summaryrefslogtreecommitdiff
path: root/43055-0.txt
diff options
context:
space:
mode:
Diffstat (limited to '43055-0.txt')
-rw-r--r--43055-0.txt686
1 files changed, 686 insertions, 0 deletions
diff --git a/43055-0.txt b/43055-0.txt
new file mode 100644
index 0000000..eedfe48
--- /dev/null
+++ b/43055-0.txt
@@ -0,0 +1,686 @@
+*** START OF THE PROJECT GUTENBERG EBOOK 43055 ***
+
+[Transcriber's Note: Bolded sections are rendered with equal signs
+e.g. =bold=.
+
+The oe ligature is rendered as[oe] e.g. Ph[oe]nixville.
+
+The following table is a cross index relating ASCE
+papers to Project Gutenberg(TM) file directories e.g.
+http://www.gutenberg.org/files/18229/ for paper 1150.
+
+ +-----+------------------------------------------------------+------+
+ |Paper|PAPER NAME & Author | PG |
+ | No | | file |
+ | | | No |
+ |-----+------------------------------------------------------+------|
+ |1150 |THE NEW YORK TUNNEL EXTENSION OF THE PENNSYLVANIA |18229 |
+ | |RAILROAD. By Charles W. Raymond | |
+ |1151 |THE NORTH RIVER DIVISION. By Charles M. Jacobs |18548 |
+ |1152 |THE EAST RIVER DIVISION. By Alfred Noble |18065 |
+ |1153 |MEADOWS DIVISION AND HARRISON TRANSFER YARD. By E. B. |18012 |
+ | |Temple | |
+ |1154 |THE BERGEN HILL TUNNELS. By F. Lavis |21083 |
+ |1155 |THE NORTH RIVER TUNNELS. By B. H. M. Hewett and W. L. |42149 |
+ | |Brown | |
+ |1156 |THE TERMINAL STATION WEST. By B. F. Cresson, Jr. |17302 |
+ |1157 |THE SITE OF THE TERMINAL STATION. By George C. Clarke |18408 |
+ |1158 |THE CROSS TOWN TUNNELS. By James H. Brace and Francis |19037 |
+ | |Mason | |
+ |1159 |THE EAST RIVER TUNNELS. By James H. Brace, Francis |18722 |
+ | |Mason, and S. H. Woodard | |
+ +-----+------------------------------------------------------+------+
+
+]
+
+
+
+
+TRANSACTIONS
+
+OF THE
+
+AMERICAN SOCIETY
+
+OF
+
+CIVIL ENGINEERS
+
+(INSTITUTED 1852)
+
+VOL. LXVIII
+
+SEPTEMBER, 1910
+
+Edited by the Secretary, under the direction of the Committee on
+Publications. Reprints from this publication, which is copyrighted, may
+be made on condition that the full title of Paper, name of Author, and
+page reference are given.
+
+NEW YORK
+
+PUBLISHED BY THE SOCIETY
+
+1910
+
+ * * * * *
+
+Entered according to Act of Congress, in the year 1910, by the AMERICAN
+SOCIETY OF CIVIL ENGINEERS, in the Office of the Librarian of Congress,
+at Washington.
+
+ * * * * *
+
+NOTE.--This Society is not responsible, as a body, for the facts and
+opinions advanced in any of its publications.
+
+
+
+
+CONTENTS
+
+
+ THE NEW YORK TUNNEL EXTENSION OF THE
+ PENNSYLVANIA RAILROAD
+
+ NO. PAGE
+
+ 1150 THE NEW YORK TUNNEL EXTENSION OF THE PENNSYLVANIA 1
+ RAILROAD. By Charles W. Raymond
+
+ 1151 THE NORTH RIVER DIVISION. By Charles M. Jacobs 32
+
+ 1152 THE EAST RIVER DIVISION. By Alfred Noble 62
+
+ 1153 MEADOWS DIVISION AND HARRISON TRANSFER YARD. By E. B. 75
+ Temple
+
+ 1154 THE BERGEN HILL TUNNELS. By F. Lavis 84
+
+ 1155 THE NORTH RIVER TUNNELS. By B. H. M. Hewett and W. L. 152
+ Brown
+
+ 1156 THE TERMINAL STATION-WEST. By B. F. Cresson, Jr. 303
+
+ 1157 THE SITE OF THE TERMINAL STATION. By George C. Clarke 340
+
+ 1158 THE CROSS-TOWN TUNNELS. By James H. Brace and Francis 391
+ Mason
+
+ 1159 THE EAST RIVER TUNNELS. By James H. Brace, Francis Mason, 419
+ and S. H. Woodard
+
+
+ MEMOIRS OF DECEASED MEMBERS
+ PAGE
+
+ JOHN FISKE BARNARD, M. AM. SOC. C. E. 479
+
+ ROBERT L. ENGLE, M. AM. SOC. C. E. 480
+
+ CHARLES HERBERT DEANS, ASSOC. M. AM. SOC. C. E. 482
+
+ WILLIAM MEIER, ASSOC. M. AM. SOC. C. E. 485
+
+
+=This Volume and the succeeding Volume of Transactions (Vol. LXIX) will
+contain all the Papers descriptive of the New York Extension of the
+Pennsylvania Railroad. A general index covering both Volumes will be
+issued in Vol. LXIX.=
+
+ PLATES
+
+ PLATE PAPER PAGE
+
+ I. Map and Profile, Pennsylvania Tunnel & 1150 19
+ Terminal R. R., North Bergen Tunnel to Long
+ Island City
+
+ II. Map and Profile, Harrison Yard to Bergen Hill 1150 21
+ Tunnel
+
+ III. Plan of Sunnyside Yard 1150 23
+
+ IV. View of Tunnel Under Part of Atlantic Avenue, 1151 37
+ Brooklyn, N.Y.
+
+ V. New York Underground Railway Company: Section 1151 39
+ Through Surface and Underground Stations
+
+ VI. Pennsylvania Railroad Extension: Map Showing 1151 45
+ Proposed Lines Leading to Those Finally
+ Adopted
+
+ VII. Plan, Profile, and Triangulation, North River 1151 47
+ Tunnels
+
+ VIII. Typical Sections Between Manholes, Bergen 1151 51
+ Hill Tunnels
+
+ IX. Map of Manhattan Island from Twenty-third to 1152 63
+ Fortieth Streets
+
+ X. Manhattan Shaft, Lines A and B 1152 65
+
+ XI. Long Island Shaft, Lines A and B 1152 67
+
+ XII. Typical Tunnel Sections 1152 69
+
+ XIII. Plan and Profile, East River Tunnels 1152 71
+
+ XIV. Map and Profile, Cross-Town Tunnels 1152 73
+
+ XV. Plan and Profile of Lines A and B, and 1152 75
+ Sunnyside Yard
+
+ XVI. Plan and Profile of the Pennsylvania Tunnel & 1153 77
+ Terminal R. R., from Harrison, N. J., to the
+ Hudson River
+
+ XVII. Plan of Harrison Yard 1153 79
+
+ XVIII. Details of Shelters and Platforms, Harrison 1153 81
+ Transfer Station
+
+ XIX. Details of Shelters and Platforms, Harrison 1153 81
+ Transfer Station
+
+ XX. Lift Rail and Locking Device for Hackensack 1153 83
+ River Draw-Bridge
+
+ XXI. Hackensack Portal, Bergen Hill Tunnels; 1154 85
+ Method of Using Cross-Section Rod; and Belt
+ Conveyor for Handling and Placing Concrete
+
+ XXII. Scaffold Car; Headhouse; and Round Holes in 1154 87
+ Concrete Forms
+
+ XXIII. Record of Drilling, Air Pressure, Mucking, 1154 95
+ etc., in Bergen Hill Tunnels
+
+ XXIV. Belt Conveyor for Handling and Placing 1154 119
+ Concrete; Water-Proofing, Portion of
+ Completed Sand-Wall, etc.; and Methods of
+ Placing Concrete in Forms and Bench-Walls
+
+ XXV. Telephone and Telegraph Ducts and Mandrels; 1154 129
+ Tunnel Lining Forms; Placing Water-Proofing;
+ and Section of Completed Lining
+
+ XXVI. Form of Circuit-Breaker Chamber and Traveling 1154 137
+ Gantry; Forms for Storage Chamber; Rock
+ Packing Over Arches; Method of Water-Proofing
+ in Timbered Tunnels, etc.
+
+ XXVII. Method of Placing Water-Proofing and Keying 1154 145
+ Arch; View of Completed Tunnel; General View
+ of Completed Hackensack Tunnel and Arches
+ Through Cut-and-Cover Section; and View of
+ Hackensack Approach
+
+ XXVIII. Plan and Profile of Parts of North River 1155 153
+ Tunnels
+
+ XXIX. Weehawken Shaft; and Tunnel Shield Showing 1155 159
+ Hood
+
+ XXX. Yard and Offices at Manhattan and Weehawken 1155 161
+ Shafts
+
+ XXXI. Tunneling Shield 1155 167
+
+ XXXII. Thirty-Second Street Tunnels and Shield 1155 175
+ Chambers
+
+ XXXIII. General Methods of Excavation Adopted for 1155 177
+ Land Tunnels
+
+ XXXIV. Plan and Longitudinal Section of Weehawken 1155 193
+ Tunnels
+
+ XXXV. Apparatus for Cleaning and Rodding Electric 1155 205
+ Cable Ducts
+
+ XXXVI. Diagram Showing Lines and Grades in River 1155 229
+ Tunnel North
+
+ XXXVII. Cross-Section of Subaqueous Tunnels Showing 1155 231
+ Reinforcement
+
+ XXXVIII. Back of Shield in South Tunnel; and Rear View 1155 237
+ of Shield During Erection of First Ring of
+ Iron Lining
+
+ PLATE PAPER PAGE
+
+ XXXIX. View of Meeting of Shields; and Lowering 1155 253
+ Segment into Tunnel Invert
+
+ XL. Sections of Tunnel During Construction, 1155 255
+ Showing Shield, Air Locks, Platforms, Etc.
+
+ XLI. Placing Key Segment; and Method of Grouting 1155 257
+ Outside Iron
+
+ XLII. Duct Bench Concrete Form in River Tunnels 1155 283
+
+ XLIII. End of Portable and Adjustable Forms 1155 285
+ for Building Side Bench; and Steel Rod
+ Reinforcement in River Tunnels
+
+ XLIV. Details of 20-Ft. Movable Form and Traveler 1155 287
+ for Concrete Arches
+
+ XLV. Traveling Concrete Form for Face of Bench 1155 291
+ Walls
+
+ XLVI. Mechanical Analysis of Sand Used in Mortar 1155 297
+ and Concrete
+
+ XLVII. Views Showing Condition of Work at Site of 1156 307
+ Terminal Station
+
+ XLVIII. Views Showing Excavation and Supports for 1156 317
+ Ninth Avenue Structures
+
+ XLIX. Views Showing Underpinning for Ninth Avenue 1156 321
+ Elevated Railway
+
+ L. Views Showing Condition of Work Between Ninth 1156 325
+ and Tenth Avenues, and Progress on Concrete
+ Walls
+
+ LI. Views Showing Box Drains and Tie-Rods in 1156 333
+ Walls; the Completed Tenth Avenue Portal; and
+ the Disposal Trestle
+
+ LII. Girders Under the Ninth Avenue Elevated 1156 335
+ Railroad; Method of Supporting Elevated
+ Railway Columns; and View of Inside of Form
+ for Walls, Showing Drains, Tie-Rods, Etc.
+
+ LIII. Pennsylvania Station, New York City; Plan 1157 341
+ Showing Area at Track Level
+
+ LIV. Diagram Showing Widths of Base of Retaining 1157 349
+ Wall Required for Different Batters and
+ Pressures, Pennsylvania Station
+
+ LV. Material Trestle Over N. Y. C. & H. R. R. R. 1157 361
+ Co.'s Tracks; and Construction of Pier No.
+ 72, North River
+
+ LVI. Material Trestle Showing First Chutes in 1157 363
+ Operation; and Views of East and West Pits at
+ Terminal Site
+
+ LVII. Methods of Excavation, Cross-Town Tunnels, 1158 393
+ Manhattan
+
+ LVIII. Views of Parts of First Avenue Plant, 1158 395
+ Cross-Town Tunnels
+
+ LIX. Methods of Tunneling, Timbering, and Lining, 1158 399
+ Cross-Town Tunnels
+
+ LX. Methods of Timbering and Underpinning, 1158 407
+ Cross-Town Tunnels
+
+ LXI. Sections Showing Method of Excavating and 1158 413
+ Timbering in Heavy Ground, Three-Track
+ Tunnel; and Carriage Form for Side Walls,
+ Cross-Town Twin Tunnels
+
+ LXII. Methods of Water-Proofing and Concreting, 1158 417
+ Cross-Town Tunnels
+
+ LXIII. Methods of Excavation in All Rock, East River 1159 423
+ Tunnels
+
+ LXIV. Tunneling in Compressed Air, Air-Lock, 1159 425
+ Caisson, etc., East River Tunnels
+
+ LXV. Shields Fitted with Sectional Sliding Hoods 1159 433
+ and Sliding Extensions and with Fixed Hoods
+ and Fixed Extensions to Floors, East River
+ Tunnels
+
+ LXVI. Rear of Shield Showing Complete Fittings, 1159 435
+ and Shield with Lower Portion of Bulkhead
+ Removed, East River Tunnels
+
+ LXVII. Methods of Tunneling in Rock, East River 1159 437
+ Tunnels
+
+ LXVIII. Operation of Shields, East River Tunnels 1159 439
+
+ LXIX. Operations in Shoving the Shield Forward in 1159 441
+ Rock and Sand, East River Tunnels
+
+ LXX. Small Shaft, Breasting and Poling, Shutters 1159 443
+ on Front of Shield, and Hydraulic Erector,
+ East River Tunnels
+
+ LXXI. Operations in Shoving the Shield Forward in 1159 445
+ Sand, and Final Breasting and Bulkheading,
+ East River Tunnels
+
+ LXXII. Method of Operating Shields in Soft Ground, 1159 453
+ East River Tunnels
+
+ LXXIII. Reinforcement of Broken Plates, and Inflow of 1159 455
+ Soft Clay Through Shield, East River Tunnels
+
+ LXXIV. Methods of Placing Concrete Inside the Iron 1159 475
+ Tube, East River Tunnels
+
+
+
+
+MEMOIRS OF DECEASED MEMBERS.
+
+
+=JOHN FISKE BARNARD, M. Am. Soc. C. E.=[1]
+
+[1] Memoir prepared by W. K. Barnard, Assoc. M. Am. Soc. C. E.
+
+DIED FEBRUARY 6TH, 1910.
+
+John Fiske Barnard was born in Worcester, Mass., on April 23d. 1829. He
+was graduated from the Bridgewater Normal School, and from Rensselaer
+Polytechnic Institute.
+
+In November, 1850, Mr. Barnard entered the railway service. He
+held various engineering and operating positions with the Grand Trunk
+Railway and its subsidiary lines in Lower Canada, and served as Chief
+Engineer of the Grand Trunk South of the St. Lawrence River for the
+last three years of his connection with that road.
+
+In May, 1869, he went to the Missouri Valley Railroad as Superintendent
+and Chief Engineer. During the same year he was appointed Chief
+Engineer of the Kansas City-St. Joseph and Council Bluffs Railroad,
+and remained with this road and the Hannibal and St. Joseph Railroad
+(both now a part of the Burlington Missouri Lines), as Chief Engineer,
+General Superintendent, and General Manager, until 1886. During this
+time Mr. Barnard was also President of the Atchison Union Depot Company
+and the St. Joseph Union Stock Yards Company, Secretary and Treasurer
+of the St. Joseph Depot Company, and Director in various railroad
+companies.
+
+In 1886, Mr. Barnard was appointed President and General Manager of
+the Ohio and Mississippi Railway, which position he occupied until
+1892. From that time until 1893, he was engaged on several reports
+of projected railroads and appraisals of industrial and railroad
+properties.
+
+From 1893 to 1898, Mr. Barnard was Receiver of the Omaha and St. Louis
+(now Wabash) Railway, during part of which time he was also President
+of the Alton Bridge Company, and Receiver of the St. Clair-Madison and
+St. Louis Belt Line.
+
+In the spring of 1905 he moved to Los Angeles, Cal., where he lived
+until February 6th, 1910, when, after an illness of several months, he
+died at his home at the age of 81 years.
+
+Mr. Barnard was elected a Member of the American Society of Civil
+Engineers on September 1st, 1880. He was also a Member of the American
+Geographical Society.
+
+
+=ROBERT L. ENGLE, M. Am. Soc. C. E.=[2]
+
+[2] Memoir prepared by O. E. Selby, Jun. Am. Soc. C. E.
+
+DIED OCTOBER 16TH, 1909.
+
+Robert L. Engle was born on December 5th, 1846. He was a product of
+the time when opportunities for technical training were few, so that
+his engineering education was gained largely by contact with actual
+work. He began his professional career after the Civil War, in which
+he served for two years in the One Hundred and Forty-eighth Indiana
+Volunteer Infantry.
+
+The first construction work of any note on which Mr. Engle was engaged
+was the building of the Ohio and Mississippi Railroad, now a part of
+the Baltimore and Ohio System, extending from Cincinnati to St. Louis.
+Later, and up to 1878, he was connected with the construction of the
+Cincinnati Southern Railway, Cincinnati's municipally owned railway,
+as Division Engineer, at Ray Springs, Tenn. This work included several
+tunnels and other heavy work in the mountain territory.
+
+After the completion of the Cincinnati Southern, Mr. Engle went West,
+and was engaged in the construction of the Santa Fé Railroad at
+Trinidad, Colo., in the capacity of Assistant Chief Engineer. Under
+his direction the Royal Gorge Hanging Bridge was built, and much other
+interesting work was carried out. Mr. Engle's forte was location, and
+in the mountainous regions of the West he found ample exercise for this
+faculty. From Trinidad he moved to Santa Fé, N. Mex. His name is borne
+by Engle, N. Mex., now a thriving Western town.
+
+While still in the West, Mr. Engle was connected with the Mexican
+Central Railroad, at Chihuahua, Mexico, on construction work, and with
+the Denver and Rio Grande Railroad. It is thus seen that he played
+a part in much of the important pioneer railroad development of the
+mountain region of the West.
+
+In 1885, Mr. Engle began work on the location and construction of the
+Chicago, Burlington, and Northern Railroad, now part of the Burlington
+System, being located at St. Paul, Minn., as Assistant Chief Engineer
+of that portion of the line north of La Crosse, Wis. Later, his
+jurisdiction included the whole line. During 1887 and a part of 1888,
+he had charge of the construction of the Illinois Valley and Northern
+Railroad, as Chief Engineer, at La Salle, Ill. In the latter part of
+1888 he conducted surveys for coal branch lines connecting with the
+Chesapeake and Ohio Railway, in the mountains of West Virginia.
+
+Beginning in September, 1889, Mr. Engle was Resident Engineer on the
+construction of the Louisville and Jeffersonville Bridge over the Ohio
+River. During his term of service the substructure, involving several
+deep pneumatic foundations, was built, and parts of the approaches
+were erected. During his stay at Louisville Mr. Engle was selected as
+Arbitrator in a matter of disputed classification between the company
+and the contractor for the Pike's Peak Rack Railroad, and effected a
+satisfactory settlement. Among other things his later service included
+location work on the Tennessee Central Railroad, in 1892; location
+and construction work for the Missouri, Kansas and Texas Railroad, in
+Arkansas; and construction work on the Tidewater Railroad, now the
+Virginian Railway, at Princeton, W. Va. At the time of his death he was
+employed as Engineer for the contracting firm of Carpenter and Boxley,
+at Johnson City, Tenn.
+
+With the death of Robert L. Engle, the Profession loses one of those
+sturdy, self-made engineers, to whom the country is largely indebted
+for pushing railroad construction overland and through the West. In
+character, rugged like the mountains with which he was associated,
+he was still the gentlest of souls to those associated with him in
+subordinate capacities. The writer knew him as Chief and friend for
+many years, and cannot recall any departures from the lines of the
+highest dignity, rectitude, good habits, and good nature.
+
+Mr. Engle was a Member of the Engineers' Club of Cincinnati from the
+time of its organization. He maintained his home in Cincinnati for
+twenty-one years, while his engagements kept him at various other
+places.
+
+On February 20th, 1879, Mr. Engle married Miss Sallie McQueety, of
+Cincinnati, and is survived by her and their son and two daughters.
+His family and social relations were most happy, although his enforced
+absences from home kept him from much of the social contact which his
+qualities deserved.
+
+Mr. Engle was elected a Member of the American Society of Civil
+Engineers on September 7th, 1881.
+
+
+=CHARLES HERBERT DEANS, Assoc. M. Am. Soc. C. E.=[3]
+
+[3]Memoir prepared by Emil Diebitsch and Edwin S. Jarrett, Members, Am.
+Soc. C. E.
+
+DIED MARCH 7TH, 1909.
+
+Charles Herbert Deans was born in Chester, Delaware County, Pa., on
+November 30th, 1863, and died at his home in Ph[oe]nixville, Pa., on
+March 7th, 1909.
+
+His father, Charles Woodbury Deans, was prominent in educational work,
+and was active in the early organization and in the popularization of
+the Common School System of the State of Pennsylvania.
+
+On his father's side Mr. Deans was descended from the Deans and
+Sterling families, who, immediately following the War of the
+Revolution, emigrated from Connecticut to Susquehanna and Wyoming
+Counties, Pennsylvania. His mother was Priscilla Lyons Williams, of
+Chester, Delaware County, Pa., who was descended from the Lyons family
+of New Jersey and the Williams and Pennell families of Pennsylvania.
+
+From both his father and his mother Mr. Deans inherited a taste and
+aptitude for study. His youthful environment was among books and in an
+atmosphere which naturally encouraged the desire he early formed to fit
+himself for a professional life.
+
+His education was begun in private schools, but later he attended
+the public schools, and was graduated from the High School at
+Ph[oe]nixville, Pa., in 1881. He spent the next four years in practical
+work, learning business methods, becoming an excellent and accurate
+accountant, and familiarizing himself, in the works of the Ph[oe]nix
+Iron Company, with mill and shop methods and practice, and the
+metallurgy of iron and steel.
+
+In 1885, Mr. Deans entered Lehigh University, well prepared in his
+studies, with a mind ripe for the absorption of further knowledge, and
+a temperament for enjoying to the utmost the four years of University
+life before him. He was a good student, standing well up in the first
+quarter of his class. He was elected a member of Theta Delta Chi
+Fraternity, was one of the Editors and Assistant Business Manager of
+the college Annual in his Junior year, and Business Manager of the
+Engineering Journal in his Senior year. He was graduated in 1889 with
+the degree of C. E.
+
+As a boy Mr. Deans was fond of games and all healthy outdoor sports.
+He was a lover of Nature and of animals, fond of fishing and hunting,
+and was never happier than when roaming the beautiful woods and
+mountains of his native State. With such tastes it was natural to
+find him, in his college days, a participator in, and an enthusiastic
+supporter of, athletic games.
+
+Not only in athletics, but in all things pertaining to Lehigh
+University, Mr. Deans was a most loyal and enthusiastic son of his
+Alma Mater, both at college and after he had gone out into the world.
+He thoroughly appreciated the benefits derived from his technical
+training, and was so eager that others should share them, that early in
+his business career he advanced sufficient funds to two ambitious young
+men to carry them through Lehigh.
+
+Immediately after graduation Mr. Deans entered the employ of Sooysmith
+and Company, the well-known foundation engineers and contractors. He
+rapidly advanced to positions of responsibility with this company, and,
+in 1895, became its Vice-President and Chief Executive Officer. When, a
+year or two later, Charles Sooysmith, M. Am. Soc. C. E., retired from
+active business, Mr. Deans organized, from the Sooysmith and Company
+staff, the Engineering Contract Company, of which he became President.
+Pressure of business seriously undermining his health, he was forced to
+give up temporarily all work in 1900, and to spend the next two years
+in the mountains of Northern Pennsylvania. On regaining his health, he
+associated himself with the firm of John Monks and Son, of New York
+City, and, at the time of his death, he was Second Vice-President of
+that company.
+
+While under his executive charge, both Sooysmith and Company and
+the Engineering Contract Company, constructed a number of the most
+important bridge foundations in the United States, and the former firm
+first successfully introduced pneumatic work in the foundations of the
+modern high office buildings of New York City, notably the Manhattan
+Life, Washington Life, Standard Oil, and Empire Buildings on Lower
+Broadway. At the time of his death, Mr. Deans was in full charge of the
+building of the piers of the reconstructed Baltimore and Ohio bridge
+over the Susquehanna River, at Havre de Grace, Md.
+
+In the early years of his connection with Sooysmith and Company,
+Mr. Deans was employed on work in the field, rising from subordinate
+positions to that of Superintendent in responsible charge of work.
+During this period he acquired an intimate and practical knowledge of
+foundation construction, and his subsequent career gave evidence of
+the value of this training. Being thus well-equipped, Mr. Deans soon
+became notable as a business engineer. His judgment on all substructure
+engineering problems was quick and keen, his thorough technical
+knowledge being supplemented by his penetrating practical sense. His
+business ability was of a high order, and his efficiency was largely
+increased by his industry and methodical habits. As a negotiator, he
+was in the first rank. His quick appreciation of the essentials in
+business transactions, his fertile resource in the most complicated
+financial dealings, his patience and persistence in the face of
+discouragement or delay, and his inflexible determination when once his
+decisions were reached, were qualities which placed him in the highest
+rank as a contracting engineer. To those with whom he came in close
+contact, Mr. Deans will always be remembered as exemplifying the ideal
+combination of technical training with business efficiency.
+
+He lightened the seriousness of his business transactions with a
+quick sense of fun, a fondness for a good story, and an infectious
+good humor. His genuine interest in the work of his associates and
+his unfeigned delight in their success won him many friendships which
+lasted throughout his life and which now keep his memory warm in the
+hearts of those who were fortunate enough to know him intimately.
+Strong of will, keen and clear-sighted in business transactions, loyal
+to his friends and to the interests entrusted to him, he was, above
+all, a genial, honorable, many-sided man, who loved his fellow men.
+
+Mr. Deans leaves a mother, Mrs. Charles W. Deans, of Ph[oe]nixville,
+Pa., a brother, John Sterling Deans, M. Am. Soc. C. E., Chief Engineer
+of the Ph[oe]nix Bridge Company, and two sisters, Mrs. R. Barclay
+Calley, of Seattle, Wash., and Mrs. Elmer E. Keiser, of Tacony, Pa.
+
+In 1893, Mr. Deans married Miss Helen Arnold of West Chester, Pa., who,
+with two sons, Charles Woodbury, aged 15, and Malcolm Arnold, aged 13,
+survives him.
+
+Mr. Deans was elected a Junior of the American Society of Civil
+Engineers, on December 3d, 1890, and an Associate Member on May 6th,
+1896.
+
+
+=WILLIAM MEIER, Assoc. M. Am. Soc. C. E.=[4]
+
+[4] Memoir prepared by William A. Theodorsen and E. James Fucik,
+Associate Members, Am. Soc. C. E.
+
+DIED FEBRUARY 14TH, 1910.
+
+William Meier, the son of the Reverend Jacob L. and Mary Meier, was
+born in Muscatine, Iowa, on April 10th, 1878, the family moving to
+Chicago, Ill., in the same year.
+
+Mr. Meier received his education in the public schools of Chicago and
+at the University of Illinois, from which he was graduated in 1901,
+with the degree of B. S. in Civil Engineering.
+
+After his graduation, Mr. Meier was engaged with various firms,
+principally in bridge and structural work. For a time he was with
+William M. Hughes, M. Am. Soc. C. E., and in January, 1905, he entered
+the service of the Scherzer Rolling Lift Bridge Company, as Assistant
+in the Chicago office; and later was appointed Assistant Engineer and
+Eastern Representative, with headquarters in New York City. At the time
+of his death, Mr. Meier was employed in the Bridge Department of the
+Chicago and North Western Railway.
+
+On February 14th, 1910, in diving from a spring-board, in the
+natatorium of the Young Men's Christian Association, he struck his head
+against the side or bottom of the tank. When his body was taken from
+the water, life was extinct, and all efforts at resuscitation were
+futile.
+
+Mr. Meier took great interest in all that pertained to his profession.
+
+He was elected an Associate Member of the American Society of Civil
+Engineers, on June 1st, 1909. He was also a Member of the Western
+Society of Engineers.
+
+
+
+
+
+End of the Project Gutenberg EBook of Transactions of the American Society
+of Civil Engineers, vol. LXVIII, Sept. 1910, Start/End Papers, by Various
+
+*** END OF THE PROJECT GUTENBERG EBOOK 43055 ***