suitable may be impracticable because of local circumstances.
-In India, any such arrangement would need an
-army of officials and would lead to unbounded corruption.</p>
-
-<p><span class="pagenum" id="Page15">[15]</span></p>
-
-<p>In India the water from a distributary enters the
-watercourses through &#8220;outlets&#8221; which are small masonry
-tubes passing through the banks of the distributary.
-There is no easy way of closing these outlets or at least
-of keeping them closed if the cultivators choose to open
-them, but it is easy to close a whole distributary and so
-regulate the supply. This is the chief reason why watercourses
-in India do not usually take off direct from the
-canals.</p>
-
-<p>The presence of silt in the water of a river from
-which a canal is drawn is often spoken of as being a
-great evil. If it is an evil at all it is a very mixed evil.
-The deposits of silt in the channels have been enormously
-reduced by the application of scientific principles of
-design. The clayey silt which remains in the water and
-reaches the fields, brings to them greatly increased
-fertility.</p>
-
-<p>In India the fertility of the soil is often reduced or
-destroyed by the formation on the surface of the ground
-of an efflorescence called &#8220;reh.&#8221; It consists of various
-salts or compounds of sodium and occurs chiefly where
-there is an impervious layer of subsoil. The salts exist
-as an ingredient of the upper soil. This becomes saturated
-with rain or canal water and as the water
-evaporates the salts are left on the surface. Remedies
-are drainage, or flooding the soil and running the water
-off, or deep tilling, or chemical treatment with lime or
-gypsum. (<i>Indian Engineering, 8th Jan., 1910</i>).</p>
-
-<p>The inundation canals of the Punjab have been
-described in <i>Punjab Rivers and Works</i>. All descriptions
-and remarks in the present book regarding Indian canals
-must be assumed to refer to perennial canals unless the
-contrary is stated or implied.</p>
-
-<p><span class="pagenum" id="Page16">[16]</span></p>
-
-<h3 class="inline" id="Ref18">4. <b>Losses of Water.</b></h3>
-
-<p class="inlineh">&mdash;When water flows or stands
-in an earthen channel or tank, or is spread over a field,
-losses occur from evaporation, percolation and absorption.
-Of these, absorption is by far the most
-important and, unless the contrary is stated or implied,
-it will be taken to include the others. The losses by
-evaporation are very small. The loss by evaporation
-from the surface of the water, even in the hot season
-in India when a hot wind often blows, does not exceed
-half an inch in 24 hours and on the average in India is
-only about a tenth of an inch in 24 hours.</p>
-
-<div class="figcenter" id="Fig3">
-<img src="images/illo026.png" alt="Percolation" width="300" height="262" />
-<p class="caption"><span class="smcap">Fig.</span> 3.</p>
-</div>
-
-<p>Percolation and absorption are described as follows
-by Beresford in <i>Punjab Irrigation Paper</i>, No. 10,
-&#8220;The Irrigation Duty of Water.&#8221; Percolation consists
-in flow through the interstices of boulders, shingle,
-gravel or coarse sand. The flow is similar to that in
-pipes. The water percolating into the soil from a
-channel, extends downwards and spreads outwards as it
-descends. None of it goes upwards. In fine sand and
-ordinary soil the interstices act like capillary tubes.
-The water is absorbed as by a sponge and it remains in
-the soil by virtue of capillarity. Owing to the combined
-action of capillarity and gravity the water spreads in the
-manner shown by the dotted lines in <a href="#Fig3">Fig. 3</a>. The
-amount of absorption from a channel will be greater
-the greater the area of the wetted surface. In a high<span class="pagenum" id="Page17">[17]</span>
-embankment with narrow banks, the absorption ceases
-when the water reaches the outer slopes, except in so
-far as it is evaporated from the slopes. Moreover high
-embankments are generally in clayey soil. If banks of
-sand are constructed on a layer of clay (<a href="#Fig4">Fig. 4.</a>) and
-well rammed, the absorption ceases as soon as the banks
-are saturated and the channel then holds water as well
-as any other except for evaporation from the outer
-slopes, but if the bed and subsoil are also of sand the
-absorption of the water will be far greater. Absorption
-ceases when the water extends nearly down to the level
-of the subsoil water, i.e., to a point where the effect of
-absorption from above plus gravitation is equal to the
-effect of absorption from below minus gravitation. If
-a bottle is filled with water and a small sponge jammed
-into the neck and the bottle turned upside down, the
-sponge becomes saturated but no water will be given
-out. But if a dry sponge is placed in contact with the
-wet one it will absorb moisture until saturated.</p>
-
-<div class="figcenter" id="Fig4">
-<img src="images/illo027.png" alt="Banks" width="300" height="75" />
-<p class="caption"><span class="smcap">Fig.</span> 4.</p>
-</div>
-
-<p>It is known that the loss of water is greatly influenced
-by the nature of the soil. When water is turned into a
-dry channel or onto a field, the loss is at first great. It
-decreases hourly and daily and eventually becomes
-nearly constant, tending to reach a fixed amount when
-the water extends down to nearly the level of the subsoil
-water. Observations made by Kennedy on loamy
-fields near the Bari Doab Canal in India showed that on
-a field previously dry the rate of absorption is given by
-the equation</p>
-
-<p class="formula"><i>y</i> = &middot;0891 <i>x</i> <sup>&middot;86.</sup></p>
-
-<p><span class="pagenum" id="Page18">[18]</span></p>
-
-<p class="noindent">Where <i>y</i> is the depth of water absorbed in feet and <i>x</i>
-is the time in hours. The observations extended over
-eight days. Denoting by <i>c</i> the depth of water in feet
-absorbed in one hour, it was found that on a field on
-which no rain had fallen for two months, <i>c</i> was &middot;04
-to &middot;05 but on the second watering of the crop about a
-month later <i>c</i> was &middot;02 to &middot;03 and about the same on a
-third watering. It was found that at the first commencement
-the rate of absorption was much affected by
-the state of the surface of the ground but that the
-effect was only temporary. The losses were found to
-be as follows:</p>
-
-<table class="losses1" summary="Losses">
-
-<tr class="bb">
-<th class="br"><span class="smcap">Day.</span></th>
-<th colspan="3" class="br"><span class="smcap">Loss per Day.</span></th>
-<th><span class="smcap">Loss per Hour.</span><br />(<i>c</i>)</th>
-</tr>
-
-<tr>
-<th class="br">&nbsp;</th>
-<th>&nbsp;</th>
-<th colspan="2" class="padr1 br">Feet.</th>
-<th>Feet.</th>
-</tr>
-
-<tr>
-<td class="day">1st</td>
-<td rowspan="8">&nbsp;</td>
-<td class="integer">1</td>
-<td class="fraction">&middot;36</td>
-<td class="center">&nbsp;&middot;057</td>
-</tr>
-
-<tr>
-<td class="day">2nd</td>
-<td class="integer">1</td>
-<td class="fraction">&middot;13</td>
-<td class="center">&nbsp;&middot;047</td>
-</tr>
-
-<tr>
-<td class="day">3rd</td>
-<td class="integer">1</td>
-<td class="fraction">&middot;07</td>
-<td class="center">&nbsp;&middot;046</td>
-</tr>
-
-<tr>
-<td class="day">4th</td>
-<td class="integer">1</td>
-<td class="fraction">&middot;02</td>
-<td class="center">&nbsp;&middot;043</td>
-</tr>
-
-<tr>
-<td class="day">5th</td>
-<td>&nbsp;</td>
-<td class="fraction">&middot;96</td>
-<td class="center">&nbsp;&middot;041</td>
-</tr>
-
-<tr>
-<td class="day">6th</td>
-<td>&nbsp;</td>
-<td class="fraction">&middot;90</td>
-<td class="center">&nbsp;&middot;037</td>
-</tr>
-
-<tr>
-<td class="day">7th</td>
-<td>&nbsp;</td>
-<td class="fraction">&middot;80</td>
-<td class="center">&nbsp;&middot;033</td>
-</tr>
-
-<tr>
-<td class="day">8th</td>
-<td>&nbsp;</td>
-<td class="fraction">&middot;77</td>
-<td class="center">&nbsp;&middot;032</td>
-</tr>
-
-<tr>
-<td class="br">&nbsp;</td>
-<td class="center padl1 padr1">Total</td>
-<td class="integer">8</td>
-<td class="fraction">&middot;01</td>
-<td>&nbsp;</td>
-</tr>
-
-</table>
-
-<p>In the eight days the total loss was almost exactly
-eight feet.</p>
-
-<p>The losses by absorption in the various channels of
-certain canals has been estimated to be as <span class="nowrap">follows:&mdash;</span></p>
-
-<p><span class="pagenum" id="Page19">[19]</span></p>
-
-<table class="losses2" summary="Losses">
-
-<tr class="bb">
-<th colspan="3" class="br">Channel.</th>
-<th class="br">Nature<br />of soil.</th>
-<th class="br">Mean<br />depth of<br />water in<br />Channel.</th>
-<th colspan="2" class="br">Value<br />of (<i>c</i>)</th>
-<th colspan="3" class="br">Loss<br />per Million<br />square feet<br />of<br />wetted surface.</th>
-<th>Remarks.</th>
-</tr>
-
-<tr>
-<th colspan="3" class="br">&nbsp;</th>
-<th class="br">&nbsp;</th>
-<th class="br">Feet.</th>
-<th colspan="2" class="br">&nbsp;</th>
-<th colspan="3" class="br">c. ft. per sec.</th>
-<th>&nbsp;</th>
-</tr>
-
-<tr>
-<td class="right">Main&nbsp;</td>
-<td class="left">Line</td>
-<td class="canal">Upper Bari Doab Canal</td>
-<td class="soil">Shingle and Sandy Soil</td>
-<td class="center br">6</td>
-<td class="cvalue">&middot;035</td>
-<td rowspan="4" class="br">&nbsp;</td>
-<td class="loss">9&middot;7</td>
-<td rowspan="4" class="brace bt br bb">&nbsp;</td>
-<td rowspan="4" class="brace padl0 br">-</td>
-<td rowspan="4" class="left padl1">Fairly reliable estimates based on discharge observations.</td>
-</tr>
-
-<tr>
-<td class="center">&nbsp;&#8222;</td>
-<td class="center">&#8222;&nbsp;</td>
-<td class="canal">Sirhind Canal</td>
-<td class="soil">Sandy Soil</td>
-<td class="center br">7</td>
-<td>&nbsp;</td>
-<td class="loss">9&middot;0</td>
-</tr>
-
-<tr>
-<td colspan="2" class="category">Branches</td>
-<td class="canal">Upper Bari Doab Canal</td>
-<td class="soil">Loam</td>
-<td class="br">&nbsp;</td>
-<td class="cvalue">&middot;0079</td>
-<td class="loss">2&middot;2</td>
-</tr>
-
-<tr>
-<td colspan="2" class="center">&#8222;</td>
-<td class="canal">Sirhind Canal</td>
-<td class="soil">Sandy Soil</td>
-<td class="br">&nbsp;</td>
-<td>&nbsp;</td>
-<td class="loss">5&middot;2</td>
-</tr>
-
-<tr>
-<td colspan="3" class="thinline br">&nbsp;</td>
-<td class="thinline br">&nbsp;</td>
-<td class="thinline br">&nbsp;</td>
-<td colspan="2" class="thinline br">&nbsp;</td>
-<td colspan="3" class="thinline br">&nbsp;</td>
-<td class="thinline">&nbsp;</td>
-</tr>
-
-<tr>
-<td colspan="2" class="category">Distributaries</td>
-<td class="canal">Upper Bari Doab Canal</td>
-<td class="soil">Loam</td>
-<td class="br">&nbsp;</td>
-<td class="cvalue">&middot;012</td>
-<td class="footn"><a id="FNanchor4" href="#Footnote4" class="fnanchor">[4]</a></td>
-<td class="loss">2&middot;3 to 4&middot;4<br />(average 3&middot;3)</td>
-<td rowspan="4" class="brace bt br bb">&nbsp;</td>
-<td rowspan="4" class="brace padl0 br">-</td>
-<td rowspan="4" class="left padl1">Somewhat rough estimates.</td>
-</tr>
-
-<tr>
-<td colspan="2" class="center">&#8222;</td>
-<td class="canal">Sirhind Canal</td>
-<td class="soil">Sandy Soil</td>
-<td class="br">&nbsp;</td>
-<td>&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="loss">5 to 12<br />(average 8&middot;0)</td>
-</tr>
-
-<tr>
-<td colspan="2" class="category">Watercourses</td>
-<td class="canal">Upper Bari Doab Canal</td>
-<td class="soil">Loam</td>
-<td class="br">&nbsp;</td>
-<td class="cvalue">&middot;015<br /><span class="padr2">to</span><br /> &middot;045</td>
-<td class="footn"><a href="#Footnote4" class="fnanchor">[4]</a><br />&nbsp;<br /><a
-id="FNanchor5" href="#Footnote5" class="fnanchor">[5]</a></td>
-<td class="loss">3&middot;3 to 20<br />(average 9&middot;4)</td>
-</tr>
-
-<tr>
-<td colspan="2" class="center">&#8222;</td>
-<td class="canal">Sirhind Canal</td>
-<td class="soil">Sandy Soil</td>
-<td class="br">&nbsp;</td>
-<td>&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="loss">7 to 60<br />(average 22)</td>
-</tr>
-
-<tr>
-<td colspan="3" class="thinline br">&nbsp;</td>
-<td class="thinline br">&nbsp;</td>
-<td class="thinline br">&nbsp;</td>
-<td colspan="2" class="thinline br">&nbsp;</td>
-<td colspan="3" class="thinline br">&nbsp;</td>
-<td class="thinline">&nbsp;</td>
-</tr>
-
-</table>
-
-<div class="footnote">
-
-<p id="Footnote4"><a href="#FNanchor4"><span class="label">[4]</span></a> When the channel was in continuous flow.</p>
-
-<p id="Footnote5"><a href="#FNanchor5"><span class="label">[5]</span></a> Maximum value when flow was intermittent.</p>
-
-</div><!--footnote-->
-
-<p><span class="pagenum" id="Page20">[20]</span></p>
-
-<p>Some information as to losses of water is also given
-in <a href="#Ref3"><span class="smcap">Chapter</span> IV. Art. 2</a>.</p>
-
-<p>The relative losses of water in the channels of the
-Upper Bari Doab Canal were as <span class="nowrap">follows:&mdash;</span></p>
-
-<table summary="Losses">
-
-<tr>
-<th>&nbsp;</th>
-<th>Relative<br />Loss.</th>
-</tr>
-
-<tr>
-<td class="left top padr4">In main line and branches</td>
-<td class="right bot padr2">20</td>
-</tr>
-
-<tr>
-<td class="left top padr4">In distributaries</td>
-<td class="right bot padr2">6</td>
-</tr>
-
-<tr>
-<td class="left top padr4">In watercourses</td>
-<td class="right bot padr2">21</td>
-</tr>
-
-<tr>
-<td class="left top padr4">Used in the fields</td>
-<td class="right bot padr2">53</td>
-</tr>
-
-<tr>
-<td class="left top padr4">Total</td>
-<td class="right bot padr2"><span class="bt">100</span></td>
-</tr>
-
-</table>
-
-<p class="noindent">The reasons for the great variation in the value of <i>c</i> are
-not properly known. The depth of water is not
-likely to have much influence on it. It is well known
-that the fine silt carried by the water tends to render
-the channels watertight when it deposits. The canals
-and branches receive either no deposits or deposits consisting
-chiefly of sand. The distributaries, especially in
-their lower reaches, receive deposits of fine silt which
-is only occasionally cleared away. The watercourses
-receive similar deposits but they are very frequently
-cleared out by the cultivators. This is perhaps the
-reason why the rate of loss of water in the watercourses
-is nearly three times as great as the rate of loss in the
-distributaries of the same canal. On the Sirhind canal
-the distributaries have more branches than on the Bari
-Doab canal and the watercourses are smaller. This
-accounts for the different relative losses in the two
-cases. The sandy nature of the soil on the Sirhind
-canal accounts for the general higher value of <i>c</i> on that
-canal.</p>
-
-<p><span class="pagenum" id="Page21">[21]</span></p>
-
-<p>The following formula has been deduced as giving
-the loss by absorption on a Punjab Canal.</p>
-
-<p class="formula">P = 3&middot;5 &#8730;<span class="bt">d</span> <span class="horsplit"><span class="top">WL</span>
-<span class="bot">1,000,000</span></span></p>
-
-<p class="noindent">Where P is the loss by absorption in c. ft. per second
-in a reach whose length is L, width (at water level) W
-and depth d. According to the formula the loss per
-million square feet is 10&middot;5 c. ft. per second when d is 4
-ft. and 7 c. ft. per second when d is 2 feet, These
-figures do not agree with those in the preceding table
-and it is clear that there are not yet sufficient data from
-which to construct a formula.</p>
-
-<p>The first steps taken on the Bari Doab Canal, and
-subsequently on other canals, to reduce the losses of
-water, consisted in the reduction in the number of watercourses.
-This will be referred to again (<a href="#Ref4"><span class="smcap">Chapter</span> II.
-Art. 9</a>). Further steps will be considered in <a href="#Page158"><span class="smcap">Chapter</span> V.</a></p>
-
-<h3 class="inline" id="Ref15">5. <b>Duty of Water.</b></h3>
-
-<p class="inlineh">&mdash;The number of acres irrigated
-annually by a constant discharge of 1 c. ft. of water per
-second is called the &#8220;duty&#8221; of water. In India on
-perennial canals the duty may be as much as 250 or
-even 300 acres. On inundation canals which flow for
-only five months in the year and are situated in tracts
-of scanty rainfall and light or sandy soil, the duty may
-be only 70 acres. The duties of most existing canals
-whether in India or elsewhere, are known only approximately.
-The duty is calculated on the average discharge
-entering the canal at its head less the water which is
-passed out at escapes. It thus includes all losses of water.
-The duty varies not only as between one canal and
-another but on the same canal from year to year. It<span class="pagenum" id="Page22">[22]</span>
-depends on the character of the soil, a sandy soil requiring
-more water than a clayey soil. It also depends
-on the rainfall. A moderate amount of rain causes the
-canal water to go further, but heavy rain may enable
-some crops to do without canal water or may permit of
-the concealment of canal irrigation. The duty also
-depends on the kind of crops grown, on the losses in the
-channels by absorption and on the quantity of water
-available. A liberal supply of water leads to carelessness
-in the use, but a very restricted supply is largely wasted
-owing to the shortness of the &#8220;turns&#8221; or rotational
-periods of flow in the different channels.</p>
-
-<p>There is an obvious connection between the duty of
-water and the total depth of the water, known in India
-as &#8220;delta,&#8221; given to the fields. Calculations are much
-simplified, while still being accurate enough for all practical
-purposes, by assuming that the number of seconds,
-(86,400) in a day is twice the number of square feet,
-(43,560) in an acre. Assuming this to be the case a
-discharge of 1 c. ft. per second for a day gives 2 acre-feet,
-i.e., it will cover an acre of ground to a depth of 2
-feet in a day; and in six months it will cover 100 acres
-to depth of 3&middot;65 feet. In Northern India the year is
-divided into two halves in each of which a crop is grown
-and the duty is calculated for each crop. In this case,
-if the flow of a canal has been continuous, a duty of 100
-acres per cubic foot of its mean discharge per second,
-corresponds to a total depth of 3&middot;65 feet over the area
-irrigated. Generally the flow in the half-year has not
-been continuous. In other countries, and in India on
-canals other than the perennial canals, the periods of
-flow vary a great deal. The duty cannot be calculated
-from delta or <i>vice versa</i> until the period of flow is stated.</p>
-
-<p><span class="pagenum" id="Page23">[23]</span></p>
-
-<p>The daily gauge-readings and daily discharges corresponding
-to them, having been booked, the discharges
-are added up. The total, divided by the number of
-days on which the canal has been running, gives the
-average daily discharge. Suppose that during the
-&#8220;kharif&#8221; or summer crop which is considered to last from
-1st April to 30th September or 183 days, the canal was
-closed for 13 days and that the total of the daily discharges
-on the remaining 170 days comes to 850,000 c.
-ft. per second. The average daily discharge is 5,000 c. ft.
-per second. Suppose the kharif area irrigated to be
-500,000 acres, the kharif duty is 100 acres. To find
-delta the total of the daily discharges has to be multiplied
-by the number of seconds in a day and divided by
-the number of square feet in an acre (these figures are,
-as already stated, very nearly in the ratio of two to one)
-and divided again by the number of acres irrigated.
-Thus, in the above case, delta is very nearly
-<span class="horsplit fsize80"><span class="top">850,000 &times; 2</span><span class="bot">500,000</span></span>
-or 3&middot;4 feet. For comparing the results of one canal or
-one year with another, delta is the more convenient
-figure to take. As soon as the areas irrigated by the
-canals are known for any crop, the Chief Engineer of
-the province issues a statement of the value of delta
-for each perennial canal and compares them with those
-for previous years. The value of delta for the Punjab
-canals ranges from 3 to 4 feet for the kharif and from
-1&middot;8 to 2&middot;1 feet for the &#8220;rabi&#8221; or winter crop. Individual
-canals vary greatly, the worst having nearly twice as
-high a figure as the best. The differences are due to the
-causes already mentioned.</p>
-
-<p>Although the figures of duty take no account of the
-number of days a canal was closed, they are the most
-convenient standard for judging generally of the work<span class="pagenum" id="Page24">[24]</span>
-likely to be done by a projected canal. It will readily
-be seen that figures of duty are not exact and are only
-an approximate guide. The delta figures are, on the
-perennial canals of the Punjab, also worked out for each
-month of the crop, the volume of water used from the
-beginning of the crop up to the end of the month being
-divided by the area irrigated up to the end of the month.
-But when irrigation is in full swing, some little delay
-occurs in booking the fields. Moreover the same field is
-watered a number of times during the crop and much
-depends on whether waterings have just been given or
-are just about to be given. The figures are useful to
-some extent for comparison. The figures for the rabi
-crop of 1908-09 were as follows, the figure for March
-being the final figure for the crop.</p>
-
-<table class="dontwrap" summary="Rabi">
-
-<tr>
-<th colspan="3" class="right">Up to end of</th>
-<th>Oct.,</th>
-<th>Nov.,</th>
-<th>Dec.,</th>
-<th>Jan.,</th>
-<th>Feb.,</th>
-<th>March.</th>
-</tr>
-
-<tr>
-<td class="left">Progressive<br />value of delta.</td>
-<td class="brace bt br bb">&nbsp;</td>
-<td class="brace padl0">-</td>
-<td class="center">1&middot;69</td>
-<td class="center">1&middot;34</td>
-<td class="center">1&middot;29</td>
-<td class="center">1&middot;47</td>
-<td class="center">1&middot;71</td>
-<td class="center">2&middot;05.</td>
-</tr>
-
-</table>
-
-<p>One great principle to be followed in order to obtain
-a high duty is to restrict the supply of water. A cultivator
-whose watercourse is always running full may
-waste great quantities of water, but if he knows that it
-is only to run for a few days out of a fortnight he will
-use the water carefully. It is not, of course, meant that
-the water kept back is run into escapes and wasted. It
-goes to irrigate other lands. The available supply
-of water should be spread over as large an area
-of land as just, and only just, to <span class="nowrap">suffice.<a id="FNanchor6" href="#Footnote6" class="fnanchor">[6]</a></span> Other
-methods of improving the duty are the reduction in the
-number of watercourses, the apportionment of the sizes<span class="pagenum" id="Page25">[25]</span>
-of outlets, watercourses and distributaries to the work
-that they have to do, careful attention to the distribution
-of the water and the prevention of wastage due to
-carelessness.</p>
-
-<div class="footnote">
-
-<p id="Footnote6"><a href="#FNanchor6"><span class="label">[6]</span></a>
-A system of lavish supply is in most cases likely to lead to harm by
-water-logging of the soil or its exhaustion by over-cropping or to raising of
-the spring level and injury to the public health.</p>
-
-</div><!--footnote-->
-
-<p>The following information concerning duties is taken
-from Buckley&#8217;s Irrigation Pocket <span class="nowrap">Book:&mdash;</span></p>
-
-<table class="duties" summary="Duties">
-
-<tr class="bb">
-<th class="br"><span class="smcap">Place.</span></th>
-<th colspan="4" class="br"><span class="smcap">Rabi<br />Duty.</span></th>
-<th colspan="3"><span class="smcap">Kharif<br />Duty.</span></th>
-</tr>
-
-<tr>
-<th class="br">&nbsp;</th>
-<th colspan="4" class="br">Acres</th>
-<th colspan="3">Acres</th>
-</tr>
-
-<tr>
-<td class="place">Upper India<br />(Punjab and United Provinces)</td>
-<td class="acres from">135</td>
-<td class="center top padl1 padr1">to</td>
-<td class="acres">237</td>
-<td class="footn"><a id="FNanchor7" href="#Footnote7" class="fnanchor">[7]</a></td>
-<td class="acres from">49</td>
-<td class="center top padl1 padr1">to</td>
-<td class="acres to">120</td>
-</tr>
-
-<tr>
-<td class="place">Lower Chenab <span class="nowrap">Canal<a id="FNanchor8" href="#Footnote8"
-class="fnanchor">[8]</a></span><br />(Punjab)</td>
-<td class="acres from">133</td>
-<td class="center top padl1 padr1">to</td>
-<td class="acres">134</td>
-<td rowspan="3" class="br">&nbsp;</td>
-<td class="acres from">47</td>
-<td class="center top padl1 padr1">to</td>
-<td class="acres to">88</td>
-</tr>
-
-<tr>
-<td class="place">Bengal</td>
-<td class="acres from">56</td>
-<td class="center top padl1 padr1">to</td>
-<td class="acres">130</td>
-<td class="acres from">57</td>
-<td class="center top padl1 padr1">to</td>
-<td class="acres to">113</td>
-</tr>
-
-<tr>
-<td class="place">Bombay</td>
-<td class="acres from">85</td>
-<td class="center top padl1 padr1">to</td>
-<td class="acres">118</td>
-<td class="acres from">58</td>
-<td class="center top padl1 padr1">to</td>
-<td class="acres to">159</td>
-</tr>
-
-</table>
-
-<div class="footnote">
-
-<p id="Footnote7"><a href="#FNanchor7"><span class="label">[7]</span></a> Occasionally as low as 98 or even 62.</p>
-
-<p id="Footnote8"><a href="#FNanchor8"><span class="label">[8]</span></a> The most recent canal.</p>
-
-</div><!--footnote-->
-
-<p>The period of flow in each case would be six months
-or less.</p>
-
-<p>The average rabi duties on the Lower Chenab and
-Upper Bari Doab Canals, in the Punjab, calculated on
-the discharges at the distributary heads, for periods of 3
-and 5 years respectively, ending March, 1904, were 208
-and 263 acres respectively, but in the latter case 11 per
-cent. of the area received only &#8220;first waterings.&#8221; For
-the kharif the figures are 100 and 98 respectively.</p>
-
-<p><span class="pagenum" id="Page26">[26]</span></p>
-
-<p>In Italy the duty is 55 to 70 acres, in Spain from 45
-to 205 acres, in the Western States of America generally
-60 to 150 acres. In South California the duty is 150
-to 300 acres, when, as is usual, surface irrigation is
-employed, but 300 to 500 acres with subsoil irrigation,
-the water being delivered in a pipe below ground level
-(<a href="#Page158"><span class="smcap">Chapter</span> V.</a>)</p>
-
-<p>In basin irrigation in Egypt the duty is 20 to 25
-acres, but the period of flow is only 40 days. The basins
-are flooded to about 3 feet in depth.</p>
-
-<h3 class="inline" id="Ref7">6. <b>Sketch of a Project.</b></h3>
-
-<p class="inlineh">&mdash;The tract of country to be
-dealt with in an irrigation project may be limited either
-by the natural features of the country, by its levels, by
-the quantity of water available or by financial considerations.
-If the tract is small or narrow, and
-particularly if it is not very flat, it may be obvious that
-there is only one line on which the irrigation channel
-can conveniently be constructed but in any considerable
-scheme a contour plan of the whole tract is absolutely
-necessary. The surveys for such a plan are expensive
-and take time and it is desirable, as far as possible, to
-settle beforehand the area over which they are to extend.
-This may be done to some extent by the examination
-of any existing levels and of the tract itself. Very high,
-sandy or swampy ground, whether occurring at the edge
-of the tract or in the middle of it, may have to be left
-out. The remainder, as already mentioned, is called
-the commanded area. When land occupied by houses
-or roads or which is very much broken, or which for
-any reason cannot be irrigated, has also been deducted,
-the balance is the &#8220;culturable commanded area.&#8221;</p>
-
-<p><span class="pagenum" id="Page27">[27]</span></p>
-
-<p>Either before or after the culturable commanded area
-has been approximately ascertained, the proportion of
-it which is to be irrigated must be settled. This depends
-on local circumstances. In India the supply of water
-is calculated on the supposition that a fraction, generally
-from &sup1;&#8260;&#8323; to &sup3;&#8260;&#8324;, of the culturable commanded area will be
-irrigated each year. The rest will be lying fallow or
-be temporarily out of use or be used for crops which do
-not require canal irrigation. The restriction of the area
-is necessary either because the supply of water is
-limited or in the interests of the people. Too liberal a
-supply of water tends, as already stated, to over cultivation,
-and exhaustion and water-logging of the soil.</p>
-
-<p>The next step is to estimate the duty and the discharge
-of the canal and then to fix its main dimensions.
-In Northern India the duty in the rabi is higher than
-in the kharif. It may be 200 acres in the rabi and 100
-acres in the kharif. Local circumstances determine
-which crop has the greater area. Suppose that it is
-estimated that both will be equal. Then the total
-annual area for which water is to be provided must be
-divided by two and this gives the kharif area. During the
-kharif there is usually an ample supply of water and the
-kharif mean supply of the canal is based on the kharif
-area and the kharif duty. The full supply is not run all
-through the crop because the demand fluctuates, the
-demand being greatest when all the crops have been
-sown and when there is no rain, but from experience of
-other canals the ratio of the kharif full supply to the
-kharif mean supply can be estimated. The ratio is
-generally about 1&middot;25. On the kharif full supply depends
-the size of the channel, every channel being constructed
-so as to carry a certain &#8220;full supply&#8221;<span class="pagenum" id="Page28">[28]</span>
-or maximum discharge and the top of the bank
-being made at such a height that there shall be a
-sufficient margin or &#8220;free-board&#8221; above the &#8220;full supply
-level.&#8221; The canal runs full provided that there is a
-sufficient supply in the river or that the water level of
-the river is high enough&mdash;this last condition referring
-to canals which have no weir in the river&mdash;and provided
-also that there is a sufficient &#8220;demand&#8221; for the water.
-At other times a canal runs with less than full supply.
-This generally occurs throughout most of the rabi,
-the supply of water in the river being then restricted.
-The distributaries are generally run full or &sup3;&#8260;&#8324;ths full,
-some being closed, in turn, to give water to the others.
-In the case of a country where there is only one crop
-in the year, the average discharge of the canal can be
-found by dividing the area by the estimated duty. The
-F.S. discharge can be assumed to bear such a relation
-to the average discharge as may be found by experience
-to be suitable. On some Indian inundation canals the
-F.S. discharge is taken as twice the average discharge.</p>
-
-<p>The F.S. discharge of the canal having been arrived
-at, the alignments of the canal and branches are next
-sketched out on the contour plan and certain tracts and
-discharges are assigned to each branch. The gradients
-can be ascertained from the levels of the country and
-the cross-section of the channel can then be sketched
-out. If the velocity is too great for the soil &#8220;falls&#8221;
-can be introduced. The above procedure will enable a
-rough idea to be formed of the cost of the earthwork
-of the scheme. The cost of the headworks and masonry
-works and distributaries can be best estimated by
-obtaining actual figures for existing works of similar
-character, the distributaries being reckoned at so much<span class="pagenum" id="Page29">[29]</span>
-per mile. The probable revenue which the canal will
-bring in will depend upon the rate charged for the water
-and the cost and maintenance, matters which can only be
-determined by local considerations based on the figures
-for existing canals.</p>
-
-<p>The masonry works on a canal consist of the headworks
-and of bridges, regulators and drainage crossings.
-The principles of design for such works have been dealt
-with in <i>River and Canal Engineering</i>. It is of course
-economical to make a bridge and fall in one. If the off-take
-of a distributary is anywhere in the neighbourhood
-the fall should of course be downstream of it. The
-positions of the falls should be fixed in accordance with
-these considerations. If the longitudinal section is such
-that the position of the fall cannot be much altered, it
-may be feasible to divert a road so that the bridge may
-be at the best site for the fall. In the case of a railway
-crossing, a skew bridge is often necessary. In the case
-of a road crossing it may be feasible to introduce curves
-in the road but here also a skew bridge is often necessary.</p>
-
-<hr class="chap" />
-
-<p><span class="pagenum" id="Page30">[30]</span></p>
-
-<h2>CHAPTER II.<br />
-<span class="chapname"><span class="smcap">The Designing of a Canal.</span></span></h2>
-
-<h3 class="inline" id="Ref10">1. <b>Headworks.</b></h3>
-
-<p class="inlineh">&mdash;In the design of head works no very
-precise rules can be laid down. Some general ideas can
-however be given as to the chief points to be attended
-to and some general and approximate rules stated. In
-every case a large scale plan of the river is of course
-required and also a close examination of it and study of
-its character. An attempt to forecast its action is then
-possible. Gauge readings for several years and calculations
-of discharges are of course necessary. If the bed
-of the river, in course of time, rises upstream of the
-weir or scours downstream of it, a large amount of protection
-to the bed and banks will become necessary.
-Some description of headworks and weirs, with a plan
-of the headworks of the Sirhind Canal, India, has been
-given in <i>River and Canal Engineering</i>, <span class="smcap">Chapters IV.</span> and
-<span class="smcap">X.</span> Remarks regarding the collection of information
-for such works are given in <span class="smcap">Chapter</span> II. of the same
-work. It is also explained how, by keeping the gates
-of the under-sluices closed, a &#8220;pond&#8221; is formed between
-the divide wall and the canal head so that heavy sand
-deposits in the pond and does not enter the canal. By
-closing the canal and opening the under-sluices the
-deposit is scoured away.</p>
-
-<p>The best site for the headworks of a canal depends on
-the stability and general character of the bed of the
-river but in deciding between any two proposed sites,
-the question of the additional cost of the canal, if the<span class="pagenum" id="Page31">[31]</span>
-upper site is adopted, has to be taken into account.
-Such cost may, in rugged country, be considerable.</p>
-
-<p>In the case of Indian perennial canals, the head is
-often close to the hills where the river bed is of boulders
-and shingle and fairly stable, but it is often at a distance
-from the hills and in such cases a gradual rise in
-the bed of the river, even in the absence of a weir, is
-more probable than scour. Such a rise may necessitate
-a raising of the crest of the weir and of the bed of the
-canal.</p>
-
-<div class="figcenter" id="Fig5">
-<img src="images/illo041.png" alt="Sketch" width="500" height="435" />
-<p class="caption"><span class="smcap">Fig.</span> 5.</p>
-</div>
-
-<p>In the general arrangement of a headworks a great
-deal depends on local conditions. Sometimes the river
-runs in a fairly straight and defined channel and the
-weir can then be run straight across it. Sometimes, as
-in the case of the Ganges Canal, there is a succession of
-islands and various short weirs are required in the
-different channels. At the heads of the Eastern and
-Western Jumna Canals, the river, on issuing from the
-hills, widens out (<a href="#Fig5">Fig. 5.</a>) and the weir is built obliquely<span class="pagenum" id="Page32">[32]</span>
-and not in a straight line. Its crest is higher at the east
-than at the west side. There are under-sluices at both
-sides. The upstream end and west side of the island
-are revetted. The old head of the Western Jumna
-Canal, as shown in the figure, existed long before the
-advent of the British, and a temporary weir, made of
-gabions filled with stones, was constructed across the
-river every year during the low water period and swept
-away during the floods. To have carried the weir along
-the line shown dotted, the head of the Western Jumna
-Canal being of course brought up to it, would apparently
-have been feasible and cheaper, but the off-take would
-have been in shallow water because of the curve in the
-river, and there would have been no current along the
-face of the head regulator of the canal.</p>
-
-<p>The level of the floor of the under-sluices is generally
-about the same as that of the bed of the canal. The
-sill&mdash;made to exclude shingle and sand as far as
-possible&mdash;of the canal head regulator may be 3 feet
-higher and the crest of the weir 6 to 9 feet higher. The
-top of the weir shutters is 1 to 2&middot;5 feet above the F.S. level
-of the canal which may be 5 feet or more above the bed
-of the canal. If the weir is provided with falling
-shutters the width of the waterway of the under-sluices
-may be about &sup1;&#8260;&#8321;&#8322;th of the width of the waterway of the
-weir alone, otherwise about &sup1;&#8260;&#8328;th.</p>
-
-<p>In nearly all cases the weir has a flat top and flat
-slopes both upstream and downstream. In a case where
-the river bed is of sand, the depth of water on the crest
-of the weir in floods may be 15 feet and the velocity 14
-or 15 feet per second. The downstream slope of the
-weir may be about 1 in 15, and the upstream slope 1<span class="pagenum" id="Page33">[33]</span>
-in 6. Where the river bed is of boulders the velocity
-may be still higher. The faces of the weir are usually of
-hammer-dressed stone. A lock for the passage of rafts
-is added if necessary.</p>
-
-<p>Unless the banks of the river are high, it is necessary
-to construct embankments to prevent the river water,
-when headed up by the weir during the floods, from
-spilling over the country with possible damage to the
-canal. If the river has side channels they have to be
-closed. The stream may also have to be trained, by
-means of guide banks or spurs, so as to remain in one
-channel and flow past the canal head and not form
-shoals against it. Where the river is unstable, it may
-shift its course so as to strike the weir obliquely and
-this may cause excessive heading up at one side of the
-weir. In such cases it is usual to divide the weir into
-bays or sections, each about 500 feet long, by &#8220;divide
-walls&#8221; running at right angles to the weir.</p>
-
-<p>The free-board or height of the masonry walls and
-tops of embankments above H.F. Level is about 5 feet.</p>
-
-<p>The span of each opening in the under-sluices is
-generally 20 to 35 feet. The piers may be 5 feet thick.
-It is usual to make each alternate pier project upstream
-further than the others so that long logs coming down
-the river during floods, broadside on, may be swung
-round and not be caught and held against the piers.</p>
-
-<div class="figcenter" id="Fig6">
-<img src="images/illo044.png" alt="Headwork" width="447" height="600" />
-<p class="caption"><span class="smcap">Fig.</span> 6.</p>
-</div>
-
-<div class="figcenter" id="Fig6a">
-<img src="images/illo045.png" alt="Headwork" width="600" height="115" />
-<p class="caption"><span class="smcap">Fig.</span> 6<span class="smcapall">A</span>.</p>
-</div>
-
-<p><a href="#Fig6">Figs. 6</a> and <a href="#Fig6a">6<span class="smcapall">A</span></a> show the headworks of the Upper Chenab
-Canal now under construction (<a href="#Page144"><span class="smcap">Chapter</span> IV.</a>) The site
-is in a low flat plain, but no better site could be found.
-The weir consists of 8 bays of 500 feet each. The
-crest is 10 feet above the river bed and the falling<span class="pagenum" id="Page34">[34]</span>
-shutters 6 feet high. The slopes are 1 in 6 and 1 in 15.
-The bulk of the work is rubble masonry in lime. The
-lower layer upstream of the crest is of puddle; upstream
-of the second line of wells it is rubble masonry in half
-sand and half lime; upstream of the lower line of wells
-it is of dry stone and there is an intermediate layer of
-rubble masonry in lime with the stones laid flat. Below<span class="pagenum" id="Page35">[35]</span>
-the crest there is a wall of masonry 9 feet thick and on
-the crest there are two strips of ashlar between which
-the shutters lie when down. The extreme upstream
-and downstream portions of the bed protection are of
-dry stone and 4 feet thick while next to the weir are
-concrete blocks 2 feet thick resting on dry stone. The
-width of the crest is 14 feet, of the weir 140 feet, of the
-protection 70 feet upstream and 110 feet downstream.<span class="pagenum" id="Page36">[36]</span>
-The guide banks have tops 40 feet wide and 18 and 14
-feet above the crest of the weir in the upstream and
-downstream lengths respectively, the side slopes being
-2 to 1 and the water slope being covered, up to H.W.
-level, by dry stone pitching 4 feet thick. The left guide
-bank runs upstream for 3,250 feet from the centre line
-of the canal and the right 2000 feet from the line of
-crest shutters. The under-sluices have 8 bays of 35 feet
-each and the canal head regulator 36 openings of 6&middot;5
-feet each, the large openings shown in the figure being
-sub-divided. The crest of the weir is no less than 10
-feet above the river bed and the shutters add 6 feet to
-this. The floor of the under-sluices is 4 feet higher
-than the river bed. There is thus ample allowance for
-a possible rise in the river bed.</p>
-
-<h3 class="inline" id="Ref9">2. <b>The Contour Map.</b></h3>
-
-<p class="inlineh">&mdash;The contour map, besides
-showing the contours of the country to be irrigated and
-of a strip of country, even if not to be irrigated, which
-will be traversed by the main line, should show all its
-main features, namely:&mdash;streams, drainages, railways,
-roads, embankments, reservoirs, towns, villages, habitations,
-and the boundaries of woods and cultivated lands.
-It should also show the highest water levels in all
-streams or existing canals. A map showing as many
-as possible of the above features should be obtained and
-lines of levels run for the contours. In doing this, the
-points where the lines of levels cut or pass near to any
-of the above features or boundary lines, should be noted.
-It may be necessary to correct inaccuracies in the plan
-or to supply defects in it. The greater the trouble
-taken to do this the less will be the trouble experienced
-later on.</p>
-
-<p><span class="pagenum" id="Page37">[37]</span></p>
-
-<p>The heights of the contour lines will, in very flat
-country, have eventually to be only 1 foot apart. This
-will necessitate running lines of levels half-a-mile apart
-at the most, and preferably 2000 feet apart, the pegs in
-each line being about 500 feet apart. In less flat
-country the heights of the contour lines can be further
-apart than 1 foot. Whatever distance apart is decided
-on for them, the survey should be done once for all.
-On one of the Indian canals in flat country, the lines
-of levels were at first taken 5 miles apart, the branches
-roughly aligned and then further surveys made. This
-led to great expense and delay and the procedure has
-not been repeated.</p>
-
-<p>In making a contour survey, a base line, as centrally
-situated and as long as possible, should be laid down,
-with side lines parallel to it near the boundaries of the
-tract. The cross lines at half-mile or other intervals
-should then be laid down. Some of them may run out
-beyond the side lines. Circuits of levels should be run
-along the base line, the side lines and the two extreme
-cross lines and be carefully checked. The remaining cross
-lines should then be levelled. All the levels having
-been shown on the map the contours should be sketched
-in. The scale of the map for a large project may be two
-inches to a mile. If it is likely that the survey will have
-to be extended, it will be easier to do this by prolonging
-the base line and running more cross lines, than by
-prolonging each of the cross lines already surveyed.
-This can be borne in mind when selecting the base line.</p>
-
-<h3 class="inline" id="Ref2">3. <b>Alignments and Discharges.</b></h3>
-
-<p class="inlineh">&mdash;On the contour
-map the proposed alignments of the canal, branches,
-distributaries, and escapes, determined after careful<span class="pagenum" id="Page38">[38]</span>
-consideration of all matters affecting them, are shown.
-The tracts to be irrigated by each branch and each
-distributary are now marked off, the &#8220;irrigation
-boundaries&#8221; following approximately the valleys and
-lines of drainage. Any large tracts of land which cannot
-be irrigated are of course shown and are excluded.
-Forests or other lands which are not to be irrigated
-should be similarly dealt with, otherwise confusion is
-likely to arise later. The commanded area dependent
-on each distributary is now ascertained from the map.
-A certain percentage being deducted for scattered
-unculturable areas the culturable commanded areas are
-obtained. The proportion to be irrigated (in India in the
-kharif) having previously been decided, the number of
-acres to be actually irrigated by each distributary is
-arrived at.</p>
-
-<p>The next step is to ascertain the <span class="nowrap">discharges.<a id="FNanchor9" href="#Footnote9" class="fnanchor">[9]</a></span> A
-general duty for the whole canal having been estimated
-by considering the actual figures for other canals the
-full supply of the canal at its head is arrived at.
-(<a href="#Ref5"><span class="smcap">Chapter</span> I, Art. 6</a>). In Northern India it will be the
-kharif duty and kharif full supply. Since some water
-is lost by absorption in the channels, the duty of the
-water on a branch is higher than that of the whole
-canal based on its head discharge, and the duty on a
-distributary is higher still. In designing a canal, an
-attempt has to be made to estimate the losses of water
-in the main canal and branches, so that the duties of
-the branches and distributaries may be estimated and<span class="pagenum" id="Page39">[39]</span>
-the channels designed accordingly. On the Western
-Jumna Canal the figures were estimated to be as
-<span class="nowrap">follows:&mdash;</span></p>
-
-<table class="discharges" summary="Discharges">
-
-<tr>
-<th>&nbsp;</th>
-<th class="padl2">Kharif.</th>
-<th>Rabi.</th>
-</tr>
-
-<tr>
-<td class="descr">Average discharge at canal head <span class="righttext">(c. ft. per sec.)</span></td>
-<td class="estimate padl4">3536</td>
-<td class="estimate">2755</td>
-</tr>
-
-<tr>
-<td class="descr">Duty based on the discharge <span class="righttext">(acres)</span></td>
-<td class="estimate padl4">98</td>
-<td class="estimate">138</td>
-</tr>
-
-<tr>
-<td class="descr">Estimated loss of water in canal and branches <span class="righttext">(c. ft. per sec.)</span></td>
-<td class="estimate padl4">400</td>
-<td class="estimate">300</td>
-</tr>
-
-<tr>
-<td class="descr">Average discharge at distributary head <span class="righttext">(c. ft. per sec.)</span></td>
-<td class="estimate padl4">3136</td>
-<td class="estimate">2455</td>
-</tr>
-
-<tr>
-<td class="descr">Duty based on the discharge <span class="righttext">(acres)</span></td>
-<td class="estimate padl4">111</td>
-<td class="estimate">154</td>
-</tr>
-
-</table>
-
-<div class="footnote">
-
-<p id="Footnote9"><a href="#FNanchor9"><span class="label">[9]</span></a>
-In this Article and in the rest of this Chapter it is assumed that the canal
-is a Northern Indian one. Any modifications necessary to suit canals in
-other countries will readily suggest themselves.</p>
-
-</div><!--footnote-->
-
-<p>The question of duty is one which if not carefully
-considered, may cause some confusion. A canal and
-branches, having been designed with certain assumed
-duties and with discharges based on certain values of
-N in Kutter&#8217;s co-efficient, have, let it be supposed, been
-constructed to a greater or less extent. When the
-time comes for constructing the distributaries, the
-engineers concerned may have different ideas, based on
-later experience, as regards the probable duty and the
-most suitable value of N. If they design the distributaries
-with a higher duty and a lower value of N, it is
-obvious that they can provide more distributaries than
-at first designed, or can increase their lengths. In either
-case they would provide for an increased commanded
-area. If they do not do this, they ought to adhere to
-the values at first proposed, thus making the channels
-larger than, according to their ideas, would be
-necessary. These larger channels will be able to do
-more irrigation, by an increase, not in the commanded<span class="pagenum" id="Page40">[40]</span>
-area, but in the proportion of it which is irrigated. Any
-other course would result in the canal carrying more
-water than could presumably be used by the distributaries.
-Again, the question how the assumed duty was
-arrived at may need consideration. It may have been
-arrived at by taking the duty figures of some existing
-canal, based on discharge figures which were the result,
-not of observed but of calculated discharges, and if the
-calculations were based on a value of N which experience
-has proved to be wrong, a correction is obviously
-needed. Many mistakes of the kinds indicated above
-have been made, not perhaps in the case of a project
-which has been recently got up and is then quickly
-carried out in its entirety, but in one which is carried
-out slowly or after a long period has elapsed or in one
-which consists of extensions of an existing system. So
-great, however, is the elasticity of a channel&mdash;by which
-is meant its capacity for adapting itself to varied discharges,
-a small change in the depth of water causing
-a great change in the discharge&mdash;and so considerable
-has been the uncertainty as to the real duty to be
-expected, that any mistakes made have not usually
-resulted in any serious trouble.</p>
-
-<div class="photograph w600">
-
-<img src="images/illo052.jpg" alt="" width="600" height="333" />
-
-<p class="caption">BIFURCATION AT TAIL OF CANAL.</p>
-
-<hr class="capt" />
-
-<p class="caption">The Distributaries have Gates and Winches.</p>
-
-<p class="imagelocation"><i>To face p. 41.</i></p>
-
-</div><!--photograph-->
-
-<p>It has been stated (<a href="#Ref6"><span class="smcap">Chapter</span> I, Art. 2</a>) that it is not
-desirable to let one channel tail into another. In old
-canals a distributary used sometimes, after running
-parallel to a canal, to be brought back towards it and
-tail into it. The advantage of this was that the
-distributary had not to be made very small towards the
-tail and that, if the demand abruptly ceased, the distributary
-was not likely to breach. The principle was,
-however, essentially bad. The lower part of the
-distributary was obviously too near the canal and not<span class="pagenum" id="Page41">[41]</span>
-centrally situated as regards the irrigated strip. The
-portion at the extreme tail was superfluous. Again,
-whatever volume of water was carried through the
-distributary and back into the canal, was needlessly
-detached instead of being kept in bulk. Moreover the
-duty of water on such a distributary cannot be ascertained
-without a tail gauge and the observation of
-discharges at the tail. There are similar objections to
-one distributary tailing into another. Each should be
-separate and distinct.</p>
-
-<p>A major distributary is one whose discharge is more
-than 40 c. ft. per second. It may be as much as 250
-c. ft. per second. A branch, as soon as it reaches a point
-where its discharge becomes only 250 c. ft. per second
-should be considered as a major distributary. A minor
-distributary is one whose discharge is from 8 to 40 c. ft.
-per second. A minor distributary is nearly always a
-branch of a major distributary. There are instances of
-&#8220;direct minors,&#8221; i.e., minors taking off from canals or
-branches. Such a minor, unless its discharge is a large
-fraction of that of the canal which supplies it&mdash;and this
-can seldom be the case&mdash;is objectionable because the
-petty native official who has to see to the regulation of
-supplies can manipulate the supply easily and without
-detection, and the number of persons irrigating from it
-being small, he can make private arrangements with
-them. On the Sidhnai Canal there are some half-dozen
-distributaries each of which had one or two minors
-which took off close to the head of the distributary.
-The people who irrigated from the minors managed to
-get the heads shifted and taken off direct from the canal,
-on the ground that, the water level in the canal being
-higher than in the distributary, there would be better<span class="pagenum" id="Page42">[42]</span>
-command and less silt deposit. The irrigation on all
-these minors ran up to a figure far in excess of what
-had been intended, to the detriment of lands further
-down the canal. The minor heads have all been retransferred
-to the distributaries, the difficulty as to
-command being got over, as it should have been at first,
-by constructing weirs in the distributaries. The fall in
-the water surface at the distributary head, i.e., the
-difference between the water level in the canal and that
-in the distributary downstream of its head but upstream
-of the weir, is quite trifling or even inappreciable.</p>
-
-<p>In some of the older Indian canals it was the custom
-to place the heads of distributaries, not just above a
-fall but several hundred feet above it, the idea being
-that the distributary then received less silt. This
-practice has now been discontinued. There is no valid
-reason for following it.</p>
-
-<p>The question whether, when a channel crosses a road
-on the skew, a skew bridge should be constructed or
-curves introduced into the road or channel, is one which
-requires some consideration. As far as possible the lines
-of channels should be fixed so as to cross <span class="nowrap">important<a id="FNanchor10"
-href="#Footnote10" class="fnanchor">[10]</a></span>
-roads on the square or with a small angle of skew. In
-the case of main canals or branches, the introduction of
-special curves is generally out of the question, but if
-the road is not straight something can be done by
-shifting the line one way or the other. In the case of
-&#8220;major&#8221; distributaries, curves can to some extent be
-introduced. In the case of &#8220;minor&#8221; distributaries it is
-often possible to curve the channel, with a radius of say<span class="pagenum" id="Page43">[43]</span>
-500 feet, so that it will cross the road at right angles.
-There is very little objection to a skew bridge if the
-angle of skew is not great. The angle of crossing having
-been made as near to 90&deg; as possible, the bridge can be
-made skew though not necessarily so much askew as
-the road. Slight curves can be introduced into the
-road. When the road is made askew, a bridge on the
-square involves at least three considerable curves (<a href="#Fig7">Fig. 7</a>)
-and the taking up of extra land. It also causes, in
-perpetuity most likely, a more or less inconvenient and
-unsightly arrangement and one which, in most countries,
-would not be tolerated. When the angle of skew is not
-great, it is best to introduce no curve at all into the
-road. In the case of a &#8220;village&#8221; road, which may be
-more or less undefined and liable to be shifted, the
-difficulty about land may not be great, but even in this
-case the angle of crossing should, if possible, be kept
-near to 90&deg;, especially in the case of minors, and where
-curves have to be introduced into the road they should
-be suitable ones. Abrupt angles are not only unsightly
-but are unfair to the cart drivers. The crossings of
-village roads by the minors of a certain great modern
-canal have been stigmatised as &#8220;hideous.&#8221; Indian
-canals can afford to do work properly.</p>
-
-<div class="footnote">
-
-<p id="Footnote10"><a href="#FNanchor10"><span class="label">[10]</span></a>
-In India &#8220;district&#8221; and &#8220;provincial&#8221; roads.</p>
-
-</div><!--footnote-->
-
-<div class="figcenter" id="Fig7">
-<img src="images/illo055.png" alt="Canal crossing" width="350" height="309" />
-<p class="caption"><span class="smcap">Fig.</span> 7.</p>
-</div>
-
-<p><span class="pagenum" id="Page44">[44]</span></p>
-
-<h3 class="inline" id="Ref11">4. <b>Remarks on Distributaries.</b></h3>
-
-<p class="inlineh">&mdash;Before a canal
-system can be properly designed, it is necessary to
-determine certain points in connection with the
-working of the distributaries. A distributary is intended
-to irrigate a certain kharif area. Its average kharif
-supply is determined from the assumed kharif duty.
-It generally runs full in the kharif but not always.
-In a very dry tract such as the Montgomery district of
-the Punjab, the demand is so great and so steady that a
-distributary practically runs full through the greater
-part of the kharif. In such a case the canal or branch
-must be so designed that it can keep all distributaries
-full at the same time. Its F.S. discharge will be the
-sum of all the F.S. discharges of the distributaries plus
-the losses of water by absorption.</p>
-
-<p>But in other cases, especially if the rainfall is
-considerable, a distributary does not require its full
-supply, either all through the kharif or for long at a
-time. An estimate must then be made of what it will
-require. It may be estimated that its requirements
-will be met if, during the period of greatest demand, it
-is closed for two days out of a fortnight and receives
-full supply for the remaining twelve days. In this
-case, since the various distributaries need not all be
-closed on the same days, the canal or branch can be so
-designed that it will carry a full supply equal (after
-deducting losses) to &#8310;&#8260;&#8327;ths of the aggregate full supplies
-of the distributaries. In other cases the fraction may
-be &sup3;&#8260;&#8324;ths. It is likely to be lower the greater the rainfall
-of the district. Even in the case when the distributaries
-run full through nearly the whole of the kharif, there
-will be periods when they only run with about &sup3;&#8260;&#8324;ths full<span class="pagenum" id="Page45">[45]</span>
-supply. If full supply were run at such times, many of
-the outlets would discharge more water than was
-required, the cultivators would partly close them, and
-breaches in the banks of the distributary might result.
-Thus the water level of a distributary must always be
-so arranged that it will have a good &#8220;command&#8221; when
-it is running with about three-fourths of the full supply
-discharge. The water level with &sup3;&#8260;&#8324;ths full supply is
-generally &middot;5 to &middot;75 feet below the full supply level but it
-should be calculated in each case. Generally it will be
-correct to make the water level, when &sup3;&#8260;&#8324; full supply is
-run, about 1 foot above the high ground traversed by
-the distributary, excluding any exceptionally high
-portions of small area. A more exact method is given
-in <a href="#Ref4">Art. 9</a>. The greater the proportion of the culturable
-area which is to be irrigated, the less should be the
-area of any high land which is excluded. The F.S.
-levels of the distributaries at their off-takes must be
-settled in accordance with the foregoing remarks, and
-these F.S. levels must be entered on the plan. Neglect
-to thus fix the F.S. levels of distributaries before
-designing the canals has frequently led to trouble.</p>
-
-<p>The head needed at a bifurcation in order to get the
-supply into a branch or distributary is always small
-unless the velocity is high. For a velocity of 3 feet per
-second the head required is only about &middot;16 ft., for 2 ft.
-per second &middot;1 ft.</p>
-
-<p>On an Inundation Canal which has no weir across
-the river, the mean supply downstream of the regulator
-(which is built a few miles down the canal lest it should
-be damaged by the shifting of the river) is, as has been
-mentioned, about half the full supply. The command<span class="pagenum" id="Page46">[46]</span>
-in such canals is not generally very good. A distributary
-can often obtain only mean supply and it should be
-designed so as to command the country when it is
-carrying mean supply. A detailed description of
-Inundation Canals in Northern India, is given in
-<i>Punjab Rivers and Works</i>.</p>
-
-<p>Let M, F, m, f, be the mean and full supply discharges
-at the heads of a canal and of an average distributary
-on it and let the number of distributaries be n. It has
-been seen (<a href="#Ref7">Chap. I. Art. 6.</a>) that M = &middot;8F about. Let k
-be the proportion of the supply lost by absorption in
-canal and branches. Then n&nbsp;m&nbsp;= (1&nbsp;- k)&nbsp;M&nbsp;= &middot;8&nbsp;(1&nbsp;- k)&nbsp;F.
-If the distributaries all run with full supplies&mdash;at the
-time of greatest demand&mdash;for 4 days out of 5, then,</p>
-
-<p class="formula">n&nbsp;f&nbsp;= 1&middot;25&nbsp;(1&nbsp;- k)&nbsp;F</p>
-
-<p class="formula"><span class="horsplit"><span class="top">f</span><span class="bot">m</span></span>&nbsp;=
-<span class="horsplit"><span class="top">1&middot;25</span><span class="bot">&middot;8</span></span>&nbsp;= 1&middot;56</p>
-
-<p>Since k depends on the wetted area, it is not
-likely to be so great for F as for M, but the
-above gives a general idea of the ratio of the
-full kharif discharge to the mean kharif discharge.
-On a large canal the circumstances of the distributaries
-will not all be similar. Some will run full for a greater
-proportion of their time than others. They can be
-divided into groups and the ratio of the full to the
-mean supply calculated for each group. The mean
-supply is, as above stated, obtained from the area to be
-irrigated, and the duty as estimated at the distributary
-head.</p>
-
-<p>At one time a system was introduced of making
-distributaries of large size with the idea of running
-them for short periods. One reason given for abandoning<span class="pagenum" id="Page47">[47]</span>
-this arrangement, was that there was a tendency to
-run such a distributary for too long. This reason is
-not very intelligible. It would be applicable to any
-distributary which was not intended to be run without
-cessation. The result would be that some other
-distributary would be kept short of water and this would
-imply extremely bad management. The chief reason
-against such a distributary is the greater cost of its
-construction. It would effect a saving of water. The
-ratio of the discharge to the wetted area would be high,
-though this would be to some extent neutralized by the
-greater frequency of closures, since, when water is
-admitted to a dry channel, the absorption is at first
-great. There would also be some difficulty in the
-distribution of the water because of the short period for
-which it would remain open. It will be seen (<a href="#Ref8">Chapter
-III. Art. 5</a>), that it is desirable to open and close
-always at the same hour of the day. An ordinary
-distributary might run for 11 days out of 14. One of
-double the size could not conveniently be run for
-5&sup1;&#8260;&#8322; days. A distributary can always be enlarged if
-necessary, but if made too large it is extremely difficult
-to make it smaller.</p>
-
-<p>It was also, at one time, usual to make minors, when
-there were several on a distributary, of large capacities
-so that they ran in turns. The preceding remarks apply
-to this case. The system has been abandoned.</p>
-
-<h3 class="inline" id="Ref14">5. <b>Design of Canal and Branches.</b></h3>
-
-<p class="inlineh">&mdash;The apportioning
-of discharges to the various channels having been
-effected as described in <a href="#Ref9">Art. 2</a>, the designing of the
-canal and branches is proceeded with. Rough longitudinal
-sections of all the lines are prepared by means<span class="pagenum" id="Page48">[48]</span>
-of the contour map, the ground levels being shown at
-intervals of one foot&mdash;or whatever the vertical distance
-between the contours may be&mdash;and the horizontal
-distances obtained from the map by scaling.</p>
-
-<p>On these longitudinal sections the lines proposed for
-the bed and F.S. levels are shown reach by reach and
-also the mean velocities and discharges.</p>
-
-<p>The laws of silting and scouring and the principles
-on which channels should be designed are fully gone
-into in <i>River and Canal Engineering</i>. It is there
-explained that, for a channel of depth D, there is a
-certain critical velocity, V&#8320;, which just prevents the
-deposit of the silt, consisting of heavy clay and fine
-sand, found in Indian rivers&mdash;this silt enters the canal
-in such immense quantities that the canal silt clearances
-would be impossible if much of it was deposited in
-the channels&mdash;that sand of grades heavier than <span class="bt">&middot;1</span> may
-deposit in the head of a canal and well nigh threaten
-its existence, that the clear water entering the canal
-in winter may pick up and carry on some of the sand
-but that proper steps for preventing the deposit in the
-canal can be taken at the headworks. This last
-question has been referred to in <a href="#Ref10">Art. 1</a>. The following
-additional rules for designing canals in Northern
-India are chiefly taken from those given by Kennedy in
-the explanatory notes to his Hydraulic Diagrams,
-which are in use in the Irrigation Branch in Northern
-India.</p>
-
-<ul class="rules1">
-
-<li>(1) Near the hills where the bed is of shingle the
-velocity may exceed V&#8320;. A few other soils will
-stand 1&middot;1 V&#8320;.</li>
-
-<li>(2) In ordinary channels any excess over V&#8320; will give<span class="pagenum" id="Page49">[49]</span>
-much trouble lower down.</li>
-
-<li>(3) In the first four or five miles of a distributary, V&#8320;
-should be allowed and gradually be reduced to
-&middot;85 V&#8320; at the tail, the gradient being reduced if
-convenient, while a minor or branch distributary
-should have less than V&#8320; at its off-take and still
-less at the tail. The sand is drawn off by the
-outlets and in the lower part of a distributary it
-is often non-existent.</li>
-
-<li>(4) If there is efficient silt trapping at the head of
-the canal any figures arrived at by the preceding
-rules should be multiplied by &middot;9.</li>
-
-<li>(5) In the case of a canal having its head far from
-the hills, the sand is finer and any figures arrived
-at as above may be multiplied by, perhaps, about
-&middot;75, but further experience is needed to decide
-this.</li>
-
-<li>(6) If the soil is very poor, especially if the depth of
-water is more than 6 or 7 feet, the velocity
-should be less than V&#8320;&mdash;say &middot;9 V&#8320;&mdash;so as not to
-cause falling in of the banks. Depths of more
-than 9 or 9&middot;5 feet should, as far as possible, be
-avoided for the same reason.</li>
-
-<li>(7) At a bifurcation, one branch channel may have
-no raised sill, and, owing to its smaller depth, it
-may draw off no surface water and get an
-undue share of rolling sand. Its velocity should
-be greater than V&#8320; and that of the other branch
-be less than V&#8320;.</li>
-
-<li id="Ref13">(8) At such a bifurcation it may be necessary, during<span class="pagenum" id="Page50">[50]</span>
-times of low supply, to head up the water in the
-main channel and some silt may temporarily be
-deposited in it. When the heading up ceases,
-the silt is scoured away but it mostly goes into
-the branch whose bed level is the lower. It is
-best to design such bifurcations so that the sill
-levels of the two branches are equal and, if
-possible, so that their bed levels are <span class="nowrap">equal.<a id="FNanchor11" href="#Footnote11" class="fnanchor">[11]</a></span>
-Otherwise the channel which is likely to get
-most silt should have the steeper gradient.</li>
-
-<li>(9) Any existing well established r&eacute;gime should not
-be tampered with.</li>
-
-</ul><!--rules1-->
-
-<div class="footnote">
-
-<p id="Footnote11"><a href="#FNanchor11"><span class="label">[11]</span></a>
-Appendix A in <i>River and Canal Engineering</i> deals with some instances
-of fallacies in questions concerning flow in open streams. An extract
-from it describing a remarkable divide wall recently constructed at the
-head of the Gagera branch, Lower Chenab Canal, is given in <a href="#Page169">Appendix A</a> of
-this book.</p>
-
-</div><!--footnote-->
-
-<p>Experience shows that in designing Irrigation
-Channels in the plains of India in accordance with
-Kennedy&#8217;s figures, the maximum ratio of bed width to
-depth of water is as <span class="nowrap">follows:&mdash;</span></p>
-
-<table class="dontwrap" summary="Ratios">
-
-<tr>
-<th class="center bot padl1 padr1">Discharge,<br />c. ft. per second</th>
-<th class="center bot padl1 padr1">10</th>
-<th class="center bot padl1 padr1">25</th>
-<th class="center bot padl1 padr1">100</th>
-<th class="center bot padl1 padr1">200</th>
-<th class="center bot padl1 padr1">500</th>
-<th class="center bot padl1 padr1">1,000</th>
-</tr>
-
-<tr>
-<td class="left">Ratio</td>
-<td class="center padl1 padr1">3&middot;5</td>
-<td class="center padl1 padr1">4</td>
-<td class="center padl1 padr1">4&middot;5</td>
-<td class="center padl1 padr1">5</td>
-<td class="center padl1 padr1">6</td>
-<td class="center padl1 padr1">6</td>
-</tr>
-
-</table>
-
-<p>The actual gradients of the canals generally range
-from about 1 in 8,000 for a main canal to 1 in 2,000 for
-the tail of a distributary, but near the head of a canal
-where the bed is of boulders and shingle, the gradient
-may be as steep as 1 in <span class="nowrap">1,000.<a id="FNanchor12"
-href="#Footnote12" class="fnanchor">[12]</a></span> The velocity in this
-last case may be 5 feet per second but generally it is
-not more than 3 or 4 feet per second in canals and
-branches, and 1 to 2 feet per second in distributaries.</p>
-
-<div class="footnote">
-
-<p id="Footnote12"><a href="#FNanchor12"><span class="label">[12]</span></a> On the Upper Jhelum Canal, 1 in 970.</p>
-
-</div><!--footnote-->
-
-<p><span class="pagenum" id="Page51">[51]</span></p>
-
-<p>In designing the channels, N, in Kutter&#8217;s co-efficient,
-may be taken as &middot;0225 or &middot;020, according to judgment.
-For new and smooth channels &middot;020 is generally correct.
-A channel generally becomes rougher by use but sometimes
-it becomes smoother. Cases have occurred in
-which N has been found to be &middot;016. This question is
-discussed in <i>Hydraulics</i>, Chap. VI.</p>
-
-<p>The bed width of a canal is reduced, where a
-distributary takes off, in such a way that when the
-canal and distributary are both running full, the depth
-of water in the canal continues to be uniform and the
-flow to be uniform. When the distributary is closed
-there is heading up in the canal upstream of the off-take,
-but not enough to make any appreciable difference
-unless the capacity of the distributary is a large fraction
-of that of the canal and even then no harm is likely
-to result.</p>
-
-<p>The preceding rules and principles being taken into
-consideration, the channels are designed. The bed levels,
-gradients and depths are so arranged as to give the
-velocities suited to the soil and to maintain the proper
-relation of depth to velocity. The bed width is arranged
-so as to give the proper discharge. The full supply
-level of the canal and branches has also to be so
-arranged that it shall be higher, at each distributary
-off-take, than the full supply level of the distributary.
-It is desirable to be able to give a distributary its full
-supply even when the canal is low. Generally the slope
-of the country along any line is greater than would be
-suitable for the bed, and &#8220;falls&#8221; are introduced. The
-off-take of a distributary is generally just above a fall
-and there is generally an ample margin between its<span class="pagenum" id="Page52">[52]</span>
-F.S. level and that of the canal. The discharge of the
-canal during the greater part of the rabi may be only
-about half the full supply. This discharge should
-be estimated and the water level corresponding
-to it calculated and shown on the longitudinal section.
-If possible the levels should be so arranged that even
-with its least supply the water level in the canal will
-enable full supply to be given to a distributary. If this
-cannot otherwise be managed it may be necessary to
-construct a regulator in the canal below the head of the
-distributary so that, during low supplies, the water can
-be headed up. It has been stated in <i>River and Canal
-Engineering</i>, Chapter IV., that such heading up, if
-temporary, is not at all likely to cause silt deposit in
-the canal. The designing of the distributaries is not
-proceeded with at this stage.</p>
-
-<p>Since no irrigation is usually done directly from the
-canal and branches, they are designed without any
-particular connection between the level of the water
-and that of the country traversed. Dangerously high
-embankments are of course avoided as far as possible.
-The bed is designed at such a level that the excavation
-and embankment at any place will be, as nearly as
-possible, equal. Land in India is cheap. When the
-excavation exceeds the embankment the balance is
-made into a spoil bank. When the excavation is less
-than the embankment the balance is got from borrow-pits.</p>
-
-<p>The side slopes of channels in excavation are generally
-1 to 1, in embankment 1&sup1;&#8260;&#8322; to 1. The sides of channels
-of small or moderate size usually become about &sup1;&#8260;&#8322; to 1,
-or even vertical, by the deposit of silt on the slopes.<span class="pagenum" id="Page53">[53]</span>
-This reduction of area is allowed for in the design i.e.
-the bed width is so designed that the channel will carry
-the required discharge, not with the side slopes as
-executed, but when they have become &sup1;&#8260;&#8322; to 1. In large
-canals however the sides do not always silt up but
-rather tend to fall in. When this is expected to occur
-the allowance above described is not made. Berms are
-left so that if any part of the sides fall in, the bank will
-not also fall in. The berms also allow of the channel
-being widened if that ever becomes necessary. Type
-sections are given in <a href="#Fig8">Figs. 8</a> and <a href="#Fig9">9</a>.</p>
-
-<h3 class="inline">6. <b>Banks and Roads.</b></h3>
-
-<p class="inlineh">&mdash;<a href="#Fig8">Figs. 8</a> and <a href="#Fig9">9</a> show the banks
-and spoil.</p>
-
-<div class="figcenter" id="Fig8">
-<img src="images/illo065a.png" alt="Section" width="600" height="81" />
-<p class="caption"><span class="smcap">Fig.</span> 8.</p>
-</div>
-
-<div class="figcenter" id="Fig9">
-<img src="images/illo065b.png" alt="Section" width="600" height="105" />
-<p class="caption"><span class="smcap">Fig.</span> 9.</p>
-</div>
-
-<p class="noindent">The scale is 6 feet to an inch. The depth of water, in
-this particular case, is 7 feet, and the bank, excluding
-the small raised bank, 2 feet above the water. The
-inside edge of the bank, where the small raised bank is
-shown, is kept parallel to the canal for a considerable
-distance. Its position is got by drawing a line, shown
-dotted, at, generally, 1&sup1;&#8260;&#8322; to 1. The embanked part of
-the slope is actually made at 1&sup1;&#8260;&#8322; to 1, but the
-excavation is at 1 to 1, so that a berm is left. The<span class="pagenum" id="Page54">[54]</span>
-width of this berm of course varies as the depth of
-digging varies. If there is likely to be much falling in
-of the sides the berm can be made wider, the dotted
-line starting, not from the edge of the bed, but from a
-point further in. On an inundation canal in sandy soil
-the berm may be 20 feet wide. In figure 8, the inside
-slope above the berm is supposed to have silted up to
-a slope of 1 to 1. In cases where it is expected the
-whole inside slope will silt to &sup1;&#8260;&#8322; to 1 the dotted line, to
-give the edge of the bank, can be shifted towards the
-channel so that the berm at the ground level when
-the channel is excavated will be very small for the
-minimum depth of digging. There is no need for the
-inner edge of the bank to run parallel to the canal for
-great distances. Its position can be shifted whenever
-suitable and the width of the berm at ground level
-varied. This prevents the occupation of a needlessly
-great width of land. It used at one time to be not
-unusual to make a bank with a berm on the land side,
-similar to that formed by the spoil in <a href="#Fig8">Fig. 8</a>, but at
-about the level of full supply in the canal. The principle
-is not a good one. Salient angles are liable to be
-worn away. If earth has to be added to a bank to
-strengthen it, the whole can be widened or the rear slope
-flattened. The roadway is shown 18 feet wide, which is
-nearly the maximum. For the drainage of rain water it
-has a transverse slope, away from the canal, of about 1 in
-50. The small raised bank on the canal side is to give
-safety to wheeled vehicles. It is provided on the patrol<span class="pagenum" id="Page55">[55]</span>
-<span class="nowrap">bank<a id="FNanchor13" href="#Footnote13"
-class="fnanchor">[13]</a></span> on main lines and places where there is much
-traffic or where there is plenty of width of bank to spare.
-When the ground level is, for a considerable distance,
-above the proper bank level&mdash;which is at a fixed height
-above the F.S. Level&mdash;so that the road and its side-drain
-have to be cut out, much earthwork can be saved
-by allowing them to be at a higher level and, in the case
-at least of the non-patrol road, giving the road a reduced
-width.</p>
-
-<div class="footnote">
-
-<p id="Footnote13"><a href="#FNanchor13"><span class="label">[13]</span></a>
-A canal has an unmetalled driving road&mdash;called the &#8220;patrol road&#8221;
-or &#8220;inspection road&#8221; on one bank. This road is reserved for the use of
-officials. Otherwise, it would soon be cut up and worn away, and the cost
-of repairs would be excessive. The patrol road should be on that bank which
-is, in the morning (the time when inspections are usually made) in the shade
-of trees planted on the landward side. Trees are not usually planted near
-the water edge as they are sometimes blown down. In Northern India the
-canals generally flow in a southerly direction, so that the left bank is best
-for the patrol bank. On the other bank there is a bridle road which is open
-to the public. Near a rest house&mdash;unless there is a bridge actually at the
-place&mdash;the patrol road should be on the same bank as the rest house. It can
-if necessary cross at the first bridge. Frequently there is also on one or both
-sides of the canal a &#8220;boundary road,&#8221; which is open to the public, along the
-toe of the outer slope. Along a distributary there may be a boundary road
-on one side. It is generally the only road which can take wheeled traffic,
-and in this case it should be reserved for officials unless money is provided to
-keep it always in repair. Officials have to be on tour for weeks or months
-at a time, and in all weathers. Their baggage carts also have to precede and
-follow them. Anything which facilitates their touring about and seeing
-things for themselves is, in India, most desirable. At a watercourse
-crossing the boundary road along a distributary should be taken by a curved
-incline up on to the bank and down again. Thus not only is the cost of a
-culvert saved, but any touring official who is driving obtains a view of the
-channel which he cannot get from the boundary road.</p>
-
-</div><!--footnote-->
-
-<div class="figcenter" id="Fig10">
-<img src="images/illo067.png" alt="Section" width="600" height="74" />
-<p class="caption"><span class="smcap">Fig.</span> 10.</p>
-</div>
-
-<p>In shallow digging, the plan of setting back the banks
-(<a href="#Fig10">Fig. 10</a>) and letting silt deposit as shown by the dotted
-lines, is one which should be followed much oftener than
-it is. It not only gives eventually a very strong bank,
-but it enables the borrow pits, from which the earth for
-the banks is got, to be dug inside the banks. Outside
-borrow pits, besides being a source of expense, owing to
-compensation having to be paid to those in whose land<span class="pagenum" id="Page56">[56]</span>
-they are dug, cause great areas of hollows which are not
-only unsightly, but are often full of stagnant water and
-are thus a fruitful source of mosquitoes and malaria.
-Insufficient attention has hitherto been paid to this
-matter.</p>
-
-<p>In designing each reach of a canal or branch, type
-cross sections should be drawn out for several different
-depths of digging, <i>e.g.</i>, one for very shallow digging, <i>i.e.</i>,
-where the bed is little, if at all, above the ground level,
-one for deep digging where the ground is higher than
-the water level, and one for the &#8220;balancing depth,&#8221;
-where the area of the channel excavation is equal to the
-earth required for the banks. In calculating the earthwork
-the sectional area of the digging or of the embankment
-is taken, whichever is the greater.</p>
-
-<p>The proper width and height of bank for any channel
-depends partly on the maximum depth of water in the
-channel, and partly on the discharge. Given a depth of
-water of say 8 feet, a breach will obviously be more
-disastrous with a great volume of water than with a
-small volume. The following statement gives some
-figures suitable to the rather light and friable soils of
-Northern India, but the question is largely one of
-judgment. Generally a low and rather wide bank is
-preferable to a higher and narrower one. If a road,
-with or without the small raised bank next the canal, is
-required, special widths can, of course, be arranged for.
-A 14-foot bank is required for a driving road.</p>
-
-<p><span class="pagenum" id="Page57">[57]</span></p>
-
-<table class="dimensions" summary="Dimensions">
-
-<tr class="bt2 bb2">
-<th class="br">Top Width<br />of Bank.</th>
-<th colspan="2" class="br">Height<br />of Bank<br />above F. S.</th>
-<th class="br">Greatest<br />Admissible<br />Discharge.</th>
-<th colspan="2">Greatest<br />Admissible<br />Depth<br />of Water.</th>
-</tr>
-
-<tr>
-<th class="br">Feet.</th>
-<th colspan="2" class="br">Feet.</th>
-<th class="br">C. ft.<br />per sec.</th>
-<th colspan="2">Feet.</th>
-</tr>
-
-<tr>
-<td class="width">20</td>
-<td class="int">2</td>
-<td class="frac br">&nbsp;</td>
-<td class="discharge">12,000</td>
-<td class="int">12</td>
-<td class="frac">&nbsp;</td>
-</tr>
-
-<tr>
-<td class="width">18</td>
-<td class="int">2</td>
-<td class="frac br">&nbsp;</td>
-<td class="discharge">8,000</td>
-<td class="int">12</td>
-<td class="frac">&nbsp;</td>
-</tr>
-
-<tr>
-<td class="width">16</td>
-<td class="int">2</td>
-<td class="frac br">&nbsp;</td>
-<td class="discharge">5,000</td>
-<td class="int">11</td>
-<td class="frac">&nbsp;</td>
-</tr>
-
-<tr>
-<td class="width">14</td>
-<td class="int">2</td>
-<td class="frac br">&nbsp;</td>
-<td class="discharge">3,000</td>
-<td class="int">10</td>
-<td class="frac">&nbsp;</td>
-</tr>
-
-<tr>
-<td class="width">16</td>
-<td class="int">1</td>
-<td class="frac br">&middot;5</td>
-<td class="discharge">2,000</td>
-<td class="int">9</td>
-<td class="frac">&nbsp;</td>
-</tr>
-
-<tr>
-<td class="width">14</td>
-<td class="int">1</td>
-<td class="frac br">&middot;5</td>
-<td class="discharge">1,500</td>
-<td class="int">9</td>
-<td class="frac">&nbsp;</td>
-</tr>
-
-<tr>
-<td class="width">12</td>
-<td class="int">1</td>
-<td class="frac br">&middot;5</td>
-<td class="discharge">1,200</td>
-<td class="int">8</td>
-<td class="frac">&nbsp;</td>
-</tr>
-
-<tr>
-<td class="width">10</td>
-<td class="int">1</td>
-<td class="frac br">&middot;5</td>
-<td class="discharge">1,000</td>
-<td class="int">7</td>
-<td class="frac">&nbsp;</td>
-</tr>
-
-<tr>
-<td class="width">9</td>
-<td class="int">1</td>
-<td class="frac br">&middot;5</td>
-<td class="discharge">700</td>
-<td class="int">6</td>
-<td class="frac">&nbsp;</td>
-</tr>
-
-<tr>
-<td class="width">8</td>
-<td class="int">1</td>
-<td class="frac br">&middot;5</td>
-<td class="discharge">500</td>
-<td class="int">5</td>
-<td class="frac">&middot;5</td>
-</tr>
-
-<tr>
-<td class="width">7</td>
-<td class="int">1</td>
-<td class="frac br">&middot;5</td>
-<td class="discharge">400</td>
-<td class="int">5</td>
-<td class="frac">&nbsp;</td>
-</tr>
-
-<tr>
-<td class="width">6</td>
-<td class="int">1</td>
-<td class="frac br">&nbsp;</td>
-<td class="discharge">300</td>
-<td class="int">4</td>
-<td class="frac">&middot;5</td>
-</tr>
-
-<tr>
-<td class="width">5</td>
-<td class="int">1</td>
-<td class="frac br">&nbsp;</td>
-<td class="discharge">200</td>
-<td class="int">4</td>
-<td class="frac">&nbsp;</td>
-</tr>
-
-<tr>
-<td class="width">4</td>
-<td class="int">1</td>
-<td class="frac br">&nbsp;</td>
-<td class="discharge">100</td>
-<td class="int">3</td>
-<td class="frac">&middot;5</td>
-</tr>
-
-<tr class="bb2">
-<td class="width">3</td>
-<td class="int">1</td>
-<td class="frac br">&nbsp;</td>
-<td class="discharge">50</td>
-<td class="int">3</td>
-<td class="frac">&nbsp;</td>
-</tr>
-
-</table>
-
-<p>The spoil in <a href="#Fig8">Fig. 8</a> is shown at a different level from
-the bank proper, as it should be to give a neat straight
-edge to the bank. The width of the spoil may vary
-every chain. In <a href="#Fig9">Fig. 9</a> the spoil is raised to avoid
-taking up too much land. The spoil presents the best
-appearance when its height is kept uniform for as long
-a length as possible, the width varying according to
-necessity, When the height has to be altered, the
-change should be made by means of a short ramp.
-When the spoil is higher than the road, gaps in it are
-left at intervals so that rain water can pass away.
-When the spoil is heavy for a very short length it can,
-in order to avoid a short and unsightly heap, which
-would result from the adoption of the section shown in
-<a href="#Fig9">Fig. 9</a>, be placed as in
-<a href="#Fig8">Fig. 8</a>, some of it being led askew.</p>
-
-<p><span class="pagenum" id="Page58">[58]</span></p>
-
-<p>The small channel shown outside the bank in <a href="#Fig8">Fig. 8</a>
-is a watercourse for enabling trees to be grown. It has,
-of course, to be graded, and it may be in cutting or in
-embankment. If any silt clearances of the canal are
-likely to be necessary, the watercourse must be set back
-to allow room for the spoil. Such spoil, if sandy, is to
-a large extent washed down or blown away and does
-not accumulate to anything like the extent that would
-be <span class="nowrap">expected.<a id="FNanchor14" href="#Footnote14"
-class="fnanchor">[14]</a></span> Moreover the spoil can extend onto the
-watercourse when the trees have grown big, and no
-longer need watering. Outside the watercourse is
-shown the boundary road and the land boundary pillar.
-The small channel in <a href="#Fig9">Fig. 9</a> is a drain for rain water.
-It can be used as a plantation watercourse if the water
-is lifted.</p>
-
-<div class="footnote">
-
-<p id="Footnote14"><a href="#FNanchor14"><span class="label">[14]</span></a>
-This fact has been quoted (<i>The Pioneer Mail</i>, &#8220;Silt,&#8221; 8th March,
-1913) as showing that the silt supposed to be cleared is not really cleared.
-This may be the case to some extent, but shortage of spoil is little proof of it.</p>
-
-</div><!--footnote-->
-
-<p>Where there is no spoil, some extra land, perhaps
-20 feet on either bank, is usually taken up for getting
-earth from for repairs.</p>
-
-<h3 class="inline">7. <b>Trial Lines.</b></h3>
-
-<p class="inlineh">&mdash;The proposed lines of channel, determined
-as explained in Art. 5 should next be laid down
-on the ground. A line should consist of a number of
-straight portions. The curves should not be put in.
-Trial pits should be dug at intervals. Some defects in
-the line may at once become apparent because the contour
-map, owing chiefly to the lines of levels having been
-taken a considerable distance apart, is not perfect. A
-line may pass through a patch of very high or very low
-ground or too near to some building or other object
-with which it is desirable not to interfere. Alteration<span class="pagenum" id="Page59">[59]</span>
-may be desirable at a drainage crossing or at the off-take
-of a branch. The lines should be corrected where
-necessary. Sometimes the corrections may be very considerable.
-Allowance can be made for the alterations
-which will occur when the curves are laid out. Where
-there is doubt as to which line is the best, trial pits may
-be dug to obtain further information regarding the soil.</p>
-
-<p>The line should now be levelled, careful checks being
-made, a longitudinal section of it prepared and the proposed
-bed, bank and F.S. level shown. The ground
-levels ascertained by levelling the line, are certain to disagree,
-to some extent, with the contour lines. The
-latter were got only by inference from the levels of
-points in the survey lines, and they should be corrected
-in accordance with the fresh levels now available. If
-the line does not seem to be the best that can be got, a
-fresh line can be marked on the plan and the above
-procedure repeated.</p>
-
-<h3 class="inline">8. <b>Final Line and Estimate.</b></h3>
-
-<p class="inlineh">&mdash;As soon as the best line
-seems to have been found, a large scale plan of the
-country along its course should be made by taking bearings
-or off-sets from points in it to the various objects
-and noting where the line cuts them. On this plan will be
-shown the exact alignment, the curves being put in and
-the straight portions slightly shifted where necessary
-so that the line may pass at a proper distance from any
-buildings or other objects. But before this procedure is
-carried out, or while it is being carried out, the
-estimate for the work can be prepared from the longitudinal
-section already taken. Such a section is of
-course amply sufficient for a &#8220;project estimate,&#8221; in
-which only approximate figures are given, and it is quite<span class="pagenum" id="Page60">[60]</span>
-near enough for any estimate. In the case of small
-works which have often to be executed with great
-promptitude, lamentable delays have occurred owing to
-the engineer deferring the preparation of his estimate
-till he had got the line exactly fixed. Moreover there
-is a chance of the labour being thrown away in case the
-sanctioning authority directs any change in the alignment
-to be made.</p>
-
-<p>In the case of a large scheme, a project estimate is
-prepared. In this the earthwork and the area of land
-to be occupied are calculated pretty accurately. Designs
-and estimates are also prepared for the headworks and
-for the chief regulators. For works of which there are
-to be many of one type&mdash;bridges, falls, distributary
-heads and small drainage syphons&mdash;the cost is arrived
-at from lump sum figures, one drawing of each kind
-being submitted as a type. The distributaries are
-approximately estimated at mileage rates. In the case
-of a small scheme everything is estimated in detail
-except perhaps the distributaries or some of them.</p>
-
-<div class="photograph w600">
-
-<img src="images/illo074.jpg" alt="" width="600" height="336" />
-<p class="caption">CANAL WITH BRIDGE AND DISTRIBUTARY HEAD.</p>
-<hr class="capt" />
-<p class="caption">The Head has Gates and Winches.</p>
-<p class="imagelocation"><i>To face p. 61.</i></p>
-
-</div><!--photograph-->
-
-<h3 class="inline" id="Ref4">9. <b>Design of a Distributary.</b></h3>
-
-<p class="inlineh">&mdash;A distributary is a
-canal in miniature and, like a canal, it may have
-branches. It has masonry bridges, falls and drainage
-syphons. It has, as already mentioned, a masonry
-regulator at its head. At the off-take of any branch or
-distributary there is a regulator in the head of the
-branch. If the branch takes off a large proportion of
-the water there is a double regulator. A distributary
-gives off watercourses as a canal gives off distributaries.
-The watercourses belong to the people and not to
-Government and they are cleared and maintained by
-the people. Each watercourse has a masonry head<span class="pagenum" id="Page61">[61]</span>
-known as an &#8220;outlet&#8221; (<a href="#Fig11">Fig. 11</a>). The outlet is the
-point where the water passes from the hands of Government
-officials to those of the cultivators. The outlet
-is of masonry and its opening is not adjustable but is
-fixed in such a way that its discharge, when the distributary
-is full, bears, as nearly as can be arranged, the
-same ratio to the F.S. discharge of the distributary as
-the area intended to be irrigated by the watercourse
-bears to that intended to be irrigated by the distributary.</p>
-
-<div class="figcenter" id="Fig11">
-<img src="images/illo075.png" alt="Outlet" width="450" height="421" />
-<p class="caption"><span class="smcap">Fig.</span> 11.</p>
-</div>
-
-<p>The floor of the outlet is level with the bed of the
-distributary. It thus draws off rolling sand which
-might otherwise accumulate in the distributary. Small
-outlets are made of earthenware pipes, about &middot;4 feet in
-diameter, laid in concrete. Two pipes, or three, may
-be laid side by side. If more than three would be required,
-a masonry opening is adopted. The discharge
-through an outlet, is generally 2 to 5 c. feet per
-second per square foot of outlet area, and the head &middot;1
-to &middot;5 feet.</p>
-
-<p>For the tract of country allotted to any distributary,
-a contour map is prepared on a fairly large scale, say 4<span class="pagenum" id="Page62">[62]</span>
-inches to a mile. On the map the line is laid down
-and a rough longitudinal section, showing the ground
-level, is prepared as in the case of a canal.</p>
-
-<p>It has already been stated (<a href="#Ref11">Art. 4</a>) that a distributary
-is so designed that its water level, when three-fourths
-of the full supply is run, shall be well above the level
-of most of the ground along its course. In other words
-it should have a good command. A good rule is to
-allow a fall of &middot;5 feet from the level of the water in the
-distributary to that in the watercourse, a slope of 1 in
-4,000 for the water flowing along the watercourse, and
-a fall of &middot;3 feet for the water at the tail of the watercourse
-to the level of the ground. This last level is,
-like the other ground levels, taken from the contour
-map. This procedure, in short, consists in making the
-water level of the watercourse at its head govern that
-of the distributary, just as the water level in the distributary
-at its head was made to govern that in the
-canal.</p>
-
-<p>The enlarged contour map of the distributary area
-shows, among other things, the boundaries of the lands
-belonging to each village. Generally a watercourse
-supplies water to only one village. When, however, a
-village is far from the distributary, its watercourse has
-to pass for a long distance through other villages and
-it would be wasteful of water to have two separate
-watercourses. In such cases one watercourse may serve
-two villages or more. When a village is near to the
-distributary and its land extends for a long distance
-parallel to the distributary, it may have several watercourses
-for itself alone. A watercourse can generally
-be most conveniently dug along the boundary line of
-two villages, or there may be some other line which the
-people particularly <span class="nowrap">desire.<a id="FNanchor15"
-href="#Footnote15" class="fnanchor">[15]</a></span> Subject to, or modified by,
-these considerations a watercourse is designed to run on
-high ground like a distributary.</p>
-
-<div class="footnote">
-
-<p id="Footnote15"><a href="#FNanchor15"><span class="label">[15]</span></a>
-They also frequently wish the &#8220;chak&#8221;&mdash;the area irrigated by a watercourse&mdash;so
-arranged that two men who are &#8220;enemies&#8221; shall not be included in
-the same &#8220;chak.&#8221; This condition can be complied with only up to a certain
-point. Arrangements may be modified but not in such a way as to upset the
-proper rules.</p>
-
-</div><!--footnote-->
-
-<div class="photograph w450">
-
-<div class="figcenter">
-<img src="images/illo078.png" alt="" width="400" height="539" />
-<p class="caption"><span class="smcap">Contour Map (part) and Line of Distributary.</span></p>
-</div>
-
-<p class="fsize80">The scale is 1 inch to 2 miles. The contour lines at 1 foot intervals
-are shown dotted, the roads by double lines. The line of the distributary,
-in order to follow the ridge of the country, would have
-gone more to the left of the plan near the village. The shifting of
-the line to the right brings it nearer to the centre of the irrigated
-tract&mdash;supposed to be the whole area shown&mdash;and enables a single
-bridge to be built at the bifurcation of the two roads. Suitable lines
-for main watercourses are shown in thin firm lines. It is assumed
-that the command is sufficient to enable the watercourses to run off
-at the considerable angles shown.</p>
-
-<p class="imagelocation blankbefore2"><i>To face page 63</i></p>
-
-</div><!--photograph-->
-
-<p><span class="pagenum" id="Page63">[63]</span></p>
-
-<p>The great object is to reduce the total length of
-channels, <i>i.e.</i>, minors and watercourses. No watercourse
-can be allowed to run alongside of or near to
-another. It may run alongside a canal or distributary
-when really necessary to gain command but not otherwise.
-The longer the watercourse the larger the chak.
-The discharge of an outlet may be anything up to 4 or
-5 c. feet per second. This limits the size of a chak. If
-a chak is too big it can be split up or a minor can be
-designed. Very small chaks are to be avoided, but it
-is difficult to fix a minimum size. The irrigation
-boundary of the distributary, as fixed in the project, is
-shown on the map but in practice it will not be exactly
-followed. For various reasons the boundaries of a
-chak may run somewhat outside it or stop short of it.</p>
-
-<p>Where a distributary gives off a minor and there is a
-double regulator, watercourses should, as far as possible,
-be taken off from one or other of the branch channels
-and not from upstream of the double regulator. Otherwise,
-irregularities are likely to occur, both of the
-regulators being partially closed at the same time&mdash;a
-thing which is never necessary in legitimate distribution
-of the supply&mdash;in order to head up the water and
-increase the discharges of the outlets.</p>
-
-<p><span class="pagenum" id="Page64">[64]</span></p>
-
-<p>A watercourse nearly always gives off branches and
-generally a system of turns is arranged by the farmers
-among themselves, each branch in turn taking the whole
-discharge of the watercourse for a day or part of a day,
-the other branches being closed by small dams of earth.
-To irrigate a field alongside the watercourse a gap is cut
-in its bank. For fields further away, smaller channels
-run off from the watercourses at numerous points.
-Several gaps and several field channels may be in flow
-at one time, and there is a dam in the watercourse below
-the lowest one.</p>
-
-<p>Occasionally, on an old canal, one watercourse crosses
-another, the lands irrigated being at different levels, but
-such crossings do not often occur in systems of watercourses
-laid out according to modern methods. They
-are, however, quite legitimate.</p>
-
-<p>The lines of the main watercourses are sketched on
-the map, their irrigation boundaries shown on it, and
-F.S. discharges allotted to them according to the areas
-which are to be dependent on them. In order that this
-may conveniently be done the &#8220;full supply duty&#8221; or
-&#8220;full supply factor&#8221; for the distributary is obtained. It
-bears the same ratio to the ordinary duty that the mean
-supply bears to the full supply. The total of the F.S.
-discharges of all the watercourses should, with an allowance
-for loss by absorption in the distributary, be the
-same as the F.S. discharge of the distributary. If the
-results are very discrepant it shows that the sizes of the
-outlets need revision. Possibly they may all be too
-large.</p>
-
-<p>In &#8220;colonization&#8221; schemes where a canal is constructed
-to irrigate waste lands&mdash;which are the property<span class="pagenum" id="Page65">[65]</span>
-of Government and which are divided into square blocks
-and given out to colonists&mdash;Government has complete
-control of the watercourse system, and can arrange it
-exactly as desired, but in other cases landowners often
-strenuously oppose the passage of watercourses through
-their lands. Compulsory procedure according to legal
-methods is tedious, but the practical rule is not to let
-anyone have water until any watercourses which are to
-pass through his land have been not only agreed to but
-constructed.</p>
-
-<p>In ordinary cases Government possesses no power as
-to the precise line on which a watercourse is dug. It
-fixes the site of the outlet and assigns certain land to it,
-and sketches out the line of the watercourse. If the
-people choose to alter the line they can do so, but great
-alterations in the main watercourses are not generally
-feasible.</p>
-
-<p>The positions of the <span class="nowrap">outlets<a id="FNanchor16"
-href="#Footnote16" class="fnanchor">[16]</a></span> having been settled after
-discussion with the cultivators, a table is prepared
-showing the chainage of the outlets, the probable head
-or difference between the F.S. level of the distributary
-and of the watercourse, and the F.S. discharge. From
-this the sizes of the outlets are calculated and shown in
-another column. If the length of the outlet barrel is not
-more than 5 or 6 times the diameter&mdash;in the case of a
-barrel whose cross section is not round or square, the
-mean diameter&mdash;the discharge can be calculated as for
-a &#8220;short tube,&#8221; but if longer the formula for flow in pipes
-should be used, allowance being, of course, made for the
-head lost at the entrance. The outlets generally consist
-at first of wooden &#8220;shoots&#8221; or long tubes, rectangular in
-cross section. This is because, after they have been tested<span class="pagenum" id="Page66">[66]</span>
-by a year or two years&#8217; working, the sizes nearly always
-require adjustment and the cultivators often wish to
-have the site shifted.</p>
-
-<div class="footnote">
-
-<p id="Footnote16"><a href="#FNanchor16"><span class="label">[16]</span></a>
-The positions can be slightly altered by the Engineers for any
-sufficient reason.</p>
-
-</div><!--footnote-->
-
-<div class="figcenter" id="Fig11a">
-<img src="images/illo082.png" alt="Cistern" width="450" height="97" />
-<p class="caption"><span class="smcap">Fig.</span> 11.</p>
-</div>
-
-<p>The uncertainty as to the proper size of an outlet is
-due to several causes. If the command is very good
-there may be a clear fall from the outlet into the
-watercourse. In this case the discharge depends only
-on the depth of water in the distributary, and is known
-pretty accurately. But ordinarily the outlet is submerged,
-and its discharge depends on the difference
-between the water levels in the distributary and in the
-watercourse. The latter level is not fixed. The cultivators
-can lower it, to an extent which depends chiefly
-on the distance of the fields from the distributary, by
-deepening or widening the watercourse. In this way
-the discharge of the watercourse is increased except
-when a dam is temporarily made in it for the purpose of
-irrigating any comparatively high land. This uncertainty
-as to the discharge can in some cases be got over by
-building a cistern (<a href="#Fig11a">Fig. 11</a>). This has the same effect
-as raising the level of the barrel, the real outlet being
-no longer submerged, and the discharge depending on
-the depth of the crest of the overfall below the water in
-the distributary. But such cisterns add greatly to the
-cost of an outlet, and they can only be adopted when
-there is good command. A great cause of uncertainty
-as to the proper size of an outlet is the variability of the
-duty of the water on the watercourse. The soil may be
-clayey or sandy, the watercourse may be short or long,
-the crops grown may be ordinary ones or may be chiefly<span class="pagenum" id="Page67">[67]</span>
-rice, which requires three or four times as much water
-as most other crops, and the cultivators may be careful
-or the opposite. Again, the people may, if the outlet
-gives a plentiful supply, often keep it closed, but there
-is no record of such closures nor would the people admit
-that they occur. These causes may all operate in one
-direction&mdash;on a whole distributary this cannot happen
-to the same extent&mdash;and thus enormous differences in
-duty may occur. There is no way of arriving at the
-proper size for an outlet except trial. Observations of
-the discharges of the outlets are of very limited use. The
-discharge may vary according to the particular fields
-being irrigated. Observations of discharges will be
-useful in cases where the people complain, or when the
-discharge is obviously much greater or much less than
-intended and will in such cases enable temporary
-adjustments to be made, but by placing a dam in a
-watercourse and turning the water on to a high field
-near its head the people can make it appear that the
-discharge is only a fraction of what it should be.</p>
-
-<p>On any distributary there are generally some watercourses
-which have a poor command, the head at the
-outlet being, say, &middot;1 ft. or even less. Probably the
-irrigation is a good deal less than it should be. In
-such cases the rules may be set aside and a liberal size
-of outlet given. The size may be 2 or 3 times the
-calculated size. There is no harm in this. The irrigation
-cannot increase much. Similar cases frequently
-occur on inundation canals especially near the heads of
-canals or distributaries.</p>
-
-<p>The construction of masonry outlets on a distributary
-is not usually a final settlement of the matter. Further
-adjustments become necessary. This matter will be
-dealt with in <a href="#Page96"><span class="smcap">Chapter</span> III</a>.</p>
-
-<p><span class="pagenum" id="Page68">[68]</span></p>
-
-<p>On the older canals little or insufficient attention
-was given to the question of the sizes of outlets. The
-sizes were far too great and, as long as all the outlets
-in a distributary remained open, water could not reach
-the tail. The distributary used to be divided into two
-or three reaches and the outlets in the upstream reaches
-used to be closed periodically. The closures had to be
-effected through the agency of native subordinates and
-the system gave rise to corruption on a colossal scale.
-The tail villages never obtained anything like their
-proper share of water. The upper villages were over-watered
-and the soil was often water-logged and
-damaged. Moreover, even if all concerned had the
-best intentions, it was impossible to stop all leakage in
-the closed outlets, except by making earthen dams in
-the watercourses, and great waste of water resulted
-from this.</p>
-
-<p>The water level of the distributary with &sup3;&#8260;&#8324; full supply,
-designed so as to be at least &middot;5 ft. above the water level
-in the watercourse heads&mdash;or to be 1 foot above high
-ground if this simpler plan is adopted&mdash;is drawn on the
-rough longitudinal section and also the line of F.S.,
-falls being introduced where desirable and the gradients,
-F.S. depths of water and widths of channels being
-arranged, just as in the case of a canal, so as to give
-the required discharges, velocities suited to the soil and
-a suitable ratio of depth to velocity. The bed width of
-a distributary decreases in whole numbers of feet. The
-decrease occurs at outlets but not at every outlet. As
-the channel becomes smaller its velocity becomes less
-and this necessitates, according to the laws of silting
-and scour, a reduced depth of water. The height and
-width of the banks in the tail portion of a distributary<span class="pagenum" id="Page69">[69]</span>
-should be made rather greater than elsewhere&mdash;regard
-being had to the depth and volume of the water&mdash;so
-that breaches may not occur when the demand abruptly
-slackens. The longitudinal section of a distributary
-should have horizontal lines for showing the following:</p>
-
-<table class="horlines" summary="Horizontal lines">
-
-<tr>
-<td class="no">1.</td>
-<td class="descr br">Datum</td>
-<td class="no">5.</td>
-<td class="descr br">Draw-off</td>
-<td class="no">9.</td>
-<td class="descr br">Bank width</td>
-<td class="no">13.</td>
-<td class="descr">Depth of digging</td>
-</tr>
-
-<tr>
-<td class="no">2.</td>
-<td class="descr br">Bed gradient</td>
-<td class="no">6.</td>
-<td class="descr br">F.S. discharge</td>
-<td class="no">10.</td>
-<td class="descr br">Height of bank</td>
-<td class="no">14.</td>
-<td class="descr">Bed level</td>
-</tr>
-
-<tr>
-<td class="no">3.</td>
-<td class="descr br">Village</td>
-<td class="no">7.</td>
-<td class="descr br">Velocity</td>
-<td class="no">11.</td>
-<td class="descr br">F.S. depth</td>
-<td class="no">15.</td>
-<td class="descr">Ground level<a id="FNanchor17" href="#Footnote17" class="fnanchor">[17]</a></td>
-</tr>
-
-<tr>
-<td class="no">4.</td>
-<td class="descr br">Land width</td>
-<td class="no">8.</td>
-<td class="descr br">V&#8320;</td>
-<td class="no">12.</td>
-<td class="descr br">Bed width</td>
-<td class="no">16.</td>
-<td class="descr">Chainage<a id="FNanchor18" href="#Footnote18" class="fnanchor">[18]</a></td>
-</tr>
-
-</table>
-
-<div class="footnote">
-
-<p id="Footnote17"><a href="#FNanchor17"><span class="label">[17]</span></a> Called &#8220;Natural Surface&#8221; in India.</p>
-
-<p id="Footnote18"><a href="#FNanchor18"><span class="label">[18]</span></a> Called &#8220;Reduced Distance&#8221; in India.</p>
-
-</div><!--footnote-->
-
-<p>A specimen of a longitudinal section is shown in
-<a href="#Fig12">Fig. 12</a>. It shows only a few of the above items. In
-practice all would be shown, large sheets of paper being
-used with all the lines and titles printed on them.</p>
-
-<p>When a distributary is constructed the side slopes
-are made 1 to 1 in excavation and 1&sup1;&#8260;&#8322; to 1 in embankment.
-The sides usually silt up till they are &sup1;&#8260;&#8322; to 1 or
-even vertical. The silting up to &sup1;&#8260;&#8322; to 1 is, as in the
-case of a canal, allowed for in the designing. The
-berms are left so that, if any part of the side falls in,
-the bank will not also fall in. They also allow of
-widening of the channel. The remarks made in Art. 6
-regarding the design of banks, apply to distributaries,
-especially large ones.</p>
-
-<p>On a distributary there is seldom much spoil. Where
-there is no spoil, a strip of land, outside the bank and
-10 feet wide, can be taken up on either bank from
-which to obtain earth for repairs. On a minor the
-width of the strip is sometimes only 5 feet.</p>
-
-<p><span class="pagenum" id="Page70">[70]</span></p>
-
-<div class="figcenter w600" id="Fig12">
-<img src="images/illo086.png" alt="Longitudinal section" width="600" height="388" />
-<p class="caption"><span class="smcap">Fig.</span> 12.</p>
-</div>
-
-<p class="largeillo"><a href="images/illo086lg.png">Larger illustration</a> (82 kB)</p>
-
-<p>When a distributary passes through land which is
-irrigated from wells, it frequently cuts through the
-small watercourses which run from the well to the<span class="pagenum" id="Page71">[71]</span>
-fields. In such cases, either a syphon or a supplementary
-well is provided at Government cost. If several
-watercourses, all from the same well, are cut through, it
-is generally possible to combine them for the purpose of
-the crossing. The wishes of the cultivators in this
-matter are met as far as possible.</p>
-
-<p>The procedure as regards laying out the line on the
-ground, digging trial pits, correcting the line and preparing
-the estimate are the same as for the case of a
-canal.</p>
-
-<div class="figcenter" id="Fig13">
-<img src="images/illo087.png" alt="Distributary" width="450" height="310" />
-<p class="caption"><span class="smcap">Fig.</span> 13.</p>
-</div>
-
-<h3 class="inline" id="Ref1">10. <b>Best System of Distributaries.</b></h3>
-
-<p class="inlineh">&mdash;Let AB (<a href="#Fig13">Fig. 13</a>)
-represent a portion of a distributary, the irrigation boundary
-CD being two miles from AB. In order to irrigate
-a rectangular plot ACDB, the main and branch watercourses
-would be arranged somewhat as shown by the
-full and dotted lines respectively. Generally, the whole
-supply of the main watercourse would be sent in turn
-down each branch, the other branches being then dry.
-The average length open is AGE. The ends of the
-branches lie on a line drawn say 200 feet from the lines
-BD and DC, since it is not necessary for the watercourses
-to extend to the outside edges of the fields.
-Within the field there are small field watercourses which<span class="pagenum" id="Page72">[72]</span>
-extend to every part of it. By describing three rectangles
-on AC, making AB greater than, equal to and
-less than AC, it can be seen that the average length of
-watercourse open is least&mdash;relatively to the area of
-the block&mdash;when AB is equal to AC, i.e., when
-the block served by the watercourse is square as in
-the figure. If AB is 4 times AC, the average length
-of watercourse open is increased&mdash;relatively to the area
-of the block&mdash;in about the ratio of 3 to 2. Moderate
-deviations from a square are of little consequence.</p>
-
-<p>Suppose two parallel distributaries to be 4 miles
-apart, each of them being an average Indian one, say
-sixteen miles long with a gradient of one in 4,000, and
-side slopes of &sup1;&#8260;&#8322; to 1, the bed width and depth of water
-at the head being respectively 13&middot;5 feet and 2&middot;9 feet, and
-at the tail 3 feet and 1 foot. The discharge of the
-distributary, with N = &middot;0225, will be 72 c. ft. per second.
-The discharge available for the 2 mile strip along one
-bank will be 36 c. ft. per second. If the duty is 300
-acres per c. ft. the area irrigated in this strip will be
-10,800 acres, or 1,350 acres for each of the eight squares
-like ACDB. Each main watercourse would then have
-to discharge 4&middot;5 c. ft. per second. Supposing its gradient
-to be 1 in 4,000 and its side slopes &sup1;&#8260;&#8322; to 1 and N to be
-&middot;0225, its bed width would be 3 feet and depth of water
-1&middot;45 feet. Its wet border would be 6&middot;3 feet, and its
-average length 5280&#8730;2 + 5280 - 200 or 12,546 feet. Its
-wetted area would be 79,040 square feet, and the total
-wetted area of the 16 watercourses&mdash;on the two sides of
-the distributary&mdash;would be 1,264,640 square feet. The
-wetted border of the distributary itself is 19&middot;5 feet at
-the head and 5 feet at the tail, average 12&middot;25 feet, and
-its wetted area is 5,280 &times; 16 &times; 12&middot;25 or 1,034,880 square
-feet.</p>
-
-<p><span class="pagenum" id="Page73">[73]</span></p>
-
-<p>If the distributaries were two miles apart, there would
-be twice the number of distributaries, and each square
-would be one square mile instead of four. Each watercourse
-would have to discharge 1&middot;125 c. ft. per second.
-It would have a bed width of 2 ft., depth of water &middot;8 ft.,
-wet border 3&middot;8 feet, length 6,173 feet, and wetted area
-23,457 feet. The total wetted area of the 64 water
-courses would be 1,501,248 square feet, or 18 per cent.
-more than before. Each distributary would discharge
-36 c. ft. per second, the bed width and depth at the
-head being 10 feet and 2&middot;24 feet, and at the tail 2 feet
-and &middot;75 feet. The wet border at the head and tail would
-be 14&middot;5 and 3&middot;5 feet, mean 9 feet, and the wetted area of
-the two distributaries would be 1,520,640 square feet or
-50 per cent. more than before. Supposing that, in the
-case of the larger distributary considered above, the
-2-mile square was considered too large, and that rectangles
-1 mile wide were adopted, so that the watercourses
-were a mile apart, their number would be doubled
-and their length and size reduced. Their total wetted
-area would not be greatly affected, but the difference in
-the wetted areas of the two small distributaries as compared
-with the one large one, would be the same as
-before. In practice, of course, distributaries are not
-always parallel, nor are the blocks of irrigation all
-squares, and frequently, owing to peculiarities in the
-levels of the ground or the features of the country, or
-the boundaries of villages, it is necessary to align the
-watercourses in a particular manner, or to construct
-more than one watercourse where one would otherwise
-have sufficed, but the above calculations show in a
-general way the advantages of large watercourses and of
-not placing the distributaries too near together.</p>
-
-<p><span class="pagenum" id="Page74">[74]</span></p>
-
-<p>It is commonly said that a watercourse discharging
-more than 4 or 5 c. ft. per second is objectionable
-because the cultivators, if there are too many of them
-on one watercourse, cannot organize themselves in order
-to work it and keep it in order. This matter is much
-exaggerated. On the inundation canals of the Punjab
-a watercourse often discharges 10 c. ft. per second, and
-is several miles long and requires heavy clearances, but
-the people have no particular difficulty in managing it.
-Kennedy, a great authority on questions of irrigation,
-states that the length of a watercourse may be three
-miles. This, if the angle made by a watercourse with
-the distributary is 45&deg;, gives rather more than two miles
-as the width of the strip to be irrigated.</p>
-
-<p>Suppose that a distributary instead of being two miles
-from each side of the irrigated strip, ran along one side
-of it, and was four miles from the other side. If the
-block were square, as before, the side of a square would
-be 4 miles, and each watercourse would have to discharge
-18 c. ft. per second, which is far too much. The blocks
-would have to be rectangles, each being only one mile
-wide measured parallel to the distributary. It has been
-already seen that the length of watercourse in this case
-is greater than when the block is square and each side
-is two miles. Thus centrality in the alignment of the
-distributary is an advantage.</p>
-
-<p>A minor distributary has been defined (<a href="#Ref2"><span class="smcap">Chapter</span> II.,
-Art. 3</a>) as being one discharging not more than 40 c. ft.
-per second, but the term has come to be used to designate
-a branch of a major distributary, and in that sense
-it will be used in this article. When the shape of the
-area commanded by a distributary is such that watercourses<span class="pagenum" id="Page75">[75]</span>
-exceeding 2 miles in length would otherwise be
-required, one or more minors are often added. Frequently
-it is a question whether to let some of the
-watercourses be more than two miles long, or to
-construct a minor and thus shorten the watercourses to
-perhaps only one mile. Which method is best has not
-been definitely settled. It is known that the loss of
-water in watercourses is heavy, but if a minor is added
-the loss in it has to be considered. The loss must be
-high in any channel in which the ratio of wet border to
-sectional area is small. The minor also costs money in
-construction and in maintenance. On the whole the
-matter, as far as concerns cost and loss of water, is,
-perhaps, almost evenly balanced, but as regards distribution
-of the supply a system without minors is preferable.
-The off-take of a minor is generally far from the
-canal, i.e., in a more or less out-of-the-way place, and it
-is impossible to see that the regulation is properly carried
-out. Irregularities and corruption are sure to arise.
-Even if the supply is fairly distributed as between the
-minor and the distributary it is almost certain that the
-regulator, if a double one, will be manipulated for the
-illegal benefit of outlets in the distributary upstream of
-the bifurcation. There are sure to be some such outlets
-not very far distant. In any case each minor adds one,
-if not two, to the already very large number of gauges
-which have to be entered daily in the sub-divisional
-officer&#8217;s register (<a href="#Ref12"><span class="smcap">Chapter</span> III., Art. 3</a>), and adds
-also to the mileage of channel to be inspected and maintained.
-These considerations should, in many cases,
-though of course not in all, turn the scale against the
-construction of a minor. At one time it became usual
-to construct minors even when watercourses more than<span class="pagenum" id="Page76">[76]</span>
-two miles long would not otherwise have resulted. This
-custom was condemned some years ago, and is not
-likely to be re-established. Most of the difficulties just
-mentioned can, in the case of a minor which is not too
-large, either absolutely or relatively to the main distributary
-downstream of the off-take, be got over by making
-the minor head like a watercourse outlet, building it up
-to the proper size, removing the regulating apparatus
-and abolishing the reading of the gauge, but in this case
-the minor is not likely to be bigger than a large watercourse.
-Such minors should not be constructed, and
-any existing ones should, after the head has been treated
-as above, be made over to the people and considered as
-watercourses.</p>
-
-<h3 class="inline">11. <b>Outlets.</b></h3>
-
-<p class="inlineh">&mdash;The top of the head and tail walls of
-an outlet are level with the F.S. levels in the distributary
-and watercourse respectively. The steps in the
-head wall enable the cultivators to go down either to
-stop up the outlet or to remove any obstruction. The
-stepping is arranged so as to fall inside the side slope
-ultimately proposed. It is usual, in some places, to
-have the entrance to the &#8220;barrel&#8221; of the outlet made
-of cast iron. The cast iron pieces are made of various
-standard sizes. This to some extent prevents the
-&#8220;barrel&#8221; being built to a wrong size. A discrepancy
-between the size of the masonry barrel and that of the
-iron would be noticed, but if the masonry barrel is built
-too large the iron head does not always restrict the discharge.
-The action is the same as in a &#8220;diverging
-tube&#8221; well known in hydraulics.</p>
-
-<p>For sizes up to about 50 or 60 square inches the
-barrel should be nearly square. For larger sizes the<span class="pagenum" id="Page77">[77]</span>
-height should exceed the width. Up to about 100 or
-120 square inches the width can be kept down to 7 or 8
-inches so that an ordinary brick can be laid across to
-form the roof. For larger outlets the height can be
-from 1&middot;5 to 3 times the width, and the roof can be made
-of large bricks, concrete blocks or slabs of stone or of a
-flat arch of brickwork or by corbelling, but in this last
-case there should be two complete courses above the
-top of the outlet. The less the width the cheaper the
-roof, the easier the adjustment of size and the less the
-tendency to silt deposit during low supplies. If pipes
-are used they should be laid in concrete. If cast iron
-head pieces are to be used there should be several sizes
-of one width and the widths of the masonry outlets
-should be made to suit these widths.</p>
-
-<p>A masonry outlet is not generally built till the watercourse
-has been sometime in use. The exact position
-of the outlet should then be so fixed that the watercourse
-shall run out straight or with a curve and should
-not be crooked.</p>
-
-<p>The width between parapets should be, for a driving
-road or one to be made into such, 10 ft. (if the bank is
-wider, it should be narrowed just at the outlet site) and
-for a non-driving road, 8 feet to 3 feet according to the
-ultimate width of the bank. Earth backing should be
-most carefully put in and rammed, otherwise a breach
-may occur and the outlet be destroyed.</p>
-
-<p>Various attempts have been made to provide gates
-or shutters for outlets. The chief result has been
-trouble and increased cost. If grooves are made and
-shutters provided, the shutters are soon broken or lost<span class="pagenum" id="Page78">[78]</span>
-by the people. Hinged flap shutters are objectionable
-because they are often closed by boys or by malicious
-persons or by neighbours who wish to increase the
-supply in their own outlet. The cultivator, when he
-wishes to reduce the supply or to close the outlet, can
-easily do this by obstructing the orifice with a piece of
-wood or an earthenware vessel or a bundle of brushwood
-or grass.</p>
-
-<p>As regards temporary outlets, wooden outlets if large
-(unless made of seasoned wood and therefore costly) are
-liable to give great trouble. Water escapes round the
-outside or through the joints. Pipes may do well if laid
-in puddle but are brittle and costly if of large size. The
-irrigators may interfere both with wooden outlets and
-pipes and they are liable to be displaced or broken. A
-temporary outlet, if small, can be made of bricks laid in
-mud. The joints can be pointed with lime mortar.
-When the outlet is made permanent the same bricks
-are used again. But all kinds of temporary outlets are
-liable to give trouble especially in light or sandy soil.
-There is much to be said in favour of building masonry
-outlets at the first, making a barrel only, <i>i.e.</i>, omitting
-the head and tail walls and taking the chance of having
-to alter the size. The alteration is not very expensive.
-The head and tail walls are built when the size has
-been finally settled. The adjustment can be made by
-raising or lowering the roof. This should be done over
-the whole length of the outlet but lowering can be done
-temporarily over a length of 3 feet at the tail end of the
-outlet. This can be done even when the distributary
-is in flow. A reduction over a short length at the upstream
-end of a barrel does not, as already remarked,
-necessarily reduce the discharge much.</p>
-
-<p><span class="pagenum" id="Page79">[79]</span></p>
-
-<p>On inundation canals the rules regarding outlets have
-to be modified. Great numbers of watercourses take
-off directly from the canals. In such cases, especially
-near the head of a canal, the ground to be watered is
-often 5 to 8 feet above the canal bed and it is wholly
-unsuitable to place the outlet at bed level. The cost of
-the tail wall would be excessive. The floor level in such
-cases must be at about the lowest probable cleared bed
-level of the watercourse, say, in order to be safe, a foot
-or half a foot below the usual cleared bed of the
-watercourse, so that water need never be prevented
-from entering the watercourse. The irrigators should
-be consulted as to the floor level and their wishes
-be attended to as far as possible. For lift outlets
-the floor should be at the bed level of the canal
-or distributary. If this bed is to be raised in the course
-of remodelling, the floor should be at the old bed level
-until the bed has actually been raised, unless there is a
-weir which raises the water. It is necessary that lift
-outlets should work however small the canal supply
-may be. In a distributary or small canal, the head
-wall should be built up to F.S. level but in a canal with
-deep water the head wall should reach up to just above
-the roof of the outlet and be submerged in high supplies.
-The stepping of the head wall should be set back if the
-channel is to be widened and should project into the
-channel if the channel is to be narrowed. The centre
-line of the channel near the outlet site must always be
-laid down and the outlet built at right angles to it and
-also at the correct distance from it.</p>
-
-<p>Occasionally there is a wide berm, say 20 ft. or even
-50 ft., between a channel and its bank. In such a case
-the outlet should be built to suit the bank. The long<span class="pagenum" id="Page80">[80]</span>
-open cut is however objectionable because the people
-clear it and heap the spoil in Government land. Sometimes
-the bank, especially if it is crooked, can be shifted
-so as to come close to the channel at the outlet site.
-Sometimes the outlets on inundation canals are large.
-For outlets of more than 2&middot;5 square feet in area, grooves
-should be provided so that the cultivators can use a
-gate if necessary.</p>
-
-<h3 class="inline" id="Ref16">12. <b>Masonry Works.</b></h3>
-
-<p class="inlineh">&mdash;The positions and descriptions
-of all the masonry works of a proposed canal or distributary
-are of course shown on the longitudinal section
-of the channel and from this the discharges and water
-levels are obtained. The principles of design to be
-<span class="nowrap">followed<a id="FNanchor19" href="#Footnote19"
-class="fnanchor">[19]</a></span> for bridges, weirs, falls, regulators and
-syphons, are discussed in <i>River and Canal Engineering</i>.
-It is mentioned that there is no special reason for making
-the waterway of a regulator exactly the same as
-that of the stream, and that the waterway may be such
-as to give the maximum velocity considered desirable,
-and that the foundations of a bridge should be made so
-deep that it will be possible to add a floor, at a lower
-level than the bed of the stream&mdash;with the upstream
-and downstream pitching sloping up to the bed&mdash;so as
-to increase the waterway and so save pulling down the
-bridge in case the discharge of the channel is increased.
-It remains to consider certain points affecting Irrigation
-Canals.</p>
-
-<div class="footnote">
-
-<p id="Footnote19"><a href="#FNanchor19"><span class="label">[19]</span></a>
-So far as concerns their capacity for dealing with flowing water.</p>
-
-</div><!--footnote-->
-
-<p>The span of a bridge, where there are no piers, is
-generally made as shown by the dotted lines in <a href="#Fig14">Figure
-14</a>, so that the mean width of waterway is the same as<span class="pagenum" id="Page81">[81]</span>
-that of the channel. The arches, in Northern India,
-used at one time to be 60&deg; as shown by the upper
-curved line, but in recent years arches of 90&deg; as shown
-by the lower curved line, have frequently been adopted,
-the springing of the arch being below the F.S. level, so
-that the stream is somewhat contracted. The 90&deg; arch
-gives a reduced thickness and height of abutment. It
-causes increased disturbance of the water, and this may
-necessitate more downstream protection. An advantage
-of having the springing not lower than the F.S. level is
-that this admits of a raising of the F.S. level in case
-the channel is remodelled, and this arrangement is still
-common on distributaries.</p>
-
-<div class="figcenter" id="Fig14">
-<img src="images/illo097.png" alt="Bridge design" width="450" height="153" />
-<p class="caption"><span class="smcap">Fig.</span> 14.</p>
-</div>
-
-<p>When a fall and bridge are combined, the bridge is
-placed below the fall as this gives a lower level for the
-roadway. The side walls of the fall are produced downstream
-to form those of the bridge.</p>
-
-<p>The roads in India are generally unfenced and the
-banks of canals close to bridges, on both sides of the
-canal and both above and below the bridge, are generally
-more or less worn down by cattle, which, when being
-driven home in the evening and out to graze in the
-morning, go down to the stream to drink. In order to
-prevent this damage the banks are sometimes pitched,
-above the bridge as well as below it, but the cattle
-generally make a fresh &#8220;gh&aacute;t&#8221; further away. The best<span class="pagenum" id="Page82">[82]</span>
-plan is to allow a &#8220;gh&aacute;t&#8221; on one bank either above or
-below the bridge and to protect the other three places.</p>
-
-<p>In the Punjab the widths of roadways between the
-kerbs and parapets of bridges respectively have been
-fixed as <span class="nowrap">follows:&mdash;</span></p>
-
-<table class="roadwidths" summary="Road widths">
-
-<tr class="bb">
-<th class="br"><span class="smcap">Kind of Road.</span></th>
-<th colspan="4" class="br"><span class="smcap">Near Towns.</span><a id="FNanchor20"></a><a
-href="#Footnote20" class="fnanchor">[20]</a></th>
-<th colspan="4"><span class="smcap">In the Country.</span><a id="FNanchor21"></a><a href="#Footnote21" class="fnanchor">[21]</a></th>
-</tr>
-
-<tr class="bb">
-<th class="br">&nbsp;</th>
-<th colspan="2" class="br">Kerbs.</th>
-<th colspan="2" class="br">Parapets.</th>
-<th colspan="2" class="br">Kerbs.</th>
-<th colspan="2">Parapets.</th>
-</tr>
-
-<tr>
-<td class="descr">Provincial</td>
-<td class="int">22</td>
-<td class="frac br">&nbsp;</td>
-<td class="int">23</td>
-<td class="frac br">&middot;5</td>
-<td class="int">16</td>
-<td class="frac br">&nbsp;</td>
-<td class="int">17</td>
-<td class="frac">&middot;5</td>
-</tr>
-
-<tr>
-<td class="descr">District</td>
-<td class="int">18</td>
-<td class="frac br">&nbsp;</td>
-<td class="int">19</td>
-<td class="frac br">&middot;5</td>
-<td class="int">14</td>
-<td class="frac br">&nbsp;</td>
-<td class="int">15</td>
-<td class="frac">&middot;5</td>
-</tr>
-
-<tr>
-<td class="descr">Village</td>
-<td class="int">14</td>
-<td class="frac br">&nbsp;</td>
-<td class="int">15</td>
-<td class="frac br">&middot;5</td>
-<td class="int">8</td>
-<td class="frac br">&middot;5</td>
-<td class="int">10</td>
-<td class="frac">&nbsp;</td>
-</tr>
-
-</table>
-
-<div class="footnote">
-
-<p id="Footnote20"><a href="#FNanchor20"><span class="label">[20]</span></a>
-The figures show the maximum. The general width should be the
-same as for neighbouring bridges on the same road.</p>
-
-<p id="Footnote21"><a href="#FNanchor21"><span class="label">[21]</span></a>
-The parapets should be whitewashed so as to be visible at night.</p>
-
-</div><!--footnote-->
-
-<div class="figcenter" id="Fig15">
-<img src="images/illo099.png" alt="Head regulator" width="600" height="557" />
-<p class="caption"><span class="smcap">Fig.</span> 15.</p>
-</div>
-
-<p><a href="#Fig15">Fig. 15</a> shows a head regulator for a distributary.
-The scale is 10 feet to an inch. It has a double set of
-grooves for the insertion of the planks with which the
-regulation is effected. Only one set of grooves is ordinarily
-used, but when the distributary has to be closed
-for silt clearance and all leakage stopped, both sets of
-grooves can be used and earth rammed in between the
-two sets of planks. The floor is shown a foot lower
-than the bed of the distributary. This reduces the
-action of the water on the floor, and enables the bed of
-the distributary to be lowered if ever the occasion for this
-should arise. This is a good rule&mdash;in spite of the fact
-that in re-modellings the tendency is for the beds to be
-raised&mdash;for all regulators or bridges, a raised sill being<span class="pagenum" id="Page83">[83]</span>
-added (in regulators) to reduce the length of the needles
-or the number of the planks. Such sill should, where
-needles are to be used, be fairly wide, especially if
-regulation is to be done while the masonry is somewhat
-new. The distributary shown has a bed width of 10 ft.
-The span of the two openings in the head might have
-been four feet each, but are actually five feet, and this
-enables the distributary to be increased in size at any
-time. The pitched portion of the channel tapers.
-Unless needles are used, instead of horizontal planks,
-spans are not usually greater than 5 or 6 feet. Longer
-spans would give rise to difficulties in manipulating the
-planks. Sometimes distributary heads are built skew,
-but there is seldom or never any good reason for this.
-A curve can always be introduced below the head to give<span class="pagenum" id="Page84">[84]</span>
-the alignment the desired <span class="nowrap">direction.<a id="FNanchor22"
-href="#Footnote22" class="fnanchor">[22]</a></span> The small circles
-shown on the plan are &#8220;bumping posts.&#8221; On the left
-is shown a portion of the small raised bank at the edge
-of the road.</p>
-
-<div class="footnote">
-
-<p id="Footnote22"><a href="#FNanchor22"><span class="label">[22]</span></a>
-The curve can be quite sharp (see <a href="#Ref6"><span class="smcap">Chap.</span> I., Art. 2</a>), and can be
-made, if necessary, within the length of the pitching.</p>
-
-</div><!--footnote-->
-
-<div class="figcenter" id="Fig16">
-<img src="images/illo100.png" alt="Regulator" width="600" height="427" />
-<p class="caption"><span class="smcap">Fig.</span> 16.</p>
-</div>
-
-<p><a href="#Fig16">Figure 16</a> is a double regulator with needles. The
-scale is 30 feet to an inch. The spans are 15 feet. The
-roadway is on arches, but the regulating platform on
-steel beams. The needles are seen at the upstream
-sides of the regulators. They are worked from the
-platforms to which access is obtained through the gaps
-in the upstream parapets. The regulating platform
-should generally be only just clear of the F.S. level, and
-therefore lower than the roadway.</p>
-
-<div class="photograph w600">
-
-<img src="images/illo102.jpg" alt="" width="600" height="329" />
-
-<p class="caption">NEEDLE REGULATOR AND BRIDGE.</p>
-
-<hr class="capt" />
-
-<p class="caption">Needles lying on Bank.</p>
-
-<p class="imagelocation"><i>To face p. 85.</i></p>
-
-</div><!--photograph-->
-
-<p>Frequently the roadway of a bridge or small regulator
-is carried, not on arches, but on steel beams. The
-railings may be of wood or of gas pipe with the ends<span class="pagenum" id="Page85">[85]</span>
-plugged, running through angle iron posts. In the case
-of such a regulator the roadway is sometimes so light
-that camels are not allowed to cross over. This causes
-unnecessary hardship. Bridges are not too numerous.
-If the regulation is done by gates, both road and platform
-are carried on arches.</p>
-
-<p>The regulators on inundation canals, and some on
-perennial canals, are not strong enough to admit of the
-flow of water being entirely stopped, so that the depth
-of water would be perhaps 10 feet upstream and nil
-downstream. This might cause the overturning of the
-piers, or the formation of streams under the floor. In
-such cases a maximum permissible heading up is decided
-on. Such orders are, in India, liable to be lost sight of
-in course of time, and they are, at least on inundation
-canals, where sudden emergencies often occur, hardly
-reasonable. An engine driver is not told that he must
-never entirely close his throttle valve. Regulators
-should be so designed that the water can be completely
-shut off.</p>
-
-<p>The following remarks show the chief points in favour
-of needles and horizontal planks respectively.</p>
-
-<div class="needleplanks">
-
-<p><i>Advantages of Needles.</i> Needles can be placed or
-removed by one man.</p>
-
-<p>Needles do not require hooks, etc., which are liable
-to be broken or lost.</p>
-
-<p>A needle regulator requires few piers, and is
-therefore cheap.</p>
-
-<p>Water falling over planks throws a strain on the
-floor.</p>
-
-<p><span class="pagenum" id="Page86">[86]</span></p>
-
-<p>Regulation with needles is easy and rapid. A
-jammed plank, especially if low down and not horizontal,
-may give great trouble.</p>
-
-<p><i>Advantages of Planks.</i> Floating rubbish is not
-liable to collect above the Regulator because the
-water flows over the planks.</p>
-
-<p>By means of double grooves and earth filling,
-leakage can be quite stopped.</p>
-
-</div><!--needleplanks-->
-
-<p>For large works the advantages are generally with
-needles, but for small works, <i>e.g.</i> distributary heads and
-shallow water, with planks. Needles 14 feet long are
-not too long for trained men. Planks are more likely
-than needles to arrest rolling sand, and this can be
-taken into consideration in designing double regulators.
-See <a href="#Ref13">number 8</a> of Kennedy&#8217;s rules, <a href="#Ref14">Article 5</a>. When
-planks are used there should be two sets of grooves.
-Planks are very suitable for escape heads which have
-only occasionally to be opened, earth being filled in
-between the two sets of planks.</p>
-
-<div class="figcenter" id="Fig16a">
-<img src="images/illo107.png" alt="Weir" width="350" height="195" />
-<p class="caption"><span class="smcap">Fig.</span> 16<span class="smcapall">A</span></p>
-</div>
-
-<p>Regarding notched falls, in the case of small distributaries
-the notches are so narrow that they are
-extremely liable to be obstructed either accidentally by
-floating rubbish or wilfully by persons whose outlets are
-upstream of them. Weirs are not open to this objection,
-and are frequently adopted. There is not the least
-chance of their causing any silting worth mentioning.
-A simple weir if made of the proper height for the F.S.
-discharge, will cause a slight heading up with &sup3;&#8260;&#8324;ths of
-the F.S. discharge, and this unfairly benefits any outlets
-for a considerable distance upstream of the weir. This
-difficulty can be got over by making the weir as in
-<a href="#Fig16a">Fig. 16<span class="smcapall">A</span></a>.</p>
-
-<div class="photograph w600">
-
-<img src="images/illo106.jpg" alt="" width="600" height="336" />
-
-<p class="caption">BRIDGE AND NOTCH FALL.</p>
-
-<hr class="capt" />
-
-<p class="caption">In this case the usual practice of placing the bridge downstream of the fall has not been followed.<br />
-The gauge well is seen on the left bank.</p>
-
-<p class="imagelocation"><i>To face p. 87.</i></p>
-
-</div><!--photograph-->
-
-<p><span class="pagenum" id="Page87">[87]</span></p>
-
-<p>For cisterns below falls the usual rule for the depth is</p>
-
-<p class="formula">K = H + &#8731;H &#8730;D</p>
-
-<p class="noindent">where H is the depth of water in the upstream reach,
-and D is the difference between the upstream and downstream
-water levels. Another rule for distributaries is</p>
-
-<p class="formula">K = <span class="horsplit"><span class="top">H + D</span><span class="bot">3</span></span></p>
-
-<p class="noindent">the length of the cistern being 3 H and its width the
-bed width of the channel.</p>
-
-<p>At &#8220;incomplete&#8221; falls, i.e., where the tail water level
-is above the crest, it is not unusual to construct a low-level
-arch, which forms a syphon. The object is to
-allay the surging of the surface water.</p>
-
-<p>The question of skew bridges has been dealt with in
-<a href="#Ref2">Art. 3</a>. Another question is that of the heights of
-bridges. Irrigation channels, especially the smaller
-ones, are very frequently at a high level, and bridges
-have ramps which are expensive to make and to
-maintain, and are inconvenient. The lowering of distributary
-bridges in such cases, so that they become
-syphons, or nearly so, has often been advocated and is
-frequently desirable. The bed should slope down to the
-floor and up again. The heading up can be reduced by
-giving ample waterway, but it will not be necessary to
-do this if there is head to spare. The fall in the water
-surface can be recognised and shown on the longitudinal
-section. The structure becomes one of the incomplete<span class="pagenum" id="Page88">[88]</span>
-falls above described. The crown of the arch can, if
-desirable, be kept above F.S. level, so that floating
-rubbish will not accumulate.</p>
-
-<p>The width between the parapets of a regulator can be
-10 feet in the case of a driving road. It may be less,
-according to the width of the bank, in other cases.</p>
-
-<p>The upper layer of the floor of a bridge or regulator is
-of brick on edge. Below this there is a layer of brick
-laid flat, and below this, concrete of a thickness ranging
-from &middot;5 feet to 3 feet. The thicknesses of piers range
-from 1&middot;5 to 3 feet.</p>
-
-<p>The bricks used for canal work in Northern India are
-10 inches long, 4&#8311;&#8260;&#8328; inches wide, and 2&sup3;&#8260;&#8324; inches thick.
-The thicknesses of walls are about &middot;83, 1&middot;25, 1&middot;7, 2&middot;1,
-2&middot;5 feet, and so on.</p>
-
-<p>The slopes of ramps should be about 3 in 100 for
-district roads, and 5 in 100 for village roads.</p>
-
-<p>Railings should be provided along the tops of high
-walls and top of pitching near to public roads or canal
-patrol roads. Bumping posts should be provided for all
-parapets, and should not be so placed as to seriously
-obstruct the roadway.</p>
-
-<p>The quarters for the regulating staff should, when
-convenient, be in the fork between the two principal
-branches. They may be on the bank&mdash;with foundations
-on pillars carried down to ground level&mdash;but not in such
-a position as to obstruct the road or any road likely to
-be made. Rests consisting of two parallel timbers bolted
-to blocks of masonry reaching up a foot from the ground,
-should be provided for the needles or planks. The bolt
-head should be countersunk so as not to damage the
-needles and planks when they are hurriedly laid down.</p>
-
-<p><span class="pagenum" id="Page89">[89]</span></p>
-
-<p>When two or more works are close together they
-should be made to conform, and the whole site should
-be considered with reference to a neat and suitable
-arrangement of works, ramps and roadways. If an
-outlet is near to a minor or distributary head the
-parapets of the two should be in line. If two masonry
-works of any kind are near together it is often suitable
-to pitch the intervening space. If there are outlets or
-distributaries on opposite banks they should be exactly
-opposite each other. Where a road crosses a bridge or
-regulator, the bank should be at the same level as the
-road, the bank being gradually ramped back to its
-original level. The space in front of any quarters should
-have a slight slope for drainage, but otherwise be at one
-level and be connected with the road or bank by proper
-ramps. The berm or bank should be made at the exact
-level of the top of any pitching or side wall which
-adjoins it. Wing walls are frequently made too short,
-so that the earth at their ends forms a steep slope and
-is worn away, and the bank or roadway is cut into.
-The walls should extend to such a point that the earth
-at their ends cannot assume a slope steeper than the
-slope of the bank.</p>
-
-<p>It is obvious that for every masonry work there should
-be a large scale site <span class="nowrap">plan<a id="FNanchor23"
-href="#Footnote23" class="fnanchor">[23]</a></span> showing all roads, ramps, and
-adjoining works, both existing and proposed roads being
-shown for some little distance from the work.</p>
-
-<div class="footnote">
-
-<p id="Footnote23"><a href="#FNanchor23"><span class="label">[23]</span></a>
-It is, or was until recently, in some parts of India, the custom to omit
-the preparation of site plans, and to leave the fixing of the exact site of a
-work and the arrangement of ramps and other details to the judgment of the
-assistant engineer who was building it. Much unsightly work resulted. A
-chief engineer in the Punjab recently issued some orders on the subject.</p>
-
-</div><!--footnote-->
-
-<p>For each kind of masonry work there is usually a type
-design. A few of its dimensions, which are fixed, are<span class="pagenum" id="Page90">[90]</span>
-marked on it. The other dimensions are variable. It
-would be a great advantage to add to the design a
-tabular statement to show how these dimensions should
-vary under different circumstances.</p>
-
-<div class="figcenter w600" id="Fig17"><a id="Fig18"></a>
-
-<img src="images/illo110.png" alt="Pitching" width="600" height="282" />
-
-<div class="split5050">
-
-<div class="leftsplit">
-<p class="caption"><span class="smcap">Fig.</span> 17.</p>
-</div><!--leftsplit-->
-
-<div class="rightsplit">
-<p class="caption"><span class="smcap">Fig.</span> 18.</p>
-</div><!--rightsplit-->
-
-<p class="thinline allclear">&nbsp;</p>
-
-</div><!--split5050-->
-
-</div><!--figcenter-->
-
-<h3 class="inline">13. <b>Pitching.</b></h3>
-
-<p class="inlineh">&nbsp;The object of pitching upstream of
-bridges or regulators or downstream of bridges where
-there may be little or no scouring action, may be partly
-to protect the bank from damage by cattle or wear, or to
-prevent sandy sides from falling in. In such cases there
-may be pitching of the sides only, and it may be of brick
-on edge laid dry and under this one brick flat resting on
-rammed ballast (<a href="#Fig17">Fig. 17</a>). Downstream of regulators or
-weirs and downstream of bridges if contracted or having
-piers which cause a rush of water, especially if the soil is
-soft, the side pitching may be as above, but with the
-bricks over one-sixth of the area placed on end and
-projecting for half their length. This &#8220;roughened
-pitching&#8221; tends somewhat to reduce the eddying. The
-bed protection should be solid concrete or blocks of
-concrete or masonry. Immediately downstream of
-regulators or weirs where there is great disturbance,
-both side and bed pitching may consist of solid concrete
-or of concrete or masonry blocks (<a href="#Fig18">Fig. 18</a>).</p>
-
-<p><span class="pagenum" id="Page91">[91]</span></p>
-
-<div class="figcenter" id="Fig19">
-<img src="images/illo111a.png" alt="Toe wall" width="350" height="245" />
-<p class="caption"><span class="smcap">Fig.</span> 19.</p>
-</div>
-
-<p>Three kinds of toe walls are shown in <a href="#Fig17">Figures 17</a>,
-<a href="#Fig19">19</a> and <a href="#Fig20">20</a>. The kind shown in <a href="#Fig19">Fig. 19</a> contains, for a
-given depth below the bed, far more masonry than the
-one shown in <a href="#Fig17">Fig. 17</a>. It is also liable to be displaced
-and broken if scour occurs.</p>
-
-<div class="figcenter" id="Fig20">
-<img src="images/illo111b.png" alt="Toe wall" width="350" height="209" />
-<p class="caption"><span class="smcap">Fig.</span> 20.</p>
-</div>
-
-<p>The earth should in all cases be carefully cut
-to the proper slope, so that no made earth has
-to be added. If the slope has already fallen in too
-much, well rammed earth should be added. The flat
-brick and rammed ballast can be varied as the work
-proceeds, more being used in soft places and less in
-hard.</p>
-
-<p>In some parts of the Punjab, large bricks, the length,
-breadth, and thickness being about twice the corresponding
-dimensions of an ordinary brick, are made,
-and are extremely useful and cheap for pitching. Where
-the soil is sandy such bricks can be burned without
-cracking.</p>
-
-<p>Sometimes the curtain wall which runs across the bed
-at the downstream end of the pitching is carried into the
-banks and built up so as to form a profile wall (<a href="#Fig21">Fig. 21</a>).<span class="pagenum" id="Page92">[92]</span>
-This is not very suitable, because the pitching of the
-sides is apt to settle and leave the profile wall standing
-out. It is better to lay a row of blocks on the slope. If
-a hole tends to form in the bed downstream of the
-curtain wall, blocks of masonry or concrete can be laid
-and left to take up their own positions (<a href="#Fig22">Fig. 22</a>).</p>
-
-<div class="figcenter" id="Fig21">
-<img src="images/illo112a.png" alt="Curtain wall" width="500" height="178" />
-<p class="caption"><span class="smcap">Fig.</span> 21.</p>
-</div>
-
-<div class="figcenter" id="Fig22">
-<img src="images/illo112b.png" alt="Curtain wall" width="500" height="224" />
-<p class="caption"><span class="smcap">Fig.</span> 22.</p>
-</div>
-
-<p>When scour of the bed or sides occurs downstream of
-pitching, it is sometimes said that any extension of the
-pitching downstream is followed by extension of the
-scour. This may happen if the cross section of the
-stream downstream of the pitched section has become
-greater than the pitched section. In this case there is
-eddying, due to abrupt enlargement of the stream where
-the pitching ends. The increased width and lowered
-bed level (not counting mere local hollows) of the stream
-should be adhered to in the pitching. Where the
-masonry of the regulator ends and the pitching begins,
-there will be an abrupt or tapered enlargement, but the
-eddies&mdash;at very low supplies there may be a fall&mdash;cannot
-do harm.</p>
-
-<p>This principle of enlarging the pitched cross section
-can be followed, even in a new channel, if the soil is
-light and scour is feared, and for this reason the matter<span class="pagenum" id="Page93">[93]</span>
-is mentioned in the present Chapter instead of in
-<a href="#Page96">Chapter III.</a> It was once the custom to splay out the
-sides of a channel, downstream of a regulator or weir,
-so as to form a sort of pool in which the eddies exhausted
-themselves, but this gives curved banks and requires
-extra land and is not a very convenient or neat
-arrangement. Where scour of the sides is likely to
-occur, or has occurred, immediately downstream of the
-pitching the latter may be turned in as shown in
-<a href="#Fig23">Fig. 23</a>.</p>
-
-<div class="figcenter" id="Fig23">
-<img src="images/illo113.png" alt="Pitching" width="350" height="185" />
-<p class="caption"><span class="smcap">Fig.</span> 23.</p>
-</div>
-
-<p>Pitching has constantly to be replaced or extended
-owing, generally, to failure to pitch a sufficient length
-or to ram well the earth under the pitching, or to use
-properly rammed ballast or flat brick, or to give proper
-bed protection, or to the use of dry brick pitching when
-a stronger kind is needed.</p>
-
-<p>The side slopes of pitching should be 1 to 1. They
-can be &sup1;&#8260;&#8322; to 1 in rare cases, <i>e.g.</i>, when there is no room
-for 1 to 1, or in continuation of existing &sup1;&#8260;&#8322; to 1 pitching.
-No absolute rule can be laid down as to the length to be
-pitched, but in a Punjab distributary it is often about
-5 times the bed width.</p>
-
-<h3 class="inline">14. <b>Miscellaneous Items.</b></h3>
-
-<p class="inlineh">&nbsp;On Indian canals the
-<span class="nowrap">chainage<a id="FNanchor24" href="#Footnote24" class="fnanchor">[24]</a></span>
-is marked at every thousand feet. Five<span class="pagenum" id="Page94">[94]</span>
-thousand feet is called a &#8220;canal mile.&#8221; The distance
-marks are often cast iron slabs, fixed in a cylindrical
-block of brickwork about 2&middot;1 feet in diameter and 1&middot;5
-feet high, the upper edge being rounded to a radius of
-&middot;4 feet. The wedge-shaped bricks for these blocks are
-specially moulded. The iron slab should project about
-eight inches and have about a foot embedded in the
-brickwork.</p>
-
-<div class="footnote">
-
-<p id="Footnote24"><a href="#FNanchor24"><span class="label">[24]</span></a>
-In India, instead of the simple word &#8220;chainage&#8221; the term &#8220;reduced
-distance&#8221; is used. It is the distance reduced to a common starting point
-as levels are reduced to mean sea level. The expression is puzzling to non-professionals
-and new comers.</p>
-
-</div><!--footnote-->
-
-<p>On a canal having a wide bank the distance mark is
-put at the outer edge of the patrol bank, earth being
-added, if necessary, to increase the width. On a
-distributary with a narrow bank the mark should be
-on the opposite bank not the patrol bank. To enable
-the miles to be easily distinguished the masonry block
-can be sunk only &middot;5 foot in the ground, the others being
-sunk a foot. In all cases the masonry block rests on a
-pillar, 1&middot;7 feet square, of bricks laid in mud, carried
-down to the ground level.</p>
-
-<p>Profile walls (<a href="#Fig21">Fig. 21</a>, <a href="#Page92">page 92</a>) used occasionally
-to be built at frequent intervals along a distributary.
-They will not prevent scour occurring, if the stream is
-tending to scour, unless very close together. Such
-walls are of some use as showing whether the channel
-is altering, but they are expensive and have to be
-altered if, as often happens, the channel is remodelled.
-It is a much better plan to lay down blocks&mdash;about 1&sup1;&#8260;&#8324;
-foot cubes&mdash;of masonry or concrete, along the centre
-line at every 500 feet, with their upper faces level with
-the bed. If the bed scours they may be displaced but
-otherwise they are useful not only for showing what
-silt, if any, has deposited, but for showing the centre
-line of the channel. Without them the centre line is
-liable to be altered in silt clearances or berm cuttings.<span class="pagenum" id="Page95">[95]</span>
-To enable a block to be readily found and to be replaced
-in proper position if displaced, there should be two
-small concrete pillars exactly opposite to it and
-equidistant from it, one on either bank of the channel.
-Such blocks and pillars may with advantage be placed
-at quite short intervals on curves.</p>
-
-<p>The rest houses for the use of officials on tour are
-generally at intervals of about 8 to 14 miles. There is
-generally a rest house near to a large regulator and
-frequently there is one near to a small regulator. This
-facilitates inspection work and discharge observations
-and it saves money, because the house can be looked
-after by one of the regulating staff. Not infrequently
-the house is placed just too far away from the regulator.
-Similarly if a rest house is near a railway station it
-should be within a quarter of a mile of it&mdash;always
-provided that this does not bring it too near to villages
-or huts&mdash;and not a mile or more away as is sometimes
-the case. It is also a mistake to place a rest house off
-the line of channel unless perhaps when it is on a
-district road which crosses the channel.</p>
-
-<hr class="chap" />
-
-<p><span class="pagenum" id="Page96">[96]</span></p>
-
-<h2>CHAPTER III.<br />
-<span class="chapname"><span class="smcap">The Working of a Canal.</span></span></h2>
-
-<h3 class="inline">1. <b>Preliminary Remarks.</b></h3>
-
-<p class="inlineh">&nbsp;A large canal is under
-a Superintending Engineer and it often constitutes his
-sole charge. It consists generally of three to five
-&#8220;divisions,&#8221; each under an Executive Engineer. A
-division has two to four subdivisions, each under a Subdivisional
-Officer. A subdivision is divided, for purpose
-of engineering work and maintenance, into several,
-generally three or four, sections, each consisting of some
-20 miles of canal and some 40 miles of distributary, and
-being in charge of a native overseer or suboverseer, and
-for purposes of water distribution and revenue, into a
-few sections each having, perhaps, some 30,000 acres of
-irrigation and being in charge of a native zilladar. As
-far as possible the boundaries of divisions and subdivisions
-are co-terminous with those of the branches
-of the canal. A distributary is always wholly within a
-subdivision. At every regulator there is a gauge reader,
-who, supplied when necessary with permanent assistants,
-sees to the regulation of the supply. If there is a
-telegraph office at the regulator the telegraph &#8220;signaller&#8221;
-may have charge of the regulation. The zilladar has a
-staff of some ten or twelve patwaris, who record in
-books the fields watered and who are in touch with the
-people and know when the demand for water is great,
-moderate or small, and for what kind of crops it is
-needed. In each division there is generally a Deputy
-Collector who is a native official, ranking as a Subdivisional
-Officer. His duty is to specially supervise<span class="pagenum" id="Page97">[97]</span>
-the revenue staff in the whole division. Both he and
-the Subdivisional Officer have magisterial powers which
-are exercised in trying petty cases connected with the
-canal.</p>
-
-<p>Along a main canal and its branches there is nearly
-always a &#8220;canal dak&#8221; or system of conveyance of bags
-containing correspondence for the officials stationed on
-the canal or touring along it. Along the main line,
-and most of the way down the branches, there is a line
-of telegraph for the special use of the canal officials.
-The telegraph offices are at the chief regulators, with
-tapping stations, for the use of officials on tour, at the
-rest houses near to which the line runs.</p>
-
-<p>However carefully a canal has been designed,
-alterations in the channels from silting and scour soon
-take place and they go on more or less without cessation.
-In a distributary, especially if the gradient has of
-necessity been made somewhat flat, there is quite likely
-to be a deposit in the upper reach. The deposit is
-generally greatest at the head and decreases, in going
-downstream, at a fairly uniform rate. It may extend
-for half-a-mile or less or more. Or a deposit may occur
-on the sides, which grow out and contract the channel.
-This often occurs over a great length of a distributary
-or even over the whole of it. Sometimes a distributary
-scours its bed, or the sides may fall in somewhat.
-Clearances of the silt and cutting of the berms are
-effected at intervals. Falling in of the sides may be
-stopped by means of bushing, and scour of the bed may
-be stopped by raising the crest of a fall or by introducing
-a weir, but in the meantime the changes cause the
-discharge tables for the distributary to become more or<span class="pagenum" id="Page98">[98]</span>
-less erroneous. In many cases silt deposits in the
-upper part of the distributary during the summer
-months when the river water is heavily silted and scours
-away again in the winter, the r&eacute;gime of the channel
-being, on the whole, permanent. The changes which
-occur in the branches and main canal are similar to the
-above and the remedies adopted are similar. On some
-of the older canals the scour was so serious that many
-intermediate weirs had to be constructed. The remarkable
-silting in the head reach of the Sirhind Canal has
-been described in <i>River and Canal Engineering</i>,
-Chapter V. The remedy consisted in keeping the gates
-of the under-sluices properly closed so that a pond was
-formed in which the river silt deposited. When
-necessary the canal is closed, the sluices opened, and
-the silt scoured away. For a plan of the headworks see
-<a href="#Fig24">fig. 24.</a></p>
-
-<p>In working a canal, it is necessary to arrange so that
-the water sent down any channel is as nearly as possible
-in accordance with the demand. The zilladar supplies
-the Subdivisional Officer, every week or ten days, with
-an &#8220;indent&#8221; showing how much water is required in
-each distributary and the Subdivisional Officer makes
-indents on the subdivision next above. The officer in
-charge of the headworks thus knows what the demand
-is. When it is more than the supply available, the
-water is dealt out to the various divisions according to
-rules approved of by the Superintending Engineer of
-the canal.</p>
-
-<div class="figcenter w600" id="Fig24">
-<img src="images/illo119.png" alt="Map" width="600" height="375" />
-<p class="caption"><span class="smcap">Fig.</span> 24.</p>
-<p class="largeillo"><a href="images/illo119lg.png">Large map</a> (59 kB)</p>
-</div>
-
-<p>Every gauge-reader has to be given definite instructions
-as to the gauge reading to be maintained, until
-further orders, in each distributary. At the places<span class="pagenum" id="Page99">[99]<br />[100]</span><a id="Page100"></a>
-where the large branches take off, the gauge reader is
-instructed what gauge to maintain in each. In the
-event of too much water arriving, he turns the surplus
-into the escape if there is one. If there is no escape he
-has usually to raise the gauge readings of the branches
-by equal amounts. By means of the telegraph, adjustment
-is promptly effected at the headworks.</p>
-
-<p>It has already been mentioned that rain may cause an
-abrupt reduction in, or even cessation of the demand
-for water. At the same time it increases the actual
-supply. Rain, or the signs of rain, in any part of a
-canal system ought always to be reported to the other
-parts. Owing to changes in the channels, to fluctuation
-in the water level of the river, especially during the
-night, to rain or to changes in the temperature and
-moisture of the air and to lack of continuous attention
-on the part of the gauge reader, particularly at night,
-there is a constant, though perhaps small, fluctuation
-in the water level in all parts of a canal.</p>
-
-<p>It may happen that&mdash;owing to enlargement of the
-channels by scour, or to other causes&mdash;the channels of
-a canal system are able to carry more water than was
-intended. In such cases the channels are usually run
-with as much as they can carry. This may give a
-lavish supply and a lowered duty, but it increases the
-irrigated area. To restrict the supply would cause loss
-of revenue. Sometimes however, it is restricted to
-prevent water-logging of the soil. The proper procedure
-is to extend the canal to other tracts.</p>
-
-<p>In India the farmers pay for the water, not according
-to the volume used, but according to the area irrigated.
-Different rates per acre are charged for different kinds<span class="pagenum" id="Page101">[101]</span>
-of crops according to the varying amounts of water
-which they are known to require. Sugarcane, which is
-sown in the spring and stands for nearly a year before
-being cut, thus extending over the whole of the kharif
-and most of the rabi, is assessed at the highest rate.
-Next comes rice which crop, though only four or five
-months elapse between its sowing and reaping, requires
-a great quantity of water. Gardens which receive
-water all the year round also pay a high rate. Other
-kharif crops are cotton and millet. The chief rabi crops
-are wheat, barley and &#8220;gram.&#8221;</p>
-
-<p>Every field irrigated is booked by a patwari who is
-provided with a &#8220;field map&#8221; and &#8220;field book&#8221; for each
-village (perhaps 6 or 8) in his beat. The map enables
-him to recognise at a glance the field in which he is
-standing. It has a number in the map and, by referring
-to this number in the field book, he finds the area of the
-field. The patwari is also provided with a &#8220;field
-register&#8221; in which he books each field which is watered,
-showing its area and the kind of crop grown, the date
-of booking and the name of the owner and tenant. He
-goes about entering up all new irrigation and his
-proceedings are subjected to rigorous check by the
-zilladar and Deputy Collector, and also by the engineering
-staff. At the end of the crop the entries are
-abstracted into a &#8220;demand statement&#8221; in which all the
-fields cultivated by one person are brought together and,
-the proper rates being applied to them, the sum payable
-by this person is arrived at. The demand statement
-goes to the Collector of the district, who levies the money
-and pays it into the Treasury to the credit of the canal
-concerned. There is a special charge for any land
-watered in an &#8220;unauthorised manner.&#8221; This includes<span class="pagenum" id="Page102">[102]</span>
-taking water when it was another man&#8217;s turn, or taking
-it from an outlet which has been wilfully enlarged or&mdash;in
-some districts&mdash;from another man&#8217;s outlet even
-with his consent. The sizes of the outlets are carefully
-apportioned to the land allotted to them and the area
-which they irrigate is constantly being looked into in
-order to see if the size is correct or needs altering. If
-a man borrows water from another outlet such borrowing
-may or may not come to light but in any case
-confusion as to outlet sizes results.</p>
-
-<p>The water rates charged for ordinary authorised
-irrigation are decidedly low. In one district there was
-a case in which a man, being unable to get as much
-water as he needed from his own outlet, took water for
-some fields, by permission, from a neighbour&#8217;s outlet.
-This being found out he was charged for those fields at
-double the usual rate. He continued regularly to use
-the water and to pay the double rate. There were
-several cases of this kind in that one district.</p>
-
-<p>Since payment for the water is not made according
-to the volume used, the cultivators are more or less
-careless and wasteful in using it. As a rule they over-water
-the land and frequently damage or spoil it by
-water-logging. They do not always keep in proper
-order the banks of the watercourses. The banks
-often breach and water escapes. Any area thus
-flooded is charged for if it is seen by an official. The
-engineers have power to close such a watercourse until
-it is put in order, but this would cause loss of revenue
-and is not often done. The real remedy for all this is,
-as already stated, rigid restriction of the supply. The
-people will then learn&mdash;they are already learning&mdash;to
-use water more economically.</p>
-
-<p><span class="pagenum" id="Page103">[103]</span></p>
-
-<p>When the crop in any field or part of a field fails to
-come to maturity, the water rate on it is remitted. The
-failed area is known, in the Punjab, as &#8220;khar&aacute;ba.&#8221; On
-some canals the failed areas are liable to be large and
-an irrigation register, in order to be complete, has to
-show them or, what is the same thing, to show both the
-gross and the net areas, the latter being the area left
-after deducting the khar&aacute;ba or remitted area.</p>
-
-<h3 class="inline" id="Ref23">2. <b>Gauges and Regulation.</b></h3>
-
-<p class="inlineh">&mdash;In every canal, branch
-and major or minor distributary there is a &#8220;head gauge&#8221;
-below the head regulator. At every double regulator
-there is a gauge in each branch and also an upstream
-gauge. These gauges are used for the regulation of the
-supply. The zeros of the gauges are at the bed levels.
-Tables are prepared showing the discharges corresponding
-to each gauge reading&mdash;except in the case of
-upstream gauges&mdash;at intervals of &middot;1 foot.</p>
-
-<p>The question often arises whether it is necessary to
-have a gauge near the tail of a distributary. If the
-outlets have not been properly adjusted and if water
-does not reach the tail in proper quantity, a tail gauge
-is absolutely essential and its readings should be carefully
-watched by the Sub-divisional Officer. To take no
-action until complaints arise or until the irrigation
-returns at the end of the crop show that some one has
-suffered, is not correct. When it is known that
-sufficient water always reaches the tail, a tail gauge is
-not necessary.</p>
-
-<p>There may be intermediate gauges on a canal or
-branch or distributary. For convenience of reading
-they are usually at places where a distributary or minor
-takes off or where there is a rest house. They serve to<span class="pagenum" id="Page104">[104]</span>
-show whether the water level at that place alters while
-that at other places is stationary, and thus give
-indications of any changes occurring in the channel.
-The number of such intermediate gauges should be
-rigorously kept down. In fact hardly any are necessary.
-The gauge register which the Subdivisional Officer has
-to inspect daily, is, in any case, voluminous enough.</p>
-
-<p>At a double regulator it is never necessary, except as
-a very temporary arrangement in case of an accident,
-to partially close both channels at once. One or the
-other should be fully open. The upstream gauge
-reading shows whether this rule is being adhered to.
-If the bed levels of all three channels at the regulator
-are the same, the reading on one or other of the downstream
-gauges should be about the same&mdash;for the fall in
-the water passing through an open regulator is generally
-negligible&mdash;as that of the upstream gauge. In other
-cases the difference in the bed levels has to be taken
-into account.</p>
-
-<p>Immediately downstream of the off-take of a channel,
-there is, unless the water flows in without any appreciable
-fall, much oscillation of the water. For this reason
-the gauge is frequently fixed some 500 feet down the
-channel. This is anything but a good arrangement.
-The gauge-reader&#8217;s quarters are close to the off-take and
-he will not keep going down to the gauge. Moreover an
-official coming along the main channel cannot see the
-gauge. The gauge should be close to the head and in
-a gauge well where oscillations of the water are reduced
-to very small amounts. The upstream gauge requires
-no <span class="nowrap">well.<a id="FNanchor25" href="#Footnote25" class="fnanchor">[25]</a></span></p>
-
-<div class="footnote">
-
-<p id="Footnote25"><a href="#FNanchor25"><span class="label">[25]</span></a> For further details as to gauges see
-<a href="#Page183">Appendix G</a>.</p>
-
-</div><!--footnote-->
-
-<p><span class="pagenum" id="Page105">[105]</span></p>
-
-<p>All gauges should be observed daily, in the morning,
-and the reports sent by canal dak, post or wire at the
-earliest possible moment. This should be rigidly
-enforced. The register should be posted and laid before
-the Subdivisional Officer daily with the least possible
-delay. It is only in this way that the Subdivisional Officer
-can keep proper control of the water, and detect irregularities.
-Sometimes trouble arises owing to the gauge
-reports not coming in regularly. The suboverseer
-can be made responsible for seeing to this matter as
-regards all the gauge readers in his section. Gauge
-readers often reduce the supply in a branch or distributary
-at night for fear of a rise occurring in the night
-and causing a breach. This is to save themselves the
-trouble of watching at night. They are also bribed to
-tamper with the supply and run more or less in any channel
-or keep up the supply for a longer or shorter time. All
-regulation should be rigorously checked by the suboverseer,
-zilladar and Subdivisional Officer. Irregularities
-can be speedily detected if proper steps are taken such
-as going to the regulator unexpectedly. The watermarks
-on the banks can also be seen. If any man is
-found to have delayed entering a gauge reading in his
-book or despatching the gauge report it is evidence of
-an intention to deceive. The suboverseer or zilladar
-should be required to enter in his note-book all the
-checks he makes and the Subdivisional Officer should see
-the entries and take suitable steps.</p>
-
-<p>There was formerly a general order in the Punjab
-that the Subdivisional Officer should write the gauge
-register with his own hand. Such an order is not now
-considered necessary nor has the Subdivisional Officer,
-now-a-days, time to comply with it. The register<span class="pagenum" id="Page106">[106]</span>
-should however be written by the clerk carefully and
-neatly and not be made over to anyone else.</p>
-
-<p>The regulation should usually be so effected that
-rushes of water in any portion of the channel are avoided,
-but if scour occurs in a particular part of the channel it
-may be necessary to try and obtain slack water there.
-Until it is proved by experience that they are
-unnecessary, soundings should be taken periodically
-downstream of large works. When a branch or escape
-is closed the leakage should be carefully stopped. The
-necessary materials should be always kept ready in
-sufficient quantity.</p>
-
-<h3 class="inline" id="Ref12">3. <b>Gauge Readings and Discharges.</b></h3>
-
-<p class="inlineh">&nbsp;For the head
-gauge of each distributary and for certain gauges in the
-canals, discharge tables, based on actual observations,
-are prepared. If changes occur in the upper part of a
-channel, the discharge corresponding to a given gauge
-reading is altered. One remedy for this is to have a
-second gauge downstream of the &#8220;silt wedge&#8221; or scoured
-or narrowed reach. The indents are then made out with
-reference to the second gauge, but any slight adjustments
-due to fluctuation in the water level of the canal, are
-effected by means of the head gauge. Unless the
-zilladar and Subdivisional Officer are on the alert, the
-gauge reader is likely to evade going to the lower gauge
-every morning, and to enter fictitious readings for it,
-inferring them from the readings of the head gauge. If
-there are any outlets between the two gauges, their
-discharge has to be observed or estimated and added to
-the discharge of the distributary as entered in the table
-corresponding to the readings on the second gauge.
-The above system can be worked with advantage in<span class="pagenum" id="Page107">[107]</span>
-cases where the distributary bifurcates two or three
-miles from its off-take. The men in charge of the two
-regulators can work together, one of them or an assistant,
-going daily from one regulator to the other and back.</p>
-
-<p>Usually, however, the vitiating of the discharge table
-at the head gauge has to be faced, and the table to
-be constantly corrected. It is impossible to frame
-beforehand any rule or formula which would give a
-certain correction for a certain depth of silt deposit.
-Moreover, there might or might not be a contraction of
-the channel due to deposit on the sides. The usual plan
-is to observe a discharge some time during each month.
-If the result is in excess of the tabular discharge, all the
-discharges for that month are increased in the same
-proportion. They can be booked according to the table
-and totalled, and the correction applied to the total.</p>
-
-<p>Discharges of canals and branches at their heads or
-at the boundaries of divisions, are observed by the Subdivisional
-Officer about once a month. Discharges of
-distributaries are observed about once a month, usually
-by zilladars. They are also to some extent observed by
-the Subdivisional Officer, but much is left to his
-discretion. Delta is worked out for each distributary
-month by month, and also, of course, for each crop.
-Thus a general duty &#8220;at distributary heads&#8221; can be
-obtained, and may be used in new <span class="nowrap">projects<a id="FNanchor26"
-href="#Footnote26" class="fnanchor">[26]</a></span> instead of
-the duty at the canal head, allowance being made for the
-water lost by absorption in the canal and branches.</p>
-
-<div class="footnote">
-
-<p id="Footnote26"><a href="#FNanchor26"><span class="label">[26]</span></a>
-See <a href="#Ref3"><span class="smcap">Chap.</span> IV., Art. 2</a>.</p>
-
-</div><!--footnote-->
-
-<p>It cannot be said that these important figures are
-obtained as carefully as they could be. If the Subdivisional
-Officer personally observed the discharge at each<span class="pagenum" id="Page108">[108]</span>
-distributary head, even every other month, the reliability
-of the results would be much increased. In addition to
-this the discharges of canals and branches at the
-boundaries of subdivisions should be observed and the
-results compared with the distributary discharges, so as
-to show the loss by absorption. At first grave discrepancies
-among the results would be found, but they
-would be reduced as the causes of error became known.
-For the method of investigating the causes of discrepant
-discharges see <i>River and Canal Engineering</i>, <span class="smcap">Chap.</span> III.,
-Art. 5.</p>
-
-<p>A specimen of a Subdivisional Officer&#8217;s gauge register
-is given in <a href="#Tab1">table I.</a> The zilladar keeps a similar register.
-The columns headed G contain the gauge readings, those
-headed D the discharges. Until some years ago there
-were no columns for discharges. The daily discharges of
-the canal and of the branches at their heads&mdash;and at
-intermediate points if they were at the boundaries of
-divisions&mdash;were entered in the Executive Engineer&#8217;s
-office and the duty was worked out at the end of each
-crop. The zilladar merely indented for a certain gauge
-reading at the distributary head, and the Subdivisional
-Officer could tell pretty nearly what gauge reading he
-required in the canal at the beginning of his subdivision.
-Since the year 1900 or thereabouts, the
-zilladars have been required to learn a good deal about
-discharges. They have to know how to observe the
-discharge of a distributary, and to learn how the
-discharge of an outlet varies with the head or difference
-between the upstream and downstream water levels.
-They are supposed to indent for certain discharges, and
-not merely for certain gauge readings. All this knowledge
-is useful to the zilladars and tends to increase
-their efficiency, but a practice of constantly thinking in
-discharges instead of in gauge readings is unnecessary.
-If the channels were of all sorts of sizes matters would be
-different. Actually the size of a channel is apportioned
-to its work, and the proportion of its full supply which
-it is carrying at any moment is easily grasped by means
-of gauge readings alone.</p>
-
-<p><span class="pagenum" id="Page109">[109]</span></p>
-
-<p class="tabhead" id="Tab1">TABLE I&mdash;GAUGE AND DISCHARGE REGISTER.</p>
-
-<table class="register1" summary="Register">
-
-<tr class="bt bb">
-<td rowspan="2" class="center padl1 padr1 br">October, 1912.</td>
-<th rowspan="4" class="center bot br">D<br />a<br />t<br />e<br />.</th>
-<th colspan="17">Main Line, Upper Bari Doab Canal.</th>
-</tr>
-
-<tr>
-<th colspan="5" class="br bb">Tibri Regulator</th>
-<th colspan="3" class="br bb">Dhariwal</th>
-<th colspan="2" class="br bb">Kunjar</th>
-<th colspan="7" class="bb">Aliwal Regulator</th>
-</tr>
-
-<tr class="bb">
-<td rowspan="10" class="br">&nbsp;</td>
-<th colspan="1" class="br">A-<br />bove</th>
-<th colspan="2" class="br">Main<br />Canal</th>
-<th colspan="2" class="br">Kasur<br />Branch</th>
-<th colspan="3" class="br">Nangal<br />Distributary</th>
-<th colspan="2" class="br">Kaler<br />Distributary</th>
-<th class="br">A-<br />bove</th>
-<th colspan="2" class="br">Amritsar<br />Branch</th>
-<th colspan="2" class="br">Lahore<br />Branch</th>
-<th colspan="2">Escape</th>
-</tr>
-
-<tr>
-<th class="w2mplus br bb"><i>G.</i></th>
-<th class="w2mplus br bb"><i>G.</i></th>
-<th class="w2mplus br bb"><i>D.</i></th>
-<th class="w2mplus br bb"><i>G.</i></th>
-<th class="w2mplus br bb"><i>D.</i></th>
-<th colspan="2" class="br bb"><i>G.</i></th>
-<th class="w2mplus br bb"><i>D.</i></th>
-<th class="w2mplus br bb"><i>G.</i></th>
-<th class="w2mplus br bb"><i>D.</i></th>
-<th class="w2mplus br bb"><i>G.</i></th>
-<th class="w2mplus br bb"><i>G.</i></th>
-<th class="w2mplus br bb"><i>D.</i></th>
-<th class="w2mplus br bb"><i>G.</i></th>
-<th class="w2mplus br bb"><i>D.</i></th>
-<th class="w2mplus br bb"><i>G.</i></th>
-<th class="w2mplus bb"><i>D.</i></th>
-</tr>
-
-<tr>
-<td class="br highline4">&nbsp;</td>
-<td class="br highline4">&nbsp;</td>
-<td class="br highline4">&nbsp;</td>
-<td class="br highline4">&nbsp;</td>
-<td class="br highline4">&nbsp;</td>
-<td class="br highline4">&nbsp;</td>
-<td class="highline4">&nbsp;</td>
-<td class="br highline4">&nbsp;</td>
-<td class="br highline4">&nbsp;</td>
-<td class="br highline4">&nbsp;</td>
-<td class="br highline4">&nbsp;</td>
-<td class="br highline4">&nbsp;</td>
-<td class="br highline4">&nbsp;</td>
-<td class="br highline4">&nbsp;</td>
-<td class="br highline4">&nbsp;</td>
-<td class="br highline4">&nbsp;</td>
-<td class="br highline4">&nbsp;</td>
-<td class="highline4">&nbsp;</td>
-</tr>
-
-<tr>
-<td class="date">1</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="intpartg">4</td>
-<td class="fracpartg">&middot;0</td>
-<td class="dvalue">100</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td>&nbsp;</td>
-</tr>
-
-<tr>
-<td class="date">2</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="intpartg">4</td>
-<td class="fracpartg">&middot;0</td>
-<td class="dvalue">100</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td>&nbsp;</td>
-</tr>
-
-<tr>
-<td class="date">3</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="intpartg">4</td>
-<td class="fracpartg">&middot;0</td>
-<td class="dvalue">100</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td>&nbsp;</td>
-</tr>
-
-<tr>
-<td class="center br">*</td>
-<td class="center br">*</td>
-<td class="center br">*</td>
-<td class="center br">*</td>
-<td class="center br">*</td>
-<td class="center br">*</td>
-<td colspan="2" class="center br">*</td>
-<td class="center br">*</td>
-<td class="center br">*</td>
-<td class="center br">*</td>
-<td class="center br">*</td>
-<td class="center br">*</td>
-<td class="center br">*</td>
-<td class="center br">*</td>
-<td class="center br">*</td>
-<td class="center br">*</td>
-<td class="center">*</td>
-</tr>
-
-<tr>
-<td class="date">29</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="intpartg">4</td>
-<td class="fracpartg">&middot;2</td>
-<td class="dvalue">110</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td>&nbsp;</td>
-</tr>
-
-<tr>
-<td class="date">30</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="intpartg">4</td>
-<td class="fracpartg">&middot;2</td>
-<td class="dvalue">110</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td>&nbsp;</td>
-</tr>
-
-<tr>
-<td class="date">31</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="intpartg">4</td>
-<td class="fracpartg">&middot;2</td>
-<td class="dvalue">110</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td>&nbsp;</td>
-</tr>
-
-<tr class="bt bb">
-<td colspan="2" class="center br">Total</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="intpartg">127</td>
-<td class="fracpartg">&middot;1</td>
-<td class="dvalue">3255</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td>&nbsp;</td>
-</tr>
-
-<tr class="bb">
-<td colspan="2" class="center br">No. of days in flow</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td colspan="2" class="center br">31</td>
-<td class="dvalue">31</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td>&nbsp;</td>
-</tr>
-
-<tr class="bb">
-<td colspan="2" class="center br">Average</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="intpartg">4</td>
-<td class="fracpartg">&middot;1</td>
-<td class="dvalue">105</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td>&nbsp;</td>
-</tr>
-
-</table>
-
-<p><span class="pagenum" id="Page110">[110]</span></p>
-
-<p>As regards the weekly indents, the dealing with
-discharges instead of gauge readings is of little practical
-value. The zilladar merely knows that on some outlets
-the demand is great, on others moderate, and he judges
-that the distributary needs say, 4 feet of water, its full
-supply gauge being 5 feet. He cannot tell how many
-cubic feet each outlet requires. If he is required to
-indent in cubic feet per second (he is not always required
-to do this) he probably gets at the discharge from the
-gauge reading, and not the gauge reading from the
-discharge. As regards the general indent made by the
-Subdivisional Officer, the same remarks apply. He can
-probably tell what gauge he requires without going into
-discharges.</p>
-
-<p>Regarding the working out of delta month by month,
-not only are discharges more or less doubtful, but the
-area irrigated is seldom correct till near the end of the
-crop. However, the figures, towards the end of a crop,
-may be useful. If delta on any distributary is higher
-than is usual on that distributary, it may be desirable, if
-the supply in the whole canal is short, to reduce the
-supply to that distributary somewhat, but this remedy
-can be properly applied after the end of the crop by
-altering the turns (<a href="#Ref8">Art. 5</a>). Any steps in the direction<span class="pagenum" id="Page111">[111]</span>
-of altering outlets can only be taken after the end of the
-crop. Admitting, however, that the working out of
-delta during the crop is useful, it can be done by adding
-up the gauge readings for the month and taking the
-average reading and the discharge corresponding to it.
-This is not quite the same as the average of the daily
-discharges, but the difference is small, and there would
-be a wholesale and most salutary saving in clerical work.
-All the columns headed D could be omitted. The
-handiness and compactness of the register would be
-vastly increased. The discharges are only approximately
-known, and refinements of procedure are unnecessary.
-The correction of the discharge table, by means of
-observed discharges, once a month, can of course be
-effected without booking the daily <span class="nowrap">discharges.<a id="FNanchor27"
-href="#Footnote27" class="fnanchor">[27]</a></span></p>
-
-<div class="footnote">
-
-<p id="Footnote27"><a href="#FNanchor27"><span class="label">[27]</span></a>
-There should, in any case, be a special place in the gauge register for
-showing the discharge tables, with a note of the discharge observations from
-which the table was framed or in consequence of which it was altered.</p>
-
-</div><!--footnote-->
-
-<p>Supposing the columns D to be retained the calculations
-of delta can be made as shown in <a href="#Tab2">table II.</a> the
-form being printed in the gauge book. To facilitate the
-adding up of the discharges a line can be left blank in
-table I. after each ten days, and the total for the ten
-days shown on it. If the column D is not retained, the
-gauge readings can be added up. The discharge
-corresponding to the mean gauge reading of the month,
-multiplied by the number of days the distributary was
-in flow, gives the figure to be entered in column 2 of
-<a href="#Tab2">table II.</a></p>
-
-<p>The final working out of delta crop by crop is of course
-of the greatest value. The point which needs attention
-is, as already remarked, greater accuracy in the discharges.
-For reasons which have already been given (<a href="#Ref15"><span class="smcap">Chap.</span> I.,
-Art. 5</a>, and <a href="#Ref4"><span class="smcap">Chap.</span> II., Art. 9</a>) the values of delta on
-different distributaries will never be the same, but the
-causes of high values can always be investigated and, to
-some extent, remedied.</p>
-
-<p><span class="pagenum" id="Page112">[112]</span></p>
-
-<p class="tabhead" id="Tab2">TABLE II.&mdash;CALCULATION OF DELTA FOR RABI, 1912-13, NANGAL DISTRIBUTARY.</p>
-
-<table class="calculation" summary="Calculation">
-
-<tr class="bt bb">
-<th rowspan="2" class="br">Month.</th>
-<th colspan="2" class="br">Total of discharges.</th>
-<th colspan="2" class="br">No. of days in flow.</th>
-<th rowspan="2" class="br">Irrigated area<br />up to date.</th>
-<th rowspan="2" colspan="2" class="br">Delta<br />up to date.</th>
-<th rowspan="2">Remarks.</th>
-</tr>
-
-<tr class="bb">
-<th class="br">For month.</th>
-<th class="br">Up to date.</th>
-<th class="br">For month.</th>
-<th class="br">Up to date.</th>
-</tr>
-
-<tr>
-<th class="br">&nbsp;</th>
-<th class="br">&nbsp;</th>
-<th class="br">&nbsp;</th>
-<th class="br">&nbsp;</th>
-<th class="br">&nbsp;</th>
-<th class="br">Acres</th>
-<th colspan="2" class="br">Feet</th>
-<th>&nbsp;</th>
-</tr>
-
-<tr>
-<td class="left padr2 br">October</td>
-<td class="center br">3255</td>
-<td class="center br">3255</td>
-<td class="center br">31</td>
-<td class="center br">31</td>
-<td class="center br">6510</td>
-<td class="right padr0">1</td>
-<td class="left padl0 br">&middot;0</td>
-<td>&nbsp;</td>
-</tr>
-
-<tr>
-<td class="left padr2 br">November</td>
-<td class="center br">3390</td>
-<td class="center br">6345</td>
-<td class="center br">27</td>
-<td class="center br">58</td>
-<td class="center br">9000</td>
-<td class="right padl2 padr0">1</td>
-<td class="left padl0 br">&middot;41</td>
-<td class="center">Closed 3 days because of breach.</td>
-</tr>
-
-<tr class="bb">
-<td class="highline8 br">&nbsp;</td>
-<td class="highline8 br">&nbsp;</td>
-<td class="highline8 br">&nbsp;</td>
-<td class="highline8 br">&nbsp;</td>
-<td class="highline8 br">&nbsp;</td>
-<td class="highline8 br">&nbsp;</td>
-<td class="highline8">&nbsp;</td>
-<td class="highline8 br">&nbsp;</td>
-<td class="highline8">&nbsp;</td>
-</tr>
-
-</table>
-
-<p><span class="pagenum" id="Page113">[113]</span></p>
-
-<h3 class="inline" id="Ref19">4. <b>Registers of Irrigation and Outlets.</b></h3>
-
-<p class="inlineh">&nbsp;It is
-obvious that a Subdivisional Officer cannot look
-properly into matters connected with the working of his
-channels unless he has, ready to hand, a register showing,
-crop by crop, the area irrigated by each distributary and
-each outlet and keeps it posted up to date. In 1888
-the Chief Engineer of the Punjab Irrigation directed
-that each Subdivisional Officer should keep up English
-registers of irrigation by villages. The order was for
-years lost sight of. The matter has lately, in view of
-certain recent occurrences on a large perennial canal,
-again come to notice, and this most essential factor in
-the working of a canal is, it is believed, receiving
-attention.</p>
-
-<p>As to the precise form which an irrigation register
-should take, opinions and practices differ somewhat. In
-all cases the net irrigated areas should be shown&mdash;kharif,
-rabi, and total&mdash;and the total remitted area.
-The areas remitted for kharif and rabi separately may
-or may not be shown. The net percentage of the commanded
-culturable area irrigated&mdash;total of the two crops&mdash;can
-be shown in red ink and is most <span class="nowrap">useful.<a id="FNanchor28" href="#Footnote28" class="fnanchor">[28]</a></span> It
-enables the general state of affairs on any outlet to be
-seen at a glance and shows how it compares with other
-outlets and with the whole distributary.</p>
-
-<div class="footnote">
-
-<p id="Footnote28"><a href="#FNanchor28"><span class="label">[28]</span></a>
-Provided that the culturable commanded area is properly shown and
-is not made to include jungles or other tracts which were never intended to
-be irrigated.</p>
-
-</div><!--footnote-->
-
-<p><span class="pagenum" id="Page114">[114]</span></p>
-
-<p>Besides the irrigation figures it is necessary to record
-for each outlet its chainage, size of <span class="nowrap">barrel<a id="FNanchor29"
-href="#Footnote29" class="fnanchor">[29]</a></span> and commanded
-culturable area. In the case of a distributary
-which has been working for years, and on which the
-outlets are undergoing few alterations, it may be suitable
-to record the above items in a separate &#8220;outlet register,&#8221;
-and to give in the irrigation register a reference to the
-page of the outlet register. But even in such a case
-alterations will have to be made from time to time in
-the outlet register and there is great danger of its
-becoming spoilt, imperfect or unintelligible. In the
-case of a distributary on which the outlets are undergoing
-frequent changes, the items under consideration
-should be shown crop by crop, and also the material of
-the outlet&mdash;wood or masonry&mdash;and the width and mean
-height of the barrel. In no other way can the working
-of the outlet be properly followed and understood. It is
-probable that this procedure is the best in every case,
-<i>i.e.</i>, even when the alterations made are not frequent.
-By arranging the register as shown in <a href="#Tab3">table III.</a>
-the repetition of the entries, when they undergo no
-alteration, is avoided, only dots having to be made.</p>
-
-<div class="footnote">
-
-<p id="Footnote29"><a href="#FNanchor29"><span class="label">[29]</span></a>
-The sizes of the outlets should be measured by the suboverseer and
-some checked by the Subdivisional Officer and the correct sectional area, as
-actually built, entered.</p>
-
-</div><!--footnote-->
-
-<p>The <a href="#Tab3">specimen</a> shows only two outlets on a page, and
-covers five years, but three outlets can easily be shown
-on a large page, and the period can be seven years. If
-there are more than three outlets in the village, the
-lowest part of the page shows the total of the page
-instead of the total of the village, and the other outlets
-are shown on the next page, the grand total for the
-village coming at the foot.</p>
-
-<p><span class="pagenum" id="Page115">[115]</span></p>
-
-<p class="tabhead" id="Tab3">TABLE III.&mdash;REGISTER BY OUTLETS AND VILLAGES.</p>
-
-<table class="register2" summary="Sample register">
-
-<tr class="bb">
-<th colspan="12" class="largefont left padl10">Distributary..................................</th>
-<th colspan="6" class="largefont right padr10">Village..................................</th>
-</tr>
-
-<tr class="bb">
-<th rowspan="4" colspan="6" class="br">Name and<br />description<br />of outlet.</th>
-<th rowspan="4" class="br">Year</th>
-<th colspan="5" class="br">Information regarding outlet.</th>
-<th colspan="6">Working of outlet.</th>
-</tr>
-
-<tr class="bb">
-<th rowspan="3" class="br">Chainage</th>
-<th rowspan="3" class="br">Material</th>
-<th rowspan="3" class="br">Sectional area<br />of barrel.<br />(minimum)</th>
-<th colspan="2" class="br">Dimensions of barrel</th>
-<th colspan="5" class="br">Area in acres.</th>
-<th rowspan="3" >Net irrigated,<br />per cent of<br />culturable.</th>
-</tr>
-
-<tr class="bb">
-<th rowspan="2" class="br">Width</th>
-<th rowspan="2" class="br">Height</th>
-<th rowspan="2" class="br">Commanded<br />culturable</th>
-<th rowspan="2" class="br">Remitted</th>
-<th colspan="3" class="br">Net irrigated</th>
-</tr>
-
-<tr class="bb">
-<th class="w2mplus br">Kharif</th>
-<th class="w2mplus br">Rabi</th>
-<th class="w2mplus br">Total</th>
-</tr>
-
-<tr>
-<td rowspan="5" colspan="6" class="left padr2 br">Register no.<br />Name<br />Bank<br />Flow or lift</td>
-<td class="center br">1902-03</td>
-<td rowspan="5" class="br">&nbsp;</td>
-<td rowspan="5" class="br">&nbsp;</td>
-<td rowspan="5" class="br">&nbsp;</td>
-<td rowspan="5" class="br">&nbsp;</td>
-<td rowspan="5" class="br">&nbsp;</td>
-<td rowspan="5" class="br">&nbsp;</td>
-<td rowspan="5" class="br">&nbsp;</td>
-<td rowspan="5" class="br">&nbsp;</td>
-<td rowspan="5" class="br">&nbsp;</td>
-<td rowspan="5" class="br">&nbsp;</td>
-<td rowspan="5">&nbsp;</td>
-</tr>
-
-<tr>
-<td class="center br">1903-04</td>
-</tr>
-
-<tr>
-<td class="center br">1904-05</td>
-</tr>
-
-<tr>
-<td class="center br">1905-06</td>
-</tr>
-
-<tr class="bb">
-<td class="center br">1906-07</td>
-</tr>
-
-<tr>
-<td rowspan="5" colspan="6" class="left padr2 br">Register no.<br />Name<br />Bank<br />Flow or lift</td>
-<td class="center br">1902-03</td>
-<td rowspan="5" class="br">&nbsp;</td>
-<td rowspan="5" class="br">&nbsp;</td>
-<td rowspan="5" class="br">&nbsp;</td>
-<td rowspan="5" class="br">&nbsp;</td>
-<td rowspan="5" class="br">&nbsp;</td>
-<td rowspan="5" class="br">&nbsp;</td>
-<td rowspan="5" class="br">&nbsp;</td>
-<td rowspan="5" class="br">&nbsp;</td>
-<td rowspan="5" class="br">&nbsp;</td>
-<td rowspan="5" class="br">&nbsp;</td>
-<td rowspan="5">&nbsp;</td>
-</tr>
-
-<tr>
-<td class="center br">1903-04</td>
-</tr>
-
-<tr>
-<td class="center br">1904-05</td>
-</tr>
-
-<tr>
-<td class="center br">1905-06</td>
-</tr>
-
-<tr class="bb">
-<td class="center br">1906-07</td>
-</tr>
-
-<tr>
-<td rowspan="5" class="center">Total<br />of</td>
-<td rowspan="2" colspan="2">&nbsp;</td>
-<td rowspan="5" class="center padl0 padr0">Village<br />Page</td>
-<td rowspan="2" colspan="2" class="br">&nbsp;</td>
-<td class="center br">1902-03</td>
-<td rowspan="5" class="br">&nbsp;</td>
-<td rowspan="5" class="br">&nbsp;</td>
-<td rowspan="5" class="br">&nbsp;</td>
-<td rowspan="5" class="br">&nbsp;</td>
-<td rowspan="5" class="br">&nbsp;</td>
-<td rowspan="5" class="br">&nbsp;</td>
-<td rowspan="5" class="br">&nbsp;</td>
-<td rowspan="5" class="br">&nbsp;</td>
-<td rowspan="5" class="br">&nbsp;</td>
-<td rowspan="5" class="br">&nbsp;</td>
-<td rowspan="5">&nbsp;</td>
-</tr>
-
-<tr>
-<td class="center br">1903-04</td>
-</tr>
-
-<tr>
-<td class="brace padr0">-</td>
-<td class="brace bt bb bl">&nbsp;</td>
-<td class="brace bt br bb">&nbsp;</td>
-<td class="brace padl0 br">-</td>
-<td class="center br">1904-05</td>
-</tr>
-
-<tr>
-<td rowspan="2" colspan="2">&nbsp;</td>
-<td rowspan="2" colspan="2" class="br">&nbsp;</td>
-<td class="center br">1905-06</td>
-</tr>
-
-<tr class="bb">
-<td class="center br">1906-07</td>
-</tr>
-
-</table>
-
-<p><span class="pagenum" id="Page116">[116]</span></p>
-
-<p>All the outlets of the uppermost village on the distributary
-should be entered, first, even though some of
-them may be downstream of, and bear serial numbers
-lower than, the outlets of the next village. When one
-outlet irrigates two or three villages the irrigation of
-the separate villages can be entered on one page in the
-places usually allotted to outlets, and the lowest part of
-the page can show the total for the outlet, the necessary
-changes in the headings, etc. being made. If any of
-the villages has other outlets these will appear on
-another page and the total for the village can also be
-shown.</p>
-
-<p>The village totals should be posted into a second
-register prepared somewhat as shown in <a href="#Tab4">table IV.</a>
-and totalled. The totals show the irrigation for the
-whole <span class="nowrap">distributary.<a id="FNanchor30" href="#Footnote30"
-class="fnanchor">[30]</a></span> If necessary the failed areas can
-be shown in the register in red ink. If any village is
-irrigated from two or more distributaries, each portion of
-the village should be dealt with as if it was a separate
-village.</p>
-
-<div class="footnote">
-
-<p id="Footnote30"><a href="#FNanchor30"><span class="label">[30]</span></a>
-Very long channels, e.g. inundation canals from which direct irrigation
-takes place, can be divided into reaches and the irrigation of the reaches
-dealt with as if they were separate channels. A reach should generally end
-at a bifurcation or stopdam.</p>
-
-</div><!--footnote-->
-
-<p>In all registers some blank spaces should be left for
-the insertion of new outlets or new villages. The
-number of pages to be left will depend on local circumstances,
-which should be considered. In case figures
-are supplied by the revenue authorities and deal only
-with whole villages, the details obtained by the canal
-staff should always be added up and checked with them.
-Similarly the commanded culturable areas for the
-outlets and villages should be added up and checked
-with the known total for the distributary.</p>
-
-<p><span class="pagenum" id="Page117">[117]</span></p>
-
-<p class="tabhead" id="Tab4">TABLE IV.&mdash;ABSTRACT OF IRRIGATION BY VILLAGES AND CHANNELS.</p>
-
-<table class="abstract" summary="Abstract">
-
-<tr>
-<th colspan="5" class="left padl8">Canal....................................</th>
-<th colspan="7" class="right padr8">Distributary........................</th>
-</tr>
-
-<tr>
-<th colspan="5" class="left padl8">From....................................</th>
-<th colspan="7" class="right padr8">To.....................................</th>
-</tr>
-
-<tr class="bt bb">
-<th rowspan="2" class="br">Name of Village.</th>
-<th rowspan="2" class="br">Commanded<br />Culturable<br />Area (Acres)</th>
-<th rowspan="2" colspan="3" class="br">Detail.</th>
-<th colspan="7">Net Areas Irrigated in Areas.</th>
-</tr>
-
-<tr class="bb">
-<th class="br">1902-03</th>
-<th class="br">1903-04</th>
-<th class="br">1904-05</th>
-<th class="br">1905-06</th>
-<th class="br">1906-07</th>
-<th class="br">1907-08</th>
-<th>1908-09</th>
-</tr>
-
-<tr>
-<td rowspan="4" class="br">&nbsp;</td>
-<td rowspan="4" class="br">&nbsp;</td>
-<td class="w15m">&nbsp;</td>
-<td class="left">Kharif</td>
-<td class="w15m br">&nbsp;</td>
-<td rowspan="4" class="br">&nbsp;</td>
-<td rowspan="4" class="br">&nbsp;</td>
-<td rowspan="4" class="br">&nbsp;</td>
-<td rowspan="4" class="br">&nbsp;</td>
-<td rowspan="4" class="br">&nbsp;</td>
-<td rowspan="4" class="br">&nbsp;</td>
-<td rowspan="4">&nbsp;</td>
-</tr>
-
-<tr>
-<td class="w15m">&nbsp;</td>
-<td class="left">Rabi</td>
-<td class="w15m br">&nbsp;</td>
-</tr>
-
-<tr>
-<td class="w15m">&nbsp;</td>
-<td class="left">Total</td>
-<td class="w15m br">&nbsp;</td>
-</tr>
-
-<tr class="bb">
-<td colspan="3" class="center br">Per cent of<br />Culturable</td>
-</tr>
-
-<tr>
-<td rowspan="4" class="br">&nbsp;</td>
-<td rowspan="4" class="br">&nbsp;</td>
-<td class="w15m">&nbsp;</td>
-<td class="left">Kharif</td>
-<td class="w15m br">&nbsp;</td>
-<td rowspan="4" class="br">&nbsp;</td>
-<td rowspan="4" class="br">&nbsp;</td>
-<td rowspan="4" class="br">&nbsp;</td>
-<td rowspan="4" class="br">&nbsp;</td>
-<td rowspan="4" class="br">&nbsp;</td>
-<td rowspan="4" class="br">&nbsp;</td>
-<td rowspan="4">&nbsp;</td>
-</tr>
-
-<tr>
-<td class="w15m">&nbsp;</td>
-<td class="left">Rabi</td>
-<td class="w15m br">&nbsp;</td>
-</tr>
-
-<tr>
-<td class="w15m">&nbsp;</td>
-<td class="left">Total</td>
-<td class="w15m br">&nbsp;</td>
-</tr>
-
-<tr class="bb">
-<td colspan="3" class="center br">Per cent of<br />Culturable</td>
-</tr>
-
-<tr>
-<td rowspan="4" class="br">&nbsp;</td>
-<td rowspan="4" class="br">&nbsp;</td>
-<td class="w15m">&nbsp;</td>
-<td class="left">Kharif</td>
-<td class="w15m br">&nbsp;</td>
-<td rowspan="4" class="br">&nbsp;</td>
-<td rowspan="4" class="br">&nbsp;</td>
-<td rowspan="4" class="br">&nbsp;</td>
-<td rowspan="4" class="br">&nbsp;</td>
-<td rowspan="4" class="br">&nbsp;</td>
-<td rowspan="4" class="br">&nbsp;</td>
-<td rowspan="4">&nbsp;</td>
-</tr>
-
-<tr>
-<td class="w15m">&nbsp;</td>
-<td class="left">Rabi</td>
-<td class="w15m br">&nbsp;</td>
-</tr>
-
-<tr>
-<td class="w15m">&nbsp;</td>
-<td class="left">Total</td>
-<td class="w15m br">&nbsp;</td>
-</tr>
-
-<tr class="bb">
-<td colspan="3" class="center br">Per cent of<br />Culturable</td>
-</tr>
-
-<tr>
-<td class="center total br">Total</td>
-<td class="total br">&nbsp;</td>
-<td colspan="3" class="total br">&nbsp;</td>
-<td class="total br">&nbsp;</td>
-<td class="total br">&nbsp;</td>
-<td class="total br">&nbsp;</td>
-<td class="total br">&nbsp;</td>
-<td class="total br">&nbsp;</td>
-<td class="total br">&nbsp;</td>
-<td class="total">&nbsp;</td>
-</tr>
-
-</table>
-
-<p><span class="pagenum" id="Page118">[118]</span></p>
-
-<p>The percentages of culturable commanded area
-irrigated by different outlets will, as already explained,
-always show discrepancies. Any special causes of low
-percentages, e.g. a large proportion of rice, can be
-briefly noted in the register.</p>
-
-<p>On inundation canals, and some others, the alignment
-and chainage are liable to undergo alteration. In such
-cases it is best to adhere to the original chainage until
-all the alterations in alignment have been carried out.</p>
-
-<h3 class="inline" id="Ref8">5. <b>Distribution of Supply.</b></h3>
-
-<p class="inlineh">&nbsp;The question how the
-supply of a canal is to be distributed when it is less than
-the demand, is not always very simple. Suppose that
-the main canal, after perhaps giving off several distributaries,
-divides, at one place, into three branches,
-A, B, and C, whose full supply discharges are respectively
-2,500, 2,000 and 1,500 c. ft. per second. Suppose that
-the total discharge reaching the trifurcation is expected
-to be, when at the lowest during the crop, only 2,200
-c. ft. per second, instead of 6,000. It would be possible,
-supposing the discharge tables to be fairly accurate, to
-keep all the channels running with discharges proportionate
-to their full supplies, but this would not be
-suitable. The water levels would not be high enough to
-enable full supplies to be got into the distributaries, or
-at least into some of them. Moreover, the running of
-low supplies causes much loss by absorption. The plan
-usually adopted is to give each channel full supply, or
-nearly full supply, in turn, and for such a number of
-days that the turn of each branch will recur about once
-a fortnight, that being a suitable period having regard
-to the exigencies of crops, and having the advantage
-that the turn of each branch comes on a particular day<span class="pagenum" id="Page119">[119]</span>
-of the week, so that everyone concerned, and especially
-the irrigating community, can remember and understand
-it. <a href="#Tab5">Table V.</a> shows how the turns in the above case
-can be arranged. The figures show the discharges.</p>
-
-<p class="tabhead" id="Tab5">TABLE V.</p>
-
-<table class="tab5and6" summary="Table 5">
-
-<tr class="bt bb">
-<th class="br"><span class="smcap">Day.</span></th>
-<th class="br">A</th>
-<th class="br">B</th>
-<th>C</th>
-</tr>
-
-<tr>
-<td class="no">1</td>
-<td class="number br">2,200</td>
-<td class="br">&nbsp;</td>
-<td>&nbsp;</td>
-</tr>
-
-<tr>
-<td class="no">2</td>
-<td class="number br">2,200</td>
-<td class="br">&nbsp;</td>
-<td>&nbsp;</td>
-</tr>
-
-<tr>
-<td class="no">3</td>
-<td class="number br">2,200</td>
-<td class="br">&nbsp;</td>
-<td>&nbsp;</td>
-</tr>
-
-<tr>
-<td class="no">4</td>
-<td class="number br">2,200</td>
-<td class="br">&nbsp;</td>
-<td>&nbsp;</td>
-</tr>
-
-<tr>
-<td class="no">5</td>
-<td class="number br">2,200</td>
-<td class="br">&nbsp;</td>
-<td>&nbsp;</td>
-</tr>
-
-<tr>
-<td class="no">6</td>
-<td class="br">&nbsp;</td>
-<td class="number br">2,000</td>
-<td class="number">200</td>
-</tr>
-
-<tr>
-<td class="no">7</td>
-<td class="br">&nbsp;</td>
-<td class="number br">2,000</td>
-<td class="number">200</td>
-</tr>
-
-<tr>
-<td class="no">8</td>
-<td class="br">&nbsp;</td>
-<td class="number br">2,000</td>
-<td class="number">200</td>
-</tr>
-
-<tr>
-<td class="no">9</td>
-<td class="br">&nbsp;</td>
-<td class="number br">2,000</td>
-<td class="number">200</td>
-</tr>
-
-<tr>
-<td class="no">10</td>
-<td class="br">&nbsp;</td>
-<td class="number br">2,000</td>
-<td class="number">200</td>
-</tr>
-
-<tr>
-<td class="no">11</td>
-<td class="number br">700</td>
-<td class="br">&nbsp;</td>
-<td class="number">1,500</td>
-</tr>
-
-<tr>
-<td class="no">12</td>
-<td class="number br">700</td>
-<td class="br">&nbsp;</td>
-<td class="number">1,500</td>
-</tr>
-
-<tr>
-<td class="no">13</td>
-<td class="number br">700</td>
-<td class="br">&nbsp;</td>
-<td class="number">1,500</td>
-</tr>
-
-<tr>
-<td class="no">14</td>
-<td class="number br">700</td>
-<td class="br">&nbsp;</td>
-<td class="number">1,500</td>
-</tr>
-
-<tr class="bt">
-<td class="center padl1 padr1 br">Total</td>
-<td class="number br">13,800</td>
-<td class="number br">10,000</td>
-<td class="number">7,000</td>
-</tr>
-
-<tr class="bb">
-<td class="center padl1 padr1 br fsize80">Correct<br />discharge<br />according<br />to Full Supply.</td>
-<td class="number br">12,800</td>
-<td class="number br">10,300</td>
-<td class="number">7,700</td>
-</tr>
-
-</table>
-
-<p>The orders given to the gauge readers in these cases
-are simple, namely to give each branch full supply in
-turn, and to send the rest of the water down the channel
-next on the list.</p>
-
-<p><span class="pagenum" id="Page120">[120]</span></p>
-
-<p>The number of days allotted to the larger branches
-are greater than to the smallest because this will probably
-be simplest in the end, and also because the
-number of distributaries on a larger branch is likely to
-be greater, and the allotment to the distributaries is thus
-facilitated somewhat. Each branch receives water in
-one period of consecutive days. Any splitting up of the
-turn would be highly objectionable. It would cause
-waste of water, and would give rise to much difficulty in
-redistributing the supply among its distributaries. Each
-branch receives its residuum turn before it receives its
-full supply turn. The advantage of this is that water is
-not let into the channel suddenly. The total supplies
-of A, B and C are in the ratio of 13&middot;8, 10, and 7, and not,
-as they should be 12&middot;8, 10&middot;3, and 7&middot;7, but no closer
-approximation can be got. If the number of days of full
-supply allotted to each branch is changed, or if the
-residuum from C is given to B, instead of A, the relative
-total discharges differ still more from what they should
-be.</p>
-
-<p>If now the total supply is supposed to be increased to
-2,700 c. ft. per second, the discharges are as shown in
-<a href="#Tab6">table VI.</a></p>
-
-<p class="tabhead" id="Tab6">TABLE VI.</p>
-
-<table class="tab5and6" summary="Table 6">
-
-<tr class="bt bb">
-<th class="br"><span class="smcap">Day.</span></th>
-<th class="br">A</th>
-<th class="br">B</th>
-<th>C</th>
-</tr>
-
-<tr>
-<td class="no">1</td>
-<td class="number br">2,500</td>
-<td class="number br">200</td>
-<td>&nbsp;</td>
-</tr>
-
-<tr>
-<td class="no">2</td>
-<td class="number br">2,500</td>
-<td class="number br">200</td>
-<td>&nbsp;</td>
-</tr>
-
-<tr>
-<td class="no">3</td>
-<td class="number br">2,500</td>
-<td class="number br">200</td>
-<td>&nbsp;</td>
-</tr>
-
-<tr>
-<td class="no">4</td>
-<td class="number br">2,500</td>
-<td class="number br">200</td>
-<td>&nbsp;</td>
-</tr>
-
-<tr>
-<td class="no">5</td>
-<td class="number br">2,500</td>
-<td class="number br">200</td>
-<td>&nbsp;</td>
-</tr>
-
-<tr>
-<td class="no">6</td>
-<td class="br">&nbsp;</td>
-<td class="number br">2,000</td>
-<td class="number">700</td>
-</tr>
-
-<tr>
-<td class="no">7</td>
-<td class="br">&nbsp;</td>
-<td class="number br">2,000</td>
-<td class="number">700</td>
-</tr>
-
-<tr>
-<td class="no">8</td>
-<td class="br">&nbsp;</td>
-<td class="number br">2,000</td>
-<td class="number">700</td>
-</tr>
-
-<tr>
-<td class="no">9</td>
-<td class="br">&nbsp;</td>
-<td class="number br">2,000</td>
-<td class="number">700</td>
-</tr>
-
-<tr>
-<td class="no">10</td>
-<td class="br">&nbsp;</td>
-<td class="number br">2,000</td>
-<td class="number">700</td>
-</tr>
-
-<tr>
-<td class="no">11</td>
-<td class="number br">1,200</td>
-<td class="br">&nbsp;</td>
-<td class="number">1,500</td>
-</tr>
-
-<tr>
-<td class="no">12</td>
-<td class="number br">1,200</td>
-<td class="br">&nbsp;</td>
-<td class="number">1,500</td>
-</tr>
-
-<tr>
-<td class="no">13</td>
-<td class="number br">1,200</td>
-<td class="br">&nbsp;</td>
-<td class="number">1,500</td>
-</tr>
-
-<tr>
-<td class="no">14</td>
-<td class="number br">1,200</td>
-<td class="br">&nbsp;</td>
-<td class="number">1,500</td>
-</tr>
-
-<tr class="bt">
-<td class="center br">Total</td>
-<td class="number br">17,300</td>
-<td class="number br">11,000</td>
-<td class="number">9,500</td>
-</tr>
-
-<tr class="bb">
-<td class="center br fsize80">Correct<br />Discharge.</td>
-<td class="number br">15,700</td>
-<td class="number br">12,600</td>
-<td class="number">9,500</td>
-</tr>
-
-</table>
-
-<p>Considering both the above tables, A always receives
-more water than its share, while B and C on the whole
-receive too little. Considering table V. by itself, matters
-might, perhaps, be set right by altering the total number
-of days from 14 to 13 or 12, but this, besides being
-somewhat objectionable for the reason already given,
-might not improve matters when <a href="#Tab6">table VI.</a> came into
-operation. It is desirable to avoid frequent changes or
-complicated rules. It is objectionable to make any turn<span class="pagenum" id="Page121">[121]</span>
-consist of other than a whole number of days. The
-shifting of the regulator gates is begun at sunrise, a time
-when officials are about and can see what is happening.
-All gauges are read early in the morning, and those at
-regulators are read after the regulation has been done
-and the flow has become steady. If any regulation were
-done in the evening, the entry in the gauge register of
-that day would convey a wrong impression, and the
-discharge would be incorrectly booked. Moreover, any<span class="pagenum" id="Page122">[122]</span>
-system of regularly booking evening as well as morning
-gauges leads to swelling of the already voluminous
-gauge register.</p>
-
-<p>The best method of adjusting matters is to make
-slight alterations in the full supply gauges. Suppose
-the normal full supplies in all three branches to be 6 feet.
-When <a href="#Tab6">table VI.</a> is in operation the full supply of A can
-be reduced to about 5&middot;8 feet. This would give, during
-the first 5 days, less water to A and more to B, and there
-is the further advantage that a very small supply, 200
-c. ft. per second, is not run in any branch. As regards
-<a href="#Tab5">table V.</a>, branch A never receives full supply. This is a
-rare <span class="nowrap">case.<a id="FNanchor31" href="#Footnote31"
-class="fnanchor">[31]</a></span> If it were safe, as it might be, to run slightly
-more than full supply in C, this could be done, and it
-would increase the supply in C during the last four days
-and reduce that in A. Otherwise a certain gauge would
-have to be fixed for A which would give it less than
-2,200 c. ft. per second during the first 5 days, and the
-balance would go to branch B. Similarly, the gauge of
-B could be slightly reduced, and this would increase the
-balance going to C. The orders given to the gauge
-reader are, as before, to send the full supply down one
-channel, and the balance to the next. The only
-additional procedure necessary is to inform the gauge
-reader from time to time what the full supply gauges
-are. In any case such information has probably to be
-conveyed to him at times because the channels undergo
-changes, and the discharge corresponding to a given
-gauge also changes.</p>
-
-<div class="footnote">
-
-<p id="Footnote31"><a href="#FNanchor31"><span class="label">[31]</span></a>
-The total discharge, 2,200 c. ft. per second, assumed, is very low
-compared with the full supply of 6,000 c. ft. per second.</p>
-
-</div><!--footnote-->
-
-<p>When the discharge of the canal exceeds 3,500 c. ft.
-per second there is, when B and C are receiving water, a<span class="pagenum" id="Page123">[123]</span>
-second residuum, which goes to A. Tables can be
-worked out for several discharges of the main canal, but
-it is the minimum discharge which is the most important
-factor in the case. The minimum discharge, or something
-very near it, generally lasts through about half the crop,
-and it is when the supply is at a minimum that care
-and justice in the distribution are most needed.</p>
-
-<p>The chief objection to the arrangements above
-described is that the surplus to be sent down one
-channel or another is sometimes so small that it must be
-to a great extent wasted. The best means of preventing
-this is to have the discharge tables, including one for the
-main canal at some point higher up than the trifurcation,
-constantly corrected. In that case, it is known under
-what circumstances a small surplus will occur, and the
-orders can be modified so as to prevent its occurrence.
-The orders will of course be more complicated, and will
-have to be dealt with by an engineer and not a gauge
-reader.</p>
-
-<p>The turns, once satisfactorily arranged, may go on for
-years without alteration. They may require altering if
-any branch is found, in the course of time, to be doing
-worse than or better than the others, though the correction
-can probably be made by altering the full supply
-gauge.</p>
-
-<p>The turns of the branches having been arranged, it
-remains to settle those of the distributaries. The total
-available discharge being, as before, assumed to be rather
-more than one-third of the full supply discharge, each
-distributary taking off from the main canal, where it is
-not possible or not desirable to regulate the height of the
-water level in the canal, can be run with full supply for<span class="pagenum" id="Page124">[124]</span>
-four or five days out of each fortnight, and then closed.
-Whether it be four days or five may often depend on
-special circumstances such as whether the distributary
-is doing well or otherwise. If necessary the full supply
-can be adjusted. When the canal supply increases the
-four or five days can be increased.</p>
-
-<p>The same principle can be adopted for any distributary
-whose off-take is in the upper part of a branch, <i>i.e.</i>, where
-the branch is many times larger than the distributary,
-and where it is not possible or not desirable to regulate
-the water level of the branch. For a distributary further
-down the branch, the turns of branch and distributary
-can be arranged as explained above for a canal bifurcation.
-The orders given to the gauge reader are, as before,
-to give the channel whose turn it is, full supply and to
-send the balance down the other channel. When the
-turn of distributary is over it becomes the turn of the
-branch. The distributary would not be closed if this
-would cause the full supply in the branch to be exceeded.
-Care must be taken that every distributary receives full
-supply during part of the time when the branch is
-receiving full supply. If its turn came only when the
-branch was receiving a residuum supply, or rather when
-the residuum supply was reaching the distributary off-take&mdash;for
-in the case of a distributary whose off-take is
-far down a long branch the two things are not the
-same&mdash;it might, in the event of the supply in the
-main canal falling exceptionally low, receive no water at
-all.</p>
-
-<p>The time taken by a rise in travelling down a canal is
-very much the same as that taken by a fall and each takes
-effect more or less gradually. When a branch receives,
-at any point, a temporary increase in its supply, owing<span class="pagenum" id="Page125">[125]</span>
-to the closure of a distributary for, say, three days, there
-will be a rise lasting for three days at a point further
-down. The rise will take some time to come to its
-height, and some time to die away. There will be about
-three days from the commencement of the rise to the
-commencement of the fall, or from the end of the rise to
-the end of the fall. If, either in the main canal or in a
-branch, there is any distributary into which full supply
-cannot be got, its turn can be increased accordingly.
-Owing to the shortness of the turns, and to allowance
-having to be made for the time occupied by rises and
-falls in travelling down the branch, the fixing of the
-turns for distributaries near the tail of the branch
-requires a good deal of consideration. Matters are
-facilitated by making a sketch (<a href="#Fig25">Fig. 25</a>) in which the
-widths of the channels, as drawn, are roughly in proportion
-to the full supply discharges. If 14 copies of the
-sketch are made the arrangements for each day can be
-shown on them, full supply being shown black and
-residuum hatched. Distributaries would be shown as
-well as the main channels.</p>
-
-<div class="figcenter" id="Fig25">
-<img src="images/illo145.png" alt="Sketch" width="350" height="260" />
-<p class="caption"><span class="smcap">Fig.</span> 25.</p>
-</div>
-
-<p>The irrigation registers of course show how the
-irrigation of the different channels is going on from
-year to year and if changes in the turns become necessary
-they can be effected.</p>
-
-<p>After the water has entered the watercourses the
-canal officials have nothing to do with its distribution.<span class="pagenum" id="Page126">[126]</span>
-The people arrange among themselves a system of turns,
-each person taking the water for a certain number of
-&#8220;pahars&#8221;&mdash;a pahar is a watch of three hours&mdash;or
-fractions of a pahar. The zilladar can however be
-called in by any person who has a dispute with his
-neighbour. If the matter is not settled the person
-aggrieved can lodge a formal complaint and a canal
-officer then tries the case, and if necessary punishes the
-offender.</p>
-
-<p>In former days it was usual, in some places,
-for no regular turns to be fixed for the distributaries,
-orders being issued regarding them from time to time.
-The weak point about any such plan is that in the event
-of the controlling officer delaying, owing to any accident,
-to issue an order, no one knows what to do. Orders
-were also sometimes issued to zilladars giving them
-discretionary powers in distribution. No one would
-now issue such orders. The essential principle is to
-remove power from the hands of the subordinates.
-The working of the main channels by turns and the
-construction of outlets of such a size that they never
-require closure, has resulted&mdash;in places where such
-matters are attended to&mdash;in the absolute destruction
-of such <span class="nowrap">power.<a id="FNanchor32" href="#Footnote32" class="fnanchor">[32]</a></span> The only way in which a zilladar
-can injure anyone is to say that water is not
-in demand. This would however result in damaging
-the whole of the villages in his charge. He is not likely
-to do this.</p>
-
-<div class="footnote">
-
-<p id="Footnote32"><a href="#FNanchor32"><span class="label">[32]</span></a> In the printed form lately in use in the Punjab for reports on
-zilladars, one of the questions asked is whether &#8220;his arrangements&#8221; for the
-distribution of water are satisfactory, as if that was still considered to be the
-zilladar&#8217;s business.</p>
-
-</div><!--footnote-->
-
-<p>In case the supply is wholly or partially interrupted
-owing to a breach or an accident at the headworks, or
-other cause, one particular branch or distributary may<span class="pagenum" id="Page127">[127]</span>
-lose its turn or part of it. If its loss is not great it may
-be best to allow the turns to take their usual course, but
-otherwise they should be temporarily altered in such a
-way as to compensate the channels which have suffered.</p>
-
-<p>On inundation canals the water at a regulator is
-sometimes headed up,&mdash;all branches being partially
-closed&mdash;in order to give more water to outlets in the
-upstream reach. There are even some regulators&mdash;or
-rather stop-dams&mdash;constructed solely for this purpose at
-places where there is no bifurcation of the canal or distributary.
-Any such heading up should be planned out
-beforehand and days for it fixed, and also the gauge
-reading. If the water, without any heading up, rises to
-the needful height on the gauge, nothing has to be done.
-There are also places on inundation canals where the
-land is high and is only irrigable during floods. At
-such places it is usual, on some canals, to allow the
-people to make cuts in the bank when the water attains
-a certain height. Owing to the high level of the
-country, nothing in the nature of a breach can occur.
-In one canal division where the above arrangement was
-in force, the people used to send applications to the
-Executive Engineer for leave to cut the banks. This
-resulted in much delay. A list was prepared showing
-exactly where the banks might be cut, the people were
-informed and the formalities were much reduced.</p>
-
-<h3 class="inline" id="Ref5">6. <b>Extensions and Remodellings.</b></h3>
-
-<p class="inlineh">&nbsp;An existing
-canal or distributary may need remodelling for various
-reasons, and in various degrees. If the velocity is too
-high and the bed has scoured, or the sides have fallen
-in, it may be necessary to raise the crests of falls, or to
-construct intermediate weirs, or to widen the channel
-and reduce the depth. If the command is not good it<span class="pagenum" id="Page128">[128]</span>
-may be necessary to regrade the channel. If silt
-deposit occurs, the cross-section of the channel may
-have to be altered, to give a better relation between D
-and V. If there is surplus water, extensions or enlargements
-of channels may be desirable and these can
-sometimes be undertaken to a moderate extent merely
-by restricting a somewhat too lavish supply to existing
-distributaries. If the water level is dangerously high
-it may have to be lowered, or the banks raised and
-strengthened. Sometimes it is desirable to cut off
-bends either to shorten the channel and gain command
-or because the bends are sharp and cause falling in of
-the banks or, if numerous, silting. In all cases the
-general principles are the same as for entirely new projects,
-but certain details require consideration.</p>
-
-<p>The distributaries of the older canals were constructed
-before Kennedy&#8217;s laws regarding silting were known,
-and it has been necessary to remodel many of them.
-In some cases the gradient was wrong, in others the
-<span class="nowrap">cross-section.<a id="FNanchor33" href="#Footnote33"
-class="fnanchor">[33]</a></span> In some cases a distributary ran in
-rather low ground, and it was proposed to abandon it
-and construct a new one on high ground. It was however
-pointed out by Kennedy (<i>Punjab Irrigation Paper
-No. 10</i>, &#8220;Remodelling of Distributaries on old Canals,&#8221;)
-that irrigation had become established along the course
-of the distributary, that most of it would remain there
-and that a new alignment would result in increased
-length of watercourses. Such distributaries have therefore
-been allowed to remain very much as they were.</p>
-
-<div class="footnote">
-
-<p id="Footnote33"><a href="#FNanchor33"><span class="label">[33]</span></a>
-The difficulty of reducing the size of a channel which is too large is
-well known and has been discussed in <i>River and Canal Engineering</i>,
-Chapter VIII. It is there explained that a moderate reduction of width can
-be effected by &#8220;bushing,&#8221; but that for great reductions, groynes or training
-walls are necessary. When the bed of a distributary is too low it has been
-suggested that it could be raised by filling in earth in each alternate length
-of 500 feet, and leaving the rest to silt, but this would be expensive.</p>
-
-</div><!--footnote-->
-
-<p><span class="pagenum" id="Page129">[129]</span></p>
-
-<p>Remodelling should not be considered piecemeal, but
-regard should be had to the whole channel. When a
-distributary is remodelled the outlets should of course
-be dealt with as well as the channel. The chief thing
-to consider is not whether the channel as it exists is
-exactly as it was originally designed to be, but how it
-is doing its work and what kind of alteration it needs.
-Even when a simple silt clearance or berm cutting of a
-channel has to be undertaken, the work need not always
-consist in blindly restoring the channel to its original
-condition. It may be both feasible and desirable to
-remodel it to a slight extent, lowering the water for
-instance in reaches where the outlets draw off very good
-supplies and thus benefiting less fortunate reaches lower
-down.</p>
-
-<p>The irrigation boundaries of the extended or remodelled
-channel should as far as possible follow
-drainages, but these are not always important or pronounced.
-The actual irrigation boundaries should be
-shown and also those of any neighbouring channels of
-other canals, and any suitable adjustments should be
-made.</p>
-
-<p>Regarding the percentage of area to be irrigated, it
-has already been stated that one canal or distributary
-irrigates a far higher percentage than another. Generally
-when there is a high percentage in any tract, it is
-undesirable to cut it down unless it has very recently
-sprung up to the detriment of other tracts. In some
-remodelling projects a uniform percentage is taken on
-the whole area including both new and old irrigation.
-This plan is suitable when the percentage of old irrigation
-is not very high. In other cases the old irrigation<span class="pagenum" id="Page130">[130]</span>
-to be provided for may be taken as the maximum area
-actually irrigated, a little being perhaps added for
-extensions. If the irrigation of considerable areas of
-jungle tracts is contemplated and if these consist of
-numerous small patches, a further percentage can be
-added for them. If there are large jungle tracts they
-can of course be dealt with separately and any suitable
-percentage adopted for them. The percentage for each
-portion of a remodelling project is not necessarily the
-same.</p>
-
-<p>If the discharge of a channel is increased, the waterways
-of bridges may need increasing. This can often
-be done (<a href="#Ref16">Chapter II., Art. 12</a>) by making a floor at a
-low level. Or the waterway may be allowed to remain
-small, the floor being added at the bed level and the
-bridge then becoming an incomplete fall, (<a href="#Page87">page 87</a>). The
-fall in the water surface, though small, can be recognised
-and shown on the longitudinal section.</p>
-
-<p>In remodelling schemes, the longitudinal section
-should give all possible information. It should show
-not only the levels of bed and banks, but the F.S. levels
-(in blue figures) above and below all falls or regulators,
-and the levels of floors and waterways of bridges. The
-plan should show all watercourses and the &#8220;chaks&#8221; or
-areas assigned to <span class="nowrap">them.<a id="FNanchor34" href="#Footnote34" class="fnanchor">[34]</a></span> On each chak the actual
-average irrigation can be shown in blue figures and the
-proposed irrigation in red. The &#8220;draw-off&#8221; for each
-proposed outlet can then be shown on the longitudinal
-section. The area actually irrigated, as shown on the<span class="pagenum" id="Page131">[131]</span>
-map, should in each case be the mean of at least three
-years, and if possible of five years. The number of
-years should be mentioned in a note on the map. Cross-sections
-of channels should always be drawn to natural
-scale, and not with the horizontal scale differing from
-the vertical.</p>
-
-<div class="footnote">
-
-<p id="Footnote34"><a href="#FNanchor34"><span class="label">[34]</span></a>
-The field maps mentioned on <a href="#Page101">page 101</a> are prepared to a very large
-scale and show all watercourses. The maps should always be corrected up
-to date by the patwaris. The chak maps which are on a smaller scale&mdash;say
-4 inches to the mile&mdash;can thus be kept correct.</p>
-
-</div><!--footnote-->
-
-<h3 class="inline" id="Ref20">7. <b>Remodelling of outlets.</b></h3>
-
-<p class="inlineh">&nbsp;When a channel is
-remodelled, the remodelling of the outlets may consist
-in alterations of the number or sites or in alterations of
-their sizes.</p>
-
-<p>Regarding the former, a map should be prepared
-showing all watercourses, chaks and <span class="nowrap">contours.<a
-id="FNanchor35" href="#Footnote35" class="fnanchor">[35]</a></span> On
-this map new lines for the watercourses can be shown,
-the principles enunciated in <a href="#Ref4">Chapter II., Art. 9</a>, being
-generally followed, but in such a way as to utilise
-existing watercourses and outlets as far as possible.
-The work often consists in the abolition of a certain
-number of watercourses, when these are too close
-together and run parallel to one another. There may,
-however, be little gain in amalgamating two such
-watercourses if they serve two different villages. There
-is nothing to prevent the people from dividing the
-watercourse into two as soon as it gets away from the
-canal, and they are likely to do this in many cases.
-When one branch has a flatter slope than the other it
-would lose command if it took off further down. The
-people on the steeper branch might not agree to using
-the flatter one because of silt trouble, or increased
-height of embankment. In a new project it is not
-difficult to get the people to do what is needed, but<span class="pagenum" id="Page132">[132]</span>
-when once irrigation has become established it is often
-difficult to get suitable changes made. The advantages
-of amalgamating watercourses, though appreciable, have
-been a good deal exaggerated. The chief advantage is
-gained by reduction in the sizes of outlets. Then, however
-many branches the watercourse may have, they can
-only run in turns and not all together. It may
-happen that two watercourses, though taking off near
-one another, run in different directions and that the
-chaks are of suitable shapes and sizes. In such a case
-the only advantage of amalgamating is that it saves an
-outlet in the canal bank. No saving in the length of
-watercourse will be effected because there will be a
-bifurcation as soon as the watercourse leaves the canal
-boundary. If both outlets are of suitable design and
-proper size or require only slight alteration, both can
-remain but otherwise amalgamation can be effected. In
-some cases amalgamation might give a discharge
-greater than that usually allowed for an outlet but this
-need form no obstacle. The chief reason for limiting
-the discharge is the alleged inability of the farmers to
-manage a large channel. This matter is exaggerated
-as already stated (<a href="#Page74">page 74</a>). In the case under consideration
-it obviously makes no difference whether
-there are two watercourses each discharging 5 c. ft. per
-second, or one discharging 10 c. ft. per second, and
-immediately dividing into two. Very small watercourses
-should, when possible, be joined to others but
-if there is no other near enough they must generally
-remain, however small they may be.</p>
-
-<div class="footnote">
-
-<p id="Footnote35"><a href="#FNanchor35"><span class="label">[35]</span></a>
-In small remodelling schemes the lines of existing watercourses show
-how the country slopes, and a contour plan is not a necessity.</p>
-
-</div><!--footnote-->
-
-<p>Regarding the alterations in sizes of outlets, whether
-or not there are alterations in their number and position,
-information as to the actual duties on the watercourses<span class="pagenum" id="Page133">[133]</span>
-should be obtained. The discharge of the watercourses
-should be observed several times and added up and
-checked with the discharge of the distributary. The
-areas irrigated are known from the irrigation register.
-If the duties are abnormal the causes can be gone into,
-and a judgement can be formed as to how far they will
-remain in existence, and whether any watercourse is
-often kept closed. If so the outlet is too large. The
-duties, modified so far as may seem desirable, can be
-used for calculating the sizes of the remodelled outlets.
-But alterations of the sizes after a year or two years&#8217;
-working will probably be necessary. The above procedure
-is also applicable to a case where the old watercourses
-had no masonry heads but were merely open cuts as on
-some inundation canals.</p>
-
-<p>A common case is that in which the channel is not
-remodelled&mdash;or at least its water level remains very
-much as before&mdash;but merely the outlets are altered in
-number, position or size, or in any or all of these. If
-the land irrigated by an outlet is high, the irrigation
-may be far short of what was expected, and the size of
-the outlet may have to be increased or its site shifted,
-generally upstream. This is often done at the request
-of the people, and at their <span class="nowrap">expense.<a id="FNanchor36" href="#Footnote36" class="fnanchor">[36]</a></span></p>
-
-<div class="footnote">
-
-<p id="Footnote36"><a href="#FNanchor36"><span class="label">[36]</span></a>
-On some of the more modern canals the people are not allowed to pay
-for outlets, so that no question of ownership can arise.</p>
-
-</div><!--footnote-->
-
-<p>Old outlets should always be removed when superseded
-by others. Otherwise they are apt to be reopened
-or claims set up regarding them.</p>
-
-<p>Near the tail of a channel the discharge of an outlet
-may be an appreciable fraction of that of the channel.
-In such a case the adjustment of the size of the outlet, and<span class="pagenum" id="Page134">[134]</span>
-that of the channel or of any weir or fall in the channel,
-should be considered together, the irrigation on the outlet
-and that on the channel downstream of it being compared.
-And similarly as to the sizes of any two or more tail
-outlets. Such outlets are sometimes left without
-masonry heads on the ground that this injures no one.
-It may injure an outlet upstream of them by drawing
-down the water. Tail outlets often need constructing
-or reducing in size to raise the water level in the reach
-upstream of them.</p>
-
-<p>Whenever the size of an old outlet is altered the
-design should be altered if unsuitable. The parapets
-should be brought into proper line, the roadway corrected,
-the floor level adjusted and any splayed wing
-walls abolished. If the outlet is skew it should be
-made square. All this should also be done to all old
-outlets or heads of minors even if the sizes are correct,
-whenever remodelling of outlets on any channel is
-<span class="nowrap">undertaken.<a id="FNanchor37" href="#Footnote37" class="fnanchor">[37]</a></span></p>
-
-<div class="footnote">
-
-<p id="Footnote37"><a href="#FNanchor37"><span class="label">[37]</span></a>
-Wherever an outlet is built or altered, a template, made to the
-exact size of barrel required, should be supplied to the subordinate
-in charge of the work.</p>
-
-</div><!--footnote-->
-
-<p>It was stated in <a href="#Page30">Chapter II.</a> that the construction of
-masonry outlets on a distributary is not usually a final
-settlement of the matter. In many cases a proper proportion
-of water does not reach the tail. Even in such a case
-matters have occasionally been left alone, or the old and
-pernicious system of closing the upper outlets has been
-resorted to. In such circumstances the irrigation of a
-group of tail villages will be found to be less than that
-of a group higher up, the people to some extent acquiescing
-in the old idea that a tail village must be a sufferer.
-Government, or at least the Irrigation Department, has<span class="pagenum" id="Page135">[135]</span>
-no particular direct interest in the matter. The total
-area irrigated, will probably be very much the same in
-any case. But an engineer who takes an interest in
-this part of his work will not allow matters to remain
-long in the state described. He will, of his own accord,
-adjust the outlets and equalise, as far as possible, the
-irrigated percentages. The people will disturb matters
-to some extent by enlarging watercourses, but there is
-a limit to this and it can be met by an occasional
-reduction of an outlet. A distributary, when once its
-outlets have been carefully adjusted, attains to something
-approaching perfection in its working. Any excess
-in the supply is taken partly by the upper outlets but
-part of it gets to the tail. Similarly any deficiency in
-the supply is distributed over the channel. The outlets
-which have a poor command and small head are most
-affected in either case. On the whole they do not lose
-or gain more than the others. The working of such a
-distributary causes great satisfaction to the engineer
-and not the least ingredient in this is the knowledge
-that he has wholly destroyed the power of his native
-subordinate.</p>
-
-<p>In an inundation canal division in the Punjab, some
-dozen distributaries, varying in length from 5 to 28
-miles, and with discharges ranging up to 300 c. feet per
-second, were dealt with as above in one season. The
-engineer in charge being specially desirous that sufficient
-water should reach the tails, reduced the sizes of some
-outlets too much. When an outlet of 1 or 2 sq. feet
-has to be reduced to a small fraction of its size it is not
-easy to say what the fraction shall be. Water reached
-the tails of all the channels in sufficient quantity, in
-some cases in rather more quantity than was necessary.<span class="pagenum" id="Page136">[136]</span>
-When the irrigation register was examined, it was
-found that the general results were entirely satisfactory.
-In a small proportion of cases outlets had irrigated too
-little and had to be re-enlarged somewhat. After a
-second season hardly any changes were needed. When
-any silt clearance or berm-cutting seemed necessary the
-irrigation register again came into play. If, for instance
-the tail outlets, as a whole, were receiving too little
-water, enlargement of the upstream reaches was effected
-with consequent lowering of the water level there.</p>
-
-<p>In the case above described the channels flowed for
-only five months in the year. Some of them silted a
-good deal but as this silting was roughly the same every
-year, it did not greatly affect the question of outlet
-sizes. On a perennial distributary of which the head
-reach silts during part of the year and scours during the
-other part, a proper distribution of supply by adjustment
-of outlet sizes alone may be more difficult. If the silt
-was frequently cleared, this would cause needless expense
-and interference with irrigation. In cases where the
-distributary is not run constantly, something can be done
-by attending to the regulation. When there is silt in
-the head reach, the discharge can be reduced and the
-period of flow proportionately increased. The lowered
-water level reduces the supplies of the upper outlets,
-and increases the discharges of those lower down.
-Moreover the periodical silting and scour are not always
-serious. Also it is not essential that the supply to each
-watercourse should be exactly the same every year.
-There are always good and bad seasons. It is sufficient
-if a watercourse is not allowed to suffer on the whole,
-and is never allowed to suffer much. There is no doubt
-that it is possible to deal satisfactorily in the above<span class="pagenum" id="Page137">[137]</span>
-manner with very many distributaries. It is frequently
-reported that &#8220;difficulty is experienced in getting water
-to the tail.&#8221; This is owing to timidity in reducing the
-sizes of outlets. The suitable plan is to reduce them to
-such an extent as to cause a proper supply to reach the
-tail and then, if necessary to enlarge some. It has been
-already remarked that only a short length of the barrel
-need be altered. The cost of this is very small. The
-real difficulty in the case is not the impossibility of
-securing good results, but the impracticability, in many
-cases, of securing the constant attention which the
-procedure <span class="nowrap">demands.<a id="FNanchor38" href="#Footnote38" class="fnanchor">[38]</a></span></p>
-
-<div class="footnote">
-
-<p id="Footnote38"><a href="#FNanchor38"><span class="label">[38]</span></a> See also <a href="#Ref17">Chapter V. Art 3</a>.</p>
-
-</div><!--footnote-->
-
-<h3 class="inline">8. <b>Miscellaneous Items.</b></h3>
-
-<p class="inlineh">&nbsp;At the headworks of a
-canal there is a permanent staff of men who work the
-gates and look after the works. They assist in discharge
-observations and in reading the gauges, and they may
-have to take soundings in the river to see what changes
-are taking place. Some one is on watch day and night
-and reads the gauges at frequent intervals. The officer
-in charge occasionally inspects the works at night
-without notice. Detailed rules regarding the above
-matters, and any others that are necessary owing to
-special local conditions, are drawn up. Sometimes there
-is difficulty in getting the staff to attend properly to the
-regulation of the supply in the canal at night. Probably
-some &#8220;tell-tale&#8221; watches would be useful. They would
-at least show the times at which the men concerned
-went to the gauges or other points.</p>
-
-<p>At the headworks, and at all important regulators, a
-stock of concrete blocks should be kept ready for the
-execution of any urgent repairs.</p>
-
-<p><span class="pagenum" id="Page138">[138]</span></p>
-
-<p>Regarding the ordinary maintenance work on the
-channels, details are given in <a href="#Page171">Appendices B</a> and <a href="#Page174">C</a>.
-<a href="#Page175">Appendix D</a>, reprinted from <i>Punjab Rivers and Works</i>,
-contains rules for watching and protecting any banks or
-embankments which require it.</p>
-
-<p>Silt clearances and berm cutting of channels have
-been mentioned in <a href="#Page96">Art. 1</a>. Special attention should
-be given to the accurate ranging of the centre line.
-Otherwise the channel may become crooked. The great
-defect in the earthwork ordinarily met with in the
-banks of canals and distributaries is that the clods are
-not broken. In consequence of this new banks are
-extremely liable to breach, and much trouble and expense
-result. Sometimes a dam is thrown across a new
-distributary, and the channel upstream of it is gradually
-filled with water, the bank being watched and leakages
-made good. The dam is then shifted to a place further
-down. In this way the banks are consolidated.</p>
-
-<p>When a distributary is closed for silt clearance or
-other work, if the head regulator has planks and a double
-set of grooves, it is possible to stop all leakage by filling
-in earth between the two sets of planks and ramming it,
-but otherwise it is necessary to construct an earthen dam
-just below the regulator. Upstream of the dam the water,
-owing to the leakage through the planks, gates or needles,
-rises to the same level as the water in the canal. Native
-subordinates have a remarkable aptitude for allowing
-such dams to break while the work in the distributary is
-in progress or before it is measured. Now and then the
-dam is wilfully cut. The remedy is to make the dam of
-proper strength&mdash;the top should be 8 feet wide and a foot
-above the water,&mdash;and to have it watched day and night.</p>
-
-<p><span class="pagenum" id="Page139">[139]</span></p>
-
-<p>At a bend in a channel there is often a silt bank next
-the convex bank, and a hollow near the concave bank.
-The average bed level is probably very much the same
-as in the straight reaches. Removal of the silt bank is
-unnecessary, and if removed it quickly forms again.</p>
-
-<p>Any length of channel in which the depth of silt to
-be cleared is small, say &middot;50 foot in a large channel and
-&middot;40 foot in a small one, should not be cleared, provided
-its length is considerable (say 1,000 feet), and that it is
-not close to (say within 3,000 or 2,000 feet from) the
-head of the channel. Estimates should be prepared
-accordingly, the shallow digging being struck out.
-Clearing a small depth of silt merely gives contractors
-a chance of cheating by scraping the bed.</p>
-
-<p>If the watercourses at the tail of a distributary are
-silted, the people should be pressed to clear them.
-Otherwise there will be heading up of the water of the
-distributary, and silt deposit may result.</p>
-
-<p>When a channel is scoured, any regulator in it can be
-kept partly closed so as to reduce the surface slope in
-the reach upstream of the regulator and encourage the
-deposit of silt. A table should, in such cases, be drawn
-up giving the gauge readings to be maintained at the
-tail of the reach corresponding to given readings at the
-head.</p>
-
-<p>Various methods of protecting banks are described in
-<i>River and Canal Engineering</i>, Chapter VI. The growing
-of plants on the inner slopes of channels whose sides
-fall in, needs special attention. Some remarks on this
-are given in <i>Punjab Rivers and Works</i>, Chapter II.,
-Art. 3. A specification for bushing is given in
-<a href="#Page178">Appendix E</a> of this volume.</p>
-
-<p><span class="pagenum" id="Page140">[140]</span></p>
-
-<p>A Subdivisional Officer generally receives a steady
-stream of applications from members of the irrigating
-community regarding&mdash;among other matters&mdash;outlets
-or watercourses. Generally these applications are made
-over to the zilladar to be reported on. In a large
-number of cases the applicant states that the irrigation
-of his land or &#8220;holding&#8221; is not satisfactory, or has
-fallen off, and sometimes he asks that it may be transferred,
-wholly or in part, to another watercourse which
-he thinks will give a better supply. In all such cases,
-and in some others, the first requirement is a statement
-of the irrigation figures. The irrigation register gives
-only the total for the watercourse. A printed form
-should be prepared with spaces for showing the name of
-the distributary, villages, watercourses, holdings and
-applicants concerned, and the nature of the application.
-Below this is a form, prepared somewhat as shown
-<a href="#Tab7">below</a>. When this form is filled in, the state of affairs
-can at once be seen and much trouble is saved. The
-zilladar obtains the figures from the old field registers.
-The amount of detail required as to the applicant&#8217;s
-lands depends on the nature of his application. If it
-deals with only part of his land the other parts should
-also be shown. He may for instance be giving a disproportionate
-share of water to one part. If a transfer
-to another watercourse is asked for, the figures for that
-watercourse are also required.</p>
-
-<table class="application" summary="Application">
-
-<tr class="bb">
-<th rowspan="2" colspan="4" class="br">Areas in Acres.</th>
-<th colspan="4" class="br">Applicant&#8217;s Holding.</th>
-<th rowspan="2" class="br">Total of<br />Watercourse.</th>
-<th rowspan="2">Total of<br />Distributary.</th>
-</tr>
-
-<tr class="bb">
-<th class="br w2mplus">&nbsp;</th>
-<th class="br w2mplus">&nbsp;</th>
-<th class="br w2mplus">&nbsp;</th>
-<th class="br w2mplus">Total.</th>
-</tr>
-
-<tr>
-<td colspan="4" class="high descr">Culturable commanded.</td>
-<td class="high br">&nbsp;</td>
-<td class="high br">&nbsp;</td>
-<td class="high br">&nbsp;</td>
-<td class="high br">&nbsp;</td>
-<td class="high br">&nbsp;</td>
-<td class="high">&nbsp;</td>
-</tr>
-
-<tr class="bt">
-<td colspan="4" class="thinline br">&nbsp;</td>
-<td class="thinline br">&nbsp;</td>
-<td class="thinline br">&nbsp;</td>
-<td class="thinline br">&nbsp;</td>
-<td class="thinline br">&nbsp;</td>
-<td class="thinline br">&nbsp;</td>
-<td class="thinline">&nbsp;</td>
-</tr>
-
-<tr>
-<td rowspan="3" class="high center padl1 padr1">Net<br />irrigated</td>
-<td rowspan="3" class="high brace right padr0">-</td>
-<td rowspan="3" class="high brace bt bb bl">&nbsp;</td>
-<td class="left padr1 br">19...-19...</td>
-<td rowspan="3" class="br">&nbsp;</td>
-<td rowspan="3" class="br">&nbsp;</td>
-<td rowspan="3" class="br">&nbsp;</td>
-<td rowspan="3" class="br">&nbsp;</td>
-<td rowspan="3" class="br">&nbsp;</td>
-<td rowspan="3">&nbsp;</td>
-</tr>
-
-<tr>
-<td class="left padr1 br">19...-19...</td>
-</tr>
-
-<tr>
-<td class="left padr1 br">19...-19...</td>
-</tr>
-
-<tr class="bb">
-<td colspan="4" class="thinline br">&nbsp;</td>
-<td class="thinline br">&nbsp;</td>
-<td class="thinline br">&nbsp;</td>
-<td class="thinline br">&nbsp;</td>
-<td class="thinline br">&nbsp;</td>
-<td class="thinline br">&nbsp;</td>
-<td class="thinline">&nbsp;</td>
-</tr>
-
-<tr class="bb">
-<td colspan="4" class="high descr">Total of 3 years</td>
-<td class="high br">&nbsp;</td>
-<td class="high br">&nbsp;</td>
-<td class="high br">&nbsp;</td>
-<td class="high br">&nbsp;</td>
-<td class="high br">&nbsp;</td>
-<td class="high">&nbsp;</td>
-</tr>
-
-<tr class="bb">
-<td colspan="4" class="high descr">Average</td>
-<td class="high br">&nbsp;</td>
-<td class="high br">&nbsp;</td>
-<td class="high br">&nbsp;</td>
-<td class="high br">&nbsp;</td>
-<td class="high br">&nbsp;</td>
-<td class="high">&nbsp;</td>
-</tr>
-
-<tr>
-<td colspan="4" class="high descr">Per cent. of culturable<br />commanded</td>
-<td class="high br">&nbsp;</td>
-<td class="high br">&nbsp;</td>
-<td class="high br">&nbsp;</td>
-<td class="high br">&nbsp;</td>
-<td class="high br">&nbsp;</td>
-<td class="high">&nbsp;</td>
-</tr>
-
-</table>
-
-<p><span class="pagenum" id="Page141">[141]</span></p>
-
-<p>If an application refers to a whole watercourse, the
-Subdivisional Officer can frequently, with the aid of an
-irrigation register and a set of chak maps, both kept
-up to date, dispose personally of the case. A good plan
-is to settle cases when on tour near the place concerned,
-the applicant and the zilladar being present as well as
-any other persons concerned. A certain number of
-cases have to come up again on the following tour, but
-all are settled in less time than is occupied if the papers
-go up and down between the Subdivisional Officer and
-the zilladar, the &#8220;file&#8221; of papers in any particular
-case being constantly swollen by reminders from the
-<span class="nowrap">applicant.<a id="FNanchor39" href="#Footnote39"
-class="fnanchor">[39]</a></span> Moreover, the applicants know that their
-views are known to the Subdivisional Officer. If the
-outlets on a channel need a general remodelling, such
-applications as those under consideration receive attention
-in connection with the scheme. Otherwise all the
-applications concerning one distributary can be considered
-together. If, however, a case is pressing, or the
-steps to be taken obvious, it can be settled without
-reference to any other case.</p>
-
-<div class="footnote">
-
-<p id="Footnote39"><a href="#FNanchor39"><span class="label">[39]</span></a>
-The plan of personal settlement is distasteful not only to the
-subordinates, but to the <i>munshi</i> who has charge of the &#8220;vernacular
-files.&#8221; Ordinarily he can delay a case, or manipulate it to some
-extent.</p>
-
-</div><!--footnote-->
-
-<p>The general arrangements for the &#8220;revenue&#8221; work<span class="pagenum" id="Page142">[142]</span>
-or assessment of water rates have been stated in Art. 1.
-In the Punjab the remissions for failed crops are a
-source of trouble. In some districts the failed areas are
-small, and no particular trouble arises, but in other
-districts such areas are often very large. On perennial
-canals the crop inspection is done by the zilladars, on
-most of the inundation canals by the subordinates of
-the District <span class="nowrap">Magistrate.<a id="FNanchor40"
-href="#Footnote40" class="fnanchor">[40]</a></span> In both cases the amount
-of labour involved is enormous, and the corruption to
-which the system gives rise is also enormous. In the
-case of the inundation canals the superior staff of the
-District Magistrate nominally make checks, but the
-time at their disposal is wholly inadequate. In the case
-of the perennial canals the Canal Engineers are able to
-exercise considerable checks, but nothing like enough.
-In fact the state of a crop and the proportion of the
-charge on it which should be remitted is a difficult thing
-to judge, even if the subordinates were without guile.
-It is understood that a new and statesmanlike system
-is now to be introduced, the District Magistrate deciding,
-in consultation with the Executive Engineer, whether
-the season is such as to call for any general remission
-for each kind of crop, and, if so, to what extent. The
-proportion to be remitted in that crop is then to be fixed,
-and it is to be the same for every one.</p>
-
-<div class="footnote">
-
-<p id="Footnote40"><a href="#FNanchor40"><span class="label">[40]</span></a>
-Officially called the &#8220;Collector&#8221; in some provinces, and &#8220;Deputy
-Commissioner&#8221; in others.</p>
-
-</div><!--footnote-->
-
-<p>It has been mentioned that some irrigation is
-effected by lift. The simplest form of lift is a horizontal
-pole which rests, not far from its thick end, on a support.
-From its thick end is suspended a bucket, and from its
-thin end a weight. A man lifts the thin end so that the
-bucket then dips into the water and is filled. Pulling<span class="pagenum" id="Page143">[143]</span>
-down the thin end he raises the bucket and empties it.
-A greatly improved lifting apparatus is the Persian
-wheel which is vertical and has slung from it, like the
-buckets of a dredger but moving vertically, a number of
-earthen jars, which scoop up the water. As each jar
-passes over the top of the wheel it assumes a horizontal
-position, discharges its water into a shoot, and descends
-in an inverted position. The wheel is moved by a simple
-cog-wheel arrangement actuated by a bullock which is
-driven round and round in a circular track. The
-Persian wheel is used for lifts of any height. The lift
-from a canal watercourse is a few feet, that from a well
-may be 50 feet or more.</p>
-
-<p>Most persons consider that a system of charging for
-water by volume would be a very great advance on
-present methods. It has been said that if the water
-were wasted it would be difficult for the cultivators to
-bring home the responsibility to any individual. This
-objection does not seem to have great force. Every
-individual would have a direct interest in economising
-the water, and any cultivator who was habitually
-careless would soon be detected by the others. In all
-probability the result would be a great improvement in
-the duty of the water. But the justice of any very
-rigid system of charging by volume is somewhat
-doubtful. The great difference in the duty of water on
-different watercourses has been mentioned more than once.
-Many of the causes of this are beyond the control of the
-farmers, and it would probably be necessary to charge
-reduced rates to some of them.</p>
-
-<hr class="chap" />
-
-<p><span class="pagenum" id="Page144">[144]</span></p>
-
-<h2>CHAPTER IV.<br />
-<span class="chapname"><span class="smcap">The Punjab Triple Canal Project.</span><a id="FNanchor41"></a><a
-href="#Footnote41" class="fnanchor fsize80">[41]</a></span></h2>
-
-<div class="figcenter w600" id="Fig26">
-<img src="images/illo164.png" alt="Map" width="600" height="527" />
-<p class="caption"><span class="smcap">Fig.</span> 26.</p>
-<p class="largeillo"><a href="images/illo164lg.png">Large map</a> (97 kB)</p>
-</div>
-
-<div class="footnote">
-
-<p id="Footnote41"><a href="#FNanchor41"><span class="label">[41]</span></a>
-See Report on the Project Estimates of the Upper Jhelum, Upper
-Chenab, and Lower Bari Doab Canals.</p>
-
-</div><!--footnote-->
-
-<h3 class="inline">1. <b>General Description.</b></h3>
-
-<p class="inlineh"><a href="#Fig26">Fig. 26</a> shows part of the
-Punjab. The areas marked L.J., L.C., U.B.D., and
-S.C. are already irrigated by the Lower Jhelum, Lower
-Chenab, Upper Bari <span class="nowrap">Doab<a id="FNanchor42" href="#Footnote42" class="fnanchor">[42]</a></span> and Sirhind Canals. The
-areas which it is considered very desirable to irrigate,<span class="pagenum" id="Page145">[145]</span>
-and which are provided for in the Triple Canal Project,
-are marked U.J., U.C., and L.B.D., and the new canals
-are shown by dotted lines. Other areas needing
-irrigation lie on the left bank of the lower part of the
-Sutlej, partly in British territory and partly in
-Bahawalpur State, and one <span class="nowrap">area,<a id="FNanchor43"
-href="#Footnote43" class="fnanchor">[43]</a></span> of scant rainfall and
-subject to occasional famine, lies immediately South of
-the Sirhind Canal tract. There is also a very large area
-between the Indus and the Jhelum, and it has been
-proposed to irrigate it from the Indus, but on account of
-the presence of sand-hills the project is not likely to be
-so useful as others, and it is held in abeyance. Perhaps
-a small canal may be constructed, as a tentative
-measure, to irrigate part of the tract.</p>
-
-<div class="footnote">
-
-<p id="Footnote42"><a href="#FNanchor42"><span class="label">[42]</span></a>
-Doab means &#8220;two waters,&#8221; or the tract between two rivers. The
-names of the three Doabs under consideration are formed from those
-of the rivers. They are called the Jech (Jhelum-Chenab), Rechna
-(Ravi-Chenab), and Bari (Beas-Ravi) Doabs.</p>
-
-<p id="Footnote43"><a href="#FNanchor43"><span class="label">[43]</span></a>
-It would be very expensive to bring water for this tract from the Beas
-and across the Sutlej.</p>
-
-</div><!--footnote-->
-
-<p>The winter discharges of the rivers (available for the
-rabi crop) after the existing irrigation has been supplied,
-are as follows:</p>
-
-<table class="dontwrap" summary="Discharges">
-
-<tr>
-<td class="left">Indus,</td>
-<td class="center">9,434</td>
-<td class="center">&nbsp;c. feet per</td>
-<td class="center">second</td>
-<td class="left padl1">(minimum)</td>
-</tr>
-
-<tr>
-<td class="left">Jhelum,</td>
-<td class="center">6,800</td>
-<td class="center">&#8222;</td>
-<td class="center">&#8222;</td>
-<td class="left padl1">(average)</td>
-</tr>
-
-<tr>
-<td class="left">Chenab,</td>
-<td class="center">Nil</td>
-<td colspan="3">&nbsp;</td>
-</tr>
-
-<tr>
-<td class="left">Ravi,</td>
-<td class="center">Nil</td>
-<td colspan="3">&nbsp;</td>
-</tr>
-
-<tr>
-<td class="left">Beas,</td>
-<td class="center">4,000</td>
-<td class="center">&#8222;</td>
-<td class="center">&#8222;</td>
-<td class="left padl1">(minimum)</td>
-</tr>
-
-<tr>
-<td class="left">Sutlej,</td>
-<td class="center">Nil</td>
-<td colspan="3">&nbsp;</td>
-</tr>
-
-</table>
-
-<p>In summer all the rivers have discharges (available
-for the kharif crop) far exceeding any requirements. It
-was at one time proposed to supply the Lower Bari
-Doab Canal from near the junction of the Beas and
-Sutlej, and a project for this was prepared, but before it
-was sanctioned a proposal was put forward to convey<span class="pagenum" id="Page146">[146]</span>
-the surplus water of the Jhelum eastward across the
-Chenab and Ravi. This valuable suggestion was made
-by Sir James Wilson, who was then Settlement Commissioner
-of the Punjab, and, independently, by the late
-Colonel S. L. Jacob, R.E., who had been a Chief
-Engineer in the Punjab. The proposals were, however,
-to take off the supply from the Jhelum lower down than
-as now arranged in the Triple Project. This would have
-resulted in only a partial utilisation of the Jhelum
-water, in mutilation or heavy alterations to the existing
-Lower Jhelum and Lower Chenab Canals, in for ever
-debarring the Upper Jhelum and Upper Chenab tracts
-from irrigation, and in a very costly scheme for the
-Lower Bari Doab <span class="nowrap">Canal.<a id="FNanchor44" href="#Footnote44" class="fnanchor">[44]</a></span></p>
-
-<div class="footnote">
-
-<p id="Footnote44"><a href="#FNanchor44"><span class="label">[44]</span></a>
-Colonel Jacob made his suggestion when in England after retiring
-from India, and when he had no levels to guide him.</p>
-
-</div><!--footnote-->
-
-<p>The Triple Project as prepared by Sir John Benton,
-K.C.I.E., recently Inspector General of Irrigation in
-India, gets over all the above objections. The Upper
-Jhelum Canal is to irrigate the country which it
-traverses, and in the winter, when the supply in the
-rivers is restricted, it is to deliver into the river Chenab,
-above the weir at the head of the Lower Chenab Canal,
-a discharge equal to that drawn out higher up by the
-Upper Chenab <span class="nowrap">Canal.<a id="FNanchor45" href="#Footnote45" class="fnanchor">[45]</a></span> Thus the Lower Chenab Canal,
-which at present draws off the whole of the water of the
-Chenab in winter, will not be injuriously affected in any
-way. The Upper Chenab Canal after irrigating its own
-tract is to deliver a large volume of water into the Ravi.
-The water will be taken across that river by a level<span class="pagenum" id="Page147">[147]</span>
-crossing, and supply the Lower Bari Doab Canal. The
-water brought into the Sutlej from the Beas will remain
-available for irrigation on the left bank of the Sutlej, or
-possibly for the dry tract South of the Sirhind Canal
-area. This fine scheme presented many difficulties and
-is necessarily costly. The water has to be conveyed a
-great distance, and there will be much loss by
-absorption. The Ravi crossing will be a very heavy
-work. The Upper Jhelum Canal has to be taken by a
-circuitous course round a range of hills, and to cross
-numerous heavy torrents. The scheme will, however,
-prove remunerative in spite of immense difficulties as to
-labour, caused by the outbreak of plague in the Punjab
-a few years ago.</p>
-
-<div class="footnote">
-
-<p id="Footnote45"><a href="#FNanchor45"><span class="label">[45]</span></a>
-The Indus is at a higher level than the Jhelum. The latter river
-runs in a comparatively deep valley, and it is unfortunately impossible
-to convey the water of the Indus across this valley.</p>
-
-</div><!--footnote-->
-
-<h3 class="inline" id="Ref3">2. <b>Areas and Discharges.</b></h3>
-
-<p class="inlineh">&nbsp;The figures on which
-the discharges in the Triple Project are based form a
-useful and interesting object lesson. In order to obtain
-sufficient water in the winter, it is necessary to reduce
-the rabi supply to the existing Lower Jhelum Canal.
-The figure above given for the Jhelum indicates the
-supply available after the reduction. More water will
-be supplied to the Lower Jhelum Canal for the kharif,
-the canal being enlarged for this purpose, and its total
-irrigation will be unaffected. The proportion of the
-culturable commanded area to be irrigated in the new
-tracts is 75 per cent., but from this the area irrigated by
-wells in the Upper Jhelum and Upper Chenab tracts is
-deducted. On the Lower Bari Doab Canal there is
-little well Irrigation, but there are some low-lying tracts
-near the rivers, and of these only 50 per cent. will be
-irrigated. The kharif and rabi areas are in all cases to
-be equal.</p>
-
-<p><span class="pagenum" id="Page148">[148]</span></p>
-
-<p>The areas to be irrigated in each crop are as below&mdash;</p>
-
-<table class="dontwrap" summary="Areas">
-
-<tr>
-<td class="left padr2">Lower Jhelum Canal</td>
-<td class="right">383,091</td>
-<td class="center">&nbsp;acres</td>
-</tr>
-
-<tr>
-<td class="left padr2">Upper Jhelum Canal</td>
-<td class="right">172,480</td>
-<td class="center">&#8222;</td>
-</tr>
-
-<tr>
-<td class="left padr2">Upper Chenab Canal</td>
-<td class="right">324,184</td>
-<td class="center">&#8222;</td>
-</tr>
-
-<tr>
-<td class="left padr2">Lower Bari Doab Canal</td>
-<td class="right">441,264</td>
-<td class="center">&#8222;</td>
-</tr>
-
-<tr>
-<td class="left padr4">Total</td>
-<td class="right bt">1,321,019</td>
-<td class="center">&#8222;</td>
-</tr>
-
-</table>
-
-<p>The total, excluding the existing Lower Jhelum
-Canal, is 937,928 acres. With an equal area in the
-other crop, the new annual irrigation amounts to
-1,875,856 acres.</p>
-
-<p>The kharif duty is taken as 100 acres at the distributary
-heads, this being about the figure actually
-obtained on the Lower Chenab and Upper Bari Doab
-Canals, and the required kharif discharges at the
-distributary heads are:</p>
-
-<table class="dontwrap" summary="Discharges">
-
-<tr>
-<td colspan="2" class="left padr2">Lower Jhelum</td>
-<td rowspan="4" colspan="2">&nbsp;</td>
-<td class="right padr1">3,821</td>
-<td class="left">c. feet per</td>
-<td class="left">&nbsp;second</td>
-</tr>
-
-<tr>
-<td class="left">Upper</td>
-<td class="center padr2">&#8222;</td>
-<td class="right padr1">1,725</td>
-<td class="center">&#8222;</td>
-<td class="center">&#8222;</td>
-</tr>
-
-<tr>
-<td class="center">&#8222;</td>
-<td class="left padr2">Chenab</td>
-<td class="right padr1">3,242</td>
-<td class="center">&#8222;</td>
-<td class="center">&#8222;</td>
-</tr>
-
-<tr>
-<td colspan="2" class="left padr2">Lower Bari Doab</td>
-<td class="right padr1 bb">4,413</td>
-<td class="center">&#8222;</td>
-<td class="center">&#8222;</td>
-</tr>
-
-<tr>
-<td colspan="6" class="thinline">&nbsp;</td>
-</tr>
-
-<tr>
-<td colspan="2" class="left">Total, excluding<br /><span class="padl2 padr2">Lower Jhelum</span></td>
-<td class="brace bt br bb">&nbsp;</td>
-<td class="brace left padl0">-</td>
-<td class="right padr1">9,380</td>
-<td class="center">&#8222;</td>
-<td class="center">&#8222;</td>
-</tr>
-
-</table>
-
-<p>The losses of water in canal and branches have been
-found to be, on the Upper Bari Doab Canal 10 c. feet
-per second, and on the Lower Chenab Canal 8 c. feet
-per second, per million square feet of wetted area
-respectively. The conditions of the latter canal most
-resemble those on the new canals under consideration.
-The losses calculated on the wetted areas of the
-channels, as designed, at 8 c. feet per second per million
-square feet, are as follows, in c. feet per second:</p>
-
-<p><span class="pagenum" id="Page149">[149]</span></p>
-
-<table class="dontwrap" summary="Losses">
-
-<tr>
-<td class="left padr2">Lower Jhelum Canal</td>
-<td class="right">624</td>
-<td rowspan="2" class="brace bt br bb">&nbsp;</td>
-<td rowspan="2" class="brace left padl0 padr1">-</td>
-<td rowspan="2" class="right">1,288</td>
-</tr>
-
-<tr>
-<td class="left padr2">Upper Jhelum Canal</td>
-<td class="right">664</td>
-</tr>
-
-<tr>
-<td colspan="5" class="thinline">&nbsp;</td>
-</tr>
-
-<tr>
-<td class="left padr2">Upper Chenab Canal</td>
-<td class="right">1,161</td>
-<td rowspan="2" class="brace bt br bb">&nbsp;</td>
-<td rowspan="2" class="brace left padl0 padr1">-</td>
-<td rowspan="2" class="right">2,126</td>
-</tr>
-
-<tr>
-<td class="left padr2">Lower Bari Doab Canal</td>
-<td class="right">965</td>
-</tr>
-
-<tr>
-<td colspan="5" class="thinline">&nbsp;</td>
-</tr>
-
-<tr>
-<td class="left padr4">Total</td>
-<td class="right bt">3,414</td>
-</tr>
-
-</table>
-
-<p>But in dry years the canals will be worked in rotation
-during the rabi, the Upper Chenab and Lower Bari
-Doab Canals being worked together, and the Upper
-Jhelum and Lower Jhelum together.</p>
-
-<p>When the Lower Jhelum Canal is closed, in course of
-rotation, the Upper Jhelum Canal will still be flowing,
-and the loss in it, 664 c. feet per second, has to be added
-to the figure (2,126) given above, thus bringing up the loss
-to 2,790 c. feet per second.</p>
-
-<p>In order to ascertain what the state of affairs will be
-in the rabi, the statistics obtained on the Lower Chenab
-Canal were examined. These show that the rabi duty
-at the distributary heads on that canal is 206 acres. On
-the Upper Bari Doab Canal the duty at the distributary
-heads is 263 acres, but 11 per cent. of the area receives
-only &#8220;first waterings.&#8221; The duty based on the
-remaining area is 234 acres. But the above duties are
-only attained by running higher supplies in October and
-March than during the intervening four months of the
-crop. The following remarks and figures are taken from
-the Report on the Project <span class="nowrap">Estimates:&mdash;</span></p>
-
-<p>&#8220;The statistics of working of distributaries of the
-Chenab and Bari Doab Canals give the average discharges
-shown in the following table for the three years
-ending with 1903-04. The losses by absorption are
-calculated on the wetted areas for the different rotational
-periods. The average discharge less absorption is the
-supply which reached the heads of the distributaries.</p>
-
-<p><span class="pagenum" id="Page150">[150]</span></p>
-
-<p class="tabhead" id="Tab7">CHENAB CANAL.</p>
-
-<table class="canals" summary="Discharges">
-
-<tr class="bt bb">
-<th rowspan="2" class="br"><span class="smcap">Particulars.</span> </th>
-<th colspan="7" class="br"><span class="smcap">Period.</span></th>
-<th rowspan="2" class="w2mplus"><span class="smcap">Aver-<br />age.</span></th>
-</tr>
-
-<tr class="bb">
-<th class="br w2mplus">October<br />1st-15th</th>
-<th class="br w2mplus">October<br />16th-31st</th>
-<th class="br w2mplus">No-<br />vember</th>
-<th class="br w2mplus">De-<br />cember</th>
-<th class="br w2mplus">January.</th>
-<th class="br w2mplus">February</th>
-<th class="br w2mplus">March.</th>
-</tr>
-
-<tr>
-<th class="br">&nbsp;</th>
-<th class="br">Cusecs.</th>
-<th class="br">Cusecs.</th>
-<th class="br">Cusecs.</th>
-<th class="br">Cusecs.</th>
-<th class="br">Cusecs.</th>
-<th class="br">Cusecs.</th>
-<th class="br">Cusecs.</th>
-<th>Cusecs.</th>
-</tr>
-
-<tr>
-<td class="partic">Average supply entering head of canal</td>
-<td class="number br">10,196</td>
-<td class="number br">10,285</td>
-<td class="number br">7,788</td>
-<td class="number br">5,593</td>
-<td class="number br">5,127</td>
-<td class="number br">5,500</td>
-<td class="number br">6,603</td>
-<td class="number">6,809</td>
-</tr>
-
-<tr>
-<td class="partic">Deduct absorption</td>
-<td class="number br bb">1,633</td>
-<td class="number br bb">1,633</td>
-<td class="number br bb">1,250</td>
-<td class="number br bb">1,053</td>
-<td class="number br bb">1,032</td>
-<td class="number br bb">1,171</td>
-<td class="number br bb">1,433</td>
-<td class="number bb">1,262</td>
-</tr>
-
-<tr>
-<td class="partic">Supply at distributary heads for 1,155,685 acres, the average Bari area</td>
-<td class="number br bb">8,563</td>
-<td class="number br bb">8,652</td>
-<td class="number br bb">6,538</td>
-<td class="number br bb">4,510</td>
-<td class="number br bb">4,095</td>
-<td class="number br bb">4,329</td>
-<td class="number br bb">5,170</td>
-<td class="number bb">5,546</td>
-</tr>
-
-<tr>
-<td class="partic">Proportional supply for 1,164,595 acres</td>
-<td class="number br">8,631</td>
-<td class="number br">8,721</td>
-<td class="number br">6,590</td>
-<td class="number br">4,576</td>
-<td class="number br">4,128</td>
-<td class="number br">4,364</td>
-<td class="number br">5,211</td>
-<td class="number">5,591</td>
-</tr>
-
-<tr>
-<td class="partic">Add absorption for new projects</td>
-<td class="number br bb">3,414</td>
-<td class="number br bb">3,414</td>
-<td class="number br bb">2,139</td>
-<td class="number br bb">2,139</td>
-<td class="number br bb">2,139</td>
-<td class="number br bb">2,139</td>
-<td class="number br bb">3,414</td>
-<td class="number bb">2,564</td>
-</tr>
-
-<tr class="bb">
-<td class="partic">Supply required for new projects at heads of canals</td>
-<td class="number br">12,045</td>
-<td class="number br">12,035</td>
-<td class="number br">8,729</td>
-<td class="number br">6,715</td>
-<td class="number br">6,267</td>
-<td class="number br">6,503</td>
-<td class="number br">8,625</td>
-<td class="number">8,155</td>
-</tr>
-
-</table>
-
-<p><span class="pagenum" id="Page151">[151]</span></p>
-
-<p>&#8220;The average discharge given by the third line is 5,546,
-and the average area being 1,155,685 acres, the duty at
-the heads of distributaries was 208.</p>
-
-<p>&#8220;The area 1,164,595 is the perennial rabi irrigation of
-the new projects, the area 156,424 acres, receiving only
-first waterings, being omitted to admit of a fair comparison,
-and is only 1 per cent. under the average
-attained on the Chenab Canal in the three years for
-which the table is prepared.</p>
-
-<p>&#8220;The absorption added for the two first periods is on
-the supposition that all the canals are open throughout
-October and March, <span class="nowrap">tatilling<a id="FNanchor46"
-href="#Footnote46" class="fnanchor">[46]</a></span> with an average absorption
-loss of 2,139 <span class="nowrap">cusecs<a id="FNanchor47"
-href="#Footnote47" class="fnanchor">[47]</a></span> being in force during the other four
-months. The last line of the table shows the average
-Rabi discharge required by the new projects at the heads
-of canals, inclusive of all losses calculated on the
-Chenab Canal basis of a duty of 208 acres per cusec
-obtained at the heads of distributaries.</p>
-
-<div class="footnote">
-
-<p id="Footnote46"><a href="#FNanchor46"><span class="label">[46]</span></a>
-&#8220;T&aacute;t&iacute;l&#8221; is the Indian word for rotational closure.</p>
-
-<p id="Footnote47"><a href="#FNanchor47"><span class="label">[47]</span></a>
-&#8220;Cusec&#8221; is used in India for c. ft. per second.</p>
-
-</div><!--footnote-->
-
-<p>&#8220;The Bari Doab Canal statistics furnish the means of
-the adequacy of available supply being gauged. The
-following table furnishes particulars for the average
-supply of water entering the head of the canal for the
-five years 1898-99, 1899-1900, 1901-02, 1902-03, 1903-04.
-The figures for the year 1900-01 are omitted, as it was
-a very abnormal one of very plenteous supply and heavy
-<span class="nowrap">rainfall:&mdash;</span></p>
-
-<p>&#8220;The average irrigation for the five years in question
-was 442,302 inclusive of 11 per cent. which only receives
-first waterings. This divided by the average supply,
-1,685, entering the head of a canal gives a duty of 263
-acres per cusec at the heads of distributaries.</p>
-
-<p><span class="pagenum" id="Page152">[152]</span></p>
-
-<p class="tabhead" id="Tab8">BARI DOAB CANAL.</p>
-
-<table class="canals" summary="Discharges">
-
-<tr class="bt bb">
-<th rowspan="2" class="br"><span class="smcap">Particulars.</span></th>
-<th colspan="7" class="br"><span class="smcap">Period.</span></th>
-<th rowspan="2"><span class="smcap">Aver-<br />age.</span></th>
-</tr>
-
-<tr class="bb">
-<th class="br">October<br />1st-15th</th>
-<th class="br">October<br />16th-31st</th>
-<th class="br">No-<br />vember.</th>
-<th class="br">De-<br />cember.</th>
-<th class="br">January.</th>
-<th class="br">February.</th>
-<th class="br">March.</th>
-</tr>
-
-<tr>
-<th class="br">&nbsp;</th>
-<th class="br">Cusecs.</th>
-<th class="br">Cusecs.</th>
-<th class="br">Cusecs.</th>
-<th class="br">Cusecs.</th>
-<th class="br">Cusecs.</th>
-<th class="br">Cusecs.</th>
-<th class="br">Cusecs.</th>
-<th>Cusecs.</th>
-</tr>
-
-<tr>
-<td class="partic">Average supply entering head of canal</td>
-<td class="number br">3,769</td>
-<td class="number br">2,896</td>
-<td class="number br">2,170</td>
-<td class="number br">1,755</td>
-<td class="number br">1,622</td>
-<td class="number br">1,916</td>
-<td class="number br">2,909</td>
-<td class="number">2,284</td>
-</tr>
-
-<tr>
-<td class="partic">Deduct absorption</td>
-<td class="number br bb">599</td>
-<td class="number br bb">599</td>
-<td class="number br bb">599</td>
-<td class="number br bb">599</td>
-<td class="number br bb">599</td>
-<td class="number br bb">599</td>
-<td class="number br bb">599</td>
-<td class="number bb">599</td>
-</tr>
-
-<tr>
-<td class="partic">Supply at heads of distributaries (<i>a</i>)</td>
-<td class="number br bb">3,170</td>
-<td class="number br bb">2,297</td>
-<td class="number br bb">1,571</td>
-<td class="number br bb">1,156</td>
-<td class="number br bb">1,023</td>
-<td class="number br bb">1,317</td>
-<td class="number br bb">2,310</td>
-<td class="number bb">1,685</td>
-</tr>
-
-<tr>
-<td class="partic">Corresponding supply for new schemes 3 &times; figures line (<i>a</i>)</td>
-<td class="number br">9,510</td>
-<td class="number br">6,891</td>
-<td class="number br">4,713</td>
-<td class="number br">3,468</td>
-<td class="number br">3,069</td>
-<td class="number br">3,951</td>
-<td class="number br">6,930</td>
-<td class="number">5,055</td>
-</tr>
-
-<tr>
-<td class="partic">Add absorption for new projects</td>
-<td class="number br bb">3,414</td>
-<td class="number br bb">3,414</td>
-<td class="number br bb">2,139</td>
-<td class="number br bb">2,139</td>
-<td class="number br bb">2,139</td>
-<td class="number br bb">2,139</td>
-<td class="number br bb">3,414</td>
-<td class="number bb">2,564</td>
-</tr>
-
-<tr class="bb">
-<td class="partic">Supply required for new projects at heads of canals</td>
-<td class="number br">12,924</td>
-<td class="number br">10,305</td>
-<td class="number br">6,852</td>
-<td class="number br">5,607</td>
-<td class="number br">5,208</td>
-<td class="number br">6,090</td>
-<td class="number br">10,344</td>
-<td class="number">7,619</td>
-</tr>
-
-</table>
-
-<p><span class="pagenum" id="Page153">[153]</span></p>
-
-<p>&#8220;The rabi irrigation of the new projects is 1,321,019
-<span class="nowrap">acres,<a id="FNanchor48" href="#Footnote48" class="fnanchor">[48]</a></span>
-and this divided by 442,302 gives approximately
-the multiplier 3 referred to at (<i>a</i>) in the above table.</p>
-
-<div class="footnote">
-
-<p id="Footnote48"><a href="#FNanchor48"><span class="label">[48]</span></a> Including the Lower Jhelum.</p>
-
-</div><!--footnote-->
-
-<p>&#8220;The figures given in the above <a href="#Tab8">table</a> and in the foregoing
-remarks relate to the aggregate of the areas in the
-rabi which receives a perennial supply and which only
-receives first and last waterings. On the Upper Bari
-Doab Canal the rabi which receives perennial irrigation
-is averagely 393,649 acres; the average supply of 1,685
-cusecs gives on this area a duty of 234 acres per cusec
-at the heads of the distributaries.</p>
-
-<p>&#8220;In the case of the three projects the aggregate <i>rabi</i>
-area receiving perennial irrigation as shown by the <a href="#Tab8">table</a>,
-paragraph <span class="nowrap">21<a id="FNanchor49" href="#Footnote49"
-class="fnanchor">[49]</a></span> <i>supra</i>, is 1,164,595 acres: this is 2&middot;96
-times 393,649; so that the proportional supply required
-on this basis would be slightly less than that given by
-the multiplier 3 in the above <a href="#Tab8">table</a>.</p>
-
-<div class="footnote">
-
-<p id="Footnote49"><a href="#FNanchor49"><span class="label">[49]</span></a> Not printed.
-The area is the total rabi area less the area which is
-to receive only first waterings.</p>
-
-</div><!--footnote-->
-
-<p>In explanation of the difference of the <span class="nowrap">duties:&mdash;</span></p>
-
-<table class="differences" summary="Differences">
-
-<tr>
-<td class="left padr2">Lower Chenab Canal</td>
-<td class="right padr1">208</td>
-<td class="center">acres per cusec,</td>
-</tr>
-
-<tr>
-<td class="left padr2">Upper Bari Doab Canal</td>
-<td class="right padr1">234</td>
-<td class="center">ditto,</td>
-</tr>
-
-</table>
-
-<p class="noindent">it may be stated that the Lower Chenab Canal is a
-comparatively new work, and that the duty has been
-steadily rising and, with the perfect watercourse system,
-may be relied on to reach the Upper Bari Doab Canal
-234 acres per cusec in the course of time for water
-arriving at the heads of distributaries.</p>
-
-<p class="tbstars"><span class="padr2">*</span><span class="padl2 padr2">*</span><span class="padl2 padr2">*</span><span
-class="padl2 padr2">*</span><span class="padl2 padr2">*</span><span class="padl2 padr2">*</span><span class="padl2">*</span></p>
-
-<p>&#8220;27. <b>Summary of conclusions as to sufficiency of
-supply.</b>&mdash;The following table shows all the foregoing
-results in a form readily admitting of <span class="nowrap">comparison:&mdash;</span></p>
-
-<p><span class="pagenum" id="Page154">[154]</span></p>
-
-<table class="comparison" summary="Discharges">
-
-<tr class="bt bb">
-<th rowspan="2" class="br"><span class="smcap"> Particulars.</span></th>
-<th colspan="22" class="br"><span class="smcap">Period.</span></th>
-<th rowspan="2" colspan="4" class="br">Average<br />supply<br />in river.</th>
-<th rowspan="2" class="br">Deduct<br />loss by<br />absorp-<br />tion.</th>
-<th rowspan="2" class="br">Supply<br />at<br />heads<br />of<br />distribu-<br />taries.</th>
-<th rowspan="2" class="br">Duty<br />calculated<br />on<br />1,321,019<br />acres,<br />the gross<br />rabi area.</th>
-<th rowspan="2">Duty<br />calculated<br />on<br />1,164,595<br />acres,<br />the<br />perennial<br />area.</th>
-</tr>
-
-<tr class="bb">
-<th colspan="4" class="br">1st<br />to 15th<br />Octo-<br />ber.</th>
-<th colspan="4" class="br">16th<br />to 31st<br />Octo-<br />ber.</th>
-<th colspan="4" class="br">No-<br />vem-<br />ber.</th>
-<th class="br">De-<br />cem-<br />ber.</th>
-<th class="br">Janu-<br />ary.</th>
-<th colspan="4" class="br">Febru-<br />ary.</th>
-<th colspan="4" class="br">March.</th>
-</tr>
-
-<tr>
-<th class="br">&nbsp;</th>
-<th colspan="4" class="br">Cusecs.</th>
-<th colspan="4" class="br">Cusecs.</th>
-<th colspan="4" class="br">Cusecs.</th>
-<th class="br">Cusecs.</th>
-<th class="br">Cusecs.</th>
-<th colspan="4" class="br">Cusecs.</th>
-<th colspan="4" class="br">Cusecs.</th>
-<th colspan="4" class="br">Cusecs.</th>
-<th class="br">Cusecs.</th>
-<th class="br">Cusecs.</th>
-<th class="br">&nbsp;</th>
-<th>&nbsp;</th>
-</tr>
-
-<tr>
-<td class="center padl1 padr1 br"><span class="smcap">Average Supplies available.</span></td>
-<td colspan="4" class="br">&nbsp;</td>
-<td colspan="4" class="br">&nbsp;</td>
-<td colspan="4" class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td colspan="4" class="br">&nbsp;</td>
-<td colspan="4" class="br">&nbsp;</td>
-<td colspan="4" class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td class="br">&nbsp;</td>
-<td>&nbsp;</td>
-</tr>
-
-<tr>
-<td rowspan="2" class="partic">Very favourable years 1 in 4</td>
-<td rowspan="2" class="brace">&nbsp;</td>
-<td rowspan="2" class="right brace padr0">-</td>
-<td rowspan="2" class="brace bt bb bl">&nbsp;</td>
-<td class="number br">21,400</td>
-<td colspan="4" class="number br">15,150</td>
-<td rowspan="2" class="brace">&nbsp;</td>
-<td rowspan="2" class="brace bt br bb">&nbsp;</td>
-<td rowspan="2" class="left brace padl0">-</td>
-<td rowspan="2" class="number br">11,850</td>
-<td rowspan="2" class="number br">8,626</td>
-<td rowspan="2" class="number br">11,200</td>
-<td rowspan="2" class="brace">&nbsp;</td>
-<td rowspan="2" class="right brace padr0">-</td>
-<td rowspan="2" class="brace bt bb bl">&nbsp;</td>
-<td class="number br">13,100</td>
-<td colspan="4" class="number br">21,250</td>
-<td rowspan="2" class="brace">&nbsp;</td>
-<td rowspan="2" class="brace bt br bb">&nbsp;</td>
-<td rowspan="2" class="left brace padl0">-</td>
-<td rowspan="2" class="number br">11,811</td>
-<td rowspan="2" class="number br">3,414</td>
-<td rowspan="2" class="number br">8,397</td>
-<td rowspan="2" class="number br">158</td>
-<td rowspan="2" class="number">139</td>
-</tr>
-
-<tr>
-<td class="number br">(13.063)</td>
-<td colspan="4" class="number br">(13,063)</td>
-<td class="number br">(13,063)</td>
-<td colspan="4" class="number br">(13,063)</td>
-</tr>
-
-<tr>
-<td class="thinline br">&nbsp;</td>
-<td colspan="4" class="thinline br">&nbsp;</td>
-<td colspan="4" class="thinline br">&nbsp;</td>
-<td colspan="4" class="thinline br">&nbsp;</td>
-<td class="thinline br">&nbsp;</td>
-<td class="thinline br">&nbsp;</td>
-<td colspan="4" class="thinline br">&nbsp;</td>
-<td colspan="4" class="thinline br">&nbsp;</td>
-<td colspan="4" class="thinline br">&nbsp;</td>
-<td class="thinline br">&nbsp;</td>
-<td class="thinline br">&nbsp;</td>
-<td class="thinline br">&nbsp;</td>
-<td class="thinline">&nbsp;</td>
-</tr>
-
-<tr>
-<td rowspan="2" class="partic">Ordinary years 2 in 4</td>
-<td rowspan="2" class="brace">&nbsp;</td>
-<td rowspan="2" class="right brace padr0">-</td>
-<td rowspan="2" class="brace bt bb bl">&nbsp;</td>
-<td class="number br">13,900</td>
-<td rowspan="2" class="brace">&nbsp;</td>
-<td rowspan="2" class="brace bt br bb">&nbsp;</td>
-<td rowspan="2" class="left brace padl0">-</td>
-<td rowspan="2" class="number br">11,850</td>
-<td colspan="4" rowspan="2" class="number br">10,000</td>
-<td rowspan="2" class="number br">7,400</td>
-<td rowspan="2" class="number br">7,600</td>
-<td colspan="4" rowspan="2" class="number br">9,100</td>
-<td rowspan="2" class="brace">&nbsp;</td>
-<td rowspan="2" class="right brace padr0">-</td>
-<td rowspan="2" class="brace bt bb bl">&nbsp;</td>
-<td class="number br">16,500</td>
-<td rowspan="2" class="brace">&nbsp;</td>
-<td rowspan="2" class="brace bt br bb">&nbsp;</td>
-<td rowspan="2" class="left brace padl0">-</td>
-<td rowspan="2" class="number br">9,946</td>
-<td rowspan="2" class="number br">2,989</td>
-<td rowspan="2" class="number br">6,957</td>
-<td rowspan="2" class="number br">189</td>
-<td rowspan="2" class="number">167</td>
-</tr>
-
-<tr>
-<td class="number br">13,063</td>
-<td class="number br">13,063</td>
-</tr>
-
-<tr>
-<td class="partic">Dry years 1 in 4</td>
-<td colspan="4" class="number br">10,150</td>
-<td colspan="4" class="number br">9,100</td>
-<td colspan="4" class="number br">7,275</td>
-<td class="number br">5,950</td>
-<td class="number br">5,610</td>
-<td colspan="4" class="number br">6,100</td>
-<td colspan="4" class="number br">11,345</td>
-<td colspan="4" class="number br">7,651</td>
-<td class="number br">2,564</td>
-<td class="number br">5,087</td>
-<td class="number br">259</td>
-<td class="number">229</td>
-</tr>
-
-<tr>
-<td class="partic">Minimum of 14 years</td>
-<td colspan="4" class="number br bb">9,710</td>
-<td colspan="4" class="number br bb">8,003</td>
-<td colspan="4" class="number br bb">6,624</td>
-<td class="number br bb">5,810</td>
-<td class="number br bb">5,563</td>
-<td colspan="4" class="number br bb">5,163</td>
-<td colspan="4" class="number br bb">9,791</td>
-<td colspan="4" class="number br bb">6,968</td>
-<td class="number br bb">2,458</td>
-<td class="number br bb">4,510</td>
-<td class="number br bb">293</td>
-<td class="number bb">258</td>
-</tr>
-
-<tr>
-<td class="partic">Requirements on average of Lower Chenab Canal for</td>
-<td colspan="4" class="number br">12,045</td>
-<td colspan="4" class="number br">12,135</td>
-<td colspan="4" class="number br">8,729</td>
-<td class="number br">6,715</td>
-<td class="number br">6,267</td>
-<td colspan="4" class="number br">6,503</td>
-<td colspan="4" class="number br">8,625</td>
-<td colspan="4" class="number br">8,155</td>
-<td class="number br">2,564</td>
-<td class="number br">5,591</td>
-<td class="number br">236</td>
-<td class="number">208</td>
-</tr>
-
-<tr class="bb">
-<td class="partic">Requirements on average of Upper Bari Doab Canal for 5 years</td>
-<td colspan="4" class="number br">12,924</td>
-<td colspan="4" class="number br">10,305</td>
-<td colspan="4" class="number br">6,852</td>
-<td class="number br">5,607</td>
-<td class="number br">5,208</td>
-<td colspan="4" class="number br">6,090</td>
-<td colspan="4" class="number br">10,344</td>
-<td colspan="4" class="number br">7,619</td>
-<td class="number br">2,564</td>
-<td class="number br">5,055</td>
-<td class="number br">261</td>
-<td class="number">230</td>
-</tr>
-
-</table>
-
-<p><span class="pagenum" id="Page155">[155]</span></p>
-
-<p>&#8220;The 13,063 shown in brackets represents the parts of
-the available supply which the canals can carry, the
-capacity being as <span class="nowrap">follows:&mdash;</span></p>
-
-<table class="dontwrap" summary="Capacities">
-
-<tr>
-<th>&nbsp;</th>
-<th>Cusecs.</th>
-</tr>
-
-<tr>
-<td class="left padr2">Lower Jhelum Canal</td>
-<td class="right padr1">4,563</td>
-</tr>
-
-<tr>
-<td class="left padr2">Upper Jhelum Canal</td>
-<td class="right padr1">8,500</td>
-</tr>
-
-<tr>
-<td class="right padr4">Total</td>
-<td class="right padr1 bt bb">13,063</td>
-</tr>
-
-</table>
-
-<p class="noindent">&#8220;The average supplies and duty figures are based on the
-13,063 cusec maximum capacity and not on the larger
-available supplies written above these figures where they
-occur.</p>
-
-<p>&#8220;The above table goes to show the following:</p>
-
-<p class="hind23">(<i>i</i>) In order to utilize the large supplies available
-in the Jhelum River in October and March
-every year and in some or all of the intervening
-months in other years, it is advisable to
-give the Upper Jhelum Canal the large capacity
-of 8,500 cusecs proposed.</p>
-
-<p class="hind23">(<i>ii</i>) In favourable and ordinary years, that is, in 3
-out of 4, the available supply will be ample, as
-shown by the low duties of 189 and 167 compared
-with those obtaining on the Lower
-Chenab and Upper Bari Doab Canals.</p>
-
-<p class="hind23">(<i>iii</i>) In dry years, that is, 1 in 4, it will be necessary
-to attain a duty almost exactly the same as
-that now obtaining on the Upper Bari Doab
-Canal.</p>
-
-<p class="hind23">(<i>iv</i>) That an exceptionally dry year might occur
-once in 14 years, when the supply would be 10
-per cent. short of that required by the average<span class="pagenum" id="Page156">[156]</span>
-Upper Bari Doab Canal standard of requirements:
-such exceptional cases should be met
-by remissions, which will be far preferable to
-wasting the good supplies of 13 years out of 14.</p>
-
-<p class="hind23">(<i>v</i>) That the occasional occurrence of dry years
-makes it inadvisable to attempt a greater
-proportion of rabi than half of the annual
-irrigation.&#8221;</p>
-
-<h3 class="inline">3. <b>Remarks.</b></h3>
-
-<p class="inlineh">&nbsp;The Report on the Project estimates
-gives, for each tract, remarks on its soil, rainfall, height
-of subsoil water, circumstances as to existing irrigation
-from wells or small canals and liability to floods. On
-a consideration of these matters the decision as to the
-particular parts of the tracts which are to be irrigated
-and the areas which are, in the rabi, to receive only
-restricted irrigation, <span class="nowrap">depends.<a id="FNanchor50" href="#Footnote50" class="fnanchor">[50]</a></span></p>
-
-<div class="footnote">
-
-<p id="Footnote50"><a href="#FNanchor50"><span class="label">[50]</span></a>
-It is not unusual, in tracts where the level of the subsoil water is
-high, say within 15 feet of the surface, to have some &#8220;kharif distributaries.&#8221;
-These are closed in the rabi. This tends to prevent water-logging
-of the soil. In the rabi the people lift water from wells.
-There may also be kharif distributaries in dry tracts if there is no
-water to spare in the rabi.</p>
-
-</div><!--footnote-->
-
-<p>In calculating the sizes of the canals, N in Kutter&#8217;s
-co-efficient was taken at &middot;020. In sharp curves the bed
-is paved on the side next the concave bank. In high
-embankments where the soil is sandy the best material
-is used as a core wall. The torrent works on the
-Upper Jhelum Canal have been mentioned in <i>River and
-Canal Engineering</i>, Chapter XII.</p>
-
-<p>Regarding the effect of the new canals on the
-inundation canals which take off, lower down, from the
-Chenab below its confluence with the Jhelum, it has for
-long been the policy to gradually shift the heads of these
-canals upstream in order to obtain better supplies, or
-rather to counteract the effect of the abstraction of<span class="pagenum" id="Page157">[157]</span>
-water for the recently constructed Lower Chenab and
-Lower Jhelum Canals. Any such abstraction of
-water has not much effect on the floods, but it has
-much effect in April and May, when the rivers have not
-fully risen, and in September, when they are falling.</p>
-
-<p>In order to estimate the effect on the water level of
-the Chenab&mdash;below its junction with the Jhelum&mdash;it
-was necessary to observe discharges of the river, not
-only in the winter when it is low, but in the summer
-when it is high. The depth of the water was in some
-places 40 feet, and the stream 2,000 feet wide. Fortunately
-the Subdivisional Officer was a native of India and
-did not much mind the sun. A discharge curve (<i>River
-and Canal Engineering</i>, Chapter III. Art. 5,) having been
-prepared, it was possible to construct a diagram with
-periods of time as the abscissas, the ordinates representing
-the average known gauge readings on the different dates
-and another set of ordinates representing the probable
-discharges. By deducting the discharges which it was
-intended that the new perennial canals should draw off,
-it was possible to draw fresh ordinates representing the
-diminished river discharges and the reduced river gauge
-readings corresponding to them. It was found that the
-water level would be lowered by about 1&middot;3 feet in April
-and May, and by about 1&middot;5 feet in September. It
-was, however, shown that by shifting the heads of the
-inundation canals upstream&mdash;the gradients of the
-canals being flatter than that of the river&mdash;the effect of
-the lowering of the water level could, as heretofore, be
-nullified.</p>
-
-<hr class="chap" />
-
-<p><span class="pagenum" id="Page158">[158]</span></p>
-
-<h2>CHAPTER V.<br />
-<span class="chapname"><span class="smcap">Proposed Improvements in Irrigation Canals.</span></span></h2>
-
-<h3 class="inline">1. <b>Preliminary Remarks.</b></h3>
-
-<p class="inlineh">&mdash;The chief improvements
-which have been under consideration during recent
-years are three in number. The first is increased
-economy of water in its actual use in the fields; the
-second is reduction of the losses by absorption in the
-channels; and the third is distribution by means of
-modules.</p>
-
-<p>Regarding the first, it has long been known that the
-ordinary methods of laying on the water are more or
-less wasteful. In California, when the water instead of
-being applied to the surface of the ground, is brought in
-a pipe and delivered below the ground level, the duty is
-increased from 250 to 500 acres. In India a field is
-divided, by means of small ridges of earth, into large
-compartments. The water is let into a compartment
-and gradually covers it. By the time the further side
-is soaked the nearer side has received far too much
-water. Frequently the water for a compartment,
-instead of being carried up to it by a small watercourse,
-is passed through another compartment and this adds
-to the waste. Also the number of waterings given to a
-crop is often 5 or 6, when 4 would suffice. Experiments
-made on the Upper Bari Doab Canal, by Kennedy,
-showed that the water used in the fields was nearly
-double what it might have been. The 53 c. ft. shown
-in <a href="#Ref18">Chapter 1, Art. 4</a>, as reaching the fields, were used
-up when 28 c. ft. would have sufficed. It is not certain<span class="pagenum" id="Page159">[159]</span>
-that the waste is generally quite as much as the above.
-It is possible that the restricted supplies might have
-given smaller yields of crops. More recent experiments
-made by Kanthack on the same canal give the needless
-waste as about 25 per cent. The field compartments
-ought, according to Kennedy, to be 70ft. square, the
-small branch watercourses being 140ft. apart. It would
-be better to have still smaller compartments, but this
-would be rather hard on the people.</p>
-
-<p>At one time Government issued orders, in Northern
-India, that compartments of 1296 square feet were to be
-used, and that, otherwise, increased water rates would
-be charged, but the orders were never enforced. They
-were thought to press too hardly on the people.
-Extreme measures for enforcing economy in the use of
-water in any country are likely to be introduced only
-when they become absolutely necessary owing to the
-supplies of water being otherwise insufficient.</p>
-
-<h3 class="inline">2. <b>Reduction of Losses in the Channels.</b></h3>
-
-<p class="inlineh">&mdash;For
-several years experiments have been going on in the
-Punjab as to the effect of lining watercourses with
-various materials. The following conclusions have been
-arrived <span class="nowrap">at<a id="FNanchor51" href="#Footnote51" class="fnanchor">[51]</a>:&mdash;</span></p>
-
-<div class="footnote">
-
-<p id="Footnote51"><a href="#FNanchor51"><span class="label">[51]</span></a>
-<i>Punjab Irrigation Paper</i> No. 11 C. &#8220;Lining of Watercourses
-to reduce absorption losses. Experiments of 1908-1911.&#8221;</p>
-
-</div><!--footnote-->
-
-<h4>I. <span class="smcap">Ordinary Unlined Trenches.</span></h4>
-
-<p class="hind48">(<i>a</i>) The rate of absorption varies greatly, and this
-is due probably to unequal fissuring of the
-upper layers of the soil.</p>
-
-<p class="hind48">(<i>b</i>) The rate of absorption in the three hottest
-months averaged &middot;0571 feet per hour, or more
-than double the rate (&middot;026) in the three coldest<span class="pagenum" id="Page160">[160]</span>
-months. The difference is ascribed to the
-greater viscosity of the water when cold.</p>
-
-<p class="hind48">(<i>c</i>) The average losses with canal water were &middot;0315
-feet per hour, or 8&middot;75 c. feet per second per
-million sq. <span class="nowrap">feet.<a id="FNanchor52" href="#Footnote52" class="fnanchor">[52]</a></span> With well water the figures
-were &middot;1096 and 30&middot;5. The conclusion is that
-the silt in canal water reduces the losses by
-more than two-thirds.</p>
-
-<div class="footnote">
-
-<p id="Footnote52"><a href="#FNanchor52"><span class="label">[52]</span></a>
-This loss of 8&middot;75 c. ft. per second was in water only about a foot
-deep. This confirms the conclusion arrived at in <a href="#Ref18">Chapter I, Art. 4</a>,
-that the depth of water is not a factor of much importance.</p>
-
-</div><!--footnote-->
-
-<p class="hind48">(<i>d</i>) With canal water the average loss decreased by
-40 per cent. (from &middot;0491 to &middot;0293) in about
-four years. This was no doubt due to the
-effect of the silt. With well water the loss at
-the end of four years (&middot;2293) was nearly four
-times as great as at first (&middot;0591). This may
-have been due to removal of the finer particles
-of soil by the water, but the experiments were
-made at only one place, and were not conclusive.</p>
-
-<h4>II. <span class="smcap">Lined Trenches.</span></h4>
-
-<p class="hind48">(<i>e</i>) With trenches lined with crude oil &sup1;&#8260;&#8321;&#8326; inch
-thick, or with Portland cement &sup1;&#8260;&#8321;&#8326; inch thick,
-or with clay puddle 6 inches thick, the
-&#8220;efficiency ratios,&#8221; as compared with unlined
-trenches, are respectively about 4&middot;0, 5&middot;7 and
-5&middot;7, the age of the lining being four years.
-The efficiency ratio is the inverse of the loss.
-Thus with an efficiency ratio of 3 the loss in
-the lined trench is 33 per cent. of that in the
-unlined trench.</p>
-
-<p><span class="pagenum" id="Page161">[161]</span></p>
-
-<p class="hind48">(<i>f</i>) The efficiency ratio in the case of oil may
-diminish at the rate of 10 per cent. per annum,
-but in the case of cement and clay puddle it
-tends to increase rather than to decrease.</p>
-
-<p class="blankbefore1">Assuming that the efficiency ratios are only 3&middot;0, 4&middot;5
-and 4&middot;5, and that the loss in an unlined channel is
-8 c. feet per second per million sq. feet, the saving in
-water by using channels lined with oil, cement and
-puddle respectively would be 5&middot;33, 6&middot;25 and 6&middot;25 c. feet
-per second. The average duty of the water at the canal
-head is about 242 acres, and the average revenue per
-acre is Rs 3&middot;93. The revenue from 1 c. ft. of water at
-the canal head is thus Rs 950. Only about half the
-water reaches the fields (<a href="#Ref18">Chapter I., Art. 4</a>), and the
-revenue from 1 c. ft. of water which reaches the fields
-is about Rs 1900. The mean of the above two sums is
-Rs 1425. If 6 c. ft. of water per second could be saved
-the revenue would be increased by Rs 8,550 per annum.</p>
-
-<p>The cost of lining a million square feet of channel
-with oil, cement and puddle is estimated at Rs 30,000,
-Rs 27,500 and Rs 35,000 respectively. Allowance has
-to be made for the fact that watercourses flow intermittently,
-and that a lined channel gives no saving
-when it is not in flow, also that extensions of canals
-might have to be undertaken in order to utilise the
-water saved. After making these allowances it is
-estimated, in the paper above quoted, that the saving
-effected by lining a million square feet with oil, cement
-or puddle represents the interest on a capital sum of
-Rs 69,300, Rs 81,250 and Rs 81,250 respectively, or 2
-or 3 times the sums sunk in constructing the linings.</p>
-
-<p>Hitherto the experiments have been carried out on a
-moderate scale, but extensive operations are now being<span class="pagenum" id="Page162">[162]</span>
-undertaken on the Lower Chenab Canal, and possibly on
-others.</p>
-
-<p>In cases where it is not desired to incur much expenditure,
-it may be a good plan to construct watercourses
-to a cross section somewhat larger than that ultimately
-desired. The silt deposited on the bed and sides forms,
-in most cases, a more impervious lining than the original
-soil. The same plan can be adopted in the tail portion
-of a distributary. In a larger channel there would be less
-certainty that any deposit would take place unless short
-lengths, at frequent intervals, were excavated to the
-true or ultimate section, so as to form weirs and spurs;
-and even these might not stand.</p>
-
-<p>In Italy, in cases where the water naturally contains
-lime in suspension, the beds of canals have become
-gradually watertight by the deposit of lime in the
-<span class="nowrap">channel.<a id="FNanchor53" href="#Footnote53"
-class="fnanchor">[53]</a></span> In some cases lime has been artificially
-added. It appears that a considerable period of time is
-necessary for the process.</p>
-
-<div class="footnote">
-
-<p id="Footnote53"><a href="#FNanchor53"><span class="label">[53]</span></a> Min. Proc. Inst. C. E. Vol. CXVI.</p>
-
-</div><!--footnote-->
-
-
-<h3 class="inline" id="Ref17">3. <b>Modules.</b></h3>
-
-<p class="inlineh">&mdash;A module is an appliance which automatically
-gives a constant discharge through an aperture,
-however the water level on either the upstream or
-downstream side of the aperture may fluctuate. In an
-old and simple form of module there is a horizontal
-orifice in which works loosely a tapering rod attached
-to a float. The water passes through the annular space
-surrounding the rod. If the water level rises, the rise
-of the float brings a thicker part of the rod to the
-orifice and reduces the annular space. In another kind
-of module the water is discharged through a syphon.
-If the water level alters, the syphon moves in such a<span class="pagenum" id="Page163">[163]</span>
-way that the head, or difference between the levels of
-its two ends, remains the same. The great objections
-to modules are that they are liable to get out of order
-or to be tampered with. A module recently invented
-and patented by <span class="nowrap">Gibb<a id="FNanchor54" href="#Footnote54"
-class="fnanchor">[54]</a></span> has no movable parts, and is
-not liable to these objections.</p>
-
-<div class="footnote">
-
-<p id="Footnote54"><a href="#FNanchor54"><span class="label">[54]</span></a> For description see <a href="#Page186">Appendix H</a>.</p>
-
-</div><!--footnote-->
-
-<p>A few years ago the question of the desirability of
-using modules for the outlets of distributaries in India
-was raised. The opinions of a large number of the
-senior canal engineers were called for and considered,
-and since then the subject has been thoroughly discussed.
-There are certain inherent difficulties in the
-way of moduling the outlets of a distributary. Owing,
-for instance, to rain further up the canal, or to the
-closure of a distributary owing to a breach in it, the
-canal supply may increase, and it may be necessary to
-let more water into the distributary under consideration.
-Under the present system any excesses of water
-are automatically taken by the outlets. If all outlets
-were rigidly moduled they would discharge no more
-than before the excess supply came in, and the excess
-supply would all go to the tail of the distributary, and,
-most likely, breach the banks. To get over this
-difficulty, the module has to be so arranged that when
-the water level in the distributary rises to a certain
-&#8220;maximum limit&#8221; the module ceases to act as such,
-and the discharge drawn off from the distributary
-increases as the water level rises. Again, the discharge
-of the distributary may at times be considerably less
-than its full supply. In order that, in such a case, the
-outlets towards the tail of the distributary may not be
-wholly deprived of water, it has to be arranged so that<span class="pagenum" id="Page164">[164]</span>
-when the water level in the distributary falls below a
-certain &#8220;minimum limit&#8221; the modules cease to act as
-such, and draw off supplies which are less the lower the
-water level. Such supplies are not in proportion to the
-full supplies of the outlets. It will, however, be shown
-presently that low supplies need seldom be run.
-When a distributary, say the upper reach, contains silt,
-the water level corresponding to a given discharge is
-higher than before, and care has to be taken that the
-maximum limit is high enough. At the same time the
-minimum limit must be so low that it will not be passed
-when the silt scours out. The difference between the
-maximum and minimum limits is called the &#8220;range&#8221;
-of the module.</p>
-
-<p>In Gibb&#8217;s module the above conditions can be complied
-with. The module is placed outside the bank of
-the distributary. The water is drawn off from the
-distributary by a pipe, whose lower edge is at the bed
-level of the distributary, and delivered from the module
-into the watercourse through a rectangular aperture at
-a higher level than that of the pipe. It is possible
-that, owing to the high level of the aperture, some
-rolling silt which would otherwise have passed out
-of the distributary may remain in it. The height of
-the aperture also prevents the watercourse from drawing
-off any water at all when the water level of the distributary
-falls below a certain level, but this objection is
-not important. An escape weir or notch is provided
-so that when the water level in the distributary rises
-to the maximum limit some water overflows into the
-watercourse. On the whole it appears that all difficulties
-can be got over, though a good deal of care and<span class="pagenum" id="Page165">[165]</span>
-precision is necessary in fixing the exact height of the
-maximum and minimum limits.</p>
-
-<p>The difficulties under consideration will all be reduced
-if some of the outlets on a distributary are left unmoduled,
-and this is desirable on other grounds.
-When the supply is normal, <i>i.e.</i> between the maximum
-and minimum limits, and all modules are working, the
-supply entering the distributary must be regulated with
-great precision. The outlets draw off a certain supply.
-If less than this enters the distributary the tail outlets
-must go short. If more enters there will be a surplus
-at the tail, though it can probably be disposed of,
-because the tail water will rise above the maximum
-limit. For short periods, say an hour or two, no trouble
-arises because the distributary acts as a reservoir, the
-water level rising to take in any excess supply, and
-falling to allow for a deficiency. At the tail the rise
-and fall may be hardly perceptible. But if the supply
-were deficient for a whole night the tail outlets would
-certainly go short. This could theoretically be remedied
-to some extent by letting in an excess supply for a short
-time and causing the water level at the tail to rise above
-the maximum limit, but in practice no such system of
-compensation could be worked. The very fact of the
-tail outlets having gone short for a night would not be
-known. The proper method of preventing any such
-troubles as those under consideration is to leave some of
-the outlets on the distributary un-moduled.</p>
-
-<p>It has been more than once mentioned that there are
-periods when a distributary is run, not full, but about
-three-fourths full. If that were done in the case of a
-distributary whose outlets were mostly moduled, the
-water level would probably be below the minimum limit,<span class="pagenum" id="Page166">[166]</span>
-and the modules would not be acting as such. The
-outlets would not, under these circumstances, obtain
-their proper proportionate supplies. This difficulty can,
-no doubt, be got over by running the distributary full
-for short periods at a time instead of three-fourths full
-for longer periods. The people, when once they understood
-the case, could arrange to use the water in greater
-volume for two days instead of in smaller volume for
-three. If this arrangement comes into force it will not
-be necessary to design distributaries&mdash;see <a href="#Ref19">Chapter III,
-Art. 4</a>&mdash;so as to have a good command when three-fourths
-full supply is run.</p>
-
-<p>On nearly every distributary there are some watercourses
-whose command is bad, and it has been stated
-(<a href="#Ref4">Chapter II, Art. 9</a>) that in an ordinary unmoduled distributary
-the sizes of the outlets in such cases should
-be extremely liberal. To module any such outlet would
-cause a lowering of the water level in the watercourse
-and would interfere with the irrigation. Such outlets
-should not be moduled. Again, there are some few
-outlets which are not submerged, <i>i.e.</i>, there is a free fall
-into the watercourse. The discharge does not depend
-on the water level in the watercourse, and it is not
-affected by any enlargement or clearance of it. It
-depends only on the water level in the distributary.
-This water level, if most of the outlets are moduled,
-will be fairly constant. Such outlets need not be
-moduled, and they should not be moduled unless the
-other unmoduled outlets in the reach concerned are
-sufficiently numerous, and perhaps not even then,
-because moduling involves some expense.</p>
-
-<p>A distributary generally has some falls which divide
-it into reaches. Immediately upstream of a fall the<span class="pagenum" id="Page167">[167]</span>
-water level for a given discharge is not affected by the
-silting or scouring of the channel. Any outlets near to
-and upstream of the fall are less subject than others to
-variation in discharge, and are suitable for non-moduling
-in case a sufficient number of unmoduled outlets is not
-otherwise obtainable.</p>
-
-<p>Regarding the watercourses at the extreme tail of a
-distributary it has been pointed out (<a href="#Ref20">Chapter III.,
-Art. 7</a>) that in an ordinary case they should not be left
-without masonry outlets, because they may then lower
-the water level and so unfairly reduce the supply of any
-watercourse, even though upstream of them, which has
-such an outlet. But any outlets near the tail of a
-distributary can suitably be left unmoduled because of
-the difficulty of ensuring that the supply at the tail
-shall be exactly what is needed.</p>
-
-<p>Gibb&#8217;s modules have been tried on various distributaries
-in the Punjab and found to give good results. It
-is believed however that in only one case has a whole
-distributary been moduled. The distributary is a large
-one, its length being 35 miles. It appears that the
-discharge reaching the tail of the distributary is not
-constant but varies, as was to be expected, when the
-head discharge varies for any length of time. The
-command on the distributary is good. There is nothing
-to show that matters would not have been improved,
-and money saved, by leaving some of the outlets without
-modules.</p>
-
-<p>It has been remarked above, that at the downstream
-end of a reach ending in a fall, the F.S. level of a
-distributary is not affected by silt. At the upstream
-end of the reach it is affected. There are thus two<span class="pagenum" id="Page168">[168]</span>
-gradients, one flat, and one steep. It appears to have
-been decided in one case in the Punjab, that the
-minimum limit of supply for the module should be about
-half an inch below the flat line and the maximum limit
-&middot;3 feet above the steep line. In many cases a greater
-range would be <span class="nowrap">required,<a id="FNanchor55" href="#Footnote55" class="fnanchor">[55]</a></span> say a foot.</p>
-
-<div class="footnote">
-
-<p id="Footnote55"><a href="#FNanchor55"><span class="label">[55]</span></a>
-It is understood that a range of a foot can easily be arranged for,
-and that ranges of 3 or 4 feet can be introduced at slightly increased cost.</p>
-
-</div><!--footnote-->
-
-<p>In <a href="#Ref20">Chapter III. Art. 7</a>, the case of a distributary
-without modules but with the outlets carefully adjusted,
-was considered. The question to be decided in each
-case is whether such an arrangement is preferable to
-moduling some of the outlets. This turns largely on
-the amount of attention which would be bestowed on
-the case. In view of the difficulty of securing such
-attention and of the trouble of constantly making alterations
-in a certain number of outlets, it is probable that
-moduling will in many cases be considered preferable.</p>
-
-<p>The question of moduling the heads of distributaries
-has also been considered in the Punjab. For minor or
-small distributaries modules are feasible. For a large
-distributary a module would be expensive and it appears
-that the present system of regulating is preferable.</p>
-
-<p>Kennedy&#8217;s &#8220;Gauge Outlet,&#8221; which is a kind of semi-module
-is described in <a href="#Page193">Appendix K</a>. It is being tried
-in the Punjab.</p>
-
-<hr class="chap" />
-
-<p><span class="pagenum" id="Page169">[169]</span></p>
-
-<h2>APPENDICES.</h2>
-
-<h3>APPENDIX A.<br />
-<span class="chapname">DIVIDE WALL ON LOWER CHENAB CANAL.</span></h3>
-
-<p class="appref">(See <a href="#Page50">page 50</a>, <a href="#Footnote11">first footnote</a>.)</p>
-
-<div class="figcenter" id="Fig27">
-<img src="images/illo189.png" alt="Divide wall" width="450" height="324" />
-<p class="caption"><span class="smcap">Fig.</span> 27.</p>
-</div>
-
-<p>The Gagera branch of the Lower Chenab Canal&mdash;the left-hand
-branch in <a href="#Fig27">fig. 27</a>&mdash;was found to silt. It was proposed
-to make a divide wall (<a href="#Fig27">fig. 27</a>) extending up to
-full supply level. The idea is unintelligible. The silt
-does not travel by itself but is carried or rolled by the
-water. As long as water entered the Gagera branch, silt
-would go with it. The authorities, who had apparently
-accepted the proposal, altered the estimate when they
-received it, and ordered the wall to be made as shown
-dotted and of only half the height. This was done. The
-idea seems to have been that the wall would act as a sill<span class="pagenum" id="Page170">[170]</span>
-and stop rolling silt. This is intelligible, but such sills
-do not always have much effect on rolling silt. Moreover,
-there was a large gap, A B, in the wall. The work is said
-to have proved useless, and proposals have been made to
-continue the wall from A to B. In this form it is conceivable
-that it may be of use.</p>
-
-<hr class="sec" />
-
-<p><span class="pagenum" id="Page171">[171]</span></p>
-
-<h3>APPENDIX B.<br />
-<span class="chapname">SPECIFICATION FOR MAINTENANCE
-OF CHANNELS.</span></h3>
-
-<p class="appref">(See <a href="#Page138">page 138</a>.)</p>
-
-<h4 id="Ref21">I. <span class="smcap">Roads and Banks.</span></h4>
-
-<h5 class="inline">1. <b>Filling Holes.</b></h5>
-
-<p class="inlineh">&mdash;Holes to be all dug out and
-thoroughly opened and inspected, then to be filled in with
-rammed earth. Never to be filled in a hurry or without
-digging out.</p>
-
-<h5 class="inline">2. <b>Dressing.</b></h5>
-
-<p class="inlineh">&mdash;Heavy soil to be dressed even. Light
-sandy soil to be disturbed as little as possible, and grass
-in such soil not to be removed except when in large tufts.
-When dressing is done, the road to be given (as far as
-possible) a transverse slope from the canal side of about
-1 in 50.</p>
-
-<h5 class="inline">3. <b>Trees.</b></h5>
-
-<p class="inlineh">&mdash;Branches to be lopped so as not to obstruct
-riders. Great care is needed to see that the men do not
-lop needlessly high. Roots, if projecting on road, to be
-covered up or cut out.</p>
-
-<h5 class="inline">4. <b>Petty Repairs.</b></h5>
-
-<p class="inlineh">&mdash;Settlement or wearing down, if
-slight, should be made good on maintenance estimates,
-otherwise on special estimates. Cracks should be dug out
-and filled in and rammed. Old &#8220;dead men&#8221; or walls of
-earth should be utilised or at least levelled down.</p>
-
-<h5 class="inline">5. <b>Sand or &#8220;Reh&#8221; Soil.</b></h5>
-
-<p class="inlineh">&mdash;Can be dug out to a depth
-of 9 inches and removed to a distance, and (the places<span class="pagenum" id="Page172">[172]</span>
-having been inspected by the Subdivisional Officer)
-replaced by good soil got from pits or berms, the places
-being selected with care. If the lead is slightly askew, the
-stuff removed can be put in the same pits from which
-earth is got.</p>
-
-<h5 class="inline">6. <b>Laying long coarse Grass on Road.</b></h5>
-
-<p class="inlineh">&mdash;This can
-be done in cases where the removal of sand or &#8220;reh&#8221; is
-not practicable or has proved ineffective. The grass is laid
-crosswise to prevent wheels sinking in.</p>
-
-<h4 id="Ref22">II. <span class="smcap">Jungle and Trees.</span></h4>
-
-<h5 class="inline">1. <b>Jungle.</b></h5>
-
-<p class="inlineh">&mdash;To be cut close to the ground or to be
-dug out by the roots when ordered. To be burned as
-soon as dry. Dead branches, twigs, etc., to be burned or
-removed to rest-houses, and not left about on canal land.
-Precautions to be taken against damage by fire to forests,
-etc. Clearance to include the <span class="nowrap">channel<a id="FNanchor56"
-href="#Footnote56" class="fnanchor">[56]</a></span> and both roads,
-and any jungle on the slopes of the spoil which obstructs
-the <span class="nowrap">roads.<a id="FNanchor57" href="#Footnote57" class="fnanchor">[57]</a></span></p>
-
-<div class="footnote">
-
-<p id="Footnote56"><a href="#FNanchor56"><span class="label">[56]</span></a>
-Jungle on inside slopes not to be cleared where banks fall in or
-where channel is too wide.</p>
-
-<p id="Footnote57"><a href="#FNanchor57"><span class="label">[57]</span></a>
-When an embankment runs parallel to an inundation canal, a chain
-or so distant, the intervening space need not be cleared, nor need the top
-of a bank be cleared if it is so uneven that it is not a road.</p>
-
-</div><!--footnote-->
-
-<h5 class="inline">2. <b>Trees.</b></h5>
-
-<p class="inlineh">&mdash;Trees which fall into a channel or across a
-road to have their branches cut away at once. The trunk
-to be removed so far as is possible. Trees which are dead
-or broken off should be felled, also those which have been
-blown into inclined positions, unless bad gaps will be
-caused. Trees (unless required for stock) to be sold
-as they lie and removed, including the parts below
-ground, by purchasers, within a fixed time. Logs, etc.,
-not to be left lying about on canal land. Stumps, etc.,
-to be made into charcoal and the holes filled up.</p>
-
-<p><span class="pagenum" id="Page173">[173]</span></p>
-
-<p><i>Note.</i>&mdash;The above works (<a href="#Ref21">Parts I.</a> and <a href="#Ref22">II.</a>) to be done
-immediately after the rains (repairs to roads and removal
-of trees, branches, etc., being also done during the rains
-or whenever necessary) and finished at latest by 31st
-October.</p>
-
-<h4>III. <span class="smcap">Cattle Crossings or Gh&aacute;ts.</span></h4>
-
-<h5 class="inline">1. <b>Repairs.</b></h5>
-
-<p class="inlineh">&mdash;Gh&aacute;ts to be dressed, strengthened, and
-kept neat, the bank being thrown back and curved so as
-to give a long inner slope, and lumps, etc., levelled off.</p>
-
-<h5 class="inline">2. <b>Closures.</b></h5>
-
-<p class="inlineh">&mdash;To be closed (by order of Subdivisional
-Officer and no one of lower rank) only when very near to
-a bridge or near to another <span class="nowrap">gh&aacute;t.<a id="FNanchor58"
-href="#Footnote58" class="fnanchor">[58]</a></span> If closed, to be staked
-up and bushing to be added. Not to be closed by loose
-thorny branches. Not to be allowed close to any milestone,
-outlet, etc.</p>
-
-<div class="footnote">
-
-<p id="Footnote58"><a href="#FNanchor58"><span class="label">[58]</span></a>
-Regarding gh&aacute;ts at bridges, see <a href="#Ref16">Chap. II., Art. 12</a>.</p>
-
-</div><!--footnote-->
-
-<h5 class="inline">3. <b>Small Gh&aacute;ts.</b></h5>
-
-<p class="inlineh">&mdash;Gh&aacute;ts where only foot-passengers
-cross, can run diagonally up the slopes or as may be
-convenient. They should be dressed and kept in order.</p>
-
-<h5 class="inline">4. <b>Canal Road at Gh&aacute;ts.</b></h5>
-
-<p class="inlineh">&mdash;At all gh&aacute;ts care must
-be taken that the canal road, especially if used for driving,
-is not cut up and is kept in proper order.</p>
-
-<h4>IV. <span class="smcap">Miscellaneous Items.</span></h4>
-
-<h5 class="inline">1. <b>Rubbish or Obstructions in Bed of Channel.</b></h5>
-
-<p class="inlineh">&mdash;To
-be removed from the channel when it is laid dry, and
-not left till it is about to be <span class="nowrap">reopened.<a id="FNanchor59"
-href="#Footnote59" class="fnanchor">[59]</a></span> Old stakes, etc.,
-to be sawn off when crooked or too high.</p>
-
-<div class="footnote">
-
-<p id="Footnote59"><a href="#FNanchor59"><span class="label">[59]</span></a>
-Where the bed is too low, no rubbish clearance should be done
-except in the case of very large snags, etc.</p>
-
-</div><!--footnote-->
-
-<h5 class="inline">2. <b>Temporary Aqueducts or Damaged Wooden
-Bridges.</b><a id="FNanchor60"></a><a href="#Footnote60" class="fnanchor">[60]</a></h5>
-
-<p class="inlineh">&mdash;To be removed before water is expected (but
-not sooner than is necessary) and the banks repaired and
-made good.</p>
-
-<div class="footnote">
-
-<p id="Footnote60"><a href="#FNanchor60"><span class="label">[60]</span></a> This applies to inundation canals.</p>
-
-</div><!--footnote-->
-
-<hr class="sec" />
-
-<p><span class="pagenum" id="Page174">[174]</span></p>
-
-<h3>APPENDIX C.<br />
-<span class="chapname">SPECIFICATION FOR MAINTENANCE
-OF MASONRY WORKS.</span></h3>
-
-<p class="appref">(See <a href="#Page138">page 138</a>.)</p>
-
-<h4 class="inline">1. <b>General Repairs.</b></h4>
-
-<p class="inlineh">&mdash;Masonry, plaster, pitching, etc.,
-to be kept in repair. Pitching, where defective or out
-of line, to be made right. Bumping posts to be fixed
-in proper positions. Earth to be added to ramps, etc.,
-where needed. Metalling to be regularly seen to.
-Needles, planks, hooks, railings, winches, lamp-posts,
-lamps, etc., to be kept in order and complete. Bricks,
-bats, etc., to be properly stacked. Needles, etc., to be
-neatly stacked on rests or with bricks under them. All
-surplus and useless needles, etc., to be removed. Huts
-to be kept in repair. Extra mud walls or screens not
-to be allowed when unsightly. All verandah openings
-to be edged with a 6-inch band of whitewash.</p>
-
-<h4 class="inline">2. <b>Jungle.</b></h4>
-
-<p class="inlineh">&mdash;All masonry to be kept free from jungle
-growth, and all piers free from caught jungle. For this
-purpose long bamboo weed-hooks to be supplied.</p>
-
-<h4 class="inline">3. <b>Dressing, etc.</b></h4>
-
-<p class="inlineh">&mdash;Rubbish, lumps of earth, logs,
-etc., to be cleared away, pits and holes filled up. Banks,
-slopes, etc., of main and branch channels in the neighbourhood
-of the work to be specially levelled and dressed.</p>
-
-<p><i>Note.</i>&mdash;All works should be specially seen to in October,
-and everything be in order by 31st October.</p>
-
-<hr class="sec" />
-
-<p><span class="pagenum" id="Page175">[175]</span></p>
-
-<h3>APPENDIX D.<br />
-<span class="chapname">WATCHING AND PROTECTING BANKS
-AND <span class="nowrap">EMBANKMENTS.</span><a id="FNanchor61" href="#Footnote61" class="fnanchor">[61]</a></span></h3>
-
-<p class="appref">(See <a href="#Page138">page 138</a>.)</p>
-
-<div class="footnote">
-
-<p id="Footnote61"><a href="#FNanchor61"><span class="label">[61]</span></a>
-This is reprinted from <i>Punjab Rivers and Works</i>. It was drawn
-up for inundation canals and flood embankments.</p>
-
-</div><!--footnote-->
-
-<h4 class="inline">1. <b>Watching.</b></h4>
-
-<p class="inlineh">&mdash;Every watchman employed to have
-a fixed headquarters and a fixed beat. If there is no
-permanent hut on or near the bank, grass huts should
-be erected by the men at the places fixed. The presence
-or absence of the men to be frequently tested by the
-mate and suboverseer. The suboverseers tests to be
-recorded in a book and to form the subject of frequent
-inquiry by the Subdivisional Officer, who will also record
-his remarks and take proper action in case the suboverseer
-is in fault.</p>
-
-<h4 class="inline">2. <b>Gauge Readers, Regulating Establishment,
-Bungalow Watchmen, etc.</b></h4>
-
-<p class="inlineh">&mdash;To be made to assist
-whenever possible. The allotment of a beat to each
-such man has been separately ordered.</p>
-
-<h4 class="inline">3. <b>Employment of Men on Repairs.</b></h4>
-
-<p class="inlineh">&mdash;The men,
-when not otherwise occupied, to do petty repairs, etc.,
-within their beats, but not to be put on miscellaneous
-duties and sent about as messengers, nor to act as
-orderlies or khalassies.</p>
-
-<h4 class="inline">4. <b>Strength of Establishment.</b></h4>
-
-<p class="inlineh">&mdash;Should generally<span class="pagenum" id="Page176">[176]</span>
-be greater for one and a half months in July and
-August than at other times. Care to be taken as to
-this and as to dismissing men when no longer needed.</p>
-
-<h4 class="inline">5. <b>Stakes and Mallets.</b></h4>
-
-<p class="inlineh">&mdash;To be collected beforehand,
-if necessary, at suitable places, to be accounted
-for at end of flow season and balance taken care of.</p>
-
-<h4 class="inline">6. <b>Breaches.</b></h4>
-
-<p class="inlineh">&mdash;The Establishment to be trained by
-the Subdivisional Officer to report every breach to all
-officials with the greatest possible speed. The mate,
-daroga, and suboverseer to remain there till the breach
-is closed and to promptly send a report on the prescribed
-form to the Subdivisional Officer.</p>
-
-<h4 class="inline">7. <b>Serious Breaches.</b></h4>
-
-<p class="inlineh">&mdash;In case of serious breaches
-of main channels the Subdivisional Officer to himself
-reach the spot as soon as possible.</p>
-
-<h4 class="inline">8. <b>Breach Reports.</b></h4>
-
-<p class="inlineh">&mdash;See printed form <span class="nowrap">M<a id="FNanchor62"
-href="#Footnote62" class="fnanchor">[62]</a></span> attached.
-To be promptly submitted for each breach to the Executive
-Engineer. The report contains a column for cost of
-closure. This means the stoppage of the flow and not
-the complete making up of the banks. The column for
-remarks of the Executive Engineer should be filled in
-and the report promptly returned to the Subdivisional
-Officer, who will, in the meantime, be making up the
-banks and preparing a requisition or estimate.</p>
-
-<div class="footnote">
-
-<p id="Footnote62"><a href="#FNanchor62"><span class="label">[62]</span></a> Not printed.</p>
-
-</div><!--footnote-->
-
-<h4 class="inline">9. <b>Progress Report.</b></h4>
-
-<p class="inlineh">&mdash;With the Executive Engineer&#8217;s
-monthly progress report a list of breaches will be submitted,
-canal by canal, with columns showing date of
-occurrence and cost of closure. The return should be
-on the attached form <span class="nowrap">G.<a id="FNanchor63" href="#Footnote63"
-class="fnanchor">[63]</a></span> The Subdivisional Officer
-should also submit this form to the Executive Engineer.</p>
-
-<div class="footnote">
-
-<p id="Footnote63"><a href="#FNanchor63"><span class="label">[63]</span></a>
-Not printed. The form differs slightly from a form prescribed by
-the Chief Engineer for general use in the Province.</p>
-
-</div><!--footnote-->
-
-<h4 class="inline">10. <b>Estimates.</b></h4>
-
-<p class="inlineh">&mdash;The cost of breaches is not to be<span class="pagenum" id="Page177">[177]</span>
-charged to maintenance estimates. At the close of each
-month the Executive Engineer should submit or sanction
-an estimate, accompanied by the breach reports, for
-closing any breaches which have occurred and making
-up the banks.</p>
-
-<h4 class="inline">11. <b>Breaches in the Flooded Area near Canal
-Heads.</b></h4>
-
-<p class="inlineh">&mdash;These may be of special importance. It may
-be impossible to do any good and money may be uselessly
-spent. In any such cases the Subdivisional Officer
-should at once proceed to the spot and the case should
-be reported by wire to the Executive Engineer and, if
-necessary, to the Superintending Engineer.</p>
-
-<h4 class="inline">12. <b>Breaches in Flood Embankments.</b></h4>
-
-<p class="inlineh">&mdash;The Subdivisional
-Officer must at once proceed to the spot and
-the case be reported by wire to the Executive Engineer
-and Superintending Engineer. The Breach Report forms
-can be submitted partially filled in at the earliest
-possible moment and a complete form afterwards.</p>
-
-<hr class="sec" />
-
-<p><span class="pagenum" id="Page178">[178]</span></p>
-
-<h3>APPENDIX E.<br />
-<span class="chapname">SPECIFICATION FOR BUSHING.</span></h3>
-
-<p class="appref">(See <a href="#Page139">page 139</a>.)</p>
-
-<p>1. The object of bushing is to form a silt berm and thus
-prevent or stop the falling in of the banks.</p>
-
-<p>2. The branches must be thickly packed in order that
-the water among them may become still, and also in order
-that they may not be shifted by the stream. If thickly
-packed, the pegs required will also be fewer. Most of the
-branches should be leafy and freshly cut, but, mixed with
-these, there may be a proportion of kikar or other leafless
-branches. Frequently it is possible to utilise jungle trees
-of small value, bushes, scrub jungle, or even long grass.</p>
-
-<p>3. Except when the bushes are to be very small or the
-length to be bushed very short, the proposed line for the
-edge of the berm should be marked out by long stakes
-driven in the water at fairly close intervals. Otherwise
-the work may be badly done and the berm formed
-imperfect and out of line.</p>
-
-<p>4. As the berm formed is not likely in any case to be
-perfectly straight, and as subsequent additions to it will
-be difficult, while trimming it will be easy, the bushes
-should extend slightly beyond the line of the proposed
-berm. Care should be taken that the lower branches,
-which cannot be seen when once submerged, are long
-enough.</p>
-
-<p><span class="pagenum" id="Page179">[179]</span></p>
-
-<p>5. The branches should be piled up to above water-level,
-so that, as they settle, they will assume the position
-desired, but to lay them high above full-supply level on
-the slopes is useless and wasteful. If the pegs have to be
-driven at a high level, the branches should be attached to
-them by thin ropes or twine. Long pegs standing up
-high above the ground are also wasteful. The pegs should
-as far as possible be kept in line and their heads at
-one level.</p>
-
-<p>6. If bushing is begun during low supply, it need not,
-at first, extend up to full-supply level. More branches,
-freshly cut, can be added as the supply rises. In any case
-it is generally necessary to make some additions to bushing
-from time to time, and this should be explained to contractors
-and others when fixing the rates.</p>
-
-<p>7. If the trees from which branches are cut are in
-desirable places, the branches should be cut with judgment;
-but where trees are in places where they should not be
-(<i>e.g.</i>, on the inside slopes of the channels), all the branches
-may be cut off. The trunk may be left temporarily in
-order to supply more branches.</p>
-
-<hr class="sec" />
-
-<p><span class="pagenum" id="Page180">[180]</span></p>
-
-<h3>APPENDIX F.<br />
-<span class="chapname">ESCAPES.</span></h3>
-
-<p class="appref">(See <a href="#Page9">page 9</a>.)</p>
-
-<p>There are no definite rules regarding the capacity of the
-escapes to be provided on a canal. On some canals in dry
-tracts of country the discharging power of the escapes is a
-mere fraction of that of the canal. In other cases it is
-about half that of the canal. In a district liable to heavy
-rain an escape, say at a point where a canal divides into
-branches, should be able to discharge about half of the
-main canal supply. On branches, escapes, if provided at all,
-usually discharge into reservoirs, and their period of working
-is very limited: it may be only twenty-four hours.</p>
-
-<p>On distributaries, escapes are seldom provided. It has
-been suggested, in connection with modules, that the
-people irrigating from each watercourse should be responsible
-for disposing, by means of it, of a certain
-quantity of surplus water. This would be too rigid a rule.
-On some watercourses there is much waste land or land
-under rice cultivation; in such cases surplus water can be
-passed off without damage. The canal subordinates are
-fully cognisant of such cases, and they arrange accordingly.
-In other cases surplus water would do some damage; but on
-nearly every distributary the full supply, even when there
-is no demand for water, can be got rid of for a few hours,
-or even more, without a breach occurring.</p>
-
-<p><span class="pagenum" id="Page181">[181]</span></p>
-
-<p>Escapes at outlets, in connection with modules, can be
-arranged by means of waste weirs or by means of Gregotti&#8217;s
-syphons (<i>sifoni autolivelatori</i>). The following is an
-abridged translation of part of a pamphlet by <span class="nowrap">Gregotti:&mdash;</span></p>
-
-<p class="gregotti blankbefore1">The <a href="#Fig28">figure</a> represents one of the syphons installed in the &#8220;Centrali
-Milani.&#8221;</p>
-
-<p class="gregotti">A is the supply basin of the &#8220;Centrali,&#8221; which ends in the syphon B.
-The latter is constructed with mouthpiece of rectangular section <i>a</i>, which
-is submerged in the basin A. A weir divides the mouthpiece of the
-syphon from the descending branch, <i>c</i>, of the same, also rectangular in
-section. The weir crest is at level <i>dd</i>, from 2 to 7 cm. below the
-maximum level of water surface which it is desired not to exceed in the
-supply basin.</p>
-
-<div class="figcenter" id="Fig28">
-<img src="images/illo201.png" alt="Gregotti siphon" width="450" height="394" />
-<p class="caption"><span class="smcap">Fig.</span> 28.</p>
-</div>
-
-<p class="gregotti">The descending branch, <i>c</i>, has at its base a small tank <i>e</i>, which forms a
-water seal. The syphon is completed by a tube <i>f</i>, which is attached to
-the intake branch of the syphon and which ends at a level of 2 to 7 cm.
-above the previously mentioned surface <i>dd</i>.</p>
-
-<p class="gregotti">As soon as the water surface in the supply basin tends to rise above
-the plane <i>dd</i>, a filament of water, in falling over the weir <i>b</i>, pours
-down the descending branch <i>c</i>, and when the water has risen from
-2 to 7 cm. above the crest of the weir, the thickness of the falling stream
-has become such that it is able, by lapping, with a wave-like course, the
-wall <i>gg</i>, to extract the air that has become enclosed in the syphon, and
-which cannot be replaced because the space in which the stream acts is
-closed at its base by the water in the tank <i>e</i>; and at the top also the
-aeration tube is closed by the rise in the water surface of the supply
-basin. From this point the syphon action quickly becomes fully
-established and begins to give its full discharge.</p>
-
-<p><span class="pagenum" id="Page182">[182]</span></p>
-
-<p class="gregotti">The discharge that is given is equal to that of an orifice in a thin
-partition if certain limitations are allowed for between the fall used in
-the syphon and the height of the arch, that is, the distance from the
-crest of the weir to the inside roof of the syphon.</p>
-
-<p class="gregotti">The discharge is given by the formula</p>
-
-<p class="formula fsize90">Q = &#956;A&#8730;<span class="bt">2<i>g</i><i>h</i></span>.</p>
-
-<p class="gregotti hind">Q = discharge of syphon in cubic metres per sec.</p>
-
-<p class="gregotti hind">&#956; = a coefficient of reduction of discharge which varies between wide
-limits.</p>
-
-<p class="gregotti hind">A = the minimum cross-sectional area of the syphon in square metres.</p>
-
-<p class="gregotti hind"><i>g</i> = value of acceleration due to gravity.</p>
-
-<p class="gregotti hind"><i>h</i> = the fall, or the difference of level in metres between the water
-surfaces in the supply basin A and in the small tank <i>e</i>.</p>
-
-<p class="gregotti">As soon as the supply basin surface falls, the opening of the aeration
-tube becomes uncovered and air is drawn into the syphon. But until
-the surface has fallen some centimetres the supply of air is not sufficient
-to cause the syphon action to stop completely, and thus the escape varies
-gradually from the maximum discharge to zero as the water surface falls
-a few centimetres till it reaches its original level.</p>
-
-<p class="gregotti">In certain cases it is possible to do without the aeration tube,
-especially when the fall used in the syphon is not great and when it is
-possible to arrange matters so that the velocity of the water flowing
-past in front of the syphon is small.</p>
-
-<p class="gregotti">The syphon with a width of 3 metres escapes 8 cubic metres per sec.
-of water.</p>
-
-<hr class="sec" />
-
-<p><span class="pagenum" id="Page183">[183]</span></p>
-
-<h3>APPENDIX G.<br />
-<span class="chapname">GAUGES.</span></h3>
-
-<p class="appref">(See <a href="#Ref23">Chap. III., Arts. 2</a> and <a href="#Ref12">3</a>; also see <i>Hydraulics</i>,
-Chap. VIII., Art. 5, and <a href="#Page186">Appendix H</a>.)</p>
-
-<p>1. The gauge should be placed on that bank and
-facing in that direction which enables it to be most conveniently
-read by the gauge reader and by officials passing
-the place.</p>
-
-<p>2. The gauge should be of enamelled iron secured by
-copper screws to a post of squared and seasoned wood
-which is either driven <span class="nowrap">beforehand<a id="FNanchor64"
-href="#Footnote64" class="fnanchor">[64]</a></span> into the channel or
-spiked to a masonry work. Even in the deepest channel
-a long enough post can be arranged for. A masonry
-pillar is not necessary. The post may be rectangular in
-cross-section, with upstream and downstream edges cut
-sharp. This prevents, or greatly reduces, the heaping up
-of water at the upstream side and the formation of a
-hollow downstream. If the &#8220;Ward&#8221; gauge of two
-vertical planks is used, the planks should meet at an
-acute angle, not a right angle, and not be wider than
-7 inches each.</p>
-
-<div class="footnote">
-
-<p id="Footnote64"><a href="#FNanchor64"><span class="label">[64]</span></a>
-Driving after the gauge is attached may loosen or break the screws.</p>
-
-</div><!--footnote-->
-
-<p>3. The top of the gauge should be slightly above the
-highest probable water-level. The post should extend up
-to the top of the gauge.</p>
-
-<p>4. If ever the graded bed of the channel is altered the<span class="pagenum" id="Page184">[184]</span>
-zero of the gauge should be altered. There may be some
-risk of confusion at first, but it can be avoided by exercising
-due care and making notes. The levels of the old and
-new zeros should be recorded.</p>
-
-<p>5. A gauge at a distance from the bank is objectionable.
-It collects jungle, cannot be properly read, and is liable to
-be damaged by floating logs or boats. A gauge should be
-as near as possible to one bank or the other. If the bank
-is vertical, the gauge should be quite close to it. If, owing
-to silt deposit, the gauge is dry at low supply, the deposit
-can be removed by the gauge reader.</p>
-
-<p>6. Every regulator should be given a name, generally
-that of a neighbouring village and not that of a channel,
-and the gauge book headings should be drawn up in an
-intelligent and systematic manner. Each main channel
-should be entered in order, and each regulator on the
-channel&mdash;together with the head gauges of all channels
-which take off there&mdash;should be entered, commencing from
-upstream. A specimen is given on <a href="#Page109">page 109</a>. Thus the
-head gauge of any branch appears in the register of the
-main channel from which it takes off, other gauges on the
-branch appearing in the register for the branch. And
-similarly as regards a distributary which has gauges other
-than the head gauge.</p>
-
-<p>7. Each gauge reader should be supplied with a register,
-each page having, besides the counterfoil, as many detachable
-slips&mdash;marked off by perforations&mdash;as there are
-officials&mdash;usually the Subdivisional Officer, zilladar and suboverseer&mdash;to
-whom daily gauge reports are to be sent. The
-titles and addresses of these officials are printed on the
-backs of the respective slips. The slips and counterfoil
-have printed on them a form&mdash;similar to part of the
-specimen shown on <a href="#Page109">page 109</a>&mdash;showing the names of all
-the gauges read by that particular gauge reader, so that he<span class="pagenum" id="Page185">[185]</span>
-has merely to fill in the date and readings, tear off the slips
-and despatch them. The posting of the register in the
-subdivision is facilitated if each gauge has a number and
-if the corresponding numbers are printed&mdash;besides the
-names&mdash;on the gauge slips. If the gauge reader does not
-know English, the headings of the slips are printed in the
-vernacular. If the gauge readings are telegraphed, there
-may be only one slip&mdash;besides the counterfoil&mdash;which is
-sent to the telegraph signaller.</p>
-
-<hr class="sec" />
-
-<p><span class="pagenum" id="Page186">[186]</span></p>
-
-<h3>APPENDIX H.<br />
-<span class="chapname">GIBB&#8217;S MODULE.<a id="FNanchor65"
-href="#Footnote65" class="fnanchor">[65]</a></span></h3>
-
-<p class="appref">(See <a href="#Page164">p. 164</a>.)</p>
-
-<div class="footnote">
-
-<p id="Footnote65"><a href="#FNanchor65"><span class="label">[65]</span></a>
-This description has been supplied by Glenfield &amp; Kennedy,
-Kilmarnock. The modules can, it is understood, be obtained from
-them.</p>
-
-</div><!--footnote-->
-
-<p>The attributes of a perfect module are many and varied,
-but in Gibb&#8217;s module they have all been successfully
-embodied in what is probably the simplest piece of
-apparatus of its kind ever devised. The following
-summary of the characteristics of Gibb&#8217;s module is,
-therefore, equivalent to an enumeration of the attributes
-of a perfect <span class="nowrap">module:&mdash;</span></p>
-
-<p class="highline2">Gibb&#8217;s module</p>
-
-<div class="gibb">
-
-<table class="gibb" summary="Properties">
-
-<tr>
-<td class="text">Cannot be tampered with,</td>
-<td rowspan="4" class="brace bt br bb">&nbsp;</td>
-<td rowspan="4" class="brace padl0">-</td>
-<td rowspan="4" class="text">since it has no moving parts, and because of its extreme simplicity.</td>
-</tr>
-
-<tr>
-<td class="text">Cannot get out of order,</td>
-</tr>
-
-<tr>
-<td class="text">Silt or other solid matter in the water cannot affect its action,</td>
-</tr>
-
-<tr>
-<td class="text">Requires no attention,</td>
-</tr>
-
-</table>
-
-<table class="gibb" summary="Properties">
-
-<tr>
-<td class="text">It is accurate,</td>
-<td rowspan="2" class="brace bt br bb">&nbsp;</td>
-<td rowspan="2" class="brace padl0">-</td>
-<td rowspan="2" class="text">being designed on scientific hydraulic principles.</td>
-</tr>
-
-<tr>
-<td class="text">Works with very small loss of head,</td>
-</tr>
-
-</table>
-
-<p>It is portable, and can be erected at any desired site
-very simply and easily.</p>
-
-<p>It is strong and durable.</p>
-
-<p><span class="pagenum" id="Page187">[187]</span></p>
-
-<p>The range of variation of both up- and downstream
-water-levels through which the discharge remains
-constant is more than sufficient to meet all the
-requirements of irrigation canals.</p>
-
-<p>The sufficiency of the delivery can be ascertained at
-a glance.</p>
-
-<p>The water can be drawn from any desired depth in
-the parent channel.</p>
-
-<p>When desired, means are provided whereby the
-supply can be closed or opened at will.</p>
-
-<p>Means are provided, if desired, for a sudden increase
-of discharge when the upstream water-level
-exceeds a certain limit, so that surplus water,
-which might endanger the safety of the canal,
-is allowed to escape into the branch whenever
-the danger limit is reached. The upstream
-water-level at which escapement begins can be
-fixed in accordance with the requirements of
-each site, and the action of the escape notch is
-independent of the opening and closing of the
-module.</p>
-
-<p>No designing or calculations are required. These
-have already been worked out. Known the
-discharge required, the module is supplied complete
-and ready for setting in position in the
-canal bank.</p>
-
-</div><!--gibb-->
-
-<h4><span class="smcap">Hydraulic Principle.</span></h4>
-
-<p>The entire absence of moving parts is the chief feature
-of Gibb&#8217;s module; the water simply regulates itself by
-using up all the excess of energy over and above that
-required to discharge the correct supply of water.
-The way in which this takes place will be understood
-from the following <span class="nowrap">analogy:&mdash;</span></p>
-
-<p><span class="pagenum" id="Page188">[188]</span></p>
-
-<p>We all know that when we stir tea in a cup so as
-to make it spin, the liquid rises at the rim of the cup
-and curves down into a depression in the middle, and
-the greater the spin the more marked this effect is. It
-is, we know, the centrifugal force produced by the spin
-that makes the tea remain high at the rim of the cup.
-If, while the tea is thus spinning, a teaspoon is held so
-that it dips slightly below the surface of the liquid
-near the rim, it will obstruct the flow of the outer
-portion of the liquid, which will fall in towards the
-depression in the middle. The reason for this, of
-course, is that the centrifugal force is absorbed when
-we interrupt any part of the spin with the teaspoon;
-hence the liquid must fall, and we know that when
-liquid falls it uses up &#8220;head&#8221; or energy.</p>
-
-<p>In Gibb&#8217;s module a similar action is made to take
-place in a steel chamber, semicircular or spiral in
-plan, through which the water flows in a semicircular
-path instead of circulating round and round as in the
-teacup. The surface of the stream, however, assumes
-the same form as it does in a cup, because it flows
-under the same conditions. Across the chamber are
-fixed a number of vertical steel diaphragm plates which
-take the place of the teaspoon in the above analogy.
-The lower edges of these plates are of such a shape,
-and they are fixed at such a height from the bottom
-of the chamber, as to allow a stream of just the correct
-required discharge of water to flow under them without
-interference. But if, owing to an increase of head
-caused by a rise in the upstream water-level, the water
-tends to rise higher at the circumference of the chamber,
-then the water at the surface of the stream strikes
-against the diaphragm plates, and its centrifugal force
-being absorbed, it will fall in towards the centre just as<span class="pagenum" id="Page189">[189]</span>
-happened in the teacup when the spoon was used in
-place of these plates. In this way the excess head
-that caused the additional rise of water at the circumference
-is used up by the fall back towards the centre.
-The full capacity of the semicircle or spiral for using
-up excess head or energy in this way is made available
-by the use of a sufficient number of diaphragm plates
-fixed at suitable intervals. When the range of head
-to be dealt with is not large, then a semicircular
-chamber is sufficient; but for large ranges of head the
-chamber is made of spiral form so as to lead the water
-round a complete revolution or more, as may be necessary.</p>
-
-<h4><span class="smcap">Structural Details.</span></h4>
-
-<p><a href="#Fig29">Fig. 29</a> shows the general form and structure of the
-type of module suitable for irrigation. <a href="#Fig30">Fig. 30</a> is from
-a photograph.</p>
-
-<p>The working chamber or shell A is constructed of
-mild steel plating securely riveted to a framework of
-angle steel, and the semicircular form of the shell with
-the rigid diaphragm plates B B riveted to the walls
-makes a very strong structure, and ensures durability.</p>
-
-<p>The &#8220;leading-in&#8221; bend C is of cast iron strongly
-bolted to the steel shell, and is so designed as to
-deliver the water into the module chamber in a completely
-established vortex condition.</p>
-
-<p>The socket D on this &#8220;leading-in&#8221; bend is made so
-as to allow of considerable latitude in the vertical alignment
-of the straight leading-in pipe, so that the water
-can be drawn from any desired depth in the parent
-channel, and the proportion of silt drawn off is thus
-brought under control.</p>
-
-<div class="figcenter" id="Fig29">
-
-<img src="images/illo210a.png" alt="End elevation" width="600" height="550" />
-<img src="images/illo210b.png" alt="Plan" width="600" height="480" />
-<img src="images/illo210c.jpg" alt="Front elevation" width="600" height="534" />
-
-<p class="caption"><span class="smcap">Fig.</span> 29.&mdash;Details of Gibb&#8217;s Patent Module.</p>
-
-</div><!--figcenter-->
-
-<p class="largeillo">Large illustrations: <a href="images/illo210alg.png">End Elevation (top)</a> (153 kB)<br />
-<a href="images/illo210blg.png">Plan (middle)</a> (114 kB)<br />
-<a href="images/illo210clg.jpg">Front Elevation (bottom)</a> (229 kB)</p>
-
-<p>Grooves E E and a shutter F, as illustrated, for closing<a id="Page191"></a><span class="pagenum" id="Page190">[190]<br />[191]</span>
-off the flow through the module, are provided, if required,
-but all modules are not fitted in this way, because many
-irrigation authorities consider it undesirable to provide
-the consumers with unrestricted facilities for closing
-off their supplies without previously giving notice of
-such an action.</p>
-
-<div class="figcenter" id="Fig30">
-<img src="images/illo211.jpg" alt="" width="481" height="600" />
-<p class="caption"><span class="smcap">Fig.</span> 30.&mdash;The Completed Module (Open Type for Low Heads).</p>
-</div>
-
-<p>An escape notch H is provided in the position indicated
-when desired. It may, however, be found difficult
-to determine beforehand the upstream water-level at<span class="pagenum" id="Page192">[192]</span>
-which it is necessary to allow this escape of surplus
-supply, so that it is generally more satisfactory to cut
-the escape notch after the modules have been installed
-and actual experience has indicated a suitable level for
-the notch crest.</p>
-
-<p>In the standard type of module for irrigation purposes
-the top of the module chamber is completely open, as
-shown, and this is the type generally recommended, as
-it is found that consumers have greater confidence in
-an apparatus which hides nothing from them. To meet
-the needs of special cases, however, a second type is
-also made in which the chamber is completely closed
-and considerably reduced in height, being thus specially
-suitable for sites where space is confined.</p>
-
-<p>Pipes I, of diameter suitable for all sizes of modules,
-are also supplied. These may either be welded steel or
-cast iron, as desired. An 18-feet length of pipe is usually
-found sufficient to bring the supply through the canal
-bank to the module.</p>
-
-<p>All modules supplied are treated with anti-corrosive
-paint, which ensures the protection of the metal.</p>
-
-<hr class="sec" />
-
-<p><span class="pagenum" id="Page193">[193]</span></p>
-
-<h3>APPENDIX K.<br />
-<span class="chapname">KENNEDY&#8217;S GAUGE <span class="nowrap">OUTLET.<a id="FNanchor66"
-href="#Footnote66" class="fnanchor">[66]</a></span></span></h3>
-
-<p class="appref">(See <a href="#Page168">p. 168</a>.)</p>
-
-<div class="footnote">
-
-<p id="Footnote66"><a href="#FNanchor66"><span class="label">[66]</span></a>
-See <i>Punjab Irrigation Branch Paper No. 12</i>, &#8220;Results of Tests of
-Kennedy&#8217;s Gauge Outlet.&#8221;</p>
-
-</div><!--footnote-->
-
-<p><a href="#Fig31"><span class="smcap">Fig.</span> 31</a> shows a bell-mouthed orifice discharging into
-an air-space. The jet springs across the air-space and
-traverses a gradually diverging tube. Let <i>a</i>, A be the
-sectional areas of the stream at the air-space and the
-downstream end of the tube respectively, and let V, <i>v</i>,
-and P<i>&#8336;</i>, P&#8321; be the corresponding velocities and pressures.
-Let resistances be neglected. Since the pressure in the
-air-space is P<i>&#8336;</i>,</p>
-
-<p class="formula">V = &#8730;<span class="bt">2<i>g</i><i>h</i>&#8320;</span></p>
-
-<p class="noindent">or the discharge through the tube depends only on <i>h</i>&#8320;
-and not on <i>h</i>&#8321;.</p>
-
-<div class="figcenter" id="Fig31">
-<img src="images/illo213.png" alt="Orifice" width="600" height="288" />
-<p class="caption"><span class="smcap">Fig.</span> 31.</p>
-</div>
-
-<p><span class="pagenum" id="Page194">[194]</span></p>
-
-<p>By Bernouilli&#8217;s theorem,</p>
-
-<p class="formula"><span class="horsplit"><span class="top">V&sup2;</span><span class="bot">2<i>g</i></span></span> +
-<span class="horsplit"><span class="top">P<i>&#8336;</i></span><span class="bot">W</span></span> =
-<span class="horsplit"><span class="top"><i>v</i>&sup2;</span><span class="bot">2<i>g</i></span></span> +
-<span class="horsplit"><span class="top">P&#8321;</span><span class="bot">W</span></span></p>
-
-<p class="noindent">or</p>
-
-<p class="formula"><span class="horsplit"><span class="top">P&#8321; - P<i>&#8336;</i></span><span class="bot">W</span></span> =
-<span class="horsplit"><span class="top">V&sup2; - <i>v</i>&sup2;</span><span class="bot">2<i>g</i></span></span>.</p>
-
-<p>This quantity (since <i>v</i> is small) is not much less than <i>h</i>&#8320;
-or <span class="horsplit"><span class="top">V&sup2;</span><span class="bot">2<i>g</i></span></span>.
-In other words, the water levels of two cisterns
-with an air-space between them differ only a little, or <i>h</i>&#8321;
-is small.</p>
-
-<p>The above case (two cisterns and air-space) is mentioned
-in <i>Hydraulics</i>, Chap. V. The principle is simply that
-the velocity head at the air-space is reconverted into
-pressure head by passing the stream through a gradually
-diverging tube. In the absence of such a tube the
-velocity head would be wasted by causing eddies in
-the downstream cistern.</p>
-
-<p>If the downstream cistern is a watercourse whose
-water-level is considerably lower than that of the upstream
-cistern or distributary, V is obviously unaffected.
-Also P&#8321; is obviously reduced. Therefore, by Bernouilli,
-<i>v</i> is increased, or the stream does not fill the expanded
-tube and there are eddies in the tube. The water-level
-in the watercourse may even be lower than the end
-of the tube. The discharge is unaffected.</p>
-
-<p>In practice there are, of course, resistances, but this
-fact does not affect the general conclusions stated above.
-The minimum working head (difference between the two
-water-levels) which gives a constant discharge is greater
-than would be the case in the absence of resistances. This
-&#8220;minimum working head for modularity&#8221; has been
-found to be &middot;21 foot, &middot;42 foot, and &middot;61 foot, the corresponding
-values of the &#8220;depression,&#8221; <i>h</i>&#8320;, being respectively<span class="pagenum" id="Page195">[195]</span>
-1 foot, 2 feet, and 3 feet. When the working head is
-less than the above, the discharge is less and it depends
-on the working head. The depression should, according
-to Kennedy, be about 1&middot;75 feet, but it may be more.</p>
-
-<p>The chief difficulty in using the gauge outlet as a
-module is that the air vent can be stopped up. This
-converts the apparatus into a compound diverging tube
-(<i>Hydraulics</i>, Chap. III., Art. 17). The discharge is, of
-course, increased, and it becomes dependent at all times
-on the working head. Another difficulty is that any rise
-or fall in the water-level of the distributary (and such
-rises and falls may occur owing to silting or scour, however
-carefully the discharge may be regulated) alters
-the discharge somewhat, though not to the same degree
-as in an ordinary outlet with a working head of, say,
-&middot;5 foot. In short, Kennedy&#8217;s gauge outlet, or &#8220;semi-module&#8221;
-as it is sometimes called, can modify but not
-do away with the variations of the discharges of outlets.</p>
-
-<hr class="chap" />
-
-<p><span class="pagenum" id="Page196">[196]</span></p>
-
-<h2>INDEX.</h2>
-
-<ul class="index">
-
-<li class="first">Absorption, <a href="#Page16">16</a>, <a href="#Page159">159</a>.</li>
-<li>Alignment, principles of, <a href="#Page4">4</a>.</li>
-<li>Alignment, centrality in, <a href="#Page5">5</a>.</li>
-<li>Alteration in line, <a href="#Page59">59</a>.</li>
-<li>Assiut Barrage, <a href="#Page11">11</a>.</li>
-<li>Assouan Dam, <a href="#Page11">11</a>.</li>
-
-<li class="first">Banks, construction of, <a href="#Page138">138</a>.</li>
-<li>&mdash; protection of, <a href="#Page139">139</a>, <a href="#Page175">175</a>, <a href="#Page178">178</a>.</li>
-<li>&mdash; width and height of, <a href="#Page56">56</a>.</li>
-<li>Banks and Roads, <a href="#Page53">53</a>.</li>
-<li>Basin Irrigation, <a href="#Page11">11</a>.</li>
-<li>Berms, <a href="#Page53">53</a>.</li>
-<li>Bifurcations, <a href="#Page47">47</a>.</li>
-<li>Bifurcation, head needed at, <a href="#Page45">45</a>.</li>
-<li>Borrow pits, <a href="#Page55">55</a>.</li>
-<li>Branches of Canals, <a href="#Page3">3</a>.</li>
-<li>Breaches in Banks, <a href="#Page176">176</a>.</li>
-<li>Bricks used for canal work in India, <a href="#Page88">88</a>.</li>
-<li>Bridges, <a href="#Page8">8</a>, <a href="#Page80">80</a>, <a href="#Page87">87</a>, <a href="#Page130">130</a>.</li>
-<li>&mdash; Skew, <a href="#Page29">29</a>, <a href="#Page42">42</a>.</li>
-<li>Bushing of banks, <a href="#Page178">178</a>.</li>
-
-<li class="first">Canal and branches, <a href="#Page20">20</a>, <a href="#Page47">47</a>.</li>
-<li>Canal, bed width of, <a href="#Page51">51</a>.</li>
-<li>&mdash; supplied from reservoirs, <a href="#Page3">3</a>, <a href="#Page13">13</a>.</li>
-<li>&mdash; inundation, <a href="#Page1">1</a>, <a href="#Page45">45</a>, <a href="#Page79">79</a>,
-<a href="#Page127">127</a>, <a href="#Page156">156</a>.</li>
-<li>&mdash; perennial, <a href="#Page1">1</a>.</li>
-<li>Capillarity, <a href="#Page16">16</a>.</li>
-<li>Cattle Gh&aacute;ts, <a href="#Page81">81</a>, <a href="#Page173">173</a>.</li>
-<li>Cement for lining channels, <a href="#Page160">160</a>.</li>
-<li>Chainage, <a href="#Page93">93</a>, <a href="#Page118">118</a>.</li>
-<li>Channels, alterations in, <a href="#Page97">97</a>.</li>
-<li>&mdash; enlargement of, <a href="#Page97">97</a>, <a href="#Page139">139</a>.</li>
-<li>&mdash; gradients of, <a href="#Page50">50</a>.</li>
-<li>&mdash; side slopes of, <a href="#Page52">52</a>.</li>
-<li>Colonization Schemes, <a href="#Page64">64</a>.</li>
-<li>Command, <a href="#Page2">2</a>.</li>
-<li>Commanded area, <a href="#Page4">4</a>.</li>
-<li>Contour lines, <a href="#Page37">37</a>.</li>
-<li>&mdash; plan, <a href="#Page26">26</a>, <a href="#Page36">36</a>, <a href="#Page63">63</a>.</li>
-<li>&mdash; survey, <a href="#Page37">37</a>.</li>
-<li>Crops, failure of, <a href="#Page103">103</a>, <a href="#Page142">142</a>.</li>
-<li>&mdash; kinds of, <a href="#Page101">101</a>.</li>
-<li>Culturable commanded area, <a href="#Page26">26</a>, <a href="#Page113">113</a>.</li>
-<li>Curves and bends in channels, <a href="#Page8">8</a>, <a href="#Page139">139</a>.</li>
-
-<li>&#8220;Delta,&#8221; 22, <a href="#Page110">110</a>.</li>
-<li>Deputy Collector, <a href="#Page96">96</a>.</li>
-<li>Designs and Estimates, <a href="#Page60">60</a>.</li>
-<li>Design of canals, <a href="#Page2">2</a>, <a href="#Page26">26</a>, <a href="#Page30">30</a>,
-<a href="#Page47">47</a>, <a href="#Page147">147</a>, <a href="#Page156">156</a>.</li>
-<li>Discharge of canal during rabi, <a href="#Page52">52</a>, <a href="#Page118">118</a>.</li>
-<li>Discharge observations, <a href="#Page107">107</a>.</li>
-<li>Discharges of Punjab rivers, <a href="#Page145">145</a>, <a href="#Page157">157</a>.</li>
-<li>Discharge tables, <a href="#Page106">106</a>.</li>
-<li>&mdash; through an outlet, <a href="#Page61">61</a>.</li>
-<li>Distance marks, <a href="#Page93">93</a>.</li>
-<li>Distribution of water, <a href="#Page14">14</a>, <a href="#Page118">118</a>, <a href="#Page125">125</a>.</li>
-<li>Distributaries, <a href="#Page3">3</a>, <a href="#Page20">20</a>, <a href="#Page44">44</a>, <a href="#Page46">46</a>.</li>
-<li>&mdash; best system of, <a href="#Page71">71</a>.</li>
-<li>Distributary, bed width of, <a href="#Page68">68</a>.</li>
-<li>&mdash; design of, <a href="#Page60">60</a>.</li>
-<li>&mdash; height and width of banks, <a href="#Page68">68</a>.</li>
-<li>&mdash; kharif, <a href="#Page156">156</a>.</li>
-<li>&mdash; longitudinal section of, <a href="#Page69">69</a>.</li>
-<li>&mdash; major and minor, <a href="#Page41">41</a>.</li>
-<li>&mdash; off-take of, <a href="#Page51">51</a>.</li>
-<li>&mdash; remodelling of, <a href="#Page128">128</a>.</li>
-<li>&mdash; side slopes of, <a href="#Page69">69</a>.</li>
-<li>&mdash; strip of land for, <a href="#Page69">69</a>.</li>
-<li>&mdash; with three fourths full supply, <a href="#Page45">45</a>, <a href="#Page68">68</a>, <a href="#Page166">166</a>.</li>
-<li>Divide Walls, <a href="#Page33">33</a>, <a href="#Page169">169</a>.</li>
-<li>Divisions, canal, <a href="#Page96">96</a>.</li>
-<li>Drainage, <a href="#Page10">10</a>.</li>
-<li>Drainage Crossings, <a href="#Page8">8</a>, <a href="#Page156">156</a>.</li>
-<li>Duty of water, <a href="#Page21">21</a>, <a href="#Page25">25</a>, <a href="#Page39">39</a>,
-<a href="#Page148">148</a>, <a href="#Page153">153</a>, <a href="#Page154">154</a>.</li>
-<li>Duty, improvement of, <a href="#Page24">24</a>, <a href="#Page102">102</a>, <a href="#Page158">158</a>.</li>
-
-<li class="first">Eastern Jumna Canal, <a href="#Page31">31</a>.</li>
-<li>Efflorescence called &#8220;Reh,&#8221; <a href="#Page15">15</a>.</li>
-<li>Egypt, irrigation in, <a href="#Page11">11</a>.</li>
-<li>Embankments, <a href="#Page9">9</a>, <a href="#Page33">33</a>, <a href="#Page156">156</a>.</li>
-<li>Escapes, <a href="#Page9">9</a>, <a href="#Page100">100</a>, <a href="#Page180">180</a>.</li>
-<li>Estimates for work, <a href="#Page59">59</a>.</li>
-<li>Evaporation, <a href="#Page16">16</a>.</li>
-<li>Executive Engineer, <a href="#Page96">96</a>.</li>
-<li>Extensions of canals, <a href="#Page127">127</a>.</li>
-<li>Extra land, <a href="#Page58">58</a>.</li>
-
-<li class="first">Falling Shutters, <a href="#Page32">32</a>.</li>
-<li>Falls, <a href="#Page8">8</a>, <a href="#Page81">81</a>, <a href="#Page87">87</a>.</li>
-<li>&mdash; incomplete, <a href="#Page87">87</a>, <a href="#Page130">130</a>.</li>
-<li>&mdash; notch, <a href="#Page86">86</a>.</li>
-<li>Field book, <a href="#Page101">101</a>.</li>
-<li>&mdash; map, <a href="#Page101">101</a>.</li>
-<li>&mdash; register, <a href="#Page101">101</a>.</li>
-<li>Final line, <a href="#Page59">59</a>.</li>
-<li>Flow and lift, <a href="#Page11">11</a>.</li>
-<li>Full supply duty, <a href="#Page64">64</a>.</li>
-<li>Full supply factor, <a href="#Page64">64</a>.</li>
-
-<li class="first">Ganges Canal, <a href="#Page31">31</a>.</li>
-<li>Gauges, <a href="#Page10">10</a>, <a href="#Page103">103</a>, <a href="#Page104">104</a>, <a href="#Page183">183</a>.</li>
-<li>Gauge reader, <a href="#Page96">96</a>, <a href="#Page98">98</a>, <a href="#Page105">105</a>, <a href="#Page184">184</a>.</li>
-<li>Gauge reading, <a href="#Page105">105</a>, <a href="#Page121">121</a>.</li>
-<li>&mdash; register, <a href="#Page105">105</a>, <a href="#Page106">106</a>, <a href="#Page108">108</a>, <a href="#Page111">111</a>.</li>
-<li>Gibb&#8217;s module, <a href="#Page164">164</a>, <a href="#Page186">186</a>.</li>
-<li>Guide banks, <a href="#Page35">35</a>.</li>
-
-<li class="first">Head for distributary, <a href="#Page82">82</a>, <a href="#Page83">83</a>.</li>
-<li>Headworks, <a href="#Page2">2</a>, <a href="#Page30">30</a>, <a href="#Page98">98</a>, <a href="#Page99">99</a>,
-<a href="#Page137">137</a>.</li>
-
-<li class="first">Indents for water, <a href="#Page98">98</a>, <a href="#Page108">108</a>, <a href="#Page110">110</a>.</li>
-<li>Inundation canals, <a href="#Page1">1</a>, <a href="#Page45">45</a>, <a href="#Page79">79</a>, <a href="#Page127">127</a>,
-<a href="#Page156">156</a>.</li>
-<li>Irrigation boundaries, <a href="#Page33">33</a>, <a href="#Page129">129</a>.</li>
-<li>&mdash; in various countries, <a href="#Page1">1</a>.</li>
-<li>&mdash; registers, <a href="#Page113">113</a>.</li>
-<li>&mdash; unauthorised, <a href="#Page101">101</a>.</li>
-
-<li class="first">Kennedy&#8217;s gauge outlet, <a href="#Page168">168</a>, <a href="#Page193">193</a>.</li>
-<li>&mdash; Rules for channel design, <a href="#Page48">48</a>.</li>
-<li>Kharif or Summer Crop, <a href="#Page23">23</a>.</li>
-<li>Kutter&#8217;s co-efficients, <a href="#Page51">51</a>.</li>
-
-<li class="first">Lift irrigation, <a href="#Page11">11</a>, <a href="#Page142">142</a>.</li>
-<li>Lime for making channels watertight, <a href="#Page162">162</a>.</li>
-<li>Longitudinal section, <a href="#Page69">69</a>, <a href="#Page130">130</a>.</li>
-<li>Losses of water in channels, <a href="#Page16">16</a>, <a href="#Page38">38</a>, <a href="#Page159">159</a>.</li>
-<li>Low supplies, <a href="#Page118">118</a>, <a href="#Page123">123</a>.</li>
-<li>Lower Chenab Canal, <a href="#Page25">25</a>, <a href="#Page144">144</a>.</li>
-<li>Lower Egypt, <a href="#Page11">11</a>.</li>
-<li>Lower Jhelum Canal, <a href="#Page144">144</a>.</li>
-
-<li class="first">Maintenance work, <a href="#Page138">138</a>, <a href="#Page171">171</a>, <a href="#Page174">174</a>.</li>
-<li>Marginal Embankments, <a href="#Page9">9</a>.</li>
-<li>Masonry works, <a href="#Page29">29</a>, <a href="#Page80">80</a>, <a href="#Page89">89</a>.</li>
-<li>&mdash; &mdash; large scale site plan, <a href="#Page89">89</a>.</li>
-<li>&mdash; &mdash; type designs, <a href="#Page89">89</a>.</li>
-<li>Mills, <a href="#Page8">8</a>.</li>
-<li>Minors, question of desirability of, <a href="#Page75">75</a>.</li>
-<li>Modules, <a href="#Page162">162</a>, <a href="#Page186">186</a>.</li>
-
-<li class="first">Navigation, <a href="#Page12">12</a>.</li>
-<li>Needles and horizontal planks, <a href="#Page85">85</a>.</li>
-
-<li class="first">Oil for lining channels, <a href="#Page160">160</a>.</li>
-<li>Older Indian canals, <a href="#Page10">10</a>, <a href="#Page68">68</a>, <a href="#Page98">98</a>.</li>
-<li>Outlet, discharge of, <a href="#Page61">61</a>.</li>
-<li>&mdash; registers, <a href="#Page113">113</a>.</li>
-<li>Outlets, <a href="#Page15">15</a>, <a href="#Page61">61</a>, <a href="#Page66">66</a>, <a href="#Page67">67</a>.</li>
-<li>&mdash; applications regarding, <a href="#Page140">140</a>.</li>
-<li>&mdash; design of, <a href="#Page76">76</a>.</li>
-<li>&mdash; on inundation canals, <a href="#Page79">79</a>.</li>
-<li>&mdash; on older canals, <a href="#Page68">68</a>.</li>
-<li>&mdash; positions of, <a href="#Page65">65</a>.</li>
-<li>&mdash; remodelling of, <a href="#Page131">131</a>.</li>
-<li>&mdash; register of, <a href="#Page113">113</a>.</li>
-<li>&mdash; size of, <a href="#Page114">114</a>, <a href="#Page134">134</a>.</li>
-<li>&mdash; temporary, <a href="#Page78">78</a>.</li>
-<li>&mdash; variability of duty on, <a href="#Page66">66</a>.</li>
-
-<li class="first">Parapets, width between, <a href="#Page77">77</a>.</li>
-<li>Patwari, <a href="#Page96">96</a>, <a href="#Page101">101</a>.</li>
-<li>Percolation, <a href="#Page16">16</a>.</li>
-<li>Perennial Canals, <a href="#Page1">1</a>.</li>
-<li>Pitching, <a href="#Page90">90</a>.</li>
-<li>Plan, large scale, <a href="#Page59">59</a>.</li>
-<li>Postal system, <a href="#Page97">97</a>.</li>
-<li>Profile walls, <a href="#Page91">91</a>, <a href="#Page94">94</a>.</li>
-<li>Project, sketch of, <a href="#Page26">26</a>.</li>
-<li>Proportion of land to be irrigated, <a href="#Page27">27</a>, <a href="#Page156">156</a>.</li>
-<li>Puddle for lining channels, <a href="#Page160">160</a>.</li>
-<li>Punjab, projects for canals in, <a href="#Page144">144</a>.</li>
-<li>Punjab rivers, <a href="#Page145">145</a>, <a href="#Page147">147</a>.</li>
-
-<li class="first">Quarters for regulating staff, <a href="#Page88">88</a>.</li>
-
-<li class="first">Rabi or winter crop, <a href="#Page23">23</a>.</li>
-<li>Railings, <a href="#Page88">88</a>.</li>
-<li>Rain, <a href="#Page9">9</a>, <a href="#Page22">22</a>, <a href="#Page100">100</a>.</li>
-<li>Ramps, <a href="#Page88">88</a>.</li>
-<li>Ratio of bed width to depth, <a href="#Page50">50</a>.</li>
-<li>Reduction in size of channel, <a href="#Page128">128</a>.</li>
-<li>Registers, irrigation, <a href="#Page113">113</a>.</li>
-<li>Regulation of supply, <a href="#Page103">103</a>, <a href="#Page121">121</a>, <a href="#Page127">127</a>.</li>
-<li>Regulators, <a href="#Page7">7</a>, <a href="#Page80">80</a>, <a href="#Page84">84</a>, <a href="#Page184">184</a>.</li>
-<li>&mdash; permissible heading up, <a href="#Page85">85</a>.</li>
-<li>Remodellings of channels, <a href="#Page127">127</a>.</li>
-<li>&mdash; of outlets and watercourses, <a href="#Page131">131</a>, <a href="#Page134">134</a>.</li>
-<li>Rest Houses, <a href="#Page95">95</a>.</li>
-<li>Reservoirs, <a href="#Page13">13</a>.</li>
-<li>Rules for designing canals, Kennedy&#8217;s, <a href="#Page48">48</a>.</li>
-
-<li class="first">Scheme, cost of, <a href="#Page28">28</a>, <a href="#Page59">59</a>.</li>
-<li>Sides, falling in of, <a href="#Page139">139</a>.</li>
-<li>Sidhnai canal minors, <a href="#Page41">41</a>.</li>
-<li>Silt, clearance of, <a href="#Page97">97</a>, <a href="#Page138">138</a>, <a href="#Page139">139</a>.</li>
-<li>&mdash; deposit, <a href="#Page15">15</a>, <a href="#Page97">97</a>.</li>
-<li>&mdash; trapping at Headworks, <a href="#Page47">47</a>.</li>
-<li>Silting and scouring, <a href="#Page15">15</a>, <a href="#Page48">48</a>, <a href="#Page98">98</a>, <a href="#Page139">139</a>.</li>
-<li>Sirhind Canal, <a href="#Page19">19</a>, <a href="#Page144">144</a>.</li>
-<li>&mdash; &mdash; silting in the head reach of, <a href="#Page98">98</a>.</li>
-<li>Soil, water-logging of, <a href="#Page10">10</a>, <a href="#Page24">24</a>, <a href="#Page102">102</a>.</li>
-<li>Spoil Banks, <a href="#Page52">52</a>, <a href="#Page57">57</a>.</li>
-<li>Subdivisions, canal, <a href="#Page95">95</a>.</li>
-<li>Subdivisional officer, <a href="#Page96">96</a>.</li>
-<li>Suboverseer, <a href="#Page96">96</a>.</li>
-<li>Superintending Engineer, <a href="#Page96">96</a>.</li>
-<li>Supply carried, <a href="#Page100">100</a>.</li>
-<li>&mdash; distribution of, <a href="#Page14">14</a>, <a href="#Page118">118</a>.</li>
-<li>&mdash; mean and full, <a href="#Page27">27</a>, <a href="#Page46">46</a>, <a href="#Page122">122</a>.</li>
-<li>&mdash; regulation of, <a href="#Page103">103</a>, <a href="#Page104">104</a>, <a href="#Page106">106</a>,
-<a href="#Page127">127</a>.</li>
-<li>Syphons, <a href="#Page7">7</a>, <a href="#Page71">71</a>, <a href="#Page87">87</a>, <a href="#Page181">181</a>.</li>
-
-<li class="first">Tailing of one channel into another, <a href="#Page40">40</a>.</li>
-<li>Telegraph, line of, <a href="#Page97">97</a>.</li>
-<li>Training of rivers, <a href="#Page33">33</a>.</li>
-<li>Trial lines, <a href="#Page58">58</a>.</li>
-<li>Trial pits, <a href="#Page58">58</a>.</li>
-<li>Triple canal project, <a href="#Page144">144</a>.</li>
-<li>Tunnels, <a href="#Page13">13</a>.</li>
-<li>Turns, or rotational periods of flow, <a href="#Page14">14</a>, <a href="#Page118">118</a>.</li>
-<li>Type cross sections, <a href="#Page56">56</a>.</li>
-
-<li class="first">Under-sluices, <a href="#Page32">32</a>.</li>
-<li>Upper Bari Doab Canal, <a href="#Page19">19</a>, <a href="#Page144">144</a>.</li>
-<li>&mdash; Chenab Canal, <a href="#Page33">33</a>, <a href="#Page144">144</a>.</li>
-<li>&mdash; Egypt, <a href="#Page11">11</a>.</li>
-<li>Upper Jhelum Canal, <a href="#Page50">50</a>, <a href="#Page144">144</a>.</li>
-
-<li class="first">Velocity, <a href="#Page12">12</a>, <a href="#Page50">50</a>.</li>
-<li>Village lands, <a href="#Page62">62</a>.</li>
-
-<li class="first">Watching banks, <a href="#Page175">175</a>.</li>
-<li>Water, payment for, <a href="#Page12">12</a>, <a href="#Page100">100</a>, <a href="#Page102">102</a>, <a href="#Page142">142</a>,
-<a href="#Page143">143</a>.</li>
-<li>Water level, fluctuation in, <a href="#Page100">100</a>, <a href="#Page124">124</a>.</li>
-<li>Watercourse, limit of size of, <a href="#Page74">74</a>.</li>
-<li>Watercourses, <a href="#Page4">4</a>, <a href="#Page20">20</a>, <a href="#Page65">65</a>.</li>
-<li>&mdash; applications regarding, <a href="#Page140">140</a>.</li>
-<li>&mdash; for trees, <a href="#Page58">58</a>.</li>
-<li>&mdash; remodelling of, <a href="#Page131">131</a>.</li>
-<li>&mdash; with poor command, <a href="#Page67">67</a>, <a href="#Page133">133</a>, <a href="#Page166">166</a>.</li>
-<li>Waterings, <a href="#Page11">11</a>, <a href="#Page24">24</a>.</li>
-<li>Water-logging of the soil, <a href="#Page10">10</a>, <a href="#Page24">24</a>, <a href="#Page102">102</a>.</li>
-<li>Wave, travel of, down a channel, <a href="#Page124">124</a>.</li>
-<li>Western America, canals in, <a href="#Page12">12</a>.</li>
-<li>&mdash; Jumna Canal, <a href="#Page31">31</a>, <a href="#Page39">39</a>.</li>
-<li>Wing Walls, <a href="#Page89">89</a>.</li>
-<li>Works, arrangement of, <a href="#Page89">89</a>.</li>
-<li>&mdash; two or more close together, <a href="#Page89">89</a>.</li>
-<li>&mdash; urgent repairs of, <a href="#Page137">137</a>.</li>
-
-<li class="first">Zilladar, <a href="#Page96">96</a>.</li>
-
-</ul><!--index-->
-
-<p class="center highline2 bt bb fsize80">Harvey &amp; Healing, Printers, Manchester Street, Cheltenham.</p>
-
-<div class="tnbot" id="TN">
-
-<h2>Transcriber&#8217;s Notes</h2>
-
-<p>The inconsistent use of periods after Roman numerals has been retained; other
-inconsistencies (spelling, hyphenation, formatting and lay-out) have
-been retained as well, except when mentioned below.</p>
-
-<p>Depending on the hard- and software used and their settings, not all
-elements may display as intended. Some of the tables are best viewed
-in a wide window.</p>
-
-<p>Page 21: The equation does not agree with the calculations given.</p>
-
-<p>Page 66, Fig. 11: There are two illustrations labelled Fig. 11, the
-hyperlinks point to the appropriate illustration.</p>
-
-<p class="blankbefore15">Changes made</p>
-
-<p>Obvious typographical errors have been corrected silently. Footnotes
-and illustrations have been moved out of text paragraphs. Some tables
-have been re-arranged or split; in several tables, the data alignment
-has been standardised.</p>
-
-<p>Page 18, table, Total of second column: 8&middot;93 changed to 8&middot;01</p>
-<p>Page 39: Kutters changed to Kutter&#8217;s</p>
-<p>Page 93: marked out changed to marked at</p>
-<p>Page 69: 3 Depth of digging changed to 13. Depth of digging</p>
-<p>Page 109, first average &middot;1 changed to 4&middot;1</p>
-<p>Page 117: Net Areas Irrigated in Areas changed to Net Areas Irrigated in Acres</p>
-<p>Page 150: Cusecs. added as in similar tables</p>
-<p>Index: Cattle Ghats changed to Cattle Gh&aacute;ts; Line for making ...
-changed to Lime for making ...; Lower Chenal Canal changed to Lower
-Chenab Canal.</p>
-
-</div><!--tnbot-->
-
-
-
-
-
-
-
-
-<pre>
-
-
-
-
-
-End of the Project Gutenberg EBook of Irrigation Works, by E. S. Bellasis
-
-*** END OF THIS PROJECT GUTENBERG EBOOK IRRIGATION WORKS ***
-
-***** This file should be named 56113-h.htm or 56113-h.zip *****
-This and all associated files of various formats will be found in:
- http://www.gutenberg.org/5/6/1/1/56113/
-
-Produced by Chris Curnow, Harry Lame
-and the Online Distributed Proofreading Team at
-http://www.pgdp.net (This file was produced from images
-generously made available by The Internet Archive)
-
-
-Updated editions will replace the previous one--the old editions will
-be renamed.
-
-Creating the works from print editions not protected by U.S. copyright
-law means that no one owns a United States copyright in these works,
-so the Foundation (and you!) can copy and distribute it in the United
-States without permission and without paying copyright
-royalties. Special rules, set forth in the General Terms of Use part
-of this license, apply to copying and distributing Project
-Gutenberg-tm electronic works to protect the PROJECT GUTENBERG-tm
-concept and trademark. Project Gutenberg is a registered trademark,
-and may not be used if you charge for the eBooks, unless you receive
-specific permission. If you do not charge anything for copies of this
-eBook, complying with the rules is very easy. You may use this eBook
-for nearly any purpose such as creation of derivative works, reports,
-performances and research. They may be modified and printed and given
-away--you may do practically ANYTHING in the United States with eBooks
-not protected by U.S. copyright law. Redistribution is subject to the
-trademark license, especially commercial redistribution.
-
-START: FULL LICENSE
-
-THE FULL PROJECT GUTENBERG LICENSE
-PLEASE READ THIS BEFORE YOU DISTRIBUTE OR USE THIS WORK
-
-To protect the Project Gutenberg-tm mission of promoting the free
-distribution of electronic works, by using or distributing this work
-(or any other work associated in any way with the phrase "Project
-Gutenberg"), you agree to comply with all the terms of the Full
-Project Gutenberg-tm License available with this file or online at
-www.gutenberg.org/license.
-
-Section 1. General Terms of Use and Redistributing Project
-Gutenberg-tm electronic works
-
-1.A. By reading or using any part of this Project Gutenberg-tm
-electronic work, you indicate that you have read, understand, agree to
-and accept all the terms of this license and intellectual property
-(trademark/copyright) agreement. If you do not agree to abide by all
-the terms of this agreement, you must cease using and return or
-destroy all copies of Project Gutenberg-tm electronic works in your
-possession. If you paid a fee for obtaining a copy of or access to a
-Project Gutenberg-tm electronic work and you do not agree to be bound
-by the terms of this agreement, you may obtain a refund from the
-person or entity to whom you paid the fee as set forth in paragraph
-1.E.8.
-
-1.B. "Project Gutenberg" is a registered trademark. It may only be
-used on or associated in any way with an electronic work by people who
-agree to be bound by the terms of this agreement. There are a few
-things that you can do with most Project Gutenberg-tm electronic works
-even without complying with the full terms of this agreement. See
-paragraph 1.C below. There are a lot of things you can do with Project
-Gutenberg-tm electronic works if you follow the terms of this
-agreement and help preserve free future access to Project Gutenberg-tm
-electronic works. See paragraph 1.E below.
-
-1.C. The Project Gutenberg Literary Archive Foundation ("the
-Foundation" or PGLAF), owns a compilation copyright in the collection
-of Project Gutenberg-tm electronic works. Nearly all the individual
-works in the collection are in the public domain in the United
-States. If an individual work is unprotected by copyright law in the
-United States and you are located in the United States, we do not
-claim a right to prevent you from copying, distributing, performing,
-displaying or creating derivative works based on the work as long as
-all references to Project Gutenberg are removed. Of course, we hope
-that you will support the Project Gutenberg-tm mission of promoting
-free access to electronic works by freely sharing Project Gutenberg-tm
-works in compliance with the terms of this agreement for keeping the
-Project Gutenberg-tm name associated with the work. You can easily
-comply with the terms of this agreement by keeping this work in the
-same format with its attached full Project Gutenberg-tm License when
-you share it without charge with others.
-
-1.D. The copyright laws of the place where you are located also govern
-what you can do with this work. Copyright laws in most countries are
-in a constant state of change. If you are outside the United States,
-check the laws of your country in addition to the terms of this
-agreement before downloading, copying, displaying, performing,
-distributing or creating derivative works based on this work or any
-other Project Gutenberg-tm work. The Foundation makes no
-representations concerning the copyright status of any work in any
-country outside the United States.
-
-1.E. Unless you have removed all references to Project Gutenberg:
-
-1.E.1. The following sentence, with active links to, or other
-immediate access to, the full Project Gutenberg-tm License must appear
-prominently whenever any copy of a Project Gutenberg-tm work (any work
-on which the phrase "Project Gutenberg" appears, or with which the
-phrase "Project Gutenberg" is associated) is accessed, displayed,
-performed, viewed, copied or distributed:
-
- This eBook is for the use of anyone anywhere in the United States and
- most other parts of the world at no cost and with almost no
- restrictions whatsoever. You may copy it, give it away or re-use it
- under the terms of the Project Gutenberg License included with this
- eBook or online at www.gutenberg.org. If you are not located in the
- United States, you'll have to check the laws of the country where you
- are located before using this ebook.
-
-1.E.2. If an individual Project Gutenberg-tm electronic work is
-derived from texts not protected by U.S. copyright law (does not
-contain a notice indicating that it is posted with permission of the
-copyright holder), the work can be copied and distributed to anyone in
-the United States without paying any fees or charges. If you are
-redistributing or providing access to a work with the phrase "Project
-Gutenberg" associated with or appearing on the work, you must comply
-either with the requirements of paragraphs 1.E.1 through 1.E.7 or
-obtain permission for the use of the work and the Project Gutenberg-tm
-trademark as set forth in paragraphs 1.E.8 or 1.E.9.
-
-1.E.3. If an individual Project Gutenberg-tm electronic work is posted
-with the permission of the copyright holder, your use and distribution
-must comply with both paragraphs 1.E.1 through 1.E.7 and any
-additional terms imposed by the copyright holder. Additional terms
-will be linked to the Project Gutenberg-tm License for all works
-posted with the permission of the copyright holder found at the
-beginning of this work.
-
-1.E.4. Do not unlink or detach or remove the full Project Gutenberg-tm
-License terms from this work, or any files containing a part of this
-work or any other work associated with Project Gutenberg-tm.
-
-1.E.5. Do not copy, display, perform, distribute or redistribute this
-electronic work, or any part of this electronic work, without
-prominently displaying the sentence set forth in paragraph 1.E.1 with
-active links or immediate access to the full terms of the Project
-Gutenberg-tm License.
-
-1.E.6. You may convert to and distribute this work in any binary,
-compressed, marked up, nonproprietary or proprietary form, including
-any word processing or hypertext form. However, if you provide access
-to or distribute copies of a Project Gutenberg-tm work in a format
-other than "Plain Vanilla ASCII" or other format used in the official
-version posted on the official Project Gutenberg-tm web site
-(www.gutenberg.org), you must, at no additional cost, fee or expense
-to the user, provide a copy, a means of exporting a copy, or a means
-of obtaining a copy upon request, of the work in its original "Plain
-Vanilla ASCII" or other form. Any alternate format must include the
-full Project Gutenberg-tm License as specified in paragraph 1.E.1.
-
-1.E.7. Do not charge a fee for access to, viewing, displaying,
-performing, copying or distributing any Project Gutenberg-tm works
-unless you comply with paragraph 1.E.8 or 1.E.9.
-
-1.E.8. You may charge a reasonable fee for copies of or providing
-access to or distributing Project Gutenberg-tm electronic works
-provided that
-
-* You pay a royalty fee of 20% of the gross profits you derive from
- the use of Project Gutenberg-tm works calculated using the method
- you already use to calculate your applicable taxes. The fee is owed
- to the owner of the Project Gutenberg-tm trademark, but he has
- agreed to donate royalties under this paragraph to the Project
- Gutenberg Literary Archive Foundation. Royalty payments must be paid
- within 60 days following each date on which you prepare (or are
- legally required to prepare) your periodic tax returns. Royalty
- payments should be clearly marked as such and sent to the Project
- Gutenberg Literary Archive Foundation at the address specified in
- Section 4, "Information about donations to the Project Gutenberg
- Literary Archive Foundation."
-
-* You provide a full refund of any money paid by a user who notifies
- you in writing (or by e-mail) within 30 days of receipt that s/he
- does not agree to the terms of the full Project Gutenberg-tm
- License. You must require such a user to return or destroy all
- copies of the works possessed in a physical medium and discontinue
- all use of and all access to other copies of Project Gutenberg-tm
- works.
-
-* You provide, in accordance with paragraph 1.F.3, a full refund of
- any money paid for a work or a replacement copy, if a defect in the
- electronic work is discovered and reported to you within 90 days of
- receipt of the work.
-
-* You comply with all other terms of this agreement for free
- distribution of Project Gutenberg-tm works.
-
-1.E.9. If you wish to charge a fee or distribute a Project
-Gutenberg-tm electronic work or group of works on different terms than
-are set forth in this agreement, you must obtain permission in writing
-from both the Project Gutenberg Literary Archive Foundation and The
-Project Gutenberg Trademark LLC, the owner of the Project Gutenberg-tm
-trademark. Contact the Foundation as set forth in Section 3 below.
-
-1.F.
-
-1.F.1. Project Gutenberg volunteers and employees expend considerable
-effort to identify, do copyright research on, transcribe and proofread
-works not protected by U.S. copyright law in creating the Project
-Gutenberg-tm collection. Despite these efforts, Project Gutenberg-tm
-electronic works, and the medium on which they may be stored, may
-contain "Defects," such as, but not limited to, incomplete, inaccurate
-or corrupt data, transcription errors, a copyright or other
-intellectual property infringement, a defective or damaged disk or
-other medium, a computer virus, or computer codes that damage or
-cannot be read by your equipment.
-
-1.F.2. LIMITED WARRANTY, DISCLAIMER OF DAMAGES - Except for the "Right
-of Replacement or Refund" described in paragraph 1.F.3, the Project
-Gutenberg Literary Archive Foundation, the owner of the Project
-Gutenberg-tm trademark, and any other party distributing a Project
-Gutenberg-tm electronic work under this agreement, disclaim all
-liability to you for damages, costs and expenses, including legal
-fees. YOU AGREE THAT YOU HAVE NO REMEDIES FOR NEGLIGENCE, STRICT
-LIABILITY, BREACH OF WARRANTY OR BREACH OF CONTRACT EXCEPT THOSE
-PROVIDED IN PARAGRAPH 1.F.3. YOU AGREE THAT THE FOUNDATION, THE
-TRADEMARK OWNER, AND ANY DISTRIBUTOR UNDER THIS AGREEMENT WILL NOT BE
-LIABLE TO YOU FOR ACTUAL, DIRECT, INDIRECT, CONSEQUENTIAL, PUNITIVE OR
-INCIDENTAL DAMAGES EVEN IF YOU GIVE NOTICE OF THE POSSIBILITY OF SUCH
-DAMAGE.
-
-1.F.3. LIMITED RIGHT OF REPLACEMENT OR REFUND - If you discover a
-defect in this electronic work within 90 days of receiving it, you can
-receive a refund of the money (if any) you paid for it by sending a
-written explanation to the person you received the work from. If you
-received the work on a physical medium, you must return the medium
-with your written explanation. The person or entity that provided you
-with the defective work may elect to provide a replacement copy in
-lieu of a refund. If you received the work electronically, the person
-or entity providing it to you may choose to give you a second
-opportunity to receive the work electronically in lieu of a refund. If
-the second copy is also defective, you may demand a refund in writing
-without further opportunities to fix the problem.
-
-1.F.4. Except for the limited right of replacement or refund set forth
-in paragraph 1.F.3, this work is provided to you 'AS-IS', WITH NO
-OTHER WARRANTIES OF ANY KIND, EXPRESS OR IMPLIED, INCLUDING BUT NOT
-LIMITED TO WARRANTIES OF MERCHANTABILITY OR FITNESS FOR ANY PURPOSE.
-
-1.F.5. Some states do not allow disclaimers of certain implied
-warranties or the exclusion or limitation of certain types of
-damages. If any disclaimer or limitation set forth in this agreement
-violates the law of the state applicable to this agreement, the
-agreement shall be interpreted to make the maximum disclaimer or
-limitation permitted by the applicable state law. The invalidity or
-unenforceability of any provision of this agreement shall not void the
-remaining provisions.
-
-1.F.6. INDEMNITY - You agree to indemnify and hold the Foundation, the
-trademark owner, any agent or employee of the Foundation, anyone
-providing copies of Project Gutenberg-tm electronic works in
-accordance with this agreement, and any volunteers associated with the
-production, promotion and distribution of Project Gutenberg-tm
-electronic works, harmless from all liability, costs and expenses,
-including legal fees, that arise directly or indirectly from any of
-the following which you do or cause to occur: (a) distribution of this
-or any Project Gutenberg-tm work, (b) alteration, modification, or
-additions or deletions to any Project Gutenberg-tm work, and (c) any
-Defect you cause.
-
-Section 2. Information about the Mission of Project Gutenberg-tm
-
-Project Gutenberg-tm is synonymous with the free distribution of
-electronic works in formats readable by the widest variety of
-computers including obsolete, old, middle-aged and new computers. It
-exists because of the efforts of hundreds of volunteers and donations
-from people in all walks of life.
-
-Volunteers and financial support to provide volunteers with the
-assistance they need are critical to reaching Project Gutenberg-tm's
-goals and ensuring that the Project Gutenberg-tm collection will
-remain freely available for generations to come. In 2001, the Project
-Gutenberg Literary Archive Foundation was created to provide a secure
-and permanent future for Project Gutenberg-tm and future
-generations. To learn more about the Project Gutenberg Literary
-Archive Foundation and how your efforts and donations can help, see
-Sections 3 and 4 and the Foundation information page at
-www.gutenberg.org Section 3. Information about the Project Gutenberg
-Literary Archive Foundation
-
-The Project Gutenberg Literary Archive Foundation is a non profit
-501(c)(3) educational corporation organized under the laws of the
-state of Mississippi and granted tax exempt status by the Internal
-Revenue Service. The Foundation's EIN or federal tax identification
-number is 64-6221541. Contributions to the Project Gutenberg Literary
-Archive Foundation are tax deductible to the full extent permitted by
-U.S. federal laws and your state's laws.
-
-The Foundation's principal office is in Fairbanks, Alaska, with the
-mailing address: PO Box 750175, Fairbanks, AK 99775, but its
-volunteers and employees are scattered throughout numerous
-locations. Its business office is located at 809 North 1500 West, Salt
-Lake City, UT 84116, (801) 596-1887. Email contact links and up to
-date contact information can be found at the Foundation's web site and
-official page at www.gutenberg.org/contact
-
-For additional contact information:
-
- Dr. Gregory B. Newby
- Chief Executive and Director
- gbnewby@pglaf.org
-
-Section 4. Information about Donations to the Project Gutenberg
-Literary Archive Foundation
-
-Project Gutenberg-tm depends upon and cannot survive without wide
-spread public support and donations to carry out its mission of
-increasing the number of public domain and licensed works that can be
-freely distributed in machine readable form accessible by the widest
-array of equipment including outdated equipment. Many small donations
-($1 to $5,000) are particularly important to maintaining tax exempt
-status with the IRS.
-
-The Foundation is committed to complying with the laws regulating
-charities and charitable donations in all 50 states of the United
-States. Compliance requirements are not uniform and it takes a
-considerable effort, much paperwork and many fees to meet and keep up
-with these requirements. We do not solicit donations in locations
-where we have not received written confirmation of compliance. To SEND
-DONATIONS or determine the status of compliance for any particular
-state visit www.gutenberg.org/donate
-
-While we cannot and do not solicit contributions from states where we
-have not met the solicitation requirements, we know of no prohibition
-against accepting unsolicited donations from donors in such states who
-approach us with offers to donate.
-
-International donations are gratefully accepted, but we cannot make
-any statements concerning tax treatment of donations received from
-outside the United States. U.S. laws alone swamp our small staff.
-
-Please check the Project Gutenberg Web pages for current donation
-methods and addresses. Donations are accepted in a number of other
-ways including checks, online payments and credit card donations. To
-donate, please visit: www.gutenberg.org/donate
-
-Section 5. General Information About Project Gutenberg-tm electronic works.
-
-Professor Michael S. Hart was the originator of the Project
-Gutenberg-tm concept of a library of electronic works that could be
-freely shared with anyone. For forty years, he produced and
-distributed Project Gutenberg-tm eBooks with only a loose network of
-volunteer support.
-
-Project Gutenberg-tm eBooks are often created from several printed
-editions, all of which are confirmed as not protected by copyright in
-the U.S. unless a copyright notice is included. Thus, we do not
-necessarily keep eBooks in compliance with any particular paper
-edition.
-
-Most people start at our Web site which has the main PG search
-facility: www.gutenberg.org
-
-This Web site includes information about Project Gutenberg-tm,
-including how to make donations to the Project Gutenberg Literary
-Archive Foundation, how to help produce our new eBooks, and how to
-subscribe to our email newsletter to hear about new eBooks.
-
-
-
-</pre>
-
-</body>
-</html>
diff --git a/old/56113-h/images/cover.jpg b/old/56113-h/images/cover.jpg
deleted file mode 100644
index 190e825..0000000
--- a/old/56113-h/images/cover.jpg
+++ /dev/null
Binary files differ
diff --git a/old/56113-h/images/cover_sm.jpg b/old/56113-h/images/cover_sm.jpg
deleted file mode 100644
index 8b216c5..0000000
--- a/old/56113-h/images/cover_sm.jpg
+++ /dev/null
Binary files differ
diff --git a/old/56113-h/images/illo004.jpg b/old/56113-h/images/illo004.jpg
deleted file mode 100644
index 0e59100..0000000
--- a/old/56113-h/images/illo004.jpg
+++ /dev/null
Binary files differ
diff --git a/old/56113-h/images/illo013.png b/old/56113-h/images/illo013.png
deleted file mode 100644
index 36afe64..0000000
--- a/old/56113-h/images/illo013.png
+++ /dev/null
Binary files differ
diff --git a/old/56113-h/images/illo015.png b/old/56113-h/images/illo015.png
deleted file mode 100644
index 473bb97..0000000
--- a/old/56113-h/images/illo015.png
+++ /dev/null
Binary files differ
diff --git a/old/56113-h/images/illo026.png b/old/56113-h/images/illo026.png
deleted file mode 100644
index 3a5b840..0000000
--- a/old/56113-h/images/illo026.png
+++ /dev/null
Binary files differ
diff --git a/old/56113-h/images/illo027.png b/old/56113-h/images/illo027.png
deleted file mode 100644
index 4d9b643..0000000
--- a/old/56113-h/images/illo027.png
+++ /dev/null
Binary files differ
diff --git a/old/56113-h/images/illo041.png b/old/56113-h/images/illo041.png
deleted file mode 100644
index 91f38d7..0000000
--- a/old/56113-h/images/illo041.png
+++ /dev/null
Binary files differ
diff --git a/old/56113-h/images/illo044.png b/old/56113-h/images/illo044.png
deleted file mode 100644
index 80c3ad1..0000000
--- a/old/56113-h/images/illo044.png
+++ /dev/null
Binary files differ
diff --git a/old/56113-h/images/illo045.png b/old/56113-h/images/illo045.png
deleted file mode 100644
index ebd0944..0000000
--- a/old/56113-h/images/illo045.png
+++ /dev/null
Binary files differ
diff --git a/old/56113-h/images/illo052.jpg b/old/56113-h/images/illo052.jpg
deleted file mode 100644
index 1e943d4..0000000
--- a/old/56113-h/images/illo052.jpg
+++ /dev/null
Binary files differ
diff --git a/old/56113-h/images/illo055.png b/old/56113-h/images/illo055.png
deleted file mode 100644
index ccf771b..0000000
--- a/old/56113-h/images/illo055.png
+++ /dev/null
Binary files differ
diff --git a/old/56113-h/images/illo065a.png b/old/56113-h/images/illo065a.png
deleted file mode 100644
index ff9a879..0000000
--- a/old/56113-h/images/illo065a.png
+++ /dev/null
Binary files differ
diff --git a/old/56113-h/images/illo065b.png b/old/56113-h/images/illo065b.png
deleted file mode 100644
index be8c1f8..0000000
--- a/old/56113-h/images/illo065b.png
+++ /dev/null
Binary files differ
diff --git a/old/56113-h/images/illo067.png b/old/56113-h/images/illo067.png
deleted file mode 100644
index 3a6747b..0000000
--- a/old/56113-h/images/illo067.png
+++ /dev/null
Binary files differ
diff --git a/old/56113-h/images/illo074.jpg b/old/56113-h/images/illo074.jpg
deleted file mode 100644
index 450a26c..0000000
--- a/old/56113-h/images/illo074.jpg
+++ /dev/null
Binary files differ
diff --git a/old/56113-h/images/illo075.png b/old/56113-h/images/illo075.png
deleted file mode 100644
index d6c5922..0000000
--- a/old/56113-h/images/illo075.png
+++ /dev/null
Binary files differ
diff --git a/old/56113-h/images/illo078.png b/old/56113-h/images/illo078.png
deleted file mode 100644
index 715d40d..0000000
--- a/old/56113-h/images/illo078.png
+++ /dev/null
Binary files differ
diff --git a/old/56113-h/images/illo082.png b/old/56113-h/images/illo082.png
deleted file mode 100644
index e4558bb..0000000
--- a/old/56113-h/images/illo082.png
+++ /dev/null
Binary files differ
diff --git a/old/56113-h/images/illo086.png b/old/56113-h/images/illo086.png
deleted file mode 100644
index 071c342..0000000
--- a/old/56113-h/images/illo086.png
+++ /dev/null
Binary files differ
diff --git a/old/56113-h/images/illo086lg.png b/old/56113-h/images/illo086lg.png
deleted file mode 100644
index 573ec7c..0000000
--- a/old/56113-h/images/illo086lg.png
+++ /dev/null
Binary files differ
diff --git a/old/56113-h/images/illo087.png b/old/56113-h/images/illo087.png
deleted file mode 100644
index b3f2f60..0000000
--- a/old/56113-h/images/illo087.png
+++ /dev/null
Binary files differ
diff --git a/old/56113-h/images/illo097.png b/old/56113-h/images/illo097.png
deleted file mode 100644
index 2ea559c..0000000
--- a/old/56113-h/images/illo097.png
+++ /dev/null
Binary files differ
diff --git a/old/56113-h/images/illo099.png b/old/56113-h/images/illo099.png
deleted file mode 100644
index bfe78ae..0000000
--- a/old/56113-h/images/illo099.png
+++ /dev/null
Binary files differ
diff --git a/old/56113-h/images/illo100.png b/old/56113-h/images/illo100.png
deleted file mode 100644
index 6e493e4..0000000
--- a/old/56113-h/images/illo100.png
+++ /dev/null
Binary files differ
diff --git a/old/56113-h/images/illo102.jpg b/old/56113-h/images/illo102.jpg
deleted file mode 100644
index 8cc6e09..0000000
--- a/old/56113-h/images/illo102.jpg
+++ /dev/null
Binary files differ
diff --git a/old/56113-h/images/illo106.jpg b/old/56113-h/images/illo106.jpg
deleted file mode 100644
index 8d30f91..0000000
--- a/old/56113-h/images/illo106.jpg
+++ /dev/null
Binary files differ
diff --git a/old/56113-h/images/illo107.png b/old/56113-h/images/illo107.png
deleted file mode 100644
index 4f068ef..0000000
--- a/old/56113-h/images/illo107.png
+++ /dev/null
Binary files differ
diff --git a/old/56113-h/images/illo110.png b/old/56113-h/images/illo110.png
deleted file mode 100644
index b0e7302..0000000
--- a/old/56113-h/images/illo110.png
+++ /dev/null
Binary files differ
diff --git a/old/56113-h/images/illo111a.png b/old/56113-h/images/illo111a.png
deleted file mode 100644
index a246921..0000000
--- a/old/56113-h/images/illo111a.png
+++ /dev/null
Binary files differ
diff --git a/old/56113-h/images/illo111b.png b/old/56113-h/images/illo111b.png
deleted file mode 100644
index d49a5c9..0000000
--- a/old/56113-h/images/illo111b.png
+++ /dev/null
Binary files differ
diff --git a/old/56113-h/images/illo112a.png b/old/56113-h/images/illo112a.png
deleted file mode 100644
index 56ae18d..0000000
--- a/old/56113-h/images/illo112a.png
+++ /dev/null
Binary files differ
diff --git a/old/56113-h/images/illo112b.png b/old/56113-h/images/illo112b.png
deleted file mode 100644
index 2723ed0..0000000
--- a/old/56113-h/images/illo112b.png
+++ /dev/null
Binary files differ
diff --git a/old/56113-h/images/illo113.png b/old/56113-h/images/illo113.png
deleted file mode 100644
index 29a92ac..0000000
--- a/old/56113-h/images/illo113.png
+++ /dev/null
Binary files differ
diff --git a/old/56113-h/images/illo119.png b/old/56113-h/images/illo119.png
deleted file mode 100644
index e79d614..0000000
--- a/old/56113-h/images/illo119.png
+++ /dev/null
Binary files differ
diff --git a/old/56113-h/images/illo119lg.png b/old/56113-h/images/illo119lg.png
deleted file mode 100644
index 90baef8..0000000
--- a/old/56113-h/images/illo119lg.png
+++ /dev/null
Binary files differ
diff --git a/old/56113-h/images/illo145.png b/old/56113-h/images/illo145.png
deleted file mode 100644
index 1cc29ea..0000000
--- a/old/56113-h/images/illo145.png
+++ /dev/null
Binary files differ
diff --git a/old/56113-h/images/illo164.png b/old/56113-h/images/illo164.png
deleted file mode 100644
index e198e36..0000000
--- a/old/56113-h/images/illo164.png
+++ /dev/null
Binary files differ
diff --git a/old/56113-h/images/illo164lg.png b/old/56113-h/images/illo164lg.png
deleted file mode 100644
index 01c4f50..0000000
--- a/old/56113-h/images/illo164lg.png
+++ /dev/null
Binary files differ
diff --git a/old/56113-h/images/illo189.png b/old/56113-h/images/illo189.png
deleted file mode 100644
index 0089928..0000000
--- a/old/56113-h/images/illo189.png
+++ /dev/null
Binary files differ
diff --git a/old/56113-h/images/illo201.png b/old/56113-h/images/illo201.png
deleted file mode 100644
index 6e3bb5c..0000000
--- a/old/56113-h/images/illo201.png
+++ /dev/null
Binary files differ
diff --git a/old/56113-h/images/illo210a.png b/old/56113-h/images/illo210a.png
deleted file mode 100644
index edc3a2e..0000000
--- a/old/56113-h/images/illo210a.png
+++ /dev/null
Binary files differ
diff --git a/old/56113-h/images/illo210alg.png b/old/56113-h/images/illo210alg.png
deleted file mode 100644
index 29fe9d6..0000000
--- a/old/56113-h/images/illo210alg.png
+++ /dev/null
Binary files differ
diff --git a/old/56113-h/images/illo210b.png b/old/56113-h/images/illo210b.png
deleted file mode 100644
index 886bd41..0000000
--- a/old/56113-h/images/illo210b.png
+++ /dev/null
Binary files differ
diff --git a/old/56113-h/images/illo210blg.png b/old/56113-h/images/illo210blg.png
deleted file mode 100644
index b38bb87..0000000
--- a/old/56113-h/images/illo210blg.png
+++ /dev/null
Binary files differ
diff --git a/old/56113-h/images/illo210c.jpg b/old/56113-h/images/illo210c.jpg
deleted file mode 100644
index ff53176..0000000
--- a/old/56113-h/images/illo210c.jpg
+++ /dev/null
Binary files differ
diff --git a/old/56113-h/images/illo210clg.jpg b/old/56113-h/images/illo210clg.jpg
deleted file mode 100644
index 523b35b..0000000
--- a/old/56113-h/images/illo210clg.jpg
+++ /dev/null
Binary files differ
diff --git a/old/56113-h/images/illo211.jpg b/old/56113-h/images/illo211.jpg
deleted file mode 100644
index 9350bec..0000000
--- a/old/56113-h/images/illo211.jpg
+++ /dev/null
Binary files differ
diff --git a/old/56113-h/images/illo213.png b/old/56113-h/images/illo213.png
deleted file mode 100644
index e0c95eb..0000000
--- a/old/56113-h/images/illo213.png
+++ /dev/null
Binary files differ
diff --git a/old/56113-h/images/spon.jpg b/old/56113-h/images/spon.jpg
deleted file mode 100644
index 4dbd40a..0000000
--- a/old/56113-h/images/spon.jpg
+++ /dev/null
Binary files differ
diff --git a/old/56113-h/images/titpag.png b/old/56113-h/images/titpag.png
deleted file mode 100644
index da1ffc5..0000000
--- a/old/56113-h/images/titpag.png
+++ /dev/null
Binary files differ