summaryrefslogtreecommitdiff
path: root/38455.txt
blob: 83174a6a080c64e8abfffb34dbeaef2ba4a24392 (plain)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574
575
576
577
578
579
580
581
582
583
584
585
586
587
588
589
590
591
592
593
594
595
596
597
598
599
600
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615
616
617
618
619
620
621
622
623
624
625
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640
641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656
657
658
659
660
661
662
663
664
665
666
667
668
669
670
671
672
673
674
675
676
677
678
679
680
681
682
683
684
685
686
687
688
689
690
691
692
693
694
695
696
697
698
699
700
701
702
703
704
705
706
707
708
709
710
711
712
713
714
715
716
717
718
719
720
721
722
723
724
725
726
727
728
729
730
731
732
733
734
735
736
737
738
739
740
741
742
743
744
745
746
747
748
749
750
751
752
753
754
755
756
757
758
759
760
761
762
763
764
765
766
767
768
769
770
771
772
773
774
775
776
777
778
779
780
781
782
783
784
785
786
787
788
789
790
791
792
793
794
795
796
797
798
799
800
801
802
803
804
805
806
807
808
809
810
811
812
813
814
815
816
817
818
819
820
821
822
823
824
825
826
827
828
829
830
831
832
833
834
835
836
837
838
839
840
841
842
843
844
845
846
847
848
849
850
851
852
853
854
855
856
857
858
859
860
861
862
863
864
865
866
867
868
869
870
871
872
873
874
875
876
877
878
879
880
881
882
883
884
885
886
887
888
889
890
891
892
893
894
895
896
897
898
899
900
901
902
903
904
905
906
907
908
909
910
911
912
913
914
915
916
917
918
919
920
921
922
923
924
925
926
927
928
929
930
931
932
933
934
935
936
937
938
939
940
941
942
943
944
945
946
947
948
949
950
951
952
953
954
955
956
957
958
959
960
961
962
963
964
965
966
967
968
969
970
971
972
973
974
975
976
977
978
979
980
981
982
983
984
985
986
987
988
989
990
991
992
993
994
995
996
997
998
999
1000
1001
1002
1003
1004
1005
1006
1007
1008
1009
1010
1011
1012
1013
1014
1015
1016
1017
1018
1019
1020
1021
1022
1023
1024
1025
1026
1027
1028
1029
1030
1031
1032
1033
1034
1035
1036
1037
1038
1039
1040
1041
1042
1043
1044
1045
1046
1047
1048
1049
1050
1051
1052
1053
1054
1055
1056
1057
1058
1059
1060
1061
1062
1063
1064
1065
1066
1067
1068
1069
1070
1071
1072
1073
1074
1075
1076
1077
1078
1079
1080
1081
1082
1083
1084
1085
1086
1087
1088
1089
1090
1091
1092
1093
1094
1095
1096
1097
1098
1099
1100
1101
1102
1103
1104
1105
1106
1107
1108
1109
1110
1111
1112
1113
1114
1115
1116
1117
1118
1119
1120
1121
1122
1123
1124
1125
1126
1127
1128
1129
1130
1131
1132
1133
1134
1135
1136
1137
1138
1139
1140
1141
1142
1143
1144
1145
1146
1147
1148
1149
1150
1151
1152
1153
1154
1155
1156
1157
1158
1159
1160
1161
1162
1163
1164
1165
1166
1167
1168
1169
1170
1171
1172
1173
1174
1175
1176
1177
1178
1179
1180
1181
1182
1183
1184
1185
1186
1187
1188
1189
1190
1191
1192
1193
1194
1195
1196
1197
1198
1199
1200
1201
1202
1203
1204
1205
1206
1207
1208
1209
1210
1211
1212
1213
1214
1215
1216
1217
1218
1219
1220
1221
1222
1223
1224
1225
1226
1227
1228
1229
1230
1231
1232
1233
1234
1235
1236
1237
1238
1239
1240
1241
1242
1243
1244
1245
1246
1247
1248
1249
1250
1251
1252
1253
1254
1255
1256
1257
1258
1259
1260
1261
1262
1263
1264
1265
1266
1267
1268
1269
1270
1271
1272
1273
1274
1275
1276
1277
1278
1279
1280
1281
1282
1283
1284
1285
1286
1287
1288
1289
1290
1291
1292
1293
1294
1295
1296
1297
1298
1299
1300
1301
1302
1303
1304
1305
1306
1307
1308
1309
1310
1311
1312
1313
1314
1315
1316
1317
1318
1319
1320
1321
1322
1323
1324
1325
1326
1327
1328
1329
1330
1331
1332
1333
1334
1335
1336
1337
1338
1339
1340
1341
1342
1343
1344
1345
1346
1347
1348
1349
1350
1351
1352
1353
1354
1355
1356
1357
1358
1359
1360
1361
1362
1363
1364
1365
1366
1367
1368
1369
1370
1371
1372
1373
1374
1375
1376
1377
1378
1379
1380
1381
1382
1383
1384
1385
1386
1387
1388
1389
1390
1391
1392
1393
1394
1395
1396
1397
1398
1399
1400
1401
1402
1403
1404
1405
1406
1407
1408
1409
1410
1411
1412
1413
1414
1415
1416
1417
1418
1419
1420
1421
1422
1423
1424
1425
1426
1427
1428
1429
1430
1431
1432
1433
1434
1435
1436
1437
1438
1439
1440
1441
1442
1443
1444
1445
1446
1447
1448
1449
1450
1451
1452
1453
1454
1455
1456
1457
1458
1459
1460
1461
1462
1463
1464
1465
1466
1467
1468
1469
1470
1471
1472
1473
1474
1475
1476
1477
1478
1479
1480
1481
1482
1483
1484
1485
1486
1487
1488
1489
1490
1491
1492
1493
1494
1495
1496
1497
1498
1499
1500
1501
1502
1503
1504
1505
1506
1507
1508
1509
1510
1511
1512
1513
1514
1515
1516
1517
1518
1519
1520
1521
1522
1523
1524
1525
1526
1527
1528
1529
1530
1531
1532
1533
1534
1535
1536
1537
1538
1539
1540
1541
1542
1543
1544
1545
1546
1547
1548
1549
1550
1551
1552
1553
1554
1555
1556
1557
1558
1559
1560
1561
1562
1563
1564
1565
1566
1567
1568
1569
1570
1571
1572
1573
1574
1575
1576
1577
1578
1579
1580
1581
1582
1583
1584
1585
1586
1587
1588
1589
1590
1591
1592
1593
1594
1595
1596
1597
1598
1599
1600
1601
1602
1603
1604
1605
1606
1607
1608
1609
1610
1611
1612
1613
1614
1615
1616
1617
1618
1619
1620
1621
1622
1623
1624
1625
1626
1627
1628
1629
1630
1631
1632
1633
1634
1635
1636
1637
1638
1639
1640
1641
1642
1643
1644
1645
1646
1647
1648
1649
1650
1651
1652
1653
1654
1655
1656
1657
1658
1659
1660
1661
1662
1663
1664
1665
1666
1667
1668
1669
1670
1671
1672
1673
1674
1675
1676
1677
1678
1679
1680
1681
1682
1683
1684
1685
1686
1687
1688
1689
1690
1691
1692
1693
1694
1695
1696
1697
1698
1699
1700
1701
1702
1703
1704
1705
1706
1707
1708
1709
1710
1711
1712
1713
1714
1715
1716
1717
1718
1719
1720
1721
1722
1723
1724
1725
1726
1727
1728
1729
1730
1731
1732
1733
1734
1735
1736
1737
1738
1739
1740
1741
1742
1743
1744
1745
1746
1747
1748
1749
1750
1751
1752
1753
1754
1755
1756
1757
1758
1759
1760
1761
1762
1763
1764
1765
1766
1767
1768
1769
1770
1771
1772
1773
1774
1775
1776
1777
1778
1779
1780
1781
1782
1783
1784
1785
1786
1787
1788
1789
1790
1791
1792
1793
1794
1795
1796
1797
1798
1799
1800
1801
1802
1803
1804
1805
1806
1807
1808
1809
1810
1811
1812
1813
1814
1815
1816
1817
1818
1819
1820
1821
1822
1823
1824
1825
1826
1827
1828
1829
1830
1831
1832
1833
1834
1835
1836
1837
1838
1839
1840
1841
1842
1843
1844
1845
1846
1847
1848
1849
1850
1851
1852
1853
1854
1855
1856
1857
1858
1859
1860
1861
1862
1863
1864
1865
1866
1867
1868
1869
1870
1871
1872
1873
1874
1875
1876
1877
1878
1879
1880
1881
1882
1883
1884
1885
1886
1887
1888
1889
1890
1891
1892
1893
1894
1895
1896
1897
1898
1899
1900
1901
1902
1903
1904
1905
1906
1907
1908
1909
1910
1911
1912
1913
1914
1915
1916
1917
1918
1919
1920
1921
1922
1923
1924
1925
1926
1927
1928
1929
1930
1931
1932
1933
1934
1935
1936
1937
1938
1939
1940
1941
1942
1943
1944
1945
1946
1947
1948
1949
1950
1951
1952
1953
1954
1955
1956
1957
1958
1959
1960
1961
1962
1963
1964
1965
1966
1967
1968
1969
1970
1971
1972
1973
1974
1975
1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
2036
2037
2038
2039
2040
2041
2042
2043
2044
2045
2046
2047
2048
2049
2050
2051
2052
2053
2054
2055
2056
2057
2058
2059
2060
2061
2062
2063
2064
2065
2066
2067
2068
2069
2070
2071
2072
2073
2074
2075
2076
2077
2078
2079
2080
2081
2082
2083
2084
2085
2086
2087
2088
2089
2090
2091
2092
2093
2094
2095
2096
2097
2098
2099
2100
2101
2102
2103
2104
2105
2106
2107
2108
2109
2110
2111
2112
2113
2114
2115
2116
2117
2118
2119
2120
2121
2122
2123
2124
2125
2126
2127
2128
2129
2130
2131
2132
2133
2134
2135
2136
2137
2138
2139
2140
2141
2142
2143
2144
2145
2146
2147
2148
2149
2150
2151
2152
2153
2154
2155
2156
2157
2158
2159
2160
2161
2162
2163
2164
2165
2166
2167
2168
2169
2170
2171
2172
2173
2174
2175
2176
2177
2178
2179
2180
2181
2182
2183
2184
2185
2186
2187
2188
2189
2190
2191
2192
2193
2194
2195
2196
2197
2198
2199
2200
2201
2202
2203
2204
2205
2206
2207
2208
2209
2210
2211
2212
2213
2214
2215
2216
2217
2218
2219
2220
2221
2222
2223
2224
2225
2226
2227
2228
2229
2230
2231
2232
2233
2234
2235
2236
2237
2238
2239
2240
2241
2242
2243
2244
2245
2246
2247
2248
2249
2250
2251
2252
2253
2254
2255
2256
2257
2258
2259
2260
2261
2262
2263
2264
2265
2266
2267
2268
2269
2270
2271
2272
2273
2274
2275
2276
2277
2278
2279
2280
2281
2282
2283
2284
2285
2286
2287
2288
2289
2290
2291
2292
2293
2294
2295
2296
2297
2298
2299
2300
2301
2302
2303
2304
2305
2306
2307
2308
2309
2310
2311
2312
2313
2314
2315
2316
2317
2318
2319
2320
2321
2322
2323
2324
2325
2326
2327
2328
2329
2330
2331
2332
2333
2334
2335
2336
2337
2338
2339
2340
2341
2342
2343
2344
2345
2346
2347
2348
2349
2350
2351
2352
2353
2354
2355
2356
2357
2358
2359
2360
2361
2362
2363
2364
2365
2366
2367
2368
2369
2370
2371
2372
2373
2374
2375
2376
2377
2378
2379
2380
2381
2382
2383
2384
2385
2386
2387
2388
2389
2390
2391
2392
2393
2394
2395
2396
2397
2398
2399
2400
2401
2402
2403
2404
2405
2406
2407
2408
2409
2410
2411
2412
2413
2414
2415
2416
2417
2418
2419
2420
2421
2422
2423
2424
2425
2426
2427
2428
2429
2430
2431
2432
2433
2434
2435
2436
2437
2438
2439
2440
2441
2442
2443
2444
2445
2446
2447
2448
2449
2450
2451
2452
2453
2454
2455
2456
2457
2458
2459
2460
2461
2462
2463
2464
2465
2466
2467
2468
2469
2470
2471
2472
2473
2474
2475
2476
2477
2478
2479
2480
2481
2482
2483
2484
2485
2486
2487
2488
2489
2490
2491
2492
2493
2494
2495
2496
2497
2498
2499
2500
2501
2502
2503
2504
2505
2506
2507
2508
2509
2510
2511
2512
2513
2514
2515
2516
2517
2518
2519
2520
2521
2522
2523
2524
2525
2526
2527
2528
2529
2530
2531
2532
2533
2534
2535
2536
2537
2538
2539
2540
2541
2542
2543
2544
2545
2546
2547
2548
2549
2550
2551
2552
2553
2554
2555
2556
2557
2558
2559
2560
2561
2562
2563
2564
2565
2566
2567
2568
2569
2570
2571
2572
2573
2574
2575
2576
2577
2578
2579
2580
2581
2582
2583
2584
2585
2586
2587
2588
2589
2590
2591
2592
2593
2594
2595
2596
2597
2598
2599
2600
2601
2602
2603
2604
2605
2606
2607
2608
2609
2610
2611
2612
2613
2614
2615
2616
2617
2618
2619
2620
2621
2622
2623
2624
2625
2626
2627
2628
2629
2630
2631
2632
2633
2634
2635
2636
2637
2638
2639
2640
2641
2642
2643
2644
2645
2646
2647
2648
2649
2650
2651
2652
2653
2654
2655
2656
2657
2658
2659
2660
2661
2662
2663
2664
2665
2666
2667
2668
2669
2670
2671
2672
2673
2674
2675
2676
2677
2678
2679
2680
2681
2682
2683
2684
2685
2686
2687
2688
2689
2690
2691
2692
2693
2694
2695
2696
2697
2698
2699
2700
2701
2702
2703
2704
2705
2706
2707
2708
2709
2710
2711
2712
2713
2714
2715
2716
2717
2718
2719
2720
2721
2722
2723
2724
2725
2726
2727
2728
2729
2730
2731
2732
2733
2734
2735
2736
2737
2738
2739
2740
2741
2742
2743
2744
2745
2746
2747
2748
2749
2750
2751
2752
2753
2754
2755
2756
2757
2758
2759
2760
2761
2762
2763
2764
2765
2766
2767
2768
2769
2770
2771
2772
2773
2774
2775
2776
2777
2778
2779
2780
2781
2782
2783
2784
2785
2786
2787
2788
2789
2790
2791
2792
2793
2794
2795
2796
2797
2798
2799
2800
2801
2802
2803
2804
2805
2806
2807
2808
2809
2810
2811
2812
2813
2814
2815
2816
2817
2818
2819
2820
2821
2822
2823
2824
2825
2826
2827
2828
2829
2830
2831
2832
2833
2834
2835
2836
2837
2838
2839
2840
2841
2842
2843
2844
2845
2846
2847
2848
2849
2850
2851
2852
2853
2854
2855
2856
2857
2858
2859
2860
2861
2862
2863
2864
2865
2866
2867
2868
2869
2870
2871
2872
2873
2874
2875
2876
2877
2878
2879
2880
2881
2882
2883
2884
2885
2886
2887
2888
2889
2890
2891
2892
2893
2894
2895
2896
2897
2898
2899
2900
2901
2902
2903
2904
2905
2906
2907
2908
2909
2910
2911
2912
2913
2914
2915
2916
2917
2918
2919
2920
2921
2922
2923
2924
2925
2926
2927
2928
2929
2930
2931
2932
2933
2934
2935
2936
2937
2938
2939
2940
2941
2942
2943
2944
2945
2946
2947
2948
2949
2950
2951
2952
2953
2954
2955
2956
2957
2958
2959
2960
2961
2962
2963
2964
2965
2966
2967
2968
2969
2970
2971
2972
2973
2974
2975
2976
2977
2978
2979
2980
2981
2982
2983
2984
2985
2986
2987
2988
2989
2990
2991
2992
2993
2994
2995
2996
2997
2998
2999
3000
3001
3002
3003
3004
3005
3006
3007
3008
3009
3010
3011
3012
3013
3014
3015
3016
3017
3018
3019
3020
3021
3022
3023
3024
3025
3026
3027
3028
3029
3030
3031
3032
3033
3034
3035
3036
3037
3038
3039
3040
3041
3042
3043
3044
3045
3046
3047
3048
3049
3050
3051
3052
3053
3054
3055
3056
3057
3058
3059
3060
3061
3062
3063
3064
3065
3066
3067
3068
3069
3070
3071
3072
3073
3074
3075
3076
3077
3078
3079
3080
3081
3082
3083
3084
3085
3086
3087
3088
3089
3090
3091
3092
3093
3094
3095
3096
3097
3098
3099
3100
3101
3102
3103
3104
3105
3106
3107
3108
3109
3110
3111
3112
3113
3114
3115
3116
3117
3118
3119
3120
3121
3122
3123
3124
3125
3126
3127
3128
3129
3130
3131
3132
3133
3134
3135
3136
3137
3138
3139
3140
3141
3142
3143
3144
3145
3146
3147
3148
3149
3150
3151
3152
3153
3154
3155
3156
3157
3158
3159
3160
3161
3162
3163
3164
3165
3166
3167
3168
3169
3170
3171
3172
3173
3174
3175
3176
3177
3178
3179
3180
3181
3182
3183
3184
3185
3186
3187
3188
3189
3190
3191
3192
3193
3194
3195
3196
3197
3198
3199
3200
3201
3202
3203
3204
3205
3206
3207
3208
3209
3210
3211
3212
3213
3214
3215
3216
3217
3218
3219
3220
3221
3222
3223
3224
3225
3226
3227
3228
3229
3230
3231
3232
3233
3234
3235
3236
3237
3238
3239
3240
3241
3242
3243
3244
3245
3246
3247
3248
3249
3250
3251
3252
3253
3254
3255
3256
3257
3258
3259
3260
3261
3262
3263
3264
3265
3266
3267
3268
3269
3270
3271
3272
3273
3274
3275
3276
3277
3278
3279
3280
3281
3282
3283
3284
3285
3286
3287
3288
3289
3290
3291
3292
3293
3294
3295
3296
3297
3298
3299
3300
3301
3302
3303
3304
3305
3306
3307
3308
3309
3310
3311
3312
3313
3314
3315
3316
3317
3318
3319
3320
3321
3322
3323
3324
3325
3326
3327
3328
3329
3330
3331
3332
3333
3334
3335
3336
3337
3338
3339
3340
3341
3342
3343
3344
3345
3346
3347
3348
3349
3350
3351
3352
3353
3354
3355
3356
3357
3358
3359
3360
3361
3362
3363
3364
3365
3366
3367
3368
3369
3370
3371
3372
3373
3374
3375
3376
3377
3378
3379
3380
3381
3382
3383
3384
3385
3386
3387
3388
3389
3390
3391
3392
3393
3394
3395
3396
3397
3398
3399
3400
3401
3402
3403
3404
3405
3406
3407
3408
3409
3410
3411
3412
3413
3414
3415
3416
3417
3418
3419
3420
3421
3422
3423
3424
3425
3426
3427
3428
3429
3430
3431
3432
3433
3434
3435
3436
3437
3438
3439
3440
3441
3442
3443
3444
3445
3446
3447
3448
3449
3450
3451
3452
3453
3454
3455
3456
3457
3458
3459
3460
3461
3462
3463
3464
3465
3466
3467
3468
3469
3470
3471
3472
3473
3474
3475
3476
3477
3478
3479
3480
3481
3482
3483
3484
3485
3486
3487
3488
3489
3490
3491
3492
3493
3494
3495
3496
3497
3498
3499
3500
3501
3502
3503
3504
3505
3506
3507
3508
3509
3510
3511
3512
3513
3514
3515
3516
3517
3518
3519
3520
3521
3522
3523
3524
3525
3526
3527
3528
3529
3530
3531
3532
3533
3534
3535
3536
3537
3538
3539
3540
3541
3542
3543
3544
3545
3546
3547
3548
3549
3550
3551
3552
3553
3554
3555
3556
3557
3558
3559
3560
3561
3562
3563
3564
3565
3566
3567
3568
3569
3570
3571
3572
3573
3574
3575
3576
3577
3578
3579
3580
3581
3582
3583
3584
3585
3586
3587
3588
3589
3590
3591
3592
3593
3594
3595
3596
3597
3598
3599
3600
3601
3602
3603
3604
3605
3606
3607
3608
3609
3610
3611
3612
3613
3614
3615
3616
3617
3618
3619
3620
3621
3622
3623
3624
3625
3626
3627
3628
3629
3630
3631
3632
3633
3634
3635
3636
3637
3638
3639
3640
3641
3642
3643
3644
3645
3646
3647
3648
3649
3650
3651
3652
3653
3654
3655
3656
3657
3658
3659
3660
3661
3662
3663
3664
3665
3666
3667
3668
3669
3670
3671
3672
3673
3674
3675
3676
3677
3678
3679
3680
3681
3682
3683
3684
3685
3686
3687
3688
3689
3690
3691
3692
3693
3694
3695
3696
3697
3698
3699
3700
3701
3702
3703
3704
3705
3706
3707
3708
3709
3710
3711
3712
3713
3714
3715
3716
3717
3718
3719
3720
3721
3722
3723
3724
3725
3726
3727
3728
3729
3730
3731
3732
3733
3734
3735
3736
3737
3738
3739
3740
3741
3742
3743
3744
3745
3746
3747
3748
3749
3750
3751
3752
3753
3754
3755
3756
3757
3758
3759
3760
3761
3762
3763
3764
3765
3766
3767
3768
3769
3770
3771
3772
3773
3774
3775
3776
3777
3778
3779
3780
3781
3782
3783
3784
3785
3786
3787
3788
3789
3790
3791
3792
3793
3794
3795
3796
3797
3798
3799
3800
3801
3802
3803
3804
3805
3806
3807
3808
3809
3810
3811
3812
3813
3814
3815
3816
3817
3818
3819
3820
3821
3822
3823
3824
3825
3826
3827
3828
3829
3830
3831
3832
3833
3834
3835
3836
3837
3838
3839
3840
3841
3842
3843
3844
3845
3846
3847
3848
3849
3850
3851
3852
3853
3854
3855
3856
3857
3858
3859
3860
3861
3862
3863
3864
3865
3866
3867
3868
3869
3870
3871
3872
3873
3874
3875
3876
3877
3878
3879
3880
3881
3882
3883
3884
3885
3886
3887
3888
3889
3890
3891
3892
3893
3894
3895
3896
3897
3898
3899
3900
3901
3902
3903
3904
3905
3906
3907
3908
3909
3910
3911
3912
3913
3914
3915
3916
3917
3918
3919
3920
3921
3922
3923
3924
3925
3926
3927
3928
3929
3930
3931
3932
3933
3934
3935
3936
3937
3938
3939
3940
3941
3942
3943
3944
3945
3946
3947
3948
3949
3950
3951
3952
3953
3954
3955
3956
3957
3958
3959
3960
3961
3962
3963
3964
3965
3966
3967
3968
3969
3970
3971
3972
3973
3974
3975
3976
3977
3978
3979
3980
3981
3982
3983
3984
3985
3986
3987
3988
3989
3990
3991
3992
3993
3994
3995
3996
3997
3998
3999
4000
4001
4002
4003
4004
4005
4006
4007
4008
4009
4010
4011
4012
4013
4014
4015
4016
4017
4018
4019
4020
4021
4022
4023
4024
4025
4026
4027
4028
4029
4030
4031
4032
4033
4034
4035
4036
4037
4038
4039
4040
4041
4042
4043
4044
4045
4046
4047
4048
4049
4050
4051
4052
4053
4054
4055
4056
4057
4058
4059
4060
4061
4062
4063
4064
4065
4066
4067
4068
4069
4070
4071
4072
4073
4074
4075
4076
4077
4078
4079
4080
4081
4082
4083
4084
4085
4086
4087
4088
4089
4090
4091
4092
4093
4094
4095
4096
4097
4098
4099
4100
4101
4102
4103
4104
4105
4106
4107
4108
4109
4110
4111
4112
4113
4114
4115
4116
4117
4118
4119
4120
4121
4122
4123
4124
4125
4126
4127
4128
4129
4130
4131
4132
4133
4134
4135
4136
4137
4138
4139
4140
4141
4142
4143
4144
4145
4146
4147
4148
4149
4150
4151
4152
4153
4154
4155
4156
4157
4158
4159
4160
4161
4162
4163
4164
4165
4166
4167
4168
4169
4170
4171
4172
4173
4174
4175
4176
4177
4178
4179
4180
4181
4182
4183
4184
4185
4186
4187
4188
4189
4190
4191
4192
4193
4194
4195
4196
4197
4198
4199
4200
4201
4202
4203
4204
4205
4206
4207
4208
4209
4210
4211
4212
4213
4214
4215
4216
4217
4218
4219
4220
4221
4222
4223
4224
4225
4226
4227
4228
4229
4230
4231
4232
4233
4234
4235
4236
4237
4238
4239
4240
4241
4242
4243
4244
4245
4246
4247
4248
4249
4250
4251
4252
4253
4254
4255
4256
4257
4258
4259
4260
4261
4262
4263
4264
4265
4266
4267
4268
4269
4270
4271
4272
4273
4274
4275
4276
4277
4278
4279
4280
4281
4282
4283
4284
4285
4286
4287
4288
4289
4290
4291
4292
4293
4294
4295
4296
4297
4298
4299
4300
4301
4302
4303
4304
4305
4306
4307
4308
4309
4310
4311
4312
4313
4314
4315
4316
4317
4318
4319
4320
4321
4322
4323
4324
4325
4326
4327
4328
4329
4330
4331
4332
4333
4334
4335
4336
4337
4338
4339
4340
4341
4342
4343
4344
4345
4346
4347
4348
4349
4350
4351
4352
4353
4354
4355
4356
4357
4358
4359
4360
4361
4362
4363
4364
4365
4366
4367
4368
4369
4370
4371
4372
4373
4374
4375
4376
4377
4378
4379
4380
4381
4382
4383
4384
4385
4386
4387
4388
4389
4390
4391
4392
4393
4394
4395
4396
4397
4398
4399
4400
4401
4402
4403
4404
4405
4406
4407
4408
4409
4410
4411
4412
4413
4414
4415
4416
4417
4418
4419
4420
4421
4422
4423
4424
4425
4426
4427
4428
4429
4430
4431
4432
4433
4434
4435
4436
4437
4438
4439
4440
4441
4442
4443
4444
4445
4446
4447
4448
4449
4450
4451
4452
4453
4454
4455
4456
4457
4458
4459
4460
4461
4462
4463
4464
4465
4466
4467
4468
4469
4470
4471
4472
4473
4474
4475
4476
4477
4478
4479
4480
4481
4482
4483
4484
4485
4486
4487
4488
4489
4490
4491
4492
4493
4494
4495
4496
4497
4498
4499
4500
4501
4502
4503
4504
4505
4506
4507
4508
4509
4510
4511
4512
4513
4514
4515
4516
4517
4518
4519
4520
4521
4522
4523
4524
4525
4526
4527
4528
4529
4530
4531
4532
4533
4534
4535
4536
4537
4538
4539
4540
4541
4542
4543
4544
4545
4546
4547
4548
4549
4550
4551
4552
4553
4554
4555
4556
4557
4558
4559
4560
4561
4562
4563
4564
4565
4566
4567
4568
4569
4570
4571
4572
4573
4574
4575
4576
4577
4578
4579
4580
4581
4582
4583
4584
4585
4586
4587
4588
4589
4590
4591
4592
4593
4594
4595
4596
4597
4598
4599
4600
4601
4602
4603
4604
4605
4606
4607
4608
4609
4610
4611
4612
4613
4614
4615
4616
4617
4618
4619
4620
4621
4622
4623
4624
4625
4626
4627
4628
4629
4630
4631
4632
4633
4634
4635
4636
4637
4638
4639
4640
4641
4642
4643
4644
4645
4646
4647
4648
4649
4650
4651
4652
4653
4654
4655
4656
4657
4658
4659
4660
4661
4662
4663
4664
4665
4666
4667
4668
4669
4670
4671
4672
4673
4674
4675
4676
4677
4678
4679
4680
4681
4682
4683
4684
4685
4686
4687
4688
4689
4690
4691
4692
4693
4694
4695
4696
4697
4698
4699
4700
4701
4702
4703
4704
4705
4706
4707
4708
4709
4710
4711
4712
4713
4714
4715
4716
4717
4718
4719
4720
4721
4722
4723
4724
4725
4726
4727
4728
4729
4730
4731
4732
4733
4734
4735
4736
4737
4738
4739
4740
4741
4742
4743
4744
4745
4746
4747
4748
4749
4750
4751
4752
4753
4754
4755
4756
4757
4758
4759
4760
4761
4762
4763
4764
4765
4766
4767
4768
4769
4770
4771
4772
4773
4774
4775
4776
4777
4778
4779
4780
4781
4782
4783
4784
4785
4786
4787
4788
4789
4790
4791
4792
4793
4794
4795
4796
4797
4798
4799
4800
4801
4802
4803
4804
4805
4806
4807
4808
4809
4810
4811
4812
4813
4814
4815
4816
4817
4818
4819
4820
4821
4822
4823
4824
4825
4826
4827
4828
4829
4830
4831
4832
4833
4834
4835
4836
4837
4838
4839
4840
4841
4842
4843
4844
4845
4846
4847
4848
4849
4850
4851
4852
4853
4854
4855
4856
4857
4858
4859
4860
4861
4862
4863
4864
4865
4866
4867
4868
4869
4870
4871
4872
4873
4874
4875
4876
4877
4878
4879
4880
4881
4882
4883
4884
4885
4886
4887
4888
4889
4890
4891
4892
4893
4894
4895
4896
4897
4898
4899
4900
4901
4902
4903
4904
4905
4906
4907
4908
4909
4910
4911
4912
4913
4914
4915
4916
4917
4918
4919
4920
4921
4922
4923
4924
4925
4926
4927
4928
4929
4930
4931
4932
4933
4934
4935
4936
4937
4938
4939
4940
4941
4942
4943
4944
4945
4946
4947
4948
4949
4950
4951
4952
4953
4954
4955
4956
4957
4958
4959
4960
4961
4962
4963
4964
4965
4966
4967
4968
4969
4970
4971
4972
4973
4974
4975
4976
4977
4978
4979
4980
4981
4982
4983
4984
4985
4986
4987
4988
4989
4990
4991
4992
4993
4994
4995
4996
4997
4998
4999
5000
5001
5002
5003
5004
5005
5006
5007
5008
5009
5010
5011
5012
5013
5014
5015
5016
5017
5018
5019
5020
5021
5022
5023
5024
5025
5026
5027
5028
5029
5030
5031
5032
5033
5034
5035
5036
5037
5038
5039
5040
5041
5042
5043
5044
5045
5046
5047
5048
5049
5050
5051
5052
5053
5054
5055
5056
5057
5058
5059
5060
5061
5062
5063
5064
5065
5066
5067
5068
5069
5070
5071
5072
5073
5074
5075
5076
5077
5078
5079
5080
5081
5082
5083
5084
5085
5086
5087
5088
5089
5090
5091
5092
5093
5094
5095
5096
5097
5098
5099
5100
5101
5102
5103
5104
5105
5106
5107
5108
5109
5110
5111
5112
5113
5114
5115
5116
5117
5118
5119
5120
5121
5122
5123
5124
5125
5126
5127
5128
5129
5130
5131
5132
5133
5134
5135
5136
5137
5138
5139
5140
5141
5142
5143
5144
5145
5146
5147
5148
5149
5150
5151
5152
5153
5154
5155
5156
5157
5158
5159
5160
5161
5162
5163
5164
5165
5166
5167
5168
5169
5170
5171
5172
5173
5174
5175
5176
5177
5178
5179
5180
5181
5182
5183
5184
5185
5186
5187
5188
5189
5190
5191
5192
5193
5194
5195
5196
5197
5198
5199
5200
5201
5202
5203
5204
5205
5206
5207
5208
5209
5210
5211
5212
5213
5214
5215
5216
5217
5218
5219
5220
5221
5222
5223
5224
The Project Gutenberg EBook of ASCE 1193: The Water-Works and Sewerage of
Monterrey, N. L., Mexico, by George Robert Graham Conway

This eBook is for the use of anyone anywhere at no cost and with
almost no restrictions whatsoever.  You may copy it, give it away or
re-use it under the terms of the Project Gutenberg License included
with this eBook or online at www.gutenberg.org


Title: ASCE 1193: The Water-Works and Sewerage of Monterrey, N. L., Mexico
       The 4th article from the June, 1911, Volume LXXII,
       Transactions of the American Society of Civil Engineers.
       Paper No. 1193, Feb. 1, 1911.

Author: George Robert Graham Conway

Release Date: December 31, 2011 [EBook #38455]

Language: English

Character set encoding: ASCII

*** START OF THIS PROJECT GUTENBERG EBOOK ASCE 1193: THE WATER-WORKS ***




Produced by Juliet Sutherland, Henry Gardiner and the
Online Distributed Proofreading Team at http://www.pgdp.net






       *       *       *       *       *

Transcriber's Note: Words in italics are indicated like _this_. Subscripts
are indicated like this: H_{2}O. The original publication has been
replicated faithfully except as listed at the end of the text.

       *       *       *       *       *




                           TABLE OF CONTENTS


          INTRODUCTORY.                                    475
          THE CONCESSION.                                  476
          GEOLOGY AND TOPOGRAPHY.                          476
          POPULATION, AREA, AND MORTALITY.                 479
          RAINFALL AND TEMPERATURE.                        480
          AVAILABLE SOURCES OF SUPPLY.                     484
          MATERIALS FOR CONCRETE.                          491
          ESTANZUELA SUPPLY.                               494
          SOUTH DISTRIBUTING RESERVOIR.                    506
          SAN GERONIMO GRAVITY SUPPLY.                     514
          DISTRIBUTING RESERVOIR AT OBISPADO.              525
          COMPARISON OF SOUTH AND OBISPADO RESERVOIRS.     530
          ANALYSES OF ESTANZUELA AND SAN GERONIMO WATERS.  532
          CITY WATER DISTRIBUTION SYSTEM.                  532
          MAIN SEWERAGE SYSTEM.                            539
          MAIN OUTFALL SEWER.                              542
          SEWAGE DISPOSAL WORKS AND IRRIGATION LANDS.      545
          QUALITY OF AND RATES FOR LABOR.                  552
          COST OF WORKS.                                   552
          TARIFFS AND SANITARY REGULATIONS.                553
          ENGINEERS, ETC.                                  556
          DISCUSSION.                                      557
          JAMES D. SCHUYLER.                               557
          DAVID T. PITKETHLY.                              559
          V. SAUCEDO.                                      563
          GEORGE T. HAMMOND.                               567
          RUDOLF MEYER.                                    576
          GEORGE ROBERT GRAHAM CONWAY.                     580




                   AMERICAN SOCIETY OF CIVIL ENGINEERS

                           INSTITUTED 1852

                             TRANSACTIONS

                            Paper No. 1193

                    THE WATER-WORKS AND SEWERAGE OF
                       MONTERREY, N. L., MEXICO.[1]

            BY GEORGE ROBERT GRAHAM CONWAY, M. AM. SOC. C. E.

     WITH DISCUSSION BY MESSRS. JAMES D. SCHUYLER, DAVID T. PITKETHLY,
         GEORGE S. BINCKLEY, VICENTE SAUCEDO, GEORGE T. HAMMOND,
             RUDOLF MEYER, AND GEORGE ROBERT GRAHAM CONWAY.




                              INTRODUCTORY.


[1] Presented at the meeting of February 1st, 1911.

Monterrey, the Capital of the State of Nuevo Leon, Mexico, is built on
the site of the old village of Santa Lucia de Leon, which was
established in 1583 by the Governor of the Kingdom of Leon, Don Luis
Carabajal. Four years later Carabajal was imprisoned by the Inquisition,
and the village of Santa Lucia was abandoned by its few inhabitants.

In 1596, Captain Diego Montemayor, a resident of Saltillo, in the
adjoining State, wishing to render a service to his king, Philip II of
Spain, assembled his friends, and on September 20th of that year,
proceeded to establish a town on the site of the old village on the
northern side of the principal spring at the place. The town was named
"Nuestra Senora de Monterrey" (Our Lady of Monterrey), after the Count
of Monterrey (Ojos de Santa Lucia y Valle de Extremadura), the ruling
Governor of New Spain, as Mexico was then called.

Monterrey is approximately in the center of the State of Nuevo Leon, 1 deg.
12' west of Mexico City, and in latitude 26 deg. 40' N. It is a distributing
railway center on the main line of the National Railroad, 270 km. from
the Rio Grande at Laredo, 1,022 km. from Mexico, and 520 km. from
Tampico by the Mexican Central Railway. It is the center of many large
industries, and is the second largest manufacturing city in the
Republic.




                            THE CONCESSION.


The works described in this paper were carried out under a guaranteed
concession granted by His Excellency, General Bernardo Reyes, Governor
of the State of Nuevo Leon, to Messrs. James D. Stocker and William
Walker, of Scranton, Pa. The concession is dated October 19th, 1904, and
is for 99 years from that date; the works for a complete water and
drainage system were to be finished in 3 years from the time of their
commencement. Before the works were designed and begun, the concession
was acquired by Mr. William Mackenzie, of the firm of Mackenzie, Mann
and Company, Limited, of Toronto, Ont., Canada, who, on May 4th, 1906,
organized the Monterrey Water-Works and Sewerage Company, Limited
(Compania de Servicio de Agua y Drenaje de Monterrey, S. A.), under the
laws of the Dominion of Canada, of which company he is President. Mr.
Mackenzie is also President of the Monterrey Railway, Light, and Power
Company, Limited, which was constructing the street railways of
Monterrey concurrently with the water-works. Under the provisions of the
concession, the Government appointed a Financial Interventor, who had
authority to examine and check the company's expenditures, and also a
Technical Inspector to examine and report on the construction. The
duties of these officials also apply to the operation of the system when
the construction is finished. The Government has the right, after the
system has been operated 40 years, to purchase the entire property,
subject to 6 months' notice, for a sum equal to 16-2/3 times the average
annual net proceeds during the 3 preceding years. This right may be
exercised at the end of 40 years, or at the end of any 10-year period
thereafter, up to 99 years from the commencement of operations.




                         GEOLOGY AND TOPOGRAPHY.


Monterrey lies in a plain at the foot of the Eastern Sierra Madre
Mountains which constitute the eastern margin of the Mexican Cordilleran
Plateau, and is surrounded by the magnificent mountains of that group,
among the most notable of which are the beautiful Mitra and Silla
Mountains. In the neighborhood of Monterrey these mountains attain
heights of from 2,000 to 2,400 m., and are noted for their broken and
jagged sky-lines. The leading geological characteristics of the district
are the uplifted limestones of the older cretaceous age which form the
main mass of the mountains.

Primarily, the mountains are compressional folds which, in the Sierra
Madre, near Monterrey, are close and vertically compressed.[2] The
drainage areas of the Santa Catarina River, which flows through
Monterrey, and of the Estanzuela and Silla Rivers, its tributaries, are
of limestone and shale; originally the shales were above the limestone,
but the convulsion which formed the Sierra Madre as an anticlinal fold,
left the originally horizontal strata standing nearly upright, and
subsequent erosion in the upper part of the anticline has exposed nearly
vertical strata in many places. The limestone being hard and resisting
erosion, there is generally, along the line of contact, an abrupt drop
vertically on the face of the limestone to the shale below. In many
places this abrupt drop is broken by a limestone talus, but the line of
contact can generally be traced. Mining operations in these mountains
have revealed the presence of large caves at a considerable elevation,
many of which contain large reservoirs of water, delivered to them
through numerous faults. The river valleys are formed of masses of
limestone conglomerate and coarse gravels, re-cemented in many cases by
the lime deposits of the flowing waters. One of the chief
characteristics of the subsoil of Monterrey itself is a local rock
called "sillar," which is a superficial deposit of carbonate of lime
from the evaporated waters. In some places the "sillar" is largely mixed
with a conglomerate called "tepetate," or "impure sillar."

[2] _Transactions_, Am. Inst. Min. Engrs., Vol. XXXII (1902), pp.
163-178.

[Illustration: PLATE II.--GENERAL PLAN OF THE WATER SUPPLY AND DRAINAGE
WORKS FOR MONTERREY, N. L., MEXICO.]

Topographically, the region around Monterrey is distinguished by the
drainage area of the River Santa Catarina, which rises in the Sierra
Madre near the Laguna de Sanchez, at an elevation of 1,850 m., as shown
on Plate II. From this Laguna it follows a tortuous course between
precipitous mountains through the Boca of Santa Catarina to Monterrey,
for a distance of 90 km., eventually finding its way to the San Juan
River, a tributary of the Rio Grande. Throughout its course it
disappears, flows underground, and again appears; and, except in flood
time, it has a subsurface flow for a distance of 16 km. above the city.
In the Canon of Santa Catarina it appears at the surface, having a
normal flow of about 1,415 liters (50 cu. ft.) per sec., and its waters
at that point are divided into two parts and carried into irrigation
canals. The drainage area of the river above Monterrey is 1,410 sq. km.,
and its bed at Monterrey is between 518 and 545 m. above sea level.

Southward from Monterrey the country rises along the valley of the Silla
for a distance of 19 km., where the Silla is separated from the San Juan
by a low divide, the former flowing northward to Monterrey and the
latter southeastward toward Allende. The Silla Valley is bounded on the
east and west by the steep ranges of the Silla and Sierra Madre
Mountains. The floor of this valley is gently rolling, but is cut by
many arroyos which carry little or no water during the greater part of
the year. The chief feeder of the Silla River is the Estanzuela, a
stream which derives its waters from several springs coming to the
surface near the line of contact between the limestone and the shale, at
elevations of about 800 and 900 m.[3] above datum. The water-shed of
this stream is rich with abundant vegetation due to the precipitation
being greater than on the Santa Catarina water-shed. To the south of the
divide the country is well wooded, and El Porvenir, 35 km. from
Monterrey, is the garden spot of the State of Nuevo Leon. Here the
rainfall is much greater than at any other point near Monterrey, and
there are many streams which are used for irrigation purposes. Monterrey
is built on a plain, chiefly on the north side of the Santa Catarina
River. This plain has a general fall toward the northeast, and beyond
the city it slopes gently northward for several miles toward the Topo
Grande River, and then southeastward to join the great coastal plain of
the Gulf of Mexico. The general elevation of the city lies between the
519- and 550-m. contours. The Plaza Zaragoza, in the center of the city,
is 533.90 m. above sea level; the elevation of the highest part of the
city, at the western boundary, is 550.05 m., and of the lowest part, at
the northeastern boundary, 518.0 m. above sea level.

[3] Throughout this paper datum refers to the height in meters above the
mean sea level of the Gulf of Mexico at the Port of Tampico.

[Illustration: PLATE III, FIG. 1.--GENERAL VIEW OF LINE, ESTANZUELA
AQUEDUCT.]




                    POPULATION, AREA, AND MORTALITY.


The population of Monterrey has increased as follows:

                  Census of   1851      14,621
                    "  "      1861      26,000
                    "  "      1871      33,811
                    "  "      1881      39,456
                    "  "      1891      41,154
                    "  "      1901      73,508
                  (Estimated) 1909      86,000 to 90,000

The greatest progress, it will be noted, was between 1891-1901, with an
increase of more than 22,000 in 10 years. In designing the new works,
provision has been made for the future requirements of a city of 200,000
persons.

The actual area within the city limits proper is 960.5 hectares (2,374
acres), forming the area to be provided with water and drainage, but the
municipal district extends to many surrounding suburbs, and covers an
area of 33,758 hectares (83,426 acres).

        TABLE 1.--POPULATION AND DEATH RATE OF MONTERREY, N. L.,
                  MEXICO, FROM 1901 TO 1909, INCLUSIVE.

  ============+========+=========+========+=========================|
              |        |         |        |DEATHS FROM TYPHOID FEVER|
              | Popu-  | Deaths  | Rate   +----+----+----+----+-----+
     Year.    |lation. |from all |  per   |    |    |    |    |     |
              |        | causes. | 1,000. |Jan.|Feb.|Mar.|Apr.|May. |
              |        |         |        |    |    |    |    |     |
  ------------+--------+---------+--------+----+----+----+----+-----+
  Census 1901 | 73,508 |   2,965 |  40.3  |  0 |  2 |  1 |  3 |  4  |
  Estim. 1902 | 74,500 |   3,338 |  44.8  |  1 |  4 |  2 |  3 |  6  |
     "   1903 | 76,000 |   3,825 |  50.3  |  3 |  2 |  4 |  1 |  0  |
     "   1904 | 77,500 |   2,905 |  37.4  |  0 |  1 |  1 |  5 |  3  |
     "   1905 | 79,000 |   2,951 |  37.4  |  2 |  0 |  0 |  3 |  3  |
     "   1906 | 80,000 |   2,935 |  36.7  |  1 |  2 |  1 |  3 |  3  |
     "   1907 | 82,500 |   3,269 |  39.6  |  4 |  6 |  3 |  3 |  5  |
     "   1908 | 84,000 |   3,188 |  37.9  |  5 |  2 |  5 |  3 |  8  |
     "   1909 | 86,000 |[4]3,477 |  40.4  |  5 |  1 |  4 |  5 | 13  |
  ============+========+=========+========+====+====+====+====+=====+

  ============+=========================================+==============+
              |  DEATHS FROM TYPHOID FEVER. (Continued) | Deaths from  |
              |----+----+----+----+----+----+----+------+ Typhoid fever|
  Year.       |    |    |    |    |    |    |    |Total | per year per |
              |Jne.|Jly.|Aug.|Sep.|Oct.|Nov.|Dec.|for   | 100,000      |
              |    |    |    |    |    |    |    |year. | population.  |
  ------------+----+----+----+----+----+----+----+------+--------------+
  Census 1901 |  3 |  6 |  6 |  3 |  6 |  4 |  2 |   40 |     54       |
  Estim. 1902 |  5 |  3 |  1 |  1 |  2 |  3 |  5 |   36 |     48       |
     "   1903 |  5 |  3 |  5 |  6 | 16 |  3 |  1 |   49 |     64       |
     "   1904 |  3 |  3 |  4 |  1 |  5 |  1 |  0 |   27 |     35       |
     "   1905 |  7 |  6 |  3 |  2 |  7 |  2 |  2 |   37 |     47       |
     "   1906 |  6 |  5 |  3 |  2 |  1 |  2 |  3 |   32 |     40       |
     "   1907 |  6 |  4 |  4 |  9 |  3 |  0 |  3 |   50 |     61       |
     "   1908 |  5 |  9 |  7 |  2 |  7 |  4 |  0 |   57 |     68       |
     "   1909 | 11 | 15 | 12 |  6 |  8 |  3 |  4 |   87 |    101       |
  ============+====+====+====+====+====+====+====+======+==============+

[4] Excluding deaths due to drowning in the great flood of August 27th
and 28th.

Table 1 gives particulars of the death rate for 1901 to 1909, inclusive,
and data relative to the mortality due to typhoid fever. The high death
rate is caused by the excessive infantile mortality, which is so
prevalent throughout the whole of Mexico. The climatic condition of
Monterrey, with its exceptionally healthy subsoil, ought to make it one
of the healthiest of cities, if proper care were taken to enforce
sanitary laws. The data regarding typhoid mortality are probably
understated, as they were compiled by the writer, in the absence of any
official publications, from the actual death certificates, but no
special care is taken by the authorities to insure accuracy in such
certificates. Attention is called to the typhoid rate in May, June,
July, and August, 1909; this high rate coincides with a scarcity of
rainfall and the greatest period of drought experienced in 30 years, and
immediately precedes the great flood of August 27th. It was probably due
to the lowering of the ground-water throughout the city and the
consequent contamination of the private wells, which were largely in use
during that time. Throughout the city the wells are sunk to a depth of
about 12 or 15 m., in order to reach the subterranean waters, and the
cesspools are often in dangerous proximity to them and at a much higher
level. The nature of the subsoil, which is often much fissured and open
in the conglomerate and sillar strata, would make the passage of
contamination an easy matter, and this alone would account for a high
mortality due to water-borne diseases.




                       RAINFALL AND TEMPERATURE.


The precipitation records of Monterrey and its neighborhood are very
meager, and cannot be relied on for a longer period than from 1894 to
1909, inclusive. The records are available from 1886, but in the early
years there are many apparent discrepancies, and they are probably
inaccurate. The average rainfall for the 15 years (1894-1908) is 21.94
in.; the driest years for this period are as follows: 1894, 14.14 in.;
1902, 15.29 in.; 1907, 15.23 in.; 1908, 15.11 in. Assuming the early
records to be correct, the average rainfall for the period, 1886-1908,
would be 19.86 in.

At Saltillo, which is 50 miles due southwest, at an elevation of about
1,520 m. above sea level, the average rainfall for the 23 years,
1884-1908, inclusive, is given as 21 in. The maximum year was 1889, with
33-1/2 in., and the minimum 1903, with 7-1/2 in.

At Carmen, in the State of Tamaulipas, 144 km. southwest of Monterrey,
at an elevation of about 310 m. above sea level, the average fall for 12
years is 24.70 in., the maximum year being 1897, with a fall of 34.09
in., and the minimum year, 1905, with 13.41 in.

[Illustration: FIG. 1.--ANNUAL RAINFALL IN MONTERREY COVERING THE PERIOD
FROM 1894 TO 1909.]

Fig. 1 shows the annual variation of rainfall at Monterrey for
1894-1909. Fig. 2 shows the monthly variation during the same period,
and gives the minimum, average, and maximum for each month.

From these diagrams it will be seen that the months of least rainfall
are December, January, February, and March, with averages of 0.66, 0.59,
0.79, and 0.93 in., respectively. The months of greatest rainfall are
August, with an average of 4.39 in., and September with 4.87 in. The
maximum in any month prior to 1909 was 16.75 in., during September,
1904.

_Rainfall in 1909._--The rainfall in 1909 was unprecedented, causing the
disastrous flood in the Santa Catarina River, which will be referred to
when describing the works. Fig. 3 shows the monthly rainfall for 1906 to
1909, inclusive, and has been plotted to show the variation of rainfall
prior to the great precipitation of August, 1909. In that month there
were two heavy falls, one beginning at midnight on August 9th, and
during the following 42 hours a fall of 13.28 in. was recorded by the
gauge at the Water-Works Company's general offices, 10.20 in. of which
fell, during the first 24 hours. From 6 P. M. to 11 P. M., on August
10th, 5.019 in. were recorded, or an average of 1 in. per hour.

[Illustration: FIG. 2.--MONTHLY RAINFALL IN MONTERREY COVERING THE
PERIOD FROM 1894 TO 1909 INCLUSIVE.]

[Illustration: FIG. 3.--MONTHLY VARIATION OF RAINFALL AT MONTERREY
1906-1907-1908-1909.]

After 13 dry days, another rainstorm began, at 4 P. M., on August 25th,
and continued more or less intermittently until August 29th. During this
98-hour period there was an additional fall of 21.61 in., 11.27 in.
falling in 24 hours.

The total precipitation during the month amounted to 36.00 in. The
highest previous record for the month of August was in 1895, with a fall
of 6.61 in. Fig. 4 gives the details of the two heavy precipitations in
August. As no automatic recording gauge was available, the maximum
intensity could only be computed approximately, owing to the
intermittent character of the readings taken from the ordinary rain
gauge on the roof of the Water-Works Company's office in the city. From
the readings thus obtained, it was shown that the maximum intensity
occurred early on the morning of the 28th, and was nearly 2 in. per
hour. Above Monterrey, in the Santa Catarina water-shed, it is believed
that the precipitation was considerably greater, but no gauges were
accessible during the month.

[Illustration: FIG. 4.--CURVE OF RAINFALL AT MONTERREY DURING AUGUST
10TH & 11TH AND FROM AUGUST 25TH TO 29TH - 1909.]

The total rainfall for 1909 amounted to 47.46 in., of which 75% fell in
August. This is 50% greater than the previous highest annual record
(31.65 in. in 1900) for Monterrey.

_Temperature._--Fig. 6 gives a record of the temperature at Monterrey
from 1901 to 1909, inclusive. These records were taken at an altitude of
520 m. It will be noted that the lowest recorded temperatures are in
January and February. The lowest during these years was 24 deg. Fahr., in
January, 1905. The monthly maxima vary between 80 and 110 deg. Fahr. The
mean annual temperature is 72.65 deg. Fahr. (The mean annual barometer is
28.2 in.)

[Illustration: FIG. 6.--DIAGRAM OF TEMPERATURE VARIATION AT MONTERREY,
1901-09.]




                       AVAILABLE SOURCES OF SUPPLY.


The question of the best sources from which Monterrey should be supplied
with potable water was one that had been long under discussion, and was
the subject of many investigations prior to the granting of the present
concession. Several of the original schemes called for an impounding
reservoir in the Canon of Santa Catarina and it was on the assumption
that a dam would be built that a clause was inserted in the concession
for the purpose of making its construction obligatory. The general
character of the physical and geological conditions surrounding
Monterrey has already been referred to. A thorough study of these
conditions proved that no suitable site for impounding the Santa
Catarina River could be found, apart from the fact that periodically
this river is subject to enormous floods which tear through the steep
canon with tremendous velocity.

At the site originally proposed for the dam, a considerable underflow
was found, and later investigations, carried out under the present
concession, proved that, although borings were carried to a depth of 54
m., bed-rock could not be found, the strata being composed of gravels,
conglomerate and sand. Assuming that such a dam could have been built,
the quality of the water draining from a comparatively barren
water-shed, on which many thousands of goats are pastured, would have
made its filtration an absolute necessity before it could be delivered
to the consumers.

The various available sources from which water could be delivered to the
city by gravity were investigated by Mr. F. S. Hyde, in the autumn of
1905, and also by J. D. Schuyler, M. Am. Soc. C. E., who was afterward
retained as Consulting Engineer for the Company. The various
investigations made from time to time showed that the question of a
satisfactory supply was one of extreme difficulty, requiring prolonged
observation and study, more particularly into the character of the
underground sources of supply.

One of the chief characteristics of many of the streams in the State of
Nuevo Leon, is their disappearance and reappearance at different points
along their routes, and the Santa Catarina River, under normal
conditions, as already remarked, is a very notable example of a river
which is very dry at the surface for many kilometers of its length. In
the writer's opinion, the waters of this and similar rivers in the State
pass through many open caverns underground, so that experience gained in
the investigation of underflow waters in other places would be
insufficient to determine the quantity passing at any point along the
river if ascertained by merely computing it from the velocity of the
underflow and the area of the water-bearing gravels. The rainfall on the
water-shed of the Santa Catarina River is probably 25% greater than at
Monterrey, and all ordinary rains sink rapidly into the limestone soils
and quickly disappear. In another water-shed of a very similar
character, namely, that of the Rio Blanco, in the southern part of the
State, the underflow waters appear at the surface at a place called
Mezquital, where a metamorphosed sandstone barrier prevents them from
disappearing underground. At this point the normal quantity of water is
about 5,660 liters (200 cu. ft.) per sec., but it gradually disappears,
and a few kilometers below it has sunk to an insignificant stream,
finally disappearing altogether for about 20 km. In the neighborhood of
Monterrey similar conditions exist with regard to the surface-water
supplies, and investigations, therefore, were directed toward obtaining
unpolluted supplies from springs and underground sources.

_Santa Catarina Sources._--The chief points from which it was thought
desirable to obtain underflow supplies were (1) at the barrier of San
Geronimo, and (2) at the Canon of Santa Catarina, both shown on Plate
II.

Conditions at San Geronimo, which is only 6-1/2 km. west of Monterrey,
were investigated by the State Government in 1892, to determine the
depth of bed-rock, the rock on either side of the valley being shale,
with its original bedding planes standing almost vertical. To determine
this depth, borings were made by driving 2-in. tubes until it was
assumed that bed-rock had been reached, a method which, in strata
containing so many boulders, was obviously unreliable. These borings
indicated that bed-rock was from 12 to 15 m. below the surface. If these
had proved to be correct, there is no doubt that a development of the
underground water at this point, by constructing a submerged dam
combined with an infiltration gallery, would have yielded a large
supply.

In March, 1906, the Company commenced operations at San Geronimo by
sinking a well a few meters north of the then dry bed of the river.
Water was found in considerable quantities a few meters below the
surface, practically at the level of the river, that is, 570 m. above
datum. This supply was used for provisional purposes, and will be
referred to later in describing the San Geronimo gravity supply works.

Between August, 1906, and January, 1907, 4-in. bore-holes were sunk in
the river bed and on the high ground to the north with a "Keystone"
driller outfit. These borings showed bed-rock immediately under the
river bed, at a depth of from 15 to 45 m., but dipping gradually as the
borings were carried northward.

Boring operations were also carried on at Santa Catarina, during
November and December, 1906, and in January, 1907, to determine the
geological conditions, and the results are shown on Fig. 7. From the
area of water-bearing gravels found, it was proposed to tap the
underflow water at the 630-m. level by an infiltration gallery. This
would have necessitated a gravitation tunnel 3,000 m. long, and an
aqueduct of 14 km., which it was proposed to carry to one of two
distributing reservoirs at Guadalupe, on the south side of the river,
opposite Monterrey. In May, 1907, the writer, after making a study of
all the available data which had been accumulated, had additional
borings sunk farther across the valley to the north, and these revealed
a considerable area of water-bearing gravels, and proved that, in former
geological times, the Santa Catarina flowed about 500 m. north of its
present position, and to the back of Obispado Mountain, instead of
through the city. This aspect of the subject was discussed with Mr.
Schuyler, who agreed with the writer that, in the interest of economy,
it was better to tap this supply by an infiltration gallery at the
560-m. level, and bring the water thus obtained to a reservoir to be
placed at the western limits of the city, dividing the city, for
distribution purposes, into two interchangeable systems, a high- and a
low-pressure, the high-pressure system being supplied from Estanzuela,
18 km. south of the city. One advantage to be gained from this change
was that the scheme was capable of considerable extension, and any
future developments at Santa Catarina Canon would form part of the works
to be constructed for both high- and low-pressure districts.

[Illustration: FIG. 7.--CROSS-SECTION OF SANTA CATARINA RIVER AT SANTA
CATARINA.]

The future extension of the Santa Catarina sources, the writer believes,
can be developed best by driving an infiltration gallery 10 m. below the
surface of the Santa Catarina River, a little west of the village of the
same name, and then conveying the water through a comparatively short
gravitation tunnel and pressure conduit to a main reservoir near San
Geronimo having a top water level at an elevation of about 590 m. above
datum.

_Southern Sources of Supply._--The available sources of supply southward
from Monterrey include a number of springs at various points in a
distance of 40 km. Many of these springs are of uncertain quantity, and
some are quite dry during periods of drought. The chief perennial
springs near Monterrey are those which contribute to form the Estanzuela
and Diente Rivers, both tributaries of the Silla, while farther south,
at the Potrero Cerna, near El Porvenir, there are excellent springs, at
a considerable elevation, with a minimum flow of from 170 to 200 liters
(from 6 to 7 cu. ft.) per sec. The total quantity of water available
from all these springs during the driest season would probably not be
less than about 560 or 700 liters (from 20 to 25 cu. ft.) per sec.

The Estanzuela springs issue at the foot of the Sierra Madre Mountains,
and have a normal flow of from 56 to 85 liters (2 to 3 cu. ft.) per sec.
in an ordinary dry year; they probably derive their water, through the
limestone formation, from the neighboring water-shed of Santa Catarina,
as the catchment area of the stream is only 910 hectares, and the stream
has never been known to fail, even in the driest periods of prolonged
drought. The rainfall on the area is about 30 in. per annum, and the
catchment area is well wooded and covered with abundant vegetation. The
El Diente springs have an ordinary dry-weather flow of about 28-1/2
liters (1 cu. ft.) per sec.; but part of the water is carried
underground, and the real quantity is much greater and could be
developed by a small submerged dam carried down to bed-rock.

The elevation and the extreme purity of the water of the Estanzuela
River made its acquisition very desirable, and the Company, therefore,
purchased the Federal water rights owned by various members of the
Estanzuela community, amounting to 91 liters per sec., and has since
acquired a Federal concession to all the flood-waters of that river. It
was decided, therefore, to adopt the Estanzuela River as the first step
toward developing the water to the south of Monterrey for a
high-pressure supply, the advantage of the scheme being that from time
to time extensions could be made to tap other sources by gravity, as the
demands of the city required. The Estanzuela scheme, therefore, is a
preliminary step toward future extensions which will be necessary in
this direction as the city grows. The springs near El Porvenir, and
others which contribute to the San Juan River, can be tapped at a
sufficiently high level to convey them by a gravity pressure line to the
Estanzuela Aqueduct near Mederos.

The two sources definitely decided on in July, 1907, were those from
Estanzuela and San Geronimo. The works were designed to supply
40,000,000 liters daily, which it was assumed would be sufficient for
all future developments for a population of 200,000 at a per capita
consumption of 200 liters per day. The present requirements of the
city's population, assuming that all the water was supplied by the
Company, would be, at that rate, which is a very liberal one, only
18,000,000 liters daily. This, it was thought, would be easily met by
the San Geronimo source alone, as it was estimated that it would provide
not less than 20,000,000 liters, if the infiltration gallery was driven
far enough into the water-bearing gravels.

The question of a high-pressure water supply for domestic use in a city
like Monterrey is not a serious one, as practically nine-tenths of the
houses are of one story. The increase in the number of large commercial
buildings, however, will make the demand greater in the future, and this
point has been kept in mind in arranging the division of the
distribution systems.




                         MATERIALS FOR CONCRETE.


_Cement._--In the early stages of construction the cement for the work
was obtained from the Associated Portland Cement Manufacturers, Limited,
of London, which supplied the "Pyramid" brand, from the Knight, Bevan,
and Sturges Works, but later the supply was obtained from a new factory
at Hidalgo, near Monterrey. The total quantity of Portland cement used
was 42,500 bbl. of "Pyramid" and 32,500 bbl. of "Hidalgo." The English
cement was tested for the Water-Works Company in London before shipment
and again at Monterrey, to conform to the British Standard
Specifications; the "Hidalgo" cement was required to pass the Standard
Specifications advocated by the Special Committee of the American
Society of Civil Engineers. The quality in each case was of the very
highest, no difficulties being experienced at any time.

_Sand and Rock._--One of the chief difficulties in connection with the
construction work in its initial stages was in procuring satisfactory
sand for the concrete. An investigation of the quality of all the
available sands in the neighborhood of Monterrey resulted in the
decision to use a manufactured sand obtained from the calcareous shales
in the foot-hills opposite the city, on the south side, and near the
site of one of the proposed reservoirs. A quarry was opened, and the raw
material was delivered by a gravity plane to a crushing plant, 230 m.
from the quarry and at a level about 50 m. lower.

The plant consisted of a No. 5 Austin gyratory rock-crusher, fitted with
elevators and revolving screens of various dimensions, driven by a
150-h.p. Erie steam engine; two sets of Traylor's heavy-duty crushing
rolls, one having 30 by 16-in. and the other 18 by 12-in. rolls; and a
Niagara sand disintegrator. This plant, except during a short period
when the requirements were beyond its capacity, was able to produce all
the sand and rock required for construction purposes. More than 40,000
tons of rock were quarried, the greater part of which was converted into
crushed stone and sand.

Table 2 gives the chemical analysis of the chief constituents of the
various sands examined.

   TABLE 2.--ANALYSIS OF SANDS IN THE NEIGHBORHOOD OF MONTERREY.

              KEY:

              A: Percentage of silica (absolute), SiO_{2}
              B: Percentage of alumina, Al_{2}O_{3}
              C: Percentage of sesquioxide, Fe_{2}O_{3}
              D: Percentage of lime carbonate, CaCO_{3}

  ===+============================+=======+=======+=======+=======+
  No.| Location.                  |   A   |   B   |   C   |   D   |
  ---+----------------------------+-------+-------+-------+-------+
   1.| Arroyo Seco, near          |       |       |       |       |
     |   brickyard at Monterrey   | 60.10 |17.95  |  2.89 |  8.01 |
   2.| Arroyo Seco, near          |       |       |       |       |
     |   brickyard at Monterrey,  |       |       |       |       |
     |   No. 2                    | 42.92 |14.26  |  4.66 | 34.58 |
   3.| Near Garcia Station,       |       |       |       |       |
     |   Mexican National R. R.,  |       |       |       |       |
     |   Chiquito River, No. 1    | 50.22 | 9.72  |  1.44 | 34.62 |
   4.| Near Garcia Station.       |       |       |       |       |
     |   Mexican National R. R.,  |       |       |       |       |
     |   Chiquito River, No. 2    | 48.7  | 4.92  |  8.28 | 35.43 |
   5.| San Luis Potosi            | 85.02 | 5.00  |  7.38 |  2.21 |
   6.| Topo Grande, Pesqueria     |       |       |       |       |
     |   River                    | 40.20 | 5.15  |  4.25 | 46.50 |
   7.| Hornos, near Torreon       | 77.9  | 13.1  |  2.4  |  4.9  |
   8.| Salinas River, at Salinas  | 41.5  |  5.7  |  1.4  | 48.2  |
   9.| Pits near Caballeros, on   |       |       |       |       |
     |   Tampico Branch of        |       |       |       |       |
     |   Mexican Central R. R.    | 73.4  |  5.6  |  4.4  | 10.1  |
  10.| Santa Catarina River,      |       |       |       |       |
     |   near San Geronimo        |       |       |       |       |
     |   (washed sand)            | 12.40 |  2.06 |  1.14 | 81.70 |
  11.| Santa Catarina River,      |       |       |       |       |
     |   at Monterrey             | 17.4  |  2.50 |  2.00 | 77.00 |
  12.| Composition of rock, quarry|       |       |       |       |
     |   in foot-hills opposite   |       |       |       |       |
     |   Monterrey, Monterrey     |       |       |       |       |
     |   Water-Works and Sewer    |       |       |       |       |
     |   Company's property       | 40.44 | 15.70 |  2.20 | 34.30 |
  13.| Manufactured sand from     |       |       |       |       |
     |   above quarry             |       |       |       |       |
     |   (run of crusher)         | 51.80 | 12.14 |  8.7  | 32.6  |
     |                            |       |       |       |       |
  ===+============================+=======+=======+=======+=======+

The chief sands used for ordinary building purposes in Monterrey are
Nos. 10 and 11, which are procured from the bed of the Santa Catarina
River. As these sands contain large proportions of lime carbonates,
which make them very undesirable for important structures, their use was
limited to relatively unimportant work. The best sands procurable were
Nos. 5 and 9, but the long distance of the pits from Monterrey, and
consequently the heavy freight rate, made their use prohibitive on
economical grounds. The best of the available sands, although it was
very fine, was No. 7, from Hornos, near Torreon, as it could be depended
on for uniformity and could be obtained f. o. b. cars at Monterrey for
3.18[5] pesos per ton.

[5] All costs given in this paper are in Mexican pesos, one peso being
equivalent to 50 cents in U. S. currency.

The bulk of the sand and crushed rock used was similar to Nos. 12 and
13, and reference to the cement sand tests in Table 3, will show that
the manufactured sands gave very satisfactory results.

Table 3 gives the average tests made with the "Hidalgo" cement and
various sands, alone and in combination, for the purpose of obtaining
comparative results; the mixtures tested were composed of 3 parts of
sand to 1 of cement.

        TABLE 3.--TESTS OF "HIDALGO" CEMENT WITH VARIOUS SANDS.

      =====================================+============+============
                     Sand.                 | At 7 days. | At 28 days.
      -------------------------------------+------------+------------
      Ottawa (Standard)                    |  305 lb.   |  414 lb.
      Monterrey, 1-1/2 parts, }            |            |
      Hornos, 1-1/2 parts     }            |  188  "    |  313  "
      Monterrey                            |  253  "    |  365  "
      Hornos                               |  202  "    |  301  "
      Manufactured sand, Company's crusher |  372  "    |  566  "
      Hornos, 2 parts,     }               |            |
      Crusher sand, 1 part }               |  231  "    |  352  "
      Hornos, 1-1/2 parts,      }          |            |
      Crusher sand, 1-1/2 parts }          |  265  "    |  346  "
      Hornos, 1 part,        }             |            |
      Crusher sand, 2 parts  }             |  248  "    |  328  "
      =====================================+============+============

The Hornos sand was used during a few weeks in the latter part of 1908,
when the crusher was unable to produce all that was required. Its use
was restricted to thick walls which were required to be water-tight, and
it was always used in equal proportions with the crusher dust.




                           ESTANZUELA SUPPLY.


[Illustration: FIG. 8.--LOCATION PLAN OF ESTANZUELA DAM.]

_Intake Works._--The intake (Fig. 8) is about 1 km. below the lowest
spring and at a point where the maximum flow of the stream was observed.
The works consist of a small monolithic concrete dam, placed obliquely
across the stream at an angle selected for the purpose of obtaining a
foundation running parallel to the direction of the strata, which at
this point were lying almost vertically across the bed of the stream.
Above these strata the stream bed was formed chiefly of large cemented
limestone blocks and smaller conglomerate. No storage being possible in
this valley, which has a very precipitous fall, the height of the dam
was fixed merely to obtain a small settling basin for sand and debris
brought down in time of flood. The dam foundation was excavated to
bed-rock, from which the upper disintegrated portions were carefully
removed; the rock was then stepped, and dovetailed recesses were left
for properly bonding the concrete.

The dam is carried well into the banks. Its extreme length is 52 m., its
maximum height 4.50 m., and its greatest thickness 2 m. The up-stream
face has a batter of 1 in 12, and the down-stream face, 1 in 8. The top
of the wall is 1 m. thick. For the discharge of flood-water there is a
weir 10 m. long, and it was calculated that with a depth of 1 m. it
would discharge about 400 times the ordinary flow, or about 23,000
liters per sec., but, in addition, the whole length of the dam
(excluding that occupied by the gate-house) was arranged for the
discharge of abnormal floods, one of which, on August 27th, reached the
enormous quantity of 82,070 liters (2,900 cu. ft.) per sec., or 825 cu.
ft. per sec. per sq. mile of drainage area, a remarkable run-off from so
small an area as 910 hectares. The concrete forming the dam is a 1:3:5
mixture. The overflow sill is 692 m. above sea level. When the dam was
completed it was filled to the overflow level, in order to test the
water-tightness of the basin, which, when cleared, was found to be
slightly fissured on the north side. The leakage was sufficient to cause
a serious loss during periods of drought, and it was then decided to
line the basin with concrete, so that the stream would enter it without
being under a head greater than its own depth. The length of the basin,
measured along the center line of the original stream surface, is 85 m.,
and its area is 1,100 sq. m. At its upper end it is merely a lined
channel, 5 m. wide at the entrance. The floor of the basin has a fall of
4 m. The lining was formed in two thicknesses totaling 30.5 cm. (12
in.) of 1:2-1/2:3-1/2 concrete, laid in panels approximately 3 m.
square, the upper panels breaking joint with those immediately below; in
this way a very satisfactory and water-tight lining was obtained. A
parapet wall, 45.7 cm. high, surrounds the basin. For scouring out the
basin a 30.5-cm. (12-in.) cast-iron pipe was taken through the dam at
the lowest point, this pipe being provided with a gate-valve encased in
concrete on the down-stream face.

The gate-house was built in connection with the dam at the north end of
the overflow weir, its inner dimensions being 4.34 by 2.80 m. The
substructure, to the level of the dam, is of concrete founded on the
solid rock, and the superstructure is of brick rendered with cement
plaster. The roof is of framed timber with red French tiles.

The intake pipe is of cast iron. 40.6 cm. (16 in.) in internal diameter,
fitted outside with a movable copper screen which is further protected
by a wrought-iron hinged screen to prevent damage from stones, floating
timber, etc., during times of flood. Inside the gate-house the outlet
pipe is provided with a 40.6-cm. (16-in.) sluice-valve, operated from
the floor level by a vertical head-stock with worm-gearing. The
gate-house has a scour-out pipe (also operated by a head-stock) and
duplicate copper screens fitted to iron frames. From this house the
water is conveyed to the upper portion of the conduit, which is a
45.7-cm. (18-in.) cast-iron pipe.

Of the total area of land, 885 hectares (2,187 acres), owned by the
company, 392 hectares (970 acres) have been fenced in, to prevent any
contamination of the springs. This fence is formed of five lines of
barbed wire protected with stout hog netting at the bottom, in order to
prevent more particularly the entrance of goats, many thousands of which
pasture in the adjoining mountains.

On the high ground immediately below the intake, a 3-roomed stone house
has been constructed for the inspector in charge of the intake works,
who also keeps in daily touch with the general office and records the
condition of the stream, particulars of rainfall, etc.

_Aqueduct._--The total length of the aqueduct, from the intake dam to
the South Reservoir, is 18,700 m., made up as shown in Table 4.

                      TABLE 4.--ESTANZUELA AQUEDUCT.

  +===========================================================+==========+
  |              Description.                                 |Length,   |
  |                                                           |in meters |
  +-----------------------------------------------------------+----------+
  |                                                           |          |
  |Cast-iron pipes, 45.7 cm. (18 in.) in diameter, along      |          |
  |                   the stream bed of the Estanzuela River  |   110    |
  |                                                           |          |
  |Concrete tubes, 55.9 cm. (22 in.) in diameter,             |          |
  |                  to Mederos (including 281 m. of tunnel)  | 4,473.81 |
  |                                                           |          |
  |Cast-iron siphons, 45.7 cm. (18 in.)                       |          |
  |                          in diameter:  Calabozos    239 m |          |
  |                                        South Virgen 124 " |          |
  |                                        North Virgen 177 " |          |
  |                                        Mederos      426 " |          |
  |                                                     ----- |   966    |
  |                                                           |          |
  |Concrete tubes, 63.5 cm. (25 in.) in diameter,             |          |
  |                               Mederos to South Reservoir. |12,039.19 |
  |                                                           |          |
  |Cast-iron siphons, 50.8 cm. (20 in.) in diameter:          |          |
  |                                        Necaxa       315 m.|          |
  |                                        San Augustin 796 " |          |
  |                                                     ----- | 1,111    |
  |                                                           |          |
  +-----------------------------------------------------------+----------+
  |              Total                                        |18,700    |
  +===========================================================+==========+

The gradient of the concrete pipes is 0.43% from Estanzuela to Mederos,
and 0.53% from Mederos to the South Reservoir. The calculated
discharging capacity of the conduit when running full is 364 liters (13
cu. ft.) per sec. for the upper, and 465 liters (16.4 cu. ft.) per sec.
for the lower section. For these pipes, the coefficient, _n_, in
Kutter's formula, was taken at 0.013. At present the line has been
limited by overflows to discharge three-quarters full.

The increase in the size of the pipes from Mederos is for the purpose of
receiving the waters of the Mederos River and other springs in the San
Pablo and Aqua Verde catchment areas, as shown on Plate II.

The invert of the concrete conduit where it leaves the Estanzuela River
is 684.25 m. above datum, and at the valve-house of the South Reservoir
it is 589.00 m.

The concrete pipes were manufactured and laid under contract with Mr.
Arthur S. Bent, of Los Angeles, Cal., the Company providing all
materials, labor, etc. The contractor was paid 10 cents per lin. ft. of
pipe manufactured and 10 cents per lin. ft. laid. He was also
responsible for the satisfactory completion of the work.

[Illustration: FIG. 9.--ESTANZUELA PIPE LINE STEEL FORMS FOR THE
MANUFACTURE OF CONCRETE PIPE.]

Fig. 9 shows the details of the joint recommended by Mr. Schuyler and
adopted for these pipes. The 63.5-cm. (25-in.) pipes were 61 cm. long
and 76 mm. (3 in.) thick. The 55.9-cm. (22-in.) pipes were of the same
length, but 70 mm. (2-3/4 in.) thick. For the purpose of strengthening
these pipes while hauling them over very rough roads they were
reinforced with four rings of No. 6 galvanized-iron wire.

_Manufacture of Pipes._--The pipes were manufactured under the
Supervision of Mr. H. Stanley Bent, at a pipe yard established below
the crushing plant, from which the crushed rock and sand were delivered
by gravity in bogies run on narrow-gauge rails. The area of the pipe
yard was approximately 1-1/4 hectares, and it was laid out with parallel
lines of 76-mm. (3-in.) galvanized-iron piping with hose couplings for
sprinkling purposes. After trials with aggregates of various sizes, the
concrete for the pipes was proportioned by volume as follows:

  Crushed rock broken to pass through a 19-mm. screen   0.136 cu. m.
  Manufactured sand (run of rolls)                      0.119  "  "
  Portland cement                                       0.090  "  "
                                                        ------------
  Total                                                 0.345 cu. m.=
                                                       (12.2 cu. ft.)


[Illustration: PLATE III, FIG. 2.--STEEL FORMS FOR MOULDING CONCRETE
TUBES, ESTANZUELA AQUEDUCT.]

The above quantity manufactured two 63.5-cm. pipes; a 55.9-cm. pipe
required 0.1415 cu. m. (5 cu. ft.) of the material, in the same
proportions. Fig. 9 shows the forms for these pipes, and Fig. 2, Plate
III, illustrates the process of moulding. The forms consist of cast-iron
bottom rings, to the proper section of the joint, and inner and outer
steel forms of 3-mm. plate, provided with inner and outer locking
arrangements. The concrete was poured through a cast-iron hopper which
fitted to the top of the outer form.

The concrete, which was mixed very dry, in a 1/2-cu. yd. batch, "Smith"
mixer, was thoroughly tamped with a 22-lb. tamper, and worked until it
was of a stiff jelly-like consistency, the wire rings being added as the
concrete was placed. The best results were obtained with the minimum
quantity of water. The upper joint was moulded with a heavy cast-iron
ring. The jacket and core forms were loosened immediately, and placed
over other rings, a sufficient number of bottom rings being used for a
day's work. For the pipes required for curves, special forms were used
to give the necessary bevel to the joint. After 24 hours the finished
pipes were lifted from the bottom ring with a special lifter, and ranged
in position for coating internally with a Portland cement grout to which
a little freshly slaked lime was added. The pipes were all numbered, and
were kept moist for 10 days by constant sprinkling. They were not hauled
to the work until 28 days after they were moulded, although this rule
was sometimes broken, to the detriment of the pipes. More than 32,000
pipes were manufactured, but some were used for purposes other than the
Estanzuela Aqueduct.

_Cost of Pipes._--The contractor brought with him experienced concrete
pipe makers from California, and these were afterward assisted by
Mexican labor. In a day two tampers could manufacture from 45 to 50
pipes of the larger (63.5-cm,), and from 55 to 60 of the smaller
(55.9-cm.) size.

The cost varied from 2.75 to 3.25 pesos per pipe for the smaller, and
from 3.50 to 4.00 pesos for the larger size.

The approximate cost of manufacturing is as follows: Taking, as a fair
example, one week's work during March, 1908, the wages paid to the 74
men comprising the total pay-roll (though part of this labor was
intermittent) amounted to 981 pesos. This includes a general foreman at
10 pesos per day, four American tampers at 7.50 pesos, and Mexican labor
varying from 4 to 1 peso, and all labor necessary to handle and finish
the pipes, including coating the interiors. During this week there were
made 1,126 of the 63.5-cm. and 1,095 of the 55.9-cm. size. The pay-roll
includes 520 pesos for the larger pipes (46 cents each) and 461 pesos
for the smaller pipe (42 cents each). Table 5 shows the quantities and
cost of the materials used in the manufacture of these pipes.

                    TABLE 5.--COST OF CONCRETE PIPE.

  ========================================+===============================
                                          | FOR 1,126 PIPES 63.5 CM.
                                          | IN DIAMETER.
            Materials.                    +-------------+-----------------
                                          | Quantities. |  Cost.
  ----------------------------------------+-------------+-----------------
  Portland cement, at 8.00 pesos per      |             |
    bbl., delivered at pipe-making yard.  |   401 bbl.  | 3,208.00 pesos.
  Sand, at 2.65 pesos per cu. m.          |    85 cu. m.|   225.25  "
  Crushed rock, 19-mm. (3/4-in.), at 2.65 |             |
    pesos per cu. m.                      |    62 cu. m.|   164.30  "
  No. 6 galvanized-wire hoops. 4 rings    |             |
    to each pipe.                         | 4,504       |   203.00  "
  ----------------------------------------+-------------+-----------------
            Totals.                       |   ...       | 3,800.55 pesos.
  ----------------------------------------+-------------+-----------------
            Cost per pipe.                |   ...       |     3.37 pesos.
  ========================================+=============+=================

  ========================================+==============================
                                          | FOR 1,095 PIPES 55.9 CM.
                                          | IN DIAMETER.
            Materials.                    +-------------+----------------
                                          | Quantities. |  Cost.
  ----------------------------------------+-------------+----------------
  Portland cement, at 8.00 pesos per      |             |
    bbl., delivered at pipe-making yard.  |   303 bbl.  | 2,424.00 pesos.
  Sand, at 2.65 pesos per cu. m.          |    68 cu. m.|   180.20  "
  Crushed rock, 19-mm. (3/4-in.), at 2.65 |             |
    pesos per cu. m.                      |    50 cu. m.|   132.15  "
  No. 6 galvanized-wire hoops. 4 rings    |             |
    to each pipe.                         | 4,380       |   183.00  "
  ----------------------------------------+-------------+----------------
            Totals.                       |   ...       | 2,919.45 pesos.
  ----------------------------------------+-------------+----------------
            Cost per pipe.                |   ...       |     2.66 pesos.
  ========================================+=============+================

From Table 5 it is seen that the cost of the 63.5-cm. pipes was 3.37
pesos for material plus 0.46 peso for labor = 3.83 pesos per pipe, or
6.26 pesos per lin. m. (1.91 pesos per lin. ft.).

The cost of the 55.9-cm. pipes amounted to 2.66 pesos for material plus
0.42 peso for labor = 3.08 pesos per pipe, or 5.05 pesos per lin. m.
(1.54 pesos per lin. ft.).

The cost of cement included hauling from the bodega to the yard, a
distance of about 5 km. At a later date, after the Company had commenced
using the "Hidalgo" cement, some additional 55.9-cm. pipes were
manufactured, so as to have them on hand as a reserve in case of
emergency. In this work only Mexican labor was used, as the previous
gang had been dispersed, but the tampers had previous experience. Taking
the cost of 418 pipes made during one period of 9 days, the detailed
cost was as given in Table 6.

                  TABLE 6.--COST OF 55.9-CM. CONCRETE PIPES.

  ========================================+===============================
                                          | FOR 1,126 PIPES 63.5 CM.
                                          | IN DIAMETER.
            Materials.                    +-------------+-----------------
                                          | Quantities. |  Cost.
  ----------------------------------------+-------------+-----------------
  Portland cement, at 8.00 pesos per      |             |
    bbl., delivered at pipe-making yard.  |   401 bbl.  | 3,208.00 pesos.
  Sand, at 2.65 pesos per cu. m.          |    85 cu. m.|   225.25  "
  Crushed rock, 19-mm. (3/4-in.), at 2.65 |             |
    pesos per cu. m.                      |    62 cu. m.|   164.30  "
  No. 6 galvanized-wire hoops. 4 rings    |             |
    to each pipe.                         | 4,504       |   203.00  "
  ----------------------------------------+-------------+-----------------
            Totals.                       |   ...       | 3,800.55 pesos.
  ----------------------------------------+-------------+-----------------
            Cost per pipe.                |   ...       |     3.37 pesos.
  ========================================+=============+=================

  ========================================+==============================
                                          | FOR 1,095 PIPES 55.9 CM.
                                          | IN DIAMETER.
            Materials.                    +-------------+----------------
                                          | Quantities. |  Cost.
  ----------------------------------------+-------------+----------------
  Portland cement, at 8.00 pesos per      |             |
    bbl., delivered at pipe-making yard.  |   303 bbl.  | 2,424.00 pesos.
  Sand, at 2.65 pesos per cu. m.          |    68 cu. m.|   180.20  "
  Crushed rock, 19-mm. (3/4-in.), at 2.65 |             |
    pesos per cu. m.                      |    50 cu. m.|   132.15  "
  No. 6 galvanized-wire hoops. 4 rings    |             |
    to each pipe.                         | 4,380       |   183.00  "
  ----------------------------------------+-------------+----------------
            Totals.                       |   ...       | 2,919.45 pesos.
  ----------------------------------------+-------------+----------------
            Cost per pipe.                |   ...       |     2.66 pesos.
  ========================================+=============+================

_Excavation for Pipe Line and Siphons._--The excavation for the pipe
line and for bridge works, etc., was let by contract to Messrs. Scott
and Lee, of Monterrey, under three classifications:

      (1) "All material which in the judgment of the Engineer can
      be economically loosened with picks and handled with
      shovels."

      (2) "Indurated earth or gravel, shale or rock which can be
      loosened without blasting, and 'sillar', locally so-called,
      whether pure or mixed with other substances, and whether it
      requires blasting or not."

      (3) "All rock not included in the above which requires
      drilling or blasting."

Locally, this classification is well understood, particularly No. 2, as
it covers the sillar soils which are common in the neighborhood of
Monterrey. The contract prices were: No. 1, 50 cents; No. 2, 1.50
pesos; and No. 3, 2.50 pesos per cu. m. These prices were over and above
the clearing and grubbing of the line, which was paid for at the rate of
100 pesos per hectare.

The route of the pipe line being along broken country, at some points
difficult of access, service roadways, about 3 m. wide, for hauling
material were constructed, and, for about 7 km., a roadway was made
along the line of the trench.

The prices for the roadway, under the above classification, were: For
No. 1, 35 cents; No. 2, 1.50 pesos; and No. 3, 2.50 pesos per cu. m.

The trenches were excavated 5 cm. below the required finishing depth, to
allow for grading the pipes in selected material, and were taken out to
an average width of 40 cm. greater than the outside diameter of the
pipe, to allow for their proper jointing, and also to give sufficient
room to roll the pipes in the trenches.

The final quantities of excavation were:

          TRENCH:   No. 1             11,115 cu. m.
                    No. 2             18,096  "  "
                    No. 3              6,650  "  "
                                    --------------
                    Total             35,861 cu. m.

          ROADWAYS: No. 1             4,165 cu. m.
                    No. 2             1,999  " "
                    No. 3                30  " "
                                     -------------
                    Total             6,194 cu. m.

The route of the pipe line was laid out so as to obtain an average fill
of not more than 1 m. over the tops of the pipes, but in some cases the
cuts, for short lengths, were 3 m. deep. The excavation for this work
began in June, 1907.

_Hauling Pipes._--The pipes were hauled to the site of the work with
ox-carts and mule teams. The cost of hauling varied from 25 cents per
pipe at the lower end, to 1 peso per pipe at the upper and,
comparatively speaking, inaccessible portion of the line. The weight of
each 55.9-cm. pipe was about 182 kg.; that of each 63.5-cm. pipe was
about 216 kg.

The breakages in all the pipes cast at the pipe yard amounted to about
1%, due chiefly to unloading them carelessly near the pipe line.

_Pipe Laying._--The pipe-laying gang was composed of 7 Mexicans under
the direction of an American foreman, who was in charge of several
gangs. One gang could lay daily from 60 to 73 m. (from 100 to 120
pipes). The following was the ordinary pay-roll for one gang:

       1 Foreman at 8 pesos (proportion).         2.00 pesos.
       1 Pipe layer at 3 pesos.                   3.00  "
       1 Pipe layer's assistant at 2 pesos.       2.00  "
       1 Cement mixer at 2 pesos.                 2.00  "
       2 Outside plasterers at 2.50 pesos.        5.00  "
       2 Inside plasterers at 2.25 pesos.         4.50  "
       1 Water boy at 0.50 peso.                  0.50  "
                                                  -----------
       Total.                                    20.00 pesos.

This brings the average cost of laying the pipes to 32.8 cents per lin.
m.

The pipes were jointed with 1:2 cement mortar, the outer joint being
rounded over both pipes for a width of 12-1/2 cm. (5 in.) and a height
of about 19 mm. (3/4 in.). In making these joints the pipe layers wore
rubber gloves. The joints were kept moist, and the trench was
back-filled with fine, screened material to a depth of 10 cm. above the
top of the pipe. Inside, the joints were carefully caulked with cement
and rendered smooth, the plasterers working continuously along with the
pipe layers, doing from 20 to 35 m. at a time. Water had to be conveyed
to the trenches by barrels on burros, and during the dry season it was
sometimes carried 5 or 6 km.

[Illustration: PLATE IV, FIG. 1.--TYPICAL REINFORCED CONCRETE GIRDER
BRIDGE, ESTANZUELA AQUEDUCT.]

[Illustration: PLATE IV, FIG. 2.--ELLIPTICAL ARCH BRIDGE CARRYING
ESTANZUELA AQUEDUCT.]

_Bridges._--The line as laid out passed over many gulches and dry
arroyos, and these were crossed with reinforced concrete bridges of
varying spans and heights, two being shown on Plate IV.

These bridges were formed of continuous horizontal girders, 1.10 m. deep
and 1 m. wide, with a cantilever overhang at the abutments, varying in
length from 1 to 2 m., so as to avoid settlement between the pipes and
the bridges. The bottom reinforcement consisted of from 2 to 6 twisted
bars of mild steel, varying in different spans from 12.7 to 19 mm. (1/2
to 3/4 in.) in diameter. The turned up bars were 28-1/2 mm. (1-1/8 in.)
in diameter; they were placed on either side, carried over the upper
part of the beams, and continued along the end for the overhanging part
of the girder. These bars, when not obtainable of the full length, were
spliced with a lap of 1.2 m. with No. 6 galvanized-steel wire. The
vertical stirrups were 4.7 by 25.4 mm. (3/16 by 1 in.), of mild steel;
they were equally spaced 30.5 cm. (12 in.) apart, and carried all around
the girders, lapping at the center about 15 cm. (6 in.), all the steel
being carefully wired together before placing the concrete.

The general type of the piers and abutments is shown by Fig. 1, Plate
IV, and varies in height with practically every bridge, the foundations
in every case resting on hard rock. The concrete for the girders was a
1:2-1/2:3-1/2 mixture, the crushed stone used having all passed a mesh
of 19 mm. (3/4 in.). The piers were of 1:3-1/2:5-1/2 concrete, and heavy
"displacers" were embedded within them.

The concrete was placed after the pipes had been laid through the form
by the pipe contractor, the joints being kept clear of the bottom to the
required distance by small moulded concrete blocks. The tops of the
girders were moulded to a slightly segmental form. The bridges were all
kept watered for about 15 days, and the forms were not struck for 28
days after placing. At Station 13.4 the pipes were carried over a
picturesque arroyo on an elliptical arched bridge (Fig. 2, Plate IV) of
11 m. clear span.

The abutments of all bridges were protected by rubble walls in cement
mortar carried up 60 cm. above the tops of the girders.

The contract price for the concrete work of these bridges, the Company
furnishing the steel and cement, was 14 pesos per cu. m., and for
placing reinforcing steel 35 pesos per metric ton (2,204 lb.).

There are 49 single-span bridges, the larger spans being 9.10 m.; 8
two-span, and 11 three-span bridges, their total length, including the
overhang, amounting to 870.50 m., or 4-1/2% of the whole length of
aqueduct.

_Concrete Aprons._--At 76 points there were small depressions which did
not necessitate the construction of bridges, and at these places the
pipes were encased in blocks of concrete carried up the hillside in the
form of an apron having small abutment walls from 1 to 2 m. apart. This
also served to protect the pipes from scouring action during rainstorms.
At the upper end of the line, near the intake, the pipe had to be
protected by concrete continuously for a distance of about 300 m., in
order to prevent damage from falling rocks.

[Illustration: PLATE V, FIG. 1.--VENTILATING COLUMN AND ENTRANCE
MANHOLE, ESTANZUELA AQUEDUCT.]

_Ventilators and Manholes._--Along the route of the concrete pipe there
are 27 ventilators, one of which, together with an entrance manhole, is
shown by Fig. 1, Plate V. They consisted of simple concrete columns,
3.35 m. high, above the ground line, the interior of the shafts being
formed of fire-clay pipes, 15 cm. (6 in.) in diameter. At each
ventilator the pipe was cut and a block of concrete, the width of the
trench, filled in as a foundation. Entrance manholes were also placed at
49 points, at 27 of which they immediately adjoined the ventilating
columns.

_Estanzuela Tunnel._--At 1,560 m. from the intake at Estanzuela, the
conduit is laid through a tunnel 281 m. long. The tunnel was driven
through hard calcareous strata from the open cuttings at each end. The
inner dimensions were trimmed to approximately 2 m. high and 1-1/2 m.
wide. At the ends of the tunnel the rock was moderately easy to take
out, but the inner section was very hard and difficult to blast.
Ordinary hand drilling was adopted, and the actual cost of driving
varied from 28 pesos per lin. m. at the ends to 50 pesos in the center.

The pipes were laid through the tunnel in the ordinary way, and
back-filled from the center, so as to give a cover of about 45 cm. above
to protect them from falling pieces of shale.

[Illustration: PLATE V, FIG. 2.--PLACING CONCRETE PIPES IN FORMS FOR
BRIDGE CROSSING AT NORTH END OF TUNNEL, ESTANZUELA AQUEDUCT.]

_Siphons._--It has already been mentioned that there are 6 cast-iron
pipe siphons. The head on these varies between 10 and 38 m. All are
provided with special inlets and outlets, forming combined overflow and
ventilating chambers, and have wooden hand-sluices to divert the water
when necessary. The bottoms of all siphons are provided with 20-cm.
cast-iron scour-out pipes, fitted with valves, and carried down to a
lower point to obtain a free outlet. The valve-boxes are protected by
being placed in heavy concrete chambers carried up above the level of
ordinary floods.

The siphons are formed of cast-iron socket pipes, 3.65 m. (12 ft.) long,
caulked in the ordinary way with lead joints. The thickness of the
45.7-cm. (18-in.) pipes is 19 mm.; that of the 50.8-cm. pipes is 21 mm.
On the steep hillsides the pipes are anchored securely to the rock in
concrete blocks reinforced with heavy iron chains. In some cases these
siphons were difficult of access, but ox-teams hauled the pipes in a
very efficient and satisfactory manner.

_Overflow Chambers._--The ordinary overflows, of which there are 14, are
similar in design to the siphon inlets.

_Testing, etc._--When the line was completed it was tested for
water-tightness, and the loss was found to be about 5%, part of which
was probably due to absorption. At a later date it was found that the
waters of the Estanzuela River, which contain 150 parts of calcium
carbonate (CaCO_{3}) per million, deposited a very fine film of lime on the
interior of the pipes, completely filling any pores there might have
been. At the present time there is no measurable leakage, thus proving
that the character of the work is very satisfactory.

The water was turned into the conduit on June 11th, 1908, and delivered
to the city on the following day through a by-pass, before the reservoir
was completed.

The pipe line is patrolled daily by an inspector with the authority of a
gendarme, so as to prevent the unlawful abstraction of water, a very
necessary precaution in so dry a country.




                       SOUTH DISTRIBUTING RESERVOIR.


The distributing reservoir for the Estanzuela supply is at Guadalupe, on
the foot-hills to the south of the Santa Catarina River, about 2 km.
from the center of the city. The reservoir is a covered one, of
reinforced concrete, and its capacity is 38,000,000 liters (10,000,000
U. S. gal.).

[Illustration: PLATE VIII, FIG. 1.--GENERAL VIEW OF EXCAVATION AND
EMBANKMENT FOR SOUTH RESERVOIR BEFORE LINING.]

_Excavation and Embankment._--The heavy slope of the ground at the
selected site made the circular form the most desirable. On the low side
the ground was excavated about 2 m. below the original ground line,
while the excavation at the upper part of the slope was about 12 m.
deep. The excavated material consisted chiefly of sillar and limestone
conglomerate, which when broken up forms a calcareous clay of an
excellent character for the formation of embankments, when proper care
is taken. The dimensions fixed for the internal diameter of the finished
concrete work of the reservoir were: 81 m. (265.68 ft.) at the top, and
a depth of water of 9 m., with sides sloping 55 in 100.

[Illustration: FIG. 10.--SOUTH RESERVOIR PLAN OF EXCAVATION.]

Fig. 10 is a plan of the reservoir, with a cross-section of the
excavation and embankment. On the lower side the original ground line
was cut down in steps, and all loose earth, roots, etc., were carefully
removed. The floor of the reservoir was chiefly sillar conglomerate, a
hard material that required a considerable amount of blasting for its
removal. The embankments were formed in 10-cm. layers of sillar and
conglomerate broken into small fragments and then rolled with 3-ton
sectional rollers drawn by teams of 4 and 6 mules, which assisted in
disintegrating the mass thoroughly, and produced by constant wetting a
homogeneous and compact clay. The excavation and embankment were left so
that 15 cm. of trimming could be done at a later date, immediately prior
to the lining of the reservoir. The excavated material amounted to about
34,000 cu. m., and, of this quantity, 31,500 cu. m. were used to form
the embankment; the remainder was taken to a spoil bank immediately
adjoining, the black earth stripping being separated and reserved for
covering the reservoir, etc. The contract prices for the excavated
material placed in the embankment were:

                                                                     Pesos
                                                                     per
                                                                     cubic
                                                                     meter

  Class 1.--Material which could be removed by plows and scrapers    0.60
  Class 2.--This consisted chiefly of "sillar"                       1.09
  Class 3.--Limestone conglomerate (requiring blasting)              1.65

The prices (for the same classification) for material taken to the spoil
bank, were 0.40, 0.80, and 1.40 pesos, respectively. Of the material
taken out, 15% came under No. 1 classification, 80% under No. 2, and 5%
under No. 3.

The excavation was begun at the end of May, 1907, and completed in
January, 1908, by Scott and Lee, the contractors. The embankments were
then allowed to stand until the beginning of July, 1908, to permit the
whole to become thoroughly settled and consolidated prior to beginning
the lining. In July the work of trimming the embankments and excavating
for the foundations of the reservoir columns was commenced, under the
Company's own administration, which completed the entire work.

[Illustration: PLATE VI.--DETAILS OF BEAMS AND COLUMNS FOR SOUTH
RESERVOIR.]

[Illustration: PLATE VIII, FIG. 1.--DETAILS OF FORMS FOR SOUTH
RESERVOIR.]

[Illustration: PLATE VIII, FIG. 2.--VIEW OF WESTERN HALF OF SOUTH
RESERVOIR, SHOWING FINAL SETTING UP OF DERRICK ON CENTRAL COLUMNS.]

_Concrete Lining and Roof._--The general arrangement and details of the
side-walls, columns, and roof are shown on Plates VI, VII, VIII and IX.
The principal feature consists in dividing the reservoir into radial
sections and supporting the roof on 135 primary and 670 secondary beams,
from 135 columns, spaced as follows:

           Outer ring, at 34.25 m. from center    40 columns.
            2d    "    "  27.88 "   "             40  "
            3d    "    "  21.51 "   "             20  "
           4th    "    "  15.41 "   "             20  "
           5th    "    "   8.77 "   "             10  "
           6th    "    "   2.40 "   "              5  "
                                                 ---
               Total                             135 columns.

The inner bottom diameter of the reservoir is 70.32 m. (230.64 ft.); the
upper inside diameter is 81 m. (265.68 ft.); the water depth at the
overflow level is 9 m. (29-1/2 ft).

The roof was designed to carry a dead load (the earth cover) of 150 lb.
per sq. ft., and a live load of 100 lb. The maximum compressive fiber
stress in the concrete was assumed at 550 lb. per sq. in. for the beams,
and at 350 lb. for the columns, a low figure, because of their eccentric
loading. The tensile strength of the steel was taken at 14,500 and
16,000 lb. per sq. in. The twisted steel used for the column
reinforcement was made at the local steel plant, but for the beams,
etc., a twisted lug bar, of higher quality and greater permissible
tensile stress, was used. The total quantity of steel used was 178 tons.
It was calculated that the load on the column foundations would not
exceed 1-1/4 tons per sq. ft. With the exception of the side-wall and
floor, all the concrete was reinforced with steel, of the sizes and
spacing shown on Plate VI.

_General Construction and Erection Scheme._--The question of ordinary
forms, requiring very heavy timber work, was a serious one, as suitable
lumber is very expensive in Mexico; and the necessity of finishing this
reservoir before the end of the first term allowed under the concession,
which expired on December 31st, 1908, led to the adoption of what the
writer believes is an original scheme for so large a structure. This
scheme was to cast the columns in short sections, mould the radial and
secondary beams as separate members, and then place them in position
with derricks. At the same time, in the case of the beams, it was
important not to sacrifice either the benefit of that part of the slab
which is ordinarily assumed to act as a part of the beam, or the
additional strength due to continuity; and, in case of the columns, the
strength due to the reinforcement extending from the foundation to the
beams.

The T-beam section was secured by notching the tops of the moulded
members, with notches 10 cm. deep, throughout the lengths of the beams,
as shown on Plate VI. A computation of the maximum flange increment
shows that these notches are sufficient to transfer the flange stresses
to the stem, but, for additional security, flat steel bars were bent to
a Z-shape and embedded in the top of the beam, about 60 cm. apart.
Continuity in the beams was secured by carrying the steel to the tops of
the beams over all supports, and, after erection, concreting them into
the roof slab. The secondary beams, after casting, were dropped into
recesses left in the radial beams for the purpose.

_Concreting, Mixing, etc._--The radial beams and column sections were
cast as nearly as possible under their ultimate positions; the secondary
beams were cast outside and immediately adjoining the reservoir.

The rock and sand was brought from the Company's crushing plant, in
3-cu. yd., side-dump cars, running on a 30-in. track by gravity a
distance of 1 km., the last 150 m. requiring hauling with 6 mules. The
cars returned all the way to the crusher by gravity. These cars dumped
the material into bins on the high ground above the reservoir; from
there it was hoppered into cars which carried to the mixer all the
material for one batch of concrete. Two No. 1 Smith mixers were used,
and from 25 to 30 batches per hour could be handled in each machine.

The concrete was transported from the mixers to place in 1/2-cu. yd.,
18-in. gauge, swivel, steel dump-cars pushed by two men. All the
concrete used in the bottom of the reservoir, for the main beams,
columns, and floor, amounting to about 2,460 cu. m., was dumped through
a chute into smaller cars. The chute had so many baffle-plates and bolts
that it resembled a gravity mixer, but, although it was 12 m. long, it
effectively prevented the separation of the materials.

_Concrete Placing and Moulding._--The square foundations for the columns
were deposited _in situ_, a recess being left for the reception of the
pedestals, which were moulded in place afterward. The capitals and
pedestals were cast in one piece, and the columns in 1.21-m. (48-in.)
sections, eight 5-cm. holes being left in them by using wrought-iron
pipes, held in place by templates and removed when the castings were
about 3 hours old. The columns were erected by threading them on the
15.8-mm. (5/8-in.) reinforcing rods, which extended from the pedestals
up through the capitals. The rods were in two lengths, arranged to lap
alternately at one-fourth, the center, and three-fourths of the height
of the columns. In erection, a light timber frame was used in
conjunction with the derrick, and, as the columns were placed, the
reinforcing steel was grouted solid with 1:2 cement mortar.

All the erection was done with a combined stiff-leg or guy derrick,
having an 80-ft. boom and a 50-ft. mast, and fitted with a 30-h.p.
Lambert hoisting engine. The derrick was erected seven times at the
circumference, and its final position was on top of the center columns.
The moving of the derrick a distance of about 45 m. and its subsequent
erection occupied usually about 48 hours. The erection work was carried
on continuously, day and night, the placing of the whole of the radial
and secondary beams and columns occupying 2-1/2 months.

_Forms._--As the erection scheme was designed to reduce the cost of
forms, economical construction was of considerable importance. The wall
was formed in 40 panels, about 6 m. wide and 11.27 m. high. The chief
object in arranging them in this manner was to permit an expansion
joint, 30 cm. wide, at each panel; this joint was not filled until after
the completion of the roof, when the temperature inside the reservoir
was uniform and not subjected to such great fluctuations as if exposed
alternately to the hot sun and comparatively cool nights. The range of
temperature during the construction period sometimes amounted to 80 deg.
Fahr. in 24 hours.

The expansion joints were left to the last, when a uniform temperature
of about 70 deg. inside permitted the filling of the joints, thus avoiding
all trouble from expansion cracks.

The forms are shown in detail on Plate VII. They consisted of shutters
stiffened with four trapezoidal trusses. The bottom posts of the trusses
were fixed in holes formed in the foundation block; they were propped
back from the embankment at the top, and secured to anchorages by iron
rods.

Six sets of these forms were used to construct the whole wall. The
concrete was placed in position through stove-pipe chutes, 20 cm. in
diameter, in continuous layers, the workmen treading and spading it well
as it was deposited. The forms were allowed to remain 4 or 5 days, and
were then struck and removed to another section. The pedestals and
capital forms were of lumber, and five of each were used to cast the
total number required. In the column sections the outer steel forms used
in the manufacture of the Estanzuela pipes were adapted for this
purpose. The radial beam forms, shown on Plate VII, were arranged with
internal wedge-shaped blocks to mould accurately the recess for the
secondary beams. The bottom forms were left attached to the beams for 28
days, but the sides and ends were removed after 24 hours. Eight forms
were sufficient for the whole 135 beams.

For the secondary beams, 29 forms were used for the 670 beams, the
bottom lumber also being left until they were mature for handling.

By referring to the cross-section of the secondary beam, it will be
noticed that it is jug-shaped, shelves being left on either side for the
support of the roof forms, which were placed after the secondary beams
had been properly grouted to the radial ones. The lagging was laid
diagonally, so that the short diameter was slightly greater than the
distance between the beams. This greatly facilitated the removal of the
lagging, as it was merely necessary to strike the wedge-shaped fillets
beneath, and turn them clockwise, after tearing out the end lagging.

[Illustration: PLATE IX, FIG. 1.--VIEW OF SEPARATELY MOULDED SECONDARY
BEAMS IN YARD BELOW SOUTH RESERVOIR.]

[Illustration: PLATE IX, FIG. 2.--SETTING PRIMARY BEAMS, SOUTH
RESERVOIR.]

The writer believes that the adoption of forms of this type, rather than
the ordinary kind, led to a saving of lumber of about 400,000 ft. b. m.
During the erection and placing of the concrete, all the joining
surfaces were carefully picked and cleaned, particular care being taken
at the junction of the secondary with the radial beams, and the upper
surfaces of all beams before laying the roof slab.

After the greater part of the roof was completed, the floor was laid in
those sections where it was protected from the sun's rays. The concrete
was placed in two 15-cm. thicknesses, and the work was carried on night
and day, without any joints. The laying of the floor occupied 8 days, or
an average of nearly 100 cu. m. daily.

[Illustration: PLATE X, FIG. 1.--VIEW OF COMPLETED SECTION OF SOUTH
RESERVOIR. EXPANSION JOINTS IN SIDE-WALL NOT YET FILLED.]

_Proportions of Concrete._--All the concrete work was brought to a
smooth face by careful spading, no plastering being used throughout the
reservoir, except in the superstructures. The work was kept well watered
in every case for about 15 days. The whole of the concrete work in
connection with the reservoir was completed in 5-1/2 months. The
concrete for the columns and foundations was a 1:3:5 mixture, the
aggregate consisting of equal parts of 19-mm. (3/4-in.) and 38-mm.
(1-1/2-in.) crushed stone. The remainder of the concrete, except that
for the roof, was a 1:2:4 mixture, the aggregate also consisting of
equal parts of 19-and 38-mm. stone. With the exception of a short length
of the side-walls, the sand used was that manufactured by the Company.
When the crushing plant was unable to produce all the sand required, the
Hornos sand (see Table 3) was used in the side-walls in equal
proportions with the crusher sand.

_Reservoir Outlet and Entrance Tower._--The outlet, 61 cm. (24 in.) in
diameter, leads from a well in the center of the reservoir and passes
under the floor and embankment to an outside valve-pit, 89 m. from the
center. This pipe was laid in a trench in a solid cutting before the
construction of the embankment, and was encased in 1:4:8 concrete.
Where it passes under the embankment a 1:2:4 concrete cut-off wall, 3.6
m. wide, 2.5 m. high, and 1 m. thick, was placed across it at right
angles. The cast-iron pipe is curved upward in the central well, and has
a bellmouth on which rests a movable circular copper screen.

Above the outlet well, and on the roof of the reservoir, there is a
central tower, giving access to the interior by a steel stairway. This
tower also serves as a main ventilating shaft, and in it are arranged
the guide-screens and gearing for raising them for cleaning purposes. In
addition to the ventilation provided in the tower, 20 circular openings,
30 cm. in diameter, are carried through the roof of the reservoir at the
circumference and into the parapet walls.

_Inlet Gate-House, etc._--The inlet gate-house is above the reservoir
and about 54-1/2 m. from its center. The conduit enters at 589.00 m.
above datum, and the gate-house contains the valves for controlling the
inlet pipe to the reservoir, the by-pass, overflow, scour-out pipe, and
the copper screens. The inlet, which is 45.7 cm. (18 in.) in diameter,
is of cast-iron flanged pipes, carried on iron hangers on the side-wall
of the reservoir, and, at a point 90 cm. above the floor level, it is
turned at right angles to the side-wall and carried on concrete piers to
the center of the first row of columns. The end of the pipe is closed by
a blank flange, and the water is deflected at right angles through two
30-cm. (12-in.) branches, for the purpose of setting up a slight
circular motion as it enters the reservoir.

The valve-pit is clear of the embankment, and in it are brought together
the main supply and by-pass pipes on which are placed two 61-cm.
(24-in.) sluice-valves; and between them there is a 20-cm. (8-in.)
scour-out pipe, for emptying the reservoir into an adjoining arroyo. The
arrangement of the valves gives complete control over the contents of
the reservoir.

_Venturi Meter-House._--Fig. 11 shows the arrangement of the Venturi
meter and its automatic register in a house over the main supply pipe.
This house is designed to form a feature of the entrance gateway of the
reservoir grounds, which cover an area of 12 hectares.

[Illustration: FIG. 11.--VENTURI METER-HOUSE.]

_General._--The roof of the reservoir has been laid out as a garden, and
the embankments are turfed. The intention is to develop the Company's
land as a public park, as it commands fine views of the city and the
surrounding mountains. An inspector's house has been built, and a
private telephone line provides for communication with the Estanzuela
intake and also with the general offices in the city.

[Illustration: PLATE XVIII, FIG. 1.--VIEW OF SOUTH RESERVOIR, LOOKING
TOWARD THE CITY.]




                       SAN GERONIMO GRAVITY SUPPLY.


_Provisional Supply._--It has already been stated that the Company began
operations at San Geronimo in March, 1906, by sinking a well on the
north bank of the Santa Catarina River at San Geronimo. At this point, a
little later, a small steam pumping plant, sufficient to handle about
8,000 liters per min., was installed. The lowest depth to which this
well was ultimately sunk in water-bearing strata, was 7 m., the normal
level of the water during 1906 and 1907 never falling lower than 569 m.
above datum. Tests made from time to time during 1907-08, showed that
this well was capable of supplying nearly 10,000,000 liters (264,000
gal.) of water daily.

The excellent supply yielded by this well made it desirable to adopt it
immediately as a provisional measure, pending the completion of the
larger works forming the western source of supply. To utilize the well
to its fullest extent, a reinforced concrete reservoir, of 3,000,000
liters capacity, was constructed on the south bank of the river, the top
water level being 585 m. above datum, that is, at the same elevation as
the proposed reservoir for the Estanzuela supply. The reservoir is 53.80
m. long, 21 m. wide, and has a water depth of 3.25 m. at the overflow
level. It is excavated on a steep hill slope, and has an earth
embankment on the lower side. The lining is of concrete, 20 cm. thick,
and the roof is of reinforced concrete composed of flat arches springing
from beams carried on 46 by 35-cm. reinforced columns. There are 68 of
these columns, and they are 3 m. apart longitudinally and 5 m. apart
transversely. The roof was not constructed until October and November,
1907, and prior to that time the necessity of covering the reservoir was
amply demonstrated by the growth, during hot weather, of considerable
quantities of green algae, which had to be skimmed from the surface of
the reservoir every few days.

The delivery pipe from the pumping plant was originally of riveted steel
and was asphalted. It was 30 cm. in diameter, 2 mm. in thickness, with
slip joints, and where it crossed the river it was encased in concrete.
This pipe was afterward replaced by a cast-iron pipe of the same
diameter. The supply pipe to the city was also of sheet steel, 30 cm. in
diameter. For a part of its length it was laid in the high ground of the
south bank of the river, which it crossed near the western limits of the
city, and was then connected to a 30-cm, cast-iron pipe in the
distribution system. The total length of the pipe from the reservoir to
the city distribution system was 2,850 m.

This provisional pipe continued in service from October, 1906, until
August 27th, 1909, when the river portion was completely swept away,
together with the provisional pump-house at San Geronimo, during the
great flood in the Santa Catarina River. Fortunately, the permanent
supply works were completed at the time, so that the destruction of this
pipe line, which had already served its original purpose, had no effect
on the supply of water to the city.

[Illustration: PLATE XI.--SECTION OF INFILTRATION GALLERY, SAN GERONIMO
GRAVITY SUPPLY.]

_Infiltration Gallery._--The chief feature of the San Geronimo gravity
supply is the infiltration gallery. By referring to the profile on Plate
XI it will be seen that at this place there is a considerable area of
what is undoubtedly water-bearing gravel. The main conditions were
revealed by the borings previously carried across the valley, but the
profile has been corrected to show the actual conditions as established
at a subsequent date by shafts. Practically, the water-bearing strata
are not limited merely to the sand and coarse gravels, as the clay
formation lying above and below them is full of small gravel deposits
containing considerable volumes of water. The main direction of the
underflow is toward the east, and the hydraulic gradient, which was
established from wells sunk farther west, was found to be approximately
1%, or practically the same as the average surface of the bed of the
river above the line of the infiltration gallery.

The general scheme for tapping this underflow was to drive a main
gallery at the 560-m. level on a grade of 0.05%, which was sufficiently
high to take the supply by gravity to the western reservoir, having a
top water level at 558.75 m. above datum. This elevation is sufficient
to give an excellent pressure over about 60% of the city, and a fair
pressure to reach the upper stories of the highest houses, if required,
over the whole supply district. From this gallery it was proposed to
sink shafts at frequent intervals, for a total distance of 300 m.,
carrying them below the gallery level, to tap any water-bearing gravels
there might be in the clay formation underlying the gravels and sands.
From the main gallery it was proposed to construct branch galleries up
stream on a flat gradient, so as to obtain the advantage of an increased
head due to the steep hydraulic gradient of the underflow water.

[Illustration: FIG. 12.--DIAGRAM SHOWING VARIATION IN WATER PLANE 1905
TO MARCH 1910 AT SAN GERONIMO.]

In investigations of this kind, it is of first importance to have a
continuous record of the level of the water plane, and Fig. 12 has been
plotted to show its variation at San Geronimo from the beginning of
1905 to March, 1910. From January, 1909, to March 31st, 1910, these
levels are averages of daily readings taken in 9 shafts sunk along the
proposed line of the infiltration gallery. In 1902 the water plane was
standing at 570.18 m. above datum, but from that date until 1905 the
writer has been unable to find any records. This diagram should be
examined together with the rainfall diagram, Fig. 3, and it will be
noticed that the fall in the water plane drops with the general scarcity
of the rainfall during 1907-08, and until July, 1909. The year previous
to July, 1909, is regarded, by many competent local observers to have
been the longest period of extreme drought in 30 years in Nuevo Leon,
and the evidence which the writer has been able to gather regarding
stream flow in the neighborhood of Monterrey supports this view. The
total rainfall at Monterrey for the year prior to July 1st, 1909,
amounted to 9.98 in., or 4.16 in. less than the lowest record for any
calender year since 1894, or, in other words, about 45% of the average
annual rainfall.

The lowest point to which the water plane dropped was during June and
July, 1909, when the levels stood slightly above 565.00 m., or 5 m.
above the level of the floor of the infiltration gallery. During this
period pumping tests were made in the various wells, and from these it
was quite clear that the infiltration gallery, if carried far enough to
meet them all, would yield a supply of from 25,000,000 to 40,000,000
liters daily. During the great rainfall of August, 1909, the water
levels rose very rapidly; the heavy precipitation between August 9th and
10th caused the level to rise to 568.00 m. in about 4 days, and 6 days
after the great flood of August 27th, the water level, which had
continued rising gradually, reached 571.40 m., and then fell gradually
until at the end of March, 1910, it was practically the same as it had
been from 1902 to 1905.

[Illustration: PLATE XII.--SAN GERONIMO GRAVITY SUPPLY.]

It should be noticed that the readings were taken in the shafts on the
high ground to the west of the present river bed, and were independent
of any flow there might be in the river. During times of ordinary floods
in the river, it was very noticeable that, notwithstanding the fact that
the river water might be turbid to an extreme degree, the well even in
immediate proximity to the river bed did not show the least sign of
discoloration.

_Design of Works._--Plate XII shows the general design of the gravity
scheme, which consists of a main tunnel 550 m. long and a concrete
aqueduct, 1.06 m. (42 in.) in internal diameter and 2,311 m. in length,
discharging into a low-service distributing reservoir at the extreme
western limits of the city. The tunnel and aqueduct were laid on a
gradient of 0.05%, and the latter was designed to discharge 55,000,000
liters per day (22.8 cu. ft. per sec.) if flowing to its full capacity.

_Gravitation Tunnel._--This tunnel, shown on Plate XII and Fig. 13, was
completed prior to driving the infiltration gallery into the
water-bearing gravel, so that the water encountered in the gallery could
be easily drained off by gravity, thus avoiding a heavy outlay for
pumping. The tunnel passes through various strata, the principal ones
being calcareous shale, conglomerate, and gravels. The tunneling
operations were carried on from 5 shafts, No. 1 being 23 m. deep, and
the others varying from 20 to 10 m. The shafts in loose ground were
timbered in the usual way, having clear inside dimensions of 2 m. Shaft
No. 1, which was entirely in shale, was taken out approximately to 3.35
m. in diameter, so as to permit it to be lined with concrete having a
finished internal diameter of 2.43 m.

[Illustration: FIG. 13.--GENERAL DETAILS SAN GERONIMO GRAVITY PIPE LINE.]

Fig. 13 shows the details of the tunnel, which was lined with concrete,
the bottom and sides being approximately 23 cm. (9 in.) thick. The
interior dimension is 0.91 m. at the invert level and 1.016 m. at a
height of 1.22 m., the corners between the side-walls and the floor
being slightly curved. The arch is formed of two rings of brickwork in
cement mortar, this thickness being increased in some lengths to three
rings. Where the rock was in good condition, and not likely to
disintegrate easily, the arch, for a distance of 90 m., was left
unlined. Of the total distance of 550 m., careful timbering was required
for 300 m. In lining the timbered portion of the tunnel with concrete,
all the timber was removed, except in loose ground, where the laggings
were left in position.

While the tunnel was being driven, a start was made to drive the north
end of the infiltration gallery, which was in rock for a distance of 44
m. Water appeared at about 35 m., and then the work was temporarily
suspended until the gravitation tunnel was completed and a length of the
aqueduct had been constructed far enough down stream on the north bank
of the river to permit of draining direct to the river. This point was
reached at 1,170 m. from Shaft No. 1, and there a temporary overflow
chamber was constructed.

When the tunnel was completed, the two intermediate shafts were filled
up, the remaining three being retained permanently. Shafts Nos. 2 and 3
were lined with concrete, 76 cm. (30 in.) in internal diameter, and 23
cm. thick. They were domed at the top to form circular openings to
receive cast-iron covers. Progress on this tunnel was slow, taking from
December, 1907, to November, 1908, to complete, owing chiefly to
difficulties with an incompetent contractor. The contract was
subsequently transferred to Mr. John Phillips, of Mexico City (who was
also the contractor for the aqueduct), who completed it satisfactorily.

_Continuation of the Infiltration Gallery._--When the aqueduct (to be
referred to again) was completed as far as 1,170 m. from Shaft No. 1,
the driving of the infiltration gallery, which was 2 m. high and 1-1/2
m. wide, was continued until gravel was encountered in the roof, at 44
m. from the shaft. At this point the rock dipped at an angle of 45 deg.,
and the gravels contained quantities of large boulders mixed with fine
sand; immediately after encountering the gravel, a flow of about 90
liters per sec. was met, evidently coming through from a pot-hole in the
shale. This quantity diminished in about 10 days to about one-fourth,
but gradually increased again as the driving proceeded. The operations
of driving the tunnel from 44 m. forward were begun in the dry season,
in February, 1909, and the gravel was encountered for a distance of 24
m., or up to 68 m. from the shaft. The center of this gravel bed was
about 30 m. south of the old river channel, which had been continuously
dry at the surface for several years. Up to 68 m. the work was very
difficult, owing to the upper part being of loose gravel and the lower
in very contorted shale. The timbering of the tunnel in the full gravel
section consisted of heavy square settings, 1 m. apart. At 68 m. the
clay and gravel formation was met, and the rate of progress then was
about 4 or 5 m. a week. A short branch gallery was also driven about 7
m. up stream near Shaft No. 2. The total distance the infiltration
gallery was carried from Shaft No. 1, was 100 m., when the floods of
August, 1909, caused its suspension.

During the progress of the gallery, attempts were made to sink a 3-1/2
by 2-m. shaft at a point along the line of the infiltration gallery,
about 130 m. from Shaft No. 1, but water in such abundance was
encountered that it was practically impossible to sink it in the
ordinary way more than about 6 m. deep, the quantity of water to be
dealt with amounting to about 20,000,000 liters daily. Seven shafts were
then sunk in the high ground to the north of the river, five of these
being on the line of the gallery and two 30 m. westward. They were sunk
during the dry season prior to July, 1909. These were ordinary timbered
shafts, 2 m. square between the walings, and were carried to the depths
shown on Plate XI. In Shafts Nos. 5, 6, and 7 the water was flowing with
considerable velocity, while Shaft No. 9 seemed to have penetrated a
different water plane and one which was probably independent of that
showing in any of the other shafts, in which the water was practically
at a uniform level. The evidence obtained showed that if the gallery
could be carried to Shafts Nos. 6 or 7 a great abundance of water would
be intercepted. Owing to the difficulties of sinking ordinary shafts in
the wide river channel, circular shafts were put down. These were 1.37
m. in internal diameter and 23 cm. thick, and were of concrete
reinforced with No. 10 vertical rods, 19 mm. in diameter, tied together
with No. 6 wire. These shafts were provided with steel cutting edges.

Shaft No. 2 was sunk to a depth of 1 m. below the infiltration gallery
level, No. 3 within 2 m., and No. 4 within 4 m., before August, 1909.
The shafts were sunk by digging them out and loading them at the top,
the top of the shafts being kept generally 3 m. out of the ground. Shaft
No. 3 encountered great volumes of water, and, in order to enable
sinking operations to proceed, a pumping shaft, 2-1/4 m. square, was
sunk a little west of it to draw off the water. Notwithstanding the fact
that the prolonged period of drought had lowered the general water plane
in all the shafts to 565.00 m. above datum, the difficulties of handling
the water even at that level were considerable. At the beginning of
August the work was progressing very satisfactorily, but the
extraordinary rainfall of that month caused the work to be shut down
temporarily.

_Effect of the Floods in the Santa Catarina River._--The area of the
water-shed of the Santa Catarina River above Monterrey is about 1,410
sq. km. (544 sq. miles), and its area at San Geronimo, owing to its
configuration, is practically the same. Its general character has
already been referred to. On the night of August 10th and early on the
morning of August 11th, a big flood came down the river, flowing at its
maximum about 1,130 cu. m. (40,000 cu. ft.) per sec., due to the heavy
rainfall (Fig. 4). This flood carried away all the temporary staging
around the shafts, seriously wrecking the temporary pumping station, as
well as destroying the 30-cm. cast-iron pipe, notwithstanding the fact
that it had been encased in a block of concrete 3 m. wide and 1-1/2 m.
thick right across the river; but no damage was done to the infiltration
gallery or to the shafts in the river channel. The effect of the flood
on this pipe is shown by Fig. 2, Plate XXXI.

[Illustration: PLATE XXXI, FIG. 2.--PROFILE SKETCH, LOOKING UP STREAM ON
LINE OF 24-INCH MAIN SUPPLY PIPE.]

Following this flood, which had caused the loss of 14 lives in the city,
3 miles below San Geronimo, there was practically no rain for 13 days.
Then, on August 25th the second heavy precipitation began and continued
until August 29th, the details being shown on Fig. 4.

This precipitation, therefore, fell on a water-shed which was completely
saturated, as it had already absorbed a large proportion of the 13.38
in. of rain which fell during August 10th and 11th; and at every point
along the river, prior to August 25th, springs were issuing forth, and
there had been very little evaporation during the intervening dry spell.

The writer has calculated that at Monterrey this flood reached the
enormous quantity of 6,650 cu. m. (235,000 cu. ft.) per sec., a rate
equal to 432 cu. ft. per sec. per sq. mile of water-shed.[6] The effect
of this flood was to demolish completely about 1,200 "sillar" houses
(without taking into consideration the numerous wooden houses) at
Monterrey, and to cause a fearful loss of life, variously estimated
between 3,000 and 5,000 persons; the lower figure the writer believes is
approximately correct. At San Geronimo the original pumping station was
carried away entirely, leaving practically no trace whatever.

[6] The writer, in a brief article contributed to _Engineering News_
soon after the flood (September 23d, 1909), gave this figure as 271,500,
or approximately equal to a run-off of 500 cu. ft. per sec. per sq.
mile; but, from a later and more complete study of the conditions for
many miles above Monterrey, he believes the above quantity to be
approximately correct.

Shaft No. 2 was apparently destroyed, while No. 3 was turned at an angle
of about 50 deg. down stream and filled up completely with sand. The
infiltration gallery, near Shaft No. 2, was completely blocked with fine
sand and gravel, and access could only be obtained as far as 54 m. The
profile, Plate XI, shows the change which had taken place in the river
bed. The original course of the stream was changed to the north bank, 50
m. distant, the effect of the scouring action of the flood being to
lower the general level at this point about 3.65 m., while the southern
portion of the channel was slightly raised. At present (April, 1910),
the end of the driven portion of the infiltration gallery is about 35 m.
from the center of the stream, which is still carrying about 2,270
liters (80 cu. ft.) per sec.

Immediately after the flood the flow in the gallery was 450 liters (16
cu. ft.) per sec., and this quantity has remained constant since that
time. The probable effect of the flood was to disturb the whole
subsurface above the infiltration gallery and put it in motion,
completely cleaning the gravels of their surrounding clay, which would
account for the large infiltration of water in so limited a distance.
The water has always been limpid and pure, but its hardness remains the
same as it was prior to the flood.

With the copious supply of water from this source, due of course to
abnormal conditions and not likely to be permanent, the operations of
tunneling have been suspended temporarily; but it is proposed to
continue the driving of the gallery, from a new shaft west of No. 3.
The water encountered will be drained off by pumping until the main
water-bearing gravels, in the neighborhood of Shaft No. 5, are reached.
It is also proposed to reconstruct the 30-cm. high-level pipe line, from
San Geronimo along the high road on the north bank of the river, so that
by pumping water can be delivered to the city system from Shafts Nos. 5,
6, and 7, in the event of a shortness of supply from the Estanzuela
River.

_Shaft No. 1._--Shaft No. 1 is designed to connect the infiltration
gallery with the gravitation tunnel. This shaft has an inner diameter of
2.43 m. (8 ft.) and is fitted with a special gate-valve. In the bottom
of the door of this valve there is a smaller valve, 30 cm. in diameter,
so that, when the infiltration gallery is closed for cleaning out the
sump, the smaller door, which is operated through the same spindle by a
bevel-geared head-stock at the top of the shaft, can be opened first.
Space is also left for screens if these should be found necessary.
Access to this shaft is gained by a reinforced concrete stairway in nine
stages. The superstructure is to be supported on reinforced concrete
column foundations carried to the firm rock, owing to the loose
condition of the strata at the top of the shaft.

_Aqueduct._--The construction of the concrete conduit was begun in
April, 1908. Fig. 13 shows the general types. Type _A_ was adopted in
gravel and conglomerate formation, and Type _B_ where the excavation was
in "sillar," the soft nature of this rock permitting it to be excavated
exactly to the required external diameter of the concrete lining.

The concrete which was without steel reinforcement was a 1:2-1/2:3-1/2
mixture, the sand being from the crusher and the aggregate from the
river bed, screened to pass a 25-mm. mesh. Where the conduit crossed the
river obliquely, immediately below the gravitation tunnel, it was
strengthened with mass boulder concrete of Type _C_. During the great
flood this heavy section withstood its effects without damage of any
kind, but beyond this point, where the conduit had been laid in compact
cemented gravels, the scouring action of the flood on the north bank
lowered the level of the gravels from 2 to 3 m.; the only damage,
however, was the scouring away of the gravels at the south side of the
conduit. To prevent such an occurrence in the future, the conduit at
that point was strengthened with additional concrete for a distance of
195 m., as shown on Fig. 13. The extra concrete, amounting to 733 cu.
m., was a 1:3:5 mixture, in which was embedded 20% of heavy boulders.
The top of this special length now forms a weir for the present river
flow. Where the conduit enters the bluff on the north side of the river,
at 1,200 m., there is an overflow chamber which has a sluice-gate 76 cm.
wide, arranged so that the conduit can overflow at the present time when
running 76 cm. deep. To deflect the flow in the conduit, a wrought-iron
plate, provided with a balance weight, is dropped into a groove on the
lower side. The outlet is a 61 cm. concrete tube, having its invert
above ordinary flood level, and arranged to be closed by a gate.

At 1,963 m. the conduit is carried over an arroyo on a segmental arch of
8 m. clear span, as shown on Fig. 13. There are 5 ventilating columns
and 5 manholes on the aqueduct.

[Illustration: PLATE X, FIG. 2.--SETTING FORMS FOR SAN GERONIMO
CULVERT.]

The aqueduct terminates in the Obispado distributing reservoir
valve-house, at a level of 558.50 m. The work in connection with this
aqueduct was completed by December, 1908.




                   DISTRIBUTING RESERVOIR AT OBISPADO.


The main distributing reservoir for the San Geronimo gravity supply is
immediately below the historic Obispado (Bishop's Palace), at the western
limits of the city. The general arrangement and lay-out is shown on Plate
XIII.

[Illustration: PLATE XIII.--GENERAL PLAN AND SECTIONS, OBISPADO
RESERVOIR.]

_Valve-House._--The invert of the conduit from San Geronimo, where it
enters the valve-house, is 558.50 m. above datum. The valve-house, which
is built in the center of the reservoir, is shown on Fig. 2, Plate XVIII.
One of its special features is the provision of the main overflow at this
point instead of within the reservoir proper. The inlet, main supply
tunnel, independent by-pass overflow, scour-out pipes, gate-valves, and
screens, are all controlled within the valve-house.

[Illustration: PLATE XVIII, FIG. 2.--VIEW OF ROOF OF OBISPADO RESERVOIR,
LOOKING NORTH.]

_Reservoir._--The reservoir is rectangular, 126 by 81 m. (413.28 by
265.68 ft.) at the top, and has a water depth of 4 m. (13.1 ft.). In the
design it was necessary to limit it to the lowest economical depth, so
as to increase the static pressure over the low-pressure district as
much as possible.

_Excavation and Embankment._--The excavation, except for a depth of
about 1 m. which was in black soil, was chiefly in a disintegrated
"sillar" stratum of a heavy clayey nature, the greater part of which
could be handled conveniently with plows and scrapers; the actual
foundation on the eastern half required blasting for the final depths.

The total excavation amounted to 56,479 cu. m., of which 7,255 cu. m.
were placed in the embankment, the remainder being deposited in the
immediate neighborhood of the reservoir. The final trimming of the
banks, which were left 30 cm. full, was not undertaken until the lining
was begun. The work was done under contract with Mr. J. S. Nickerson, of
Monterrey. The excavation had only one classification, and the contract
prices were 0.50 peso per cu. m. for material carried to spoil banks,
and 1.00 peso for material placed in the embankment. The excavation was
begun in December, 1907, and completed in April, 1908. The work was then
left standing until the end of 1908 to allow the banks to consolidate
thoroughly prior to lining, which was begun on January 4th, 1909.

_Concrete Lining and Roof._--Plate XIII shows the general plan and
sections, the main feature being the simple division of the reservoir
into 24 rows of columns longitudinally and 15 rows transversely, making
a total of 360 columns, less the four left out at the central tower. All
the columns are 5 m. apart both ways. The roof was designed for a live
load of 100 lb. and a dead load of 150 lb., the same as at the South
Reservoir. With the exception of the floor, all the concrete work was
reinforced with twisted steel lug bars. The foundation load on the
columns for the eastern half of the reservoir is 0.9 ton per sq. ft.;
that on the columns for the western half, where the foundation is of
very hard sillar and conglomerate, is 1.95 tons per sq. ft.

_Under-drainage of the Floor._--To provide for proper drainage in case
of seepage, the floor was underdrained with rubble drains, 30 cm. wide
and 23 cm. deep, filled with large round gravel carted from the bed of
the Santa Catarina River. The total length of these underdrains is 1,160
m. In order to facilitate the detection of any seepage, they were
conducted to a permanent inspection pit outside of the reservoir.

_Main Distributing Conduit._--The main distributing conduit is laid
along the inside of the reservoir, at the inlet end, and carried on
elliptical arches of 2 m. span to a height of 71 cm. above the finished
floor level. This conduit is 76 cm. high and 45.7 cm. wide, and it
branches in two directions from the inlet tunnel to each side of the
reservoir, its total length being 69 m. In order to prevent any
stagnation and to give a continuous circulation, the water is delivered
at eight points, in the length of the distributing pipe, through square
openings with semicircular tops, the areas of the openings increasing
toward the ends. These inlets are placed so that the current will not
strike the roof columns.

_Outlet Tunnel and Valve-House._--The outlet tunnel is at the north end
of the reservoir, and was excavated in hard sillar rock. The tunnel is
lined with concrete 30 cm. thick, the finished internal dimensions being
1.52 by 0.91 m. The length of the tunnel is 22.5 m. to the point where
it enters the outlet-house. This house is divided by a wall 45 cm.
thick, which supports a 76-cm. (30-in.) penstock-valve. The supply pipe
to the city leaves this chamber in the west wall, and is also fitted
with a 76-cm. penstock-valve. The supply pipe has a copper screen of the
same design and dimensions as those in the inlet-house. A 30-cm.
(12-in.) scour-out pipe in this chamber provides for draining the
contents of the reservoir to a neighboring irrigation ditch, when
necessary.

The superstructure of the valve-house is of concrete, and at the floor
level there are bevel-geared head-stocks to raise the valves, etc.

_By-Pass and Supply Pipes._--The by-pass and supply pipes are carried
below the reservoir embankment to join the main 76-cm. (30-in.)
cast-iron distributing pipe to the city. For this short distance they
were constructed of concrete, 76 cm. in internal diameter, 10 cm. (4
in.) thick, reinforced with 6-1/2-mm. square steel longitudinal rods, 30
cm. from center to center in the circumference, and hooped with
6-1/2-mm. square steel rods spaced 30 cm. apart. The concrete forming
these pipes was a 1:1-1/2:2-1/2 mixture.

_Parapet Walls._--The parapet walls have 12 piers at each side and 8 at
each end. In these piers there are ventilating openings branching at the
top to each side of the parapet, with outlets provided with cast-iron
screens. This arrangement gives 4 sq. m. of ventilating space (exclusive
of that provided in the central tower), equally distributed at 40 points
around the walls of the reservoir.

_General Construction Scheme._--The concrete mixing plant, which
consisted of two No. 1 Smith mixers, was arranged in connection with the
bins and hoppers for the rock and sand on the high ground to the west,
and from there the material was conveyed on a framed timber gangway
carried right across the center of the reservoir, as shown by Fig. 1,
Plate XVII. From this central platform the concrete for the columns was
filled from stages placed on the top of traveling towers, 5 m. high,
which were run between two rows of columns on standard-gauge rails laid
on the floor of the reservoir. By this arrangement 24 columns could be
filled from each length of track. A main narrow track was also laid
right around the reservoir, with the necessary turn-outs.

[Illustration: PLATE XVII, FIG. 1.--FILLING PRIMARY BEAMS FROM TRAVELING
TOWER, OBISPADO RESERVOIR.]

[Illustration: PLATE XV, FIG. 1.--CONSTRUCTION OF WEST SIDE-WALL OF
OBISPADO RESERVOIR.]

[Illustration: PLATE XV, FIG. 2.--PRIMARY BEAMS AND COLUMNS, OBISPADO
RESERVOIR.]

[Illustration: PLATE XIV.--DETAILS OF FORMS FOR CONCRETE WORK, OBISPADO
RESERVOIR.]

The forms for the columns, primary and secondary beams, are shown on
Plate XIV. The side forms for the primary beams were struck in 24 hours,
so as to economize lumber; but the bottom lumber was left in position
for 28 days. To avoid much unnecessary timber, the secondary beam forms
were supported at the ends on reinforced concrete corbels cast on the
primary beams.

For placing the side-walls, a special traveling form was used, the
details of which are shown clearly on Plate XIV. At the end of each form
an expansion joint of 25 cm. was left to be filled after the roof was
placed in position. The concrete was delivered to the wall through
stove-pipe chutes, and carefully spaded by workmen in the limited space
between the forms and the embankment. The wall form was removed after 36
hours, by loosening the jacks and pulling forward the hooked tie-rods.
This form is also shown on Fig. 2, Plate XVI.

[Illustration: PLATE XVI, FIG. 2.--TRAVELING SIDE-WALL FORM, OBISPADO
RESERVOIR.]

[Illustration: PLATE XVI, FIG. 1.--PREPARING FLOOR FOR CONCRETING,
OBISPADO RESERVOIR.]

The concreting of the roof slab was carried on continuously, and, when
partly completed, the floor was laid in the shade. The bottom layer of
the floor, 13 cm. thick, was laid in continuous panels between the
columns, and brought to a fairly smooth surface. On this surface, after
keeping it wet for 10 days and then allowing it to dry thoroughly, a
layer of asphaltum, supplied by the American Asphaltum and Rubber
Company, of Chicago, was placed. The work was done by ordinary Mexican
laborers after they had received a few days' instruction from one of the
Asphaltum Company's superintendents. The surface of the lower layer was
kept perfectly clean, and then received one coat of "Pioneer" paint. The
asphaltum, heated in a boiler inside the reservoir to a temperature of
approximately 425 deg. Fahr., was then poured over the floor from buckets,
in a layer approximately 4 mm. thick. Where the floor joined the column
pedestals, and at each new panel section, a double thickness was used.
The labor cost of water-proofing, including superintendence, etc.,
amounted to 3.3 cents (Mexican) per sq. m. for painting with "Pioneer"
paint, and 5.4 cents for the asphaltum coating, or a total labor cost of
8.7 cents per sq. m. for the complete water-proofing. This cost is based
on a rate of 8.00 pesos per day for a foreman, and 1.00 peso for each
laborer. It required 50 U. S. gal. of the paint to cover 265.2 sq. m.,
and an average of about 6 lb. of asphaltum for 1 sq. m.

The upper concrete layer of the floor, 10 cm. thick, was placed so as to
break joint with the lower, and was brought to a smooth surface with
wooden floats sheathed with steel and reaching across the panels. In
this way a perfectly smooth surface was obtained without any plastering.

[Illustration: PLATE XVII, FIG. 2.--CENTRAL TOWER AND STAIRWAY, OBISPADO
RESERVOIR.]

The concrete for the beams, columns, side-walls, and floor, was a
1:2-1/2:4 mixture, crushed sand and stone being used throughout. In the
roof slab the mixture was 1:2:3.

The whole of the concrete work of the reservoir was completed in 6
months, by the Company's own administration, and the reservoir was first
put into service a few days after the great flood of August 27th, when
the Estanzuela supply main, crossing the Santa Catarina River, was
partly destroyed. Since that time frequent examinations of the
inspection pit, which is connected by a pipe to the rubble drains under
the floor, have never revealed the slightest leakage.

_Lay-Out of the Reservoir Roof and Grounds._--The Company owns about
11-1/2 hectares of land, which includes that occupied by the reservoir
and its surroundings, and as this property is in an attractive
situation, commanding fine views of the Sierra Madre Mountains, the
whole of the works have been given a pleasing architectural character,
and the grounds laid out to form a public park for the citizens of
Monterrey.

[Illustration: FIG. 14.--SKETCH PLAN OF LAY OUT AT OBISPADO RESERVOIR.]

The general plan of the scheme is shown by Fig. 14 and Fig. 2, Plate
XVIII. The roof, which has an area of 1 hectare, has been laid out with
walks and grass plots, and the surrounding embankments have been
converted into driveways. Above the reservoir a small plazuela of 1/2
hectare has been laid out with a space above it for a band-stand. The
whole of the ground has been encircled with carriage drives, on which it
is the intention to plant shade trees. The lay-out of this land also
embraced the scheme for protecting the reservoir by draining the
surface-water away to the irrigation ditches.




               COMPARISON OF SOUTH AND OBISPADO RESERVOIRS.


The two reservoirs are practically of the same capacity, the only
difference being the level of the overflows in their relationship to the
roof, which gives the Obispado Reservoir a slightly greater capacity.
Some comparative figures may be of interest, owing to the differences in
type and construction. Table 7 gives the comparative quantities of
material in each reservoir proper, that is to say, exclusive of the
valve-houses, lay-out of grounds, etc.

  TABLE 7.--COMPARISON OF MATERIALS IN SOUTH AND OBISPADO RESERVOIRS.

  ==========================+===============================+============
                            |    SOUTH RESERVOIR.  | _OBISPADO RESERVOIR._
                            +--------+-------------+--------+------------
                            |        | Quantities, |        | Quantities,
                            |   No.  | in cubic    |   No.  | in cubic
                            |        | meters.     |        | meters.
  --------------------------+--------+-------------+--------+------------
  _Earthwork:_              |        |             |        |
      Total excavation      |  ...   |   34,000    |   ...  |   56,479
      Placed in embankment  |  ...   |   31,500    |   ...  |    7,255
      Placed in spoil banks |  ...   |    2,500    |   ...  |   49,224
                            +--------+-------------+--------+------------
  _Concrete:_               |        |             |        |
      Columns (including    |        |             |        |
               foundations) |  135   |    1,240    |   356  |      543
      Primary beams         |  135   |      440    |   374  |      462
      Secondary beams       |  670   |      515    | 1,252  |      576
      Side-walls            |  ...   |    1,255    |   ...  |      710
                            |        |             |        |
                            | Square |             | Square |
                            | meters.|             | meters.|
      Roof slab             | 5,140  |      520    | 10,206 |    1,020
      Floor                 | 4,070  |      780    |  9,200 |    2,120
      Parapet walls         |  ...   |       90    |   ...  |      165
                            +--------+-------------+--------+------------
           Total concrete   |  ...   |    4,840    |   ...  |    5,596
                            +--------+-------------+--------+------------
                            |        |  Pounds.    |        |  Pounds.
  Reinforcing steel bars    |  ...   |  387,000    |   ...  |  380,000
                            |        |             |        |
                            |        |  Square     |        |  Square
                            |        |  meters.    |        |  meters.
  Expanded metal in roofs,  |        |             |        |
                slabs, etc. |  ...   |    5,691    |   ...  |   10,490
  ==========================+========+=============+========+============

The total cost of these reservoirs, including valve-houses, by-passes,
and the length of supply pipe where the by-pass joins, and including all
engineering expenses, etc., but exclusive of the cost of lands,
planting, fencing, and special work in connection with the formation of
parks, was as follows:

South Reservoir: 394,000 pesos, or 10,368 pesos per million liters.

Obispado Reservoir: 375,000 pesos, or 9,375 pesos[7] per million liters.

[7] Mexican currency.

These rates may be regarded as reasonable when taking into consideration
the special difficulties of construction in Mexico, and the high cost of
all imported material, on which heavy duties are levied.

The value of the materials alone in these reservoirs amounted to more
than 70% of their total cost.




              ANALYSES OF ESTANZUELA AND SAN GERONIMO WATERS.


Table 8 shows analyses of the Estanzuela and San Geronimo waters, made
in February, 1910, by Messrs. Ledoux, of New York City. The Estanzuela
sample was taken at the valve-house of the South Reservoir, while that
of San Geronimo was taken in Shaft No. 1 of the infiltration gallery
when flowing at the rate of about 450 liters per sec. Both waters are
absolutely free from turbidity.

         TABLE 8.--ANALYSES OF ESTANZUELA AND SAN GERONIMO WATERS.
                          In Parts per Million.

  ==================================+================+===============
                                    |                | San Geronimo
                                    | Estanzuela.    | Infiltration
                                    |                | Gallery.
  ----------------------------------+----------------+---------------
  Total solid matter in solution    |     209.00     |    305.00
  Organic and volatile matter       | Not weighable. | Not weighable.
                                    |                |
  ANALYSIS OF SOLIDS:               |                |
      Silica                        |      10.5      |     12.0
      Iron and Alumina              |    Traces.     |   Traces.
      Lime                          |      85.4      |    112.6
      Magnesia                      |       3.8      |     22.6
      Soda (Na_{2}O)                |      13.3      |     20.2
      Potash (K_{2}O)               |       2.0      |      1.9
      Sulphuric Acid                |      24.4      |     11.5
      Chlorine                      |       2.0      |      2.8
                                    +----------------+---------------
  PROBABLE COMBINATION OF BASES &   |                |
    ACID RADICALS IN THE SOLIDS:    |                |
      Silica                        |      10.5      |     12.0
      Iron and Alumina              |    Traces.     |   Traces.
      Sodium Chloride               |       3.3      |      4.6
      Potassium Sulphate            |       3.7      |      3.5
      Sodium Sulphate               |      26.3      |     40.8
      Calcium Sulphate              |      13.3      |     22.1
      Calcium Carbonate             |     142.7      |    184.8
      Magnesium Carbonate           |       8.4      |     49.8
                                    +----------------+---------------
                                    |     208.2      |    317.6
                                    |                |
  Nitrogen as Free Ammonia          |       0.004    |      0.032
  Nitrogen as Albuminoid Ammonia    |       0.006    |      0.022
  Nitrogen as Nitrites (N_{2}O_{3}) |       0.002    |      0.002
  Nitrogen as Nitrates (N_{2}O_{3}) |       0.100    |      1.85
  Total Hardness (as CaCO_{3})      |     155.0      |    220.0
  Alkalinity (as CaCO_{3})          |     121.0      |    180.0
  ==================================+================+===============




                     CITY WATER DISTRIBUTION SYSTEM.


[Illustration: PLATE XIX.--DIAGRAM OF THE MAIN WATER PIPES OF MONTERREY.]

The distribution system was begun in September, 1906, but the general
lay-out of the mains was modified in July, 1907, in view of the division
of the system into two services, for high and low pressure. Plate XIX
shows in skeleton form the lines of the cast-iron mains. These are laid
at the present time along routes containing houses (excluding wooden
shacks) which can be served immediately. The distribution system is
arranged to serve as follows:

               Estanzuela supply              4,150 houses.
               San Geronimo supply            8,600   "
                                             --------------
                   Total                     12,750 houses.

This represents, at the present time, a division of the city of 32-1/2%
for the Estanzuela, and 67-1/2% for the San Geronimo supply. Of the area
of the supply district north of Santa Catarina River, 57% will be
supplied from San Geronimo and 43% from Estanzuela. The real development
of the city, however, is northward in the area of the low-pressure
supply.

The static pressure over the city in the two sections varies as follows:

                Estanzuela supply             85 to 50 lb.
                San Geronimo supply           55 to 29 lb.

The main supply pipe from the South Reservoir is 61 cm. (24 in.) in
internal diameter, and this size allows ample provision for future
extensions. The supply pipe from the Obispado Reservoir is 76 cm. (30
in.) in internal diameter. On this main, in Calle de Cinco de Mayo, at a
distance of 320 m. from the reservoir, has been placed a 76-cm. (30-in.)
Venturi meter, the recording apparatus being in the house on the side of
the road. Both these supply pipes are carried well into the city, and
from them the distribution mains are laid; these are 45.7 and 30 cm. (18
and 12 in.) in internal diameter, with intermediate sections of 15 and
10 cm. (6 in. and 4 in.). Along Calle de Cinco de Mayo, where the
division between the two services takes place, two lines are laid, a
30-cm. for high pressure and a 38-cm. (15-in.) for the low pressure. A
duplicate pipe, 30 cm. (12 in.) in diameter, is also laid in Calle de
Dr. Coss. On Calle de Alvarez the low-pressure pipe is 61 cm. (24 in.),
and the high-pressure, 45.7 cm. (18 in.) in diameter. Provision is also
made for extending the range of the two services to other districts.
Practically every block is provided with gate-valves to cut off the
supply in any direction. On the 76-cm. main, 61-cm. (24-in.) valves are
used, and are connected by tapers to the pipe. On the 61-cm. mains,
45.7-cm. (18-in.) valves are used. The actual frictional loss by
reducing the valve being small, this method permitted the use of valves
of a more convenient size. On all the larger valves there are 15-cm.
by-passes fitted with independent gate-valves.

[Illustration: FIG. 15.--CONNECTION BETWEEN HIGH-AND LOW-PRESSURE AREAS
AND THE INTERSECTION OF CINCO DE MAYO AND ALVAREZ STREETS.]

Scour-out pipes, 10 cm. (4 in.) and 15 cm. (6 in.) in diameter, are
placed in various parts of the system, draining to the sewers.
Air-valves, both double and single, are also placed at high points in
different parts of the system.

_Reducing Valves._--At four points in the system the mains are arranged
so that the supply can be interchangeable. Fig. 15 shows the arrangement
of the mains at the junction of Cinco de Mayo and Alvarez Streets, and
is typical of the arrangement at the other points.

Each reducing valve is placed on a 30-cm. (12-in.) branch main between
the two services. These valves adjust themselves automatically to the
pressure required, after they have been properly regulated to the
different pressures on either side. To allow repairs to be easily made,
there are ordinary gate-valves at each end enclosed in the same pit. If
necessary, as in case of fire, any part of the system can be changed
into high pressure temporarily by closing the valves against the San
Geronimo supply.

Table 9 gives the length of the mains as laid, and the number of valves.

                    TABLE 9.--LENGTH OF WATER MAINS.

      =========================+=====================+=============
            DIAMETER:          |                     |
      --------------+----------+ Length, in meters.  | Number of
       Centimeters. |  Inches. |                     | gate-valves.
      --------------+----------+---------------------+-------------
           10.2     |     4    |     49,831.68       |    677
           15.2     |     6    |     31,918.31       |    306
           30.5     |    12    |     14,461.31       |    117
           38.1     |    15    |      1,661.98       |     11
           45.7     |    18    |      4,522.61       |      5
           61.0     |    24    |      2,826.54       |     10
           76.2     |    30    |      1,454.40       |
      --------------+----------+---------------------+-------------
                 Totals        |    106,676.83       |  1,126
      =========================+=====================+=============

The pipes were all cast according to the British Standard Specification,
in 3.65-m. (12-ft.) lengths, and were supplied by Messrs. D. Y. Stewart
and Company, and Messrs. Dick, Kerr and Company, of Kilmarnock and
London. The valves were all of standard design, faced with gun-metal,
and were supplied by Messrs. Glenfield and Kennedy, Limited, of
Kilmarnock, Scotland.

In the distribution system it is proposed to provide 200 fire-hydrants,
by arrangement with the municipality, but only a few of these have been
placed. The general type is a double hydrant for two 63.5-mm.
(2-1/2-in.) streams. These are to be placed at the corner of every block
in the business portion of the city; single-way hydrants will be used in
the residential districts.

_Laying Cast-iron Pipes._--Table 10 has been prepared to show what can
be accomplished with Mexican labor in laying pipes. In this kind of work
the labor was particularly efficient; after the gangs were once drilled
into shape, the work proceeded systematically, and at very good speed.
All the pipes, after being laid, were tested to 150 lb. per sq. in. in
the presence of the Technical Inspector.

Table 11 gives the details of the excavation, the material, and the
average cost, of laying about 106.6 km. of pipes.

_House Connections._--The ordinary house connections, which are of
19-mm. (3/4-in.) galvanized-steel pipe, are connected to the mains by
lead goosenecks and brass corporation cocks. The Company's obligation
under the concession extended to the edge of the sidewalk, and at this
point curb-boxes, chiefly of the Hays pattern, were placed; but,
subsequently, owing to the metering of every house service in the city,
the control of the Company extended to the meter, which, as a rule, is
placed immediately inside of the house. Owing to the rapid deterioration
of the house service pipes in some districts of the northern part of the
city, where the soil is formed of decaying organic matter, it has been
decided to use lead pipe entirely from the main to the meter.

_Damage Due to Floods._--During the night of August 27th, the main
61-cm. pipe, under the river bed of Santa Catarina, at the point where
the main entered the city, was destroyed for a distance of 130 m., due
to the scouring away of a whole block of city property. The Venturi
meter register chart at the South Reservoir showed that the break
occurred a few minutes before midnight. The location of this pipe is
shown by Fig. 5; its broken end was in proximity to an old bridge pier.
Fortunately, at the time of the flood, the Obispado Reservoir works were
completed, and the whole city was supplied with water from San Geronimo
within 48 hours. As only about 1,500 services had then been connected,
this delay was not serious; in fact, in the lower part of the city, the
water in the mains was sufficient until the San Geronimo supply could be
connected. To make a temporary connection to conduct the high-pressure
water to the city, a 15-cm. steel pipe was placed above ground, on the
line of the main, for a distance of 100 m. This pipe was supported by a
cable, 30 mm. in diameter, and by timber trestles. By limiting the
supply district, this pipe was of sufficient capacity to serve until the
large main could be safely restored.

   TABLE 10.--COST OF LAYING AND JOINTING CAST-IRON PIPES, EXCLUDING
   LOWERING AND TESTING.

  +--------------+----------+----------------------------------------+
  |              |          | 76 CM. (30 IN.)                        |
  |              |          +-------+------------+--------+----------+
  | Employees.   | Rate for | Total | Total cost | No. of | Cost per |
  |              | 10-hour  | No.   | of labor.  | pipes  | linear   |
  |              | day.     | men.  | Pesos.     | laid.  | meter.   |
  |              | Pesos.   |       |            |        | Pesos.   |
  +--------------+----------+-------+------------+--------+----------+
  | Foreman      | 4.50     |  1    |  4.50      | ...    |   ...    |
  | Caulkers     | 3.00     |  4    | 12.00      | ...    |   ...    |
  | Lead pourers | 2.00     |  2    |  4.00      | ...    |   ...    |
  | Lead melter  | 1.50     |  1    |  1.50      |  20    | 0.498    |
  | Pipe cutter  | 2.00     |  1    |  2.00      | ...    |   ...    |
  | Peons        | 1.00     | 12    | 12.00      | ...    |   ...    |
  | Water boy    | 0.50     |  1    |  0.50      | ...    |   ...    |
  |              |          |       |            |        |          |
  |              | ...      | 22    | 36.50      | ...    |   ...    |
  +--------------+----------+-------+------------+--------+----------+
  |              |          | 61 CM. (24 IN.)                        |
  |              |          +-------+------------+--------+----------+
  | Employees.   | Rate for | Total | Total cost | No. of | Cost per |
  |              | 10-hour  | No.   | of labor.  | pipes  | linear   |
  |              | day.     | men.  | Pesos.     | laid.  | meter.   |
  |              | Pesos.   |       |            |        | Pesos.   |
  +--------------+----------+-------+------------+--------+----------+
  | Foreman      | 4.50     |  1    |   4.50     | ...    |   ...    |
  | Caulkers     | 3.00     |  5    |  15.00     | ...    |   ...    |
  | Lead pourers | 2.00     |  2    |   4.00     | ...    |   ...    |
  | Lead melter  | 1.50     |  1    |   1.50     |  25    | 0.410    |
  | Pipe cutter  | 2.00     |  1    |   2.00     | ...    |   ...    |
  | Peons        | 1.00     | 10    |  10.00     | ...    |   ...    |
  | Water boy    | 0.50     |  1    |   0.50     | ...    |   ...    |
  |              |          |       |            |        |          |
  |              | ...      | 21    |  37.50     | ...    |   ...    |
  +--------------+----------+-------+------------+--------+----------+
  |              |          | 50 CM. (20 IN.)                        |
  |              |          +-------+------------+--------+----------+
  |              | Rate for | Total | Total cost | No. of | Cost per |
  | Employees.   | 10-hour  | No.   | of labor.  | pipes  | linear   |
  |              | day.     | men.  | Pesos.     | laid.  | meter.   |
  |              | Pesos.   |       |            |        | Pesos.   |
  +--------------+----------+-------+------------+--------+----------+
  | Foreman      | 4.50     |  1    |  4.50      | ...    |   ...    |
  | Caulkers     | 3.00     |  4    | 12.00      | ...    |   ...    |
  | Lead pourers | 2.00     |  2    |  4.00      | ...    |   ...    |
  | Lead melter  | 1.50     |  1    |  1.50      |  35    | 0.287    |
  | Pipe cutter  | 2.00     |  1    |  2.00      | ...    |   ...    |
  | Peons        | 1.00     | 12    | 12.00      | ...    |   ...    |
  | Water boy    | 0.50     |  1    |  0.50      | ...    |   ...    |
  |              |          |       |            |        |          |
  |              |          | 22    | 36.50      | ...    |   ...    |
  +--------------+----------+-------+------------+--------+----------+
  |              |          | 45.7 CM. (18 IN.)                      |
  |              |          +-------+------------+--------+----------+
  |              | Rate for | Total | Total cost | No. of | Cost per |
  | Employees.   | 10-hour  | No.   | of labor.  | pipes  | linear   |
  |              | day.     | men.  | Pesos.     | laid.  | meter.   |
  |              | Pesos.   |       |            |        | Pesos.   |
  +--------------+----------+-------+------------+--------+----------+
  | Foreman      | 4.50     |  1    |   4.50     | ...    |   ...    |
  | Caulkers     | 3.00     |  4    |  12.00     | ...    |   ...    |
  | Lead pourers | 2.00     |  2    |   4.00     | ...    |   ...    |
  | Lead melter  | 1.50     |  1    |   1.50     |  40    | 0.221    |
  | Pipe cutter  | 2.00     |  1    |   2.00     | ...    |   ...    |
  | Peons        | 1.00     |  8    |   8.00     | ...    |   ...    |
  | Water boy    | 0.50     |  1    |   0.50     | ...    |   ...    |
  |              |          |       |            |        |          |
  |              |          | 18    |  32.50     | ...    |   ...    |
  +--------------+----------+-------+------------+--------+----------+
  |              |          | 38 CM. (15 IN.)                        |
  |              |          +-------+------------+--------+----------+
  |              | Rate for | Total | Total cost | No. of | Cost per |
  | Employees.   | 10-hour  | No.   | of labor.  | pipes  | linear   |
  |              | day.     | men.  | Pesos.     | laid.  | meter.   |
  |              | Pesos.   |       |            |        | Pesos.   |
  +--------------+----------+-------+------------+--------+----------+
  | Foreman      | 4.50     |  1    |  4.50      | ...    |   ...    |
  | Caulkers     | 3.00     |  4    | 12.00      | ...    |   ...    |
  | Lead pourers | 2.00     |  2    |  4.00      | ...    |   ...    |
  | Lead melter  | 1.50     |  1    |  1.50      |  45    | 0.196    |
  | Pipe cutter  | 2.00     |  1    |  2.00      | ...    |   ...    |
  | Peons        | 1.00     |  8    |  8.00      | ...    |   ...    |
  | Water boy    | 0.50     |  1    |  0.50      | ...    |   ...    |
  |              |          |       |            |        |          |
  |              |          | 18    | 32.50      | ...    |   ...    |
  +--------------+----------+-------+------------+-------------------+
  |              |          | 30.5 CM. (12 IN.)                      |
  |              |          +-------+------------+--------+----------+
  |              | Rate for | Total | Total cost | No. of | Cost per |
  | Employees.   | 10-hour  | No.   | of labor.  | pipes  | linear   |
  |              | day.     | men.  | Pesos.     | laid.  | meter.   |
  |              | Pesos.   |       |            |        | Pesos.   |
  +--------------+----------+-------+------------+--------+----------+
  | Foreman      | 4.50     |  1    |   4.50     | ...    |   ...    |
  | Caulkers     | 3.00     |  4    |  12.00     | ...    |   ...    |
  | Lead pourers | 2.00     |  2    |   4.00     | ...    |   ...    |
  | Lead melter  | 1.50     |  1    |   1.50     |  60    | 0.147    |
  | Pipe cutter  | 2.00     |  1    |   2.00     | ...    |   ...    |
  | Peons        | 1.00     |  8    |   8.00     | ...    |   ...    |
  | Water boy    | 0.50     |  1    |   0.50     | ...    |   ...    |
  |              |          |       |            |        |          |
  |              |          | 18    |  32.50     | ...    |   ...    |
  +--------------+----------+-------+------------+--------+----------+
  |              |          | 15 CM. (6 IN.)                         |
  |              |          +-------+------------+--------+----------+
  | Employees.   | Rate for | Total | Total cost | No. of | Cost per |
  |              | 10-hour  | No.   | of labor.  | pipes  | linear   |
  |              | day.     | men.  | Pesos.     | laid.  | meter.   |
  |              | Pesos.   |       |            |        | Pesos.   |
  +--------------+----------+-------+------------+--------+----------+
  | Foreman      | 4.50     |  1    |  4.50      | ...    |   ...    |
  | Caulkers     | 3.00     |  4    | 12.00      | ...    |   ...    |
  | Lead pourers | 2.00     |  2    |  4.00      | ...    |   ...    |
  | Lead melter  | 1.50     |  1    |  1.50      | 100    | 0.082    |
  | Pipe cutter  | 2.00     |  1    |  2.00      | ...    |   ...    |
  | Peons        | 1.00     |  6    |  6.00      | ...    |   ...    |
  | Water boy    | 0.50     |  1    |  0.50      | ...    |   ...    |
  |              |          |       |            |        |          |
  |              |          | 16    | 30.50      | ...    |   ...    |
  +--------------+----------+-------+------------+--------+----------+
  |              |          | 10 CM.  (4 IN.)                        |
  |              |          +-------+------------+--------+----------+
  | Employees.   | Rate for | Total | Total cost | No. of | Cost per |
  |              | 10-hour  | No.   | of labor.  | pipes  | linear   |
  |              | day.     | men.  | Pesos.     | laid.  | meter.   |
  |              | Pesos.   |       |            |        | Pesos.   |
  +--------------+----------+-------+------------+--------+----------+
  | Foreman      | 4.50     |  1    |   4.50     | ...    |   ...    |
  | Caulkers     | 3.00     |  4    |  12.00     | ...    |   ...    |
  | Lead pourers | 2.00     |  2    |   4.00     | ...    |   ...    |
  | Lead melter  | 1.50     |  1    |   1.50     | 150    | 0.0574   |
  | Pipe cutter  | 2.00     |  1    |   2.00     | ...    |   ...    |
  | Peons        | 1.00     |  6    |   6.00     | ...    |   ...    |
  | Water boy    | 0.50     |  1    |   0.50     | ...    |   ...    |
  |              |          |       |            |        |          |
  |              |          | 16    |  30.50     | ...    |   ...    |
  +--------------+----------+-------+------------+--------+----------+

                TABLE 11.--CAST-IRON WATER PIPES.--COST
                 OF MATERIALS AND LAYING AT MONTERREY.

                 MATERIALS PER STANDARD LENGTH OF PIPE .

 Key: cm = centimeter in = inch mm = millimeter kg = kilogram m = linear meter
 +-----------+------+-------+--------+-------------+--------+--------+-------+
 |   PIPE    |      |Weight |Cost/   |    LEAD     |  OAKUM |CHARCOAL| Total |
 | DIAMETER  |Thick-|  of   |piece   +------+------+--------+--------+ Ma-   |
 +------+----+ ness | Pipe  |fob Mon-|Weight| Cost |  Cost  | Cost   |terial |
 |      |    |      |       |terrey  |      |      |        |        | Cost  |
 |  cm  | in |  mm  |  kg   | pesos  |  kg  |pesos | pesos  | pesos  | per m |
 +------+----+------+-------+--------+------+------+--------+--------+-------+
 | 10   |  4 | 10.3 |   109 |  11.65 |  2.0 | 0.37 | 0.025  | 0.0525 |  3.30 |
 | 15   |  6 | 11.1 |   163 |  15.74 |  3.7 | 0.67 | 0.0675 | 0.065  |  4.51 |
 | 30.5 | 12 | 15.8 |   463 |  76.50 |  7.9 | 1.44 | 0.1225 | 0.1    | 21.35 |
 | 38   | 15 | 17.4 |   680 |  79.36 | 10.6 | 1.94 | 0.175  | 0.12   | 22.30 |
 | 45.7 | 18 | 19.0 |   871 |  90.28 | 13.4 | 2.42 | 0.2375 | 0.1375 | 25.42 |
 | 61   | 24 | 22.2 | 1,261 | 117.60 | 18.8 | 3.42 | 0.335  | 0.175  | 33.20 |
 | 76   | 30 | 25.4 | 1,946 | 199.05 | 24.5 | 4.42 | 0.44   | 0.2125 | 55.77 |
 +------+----+------+-------+--------+------+------+--------+--------+-------+

                           LABOR.

  Key: cm = centimeter, in = inch, m = meter
  +-----------+------+------+------+------+-------+-------+----
  |           |      |      |      |      |       |Total  |
  | DIAMETER  |      |      | Cubic| Cost |Back-  |cost,  |
  | OF PIPE:  | Width|Depth |meters| of   |filling|exca-  |
  |           |  of  |      | per  |exca- |and re-|vation |
  +------+----+trench|      |linear|vation|moving |back-  | Continues
  |      |    |      |      | meter| per  |surplus|filling|
  |  cm  | in |  m   |  m   |      |lin. m|Pesos  |etc.   |
  |      |    |      |      |      |      |       |Pesos  |
  +------+----+------+------+------+------+-------+-------+----
  | 10   |  4 | 0.55 | 0.90 | 0.50 | 0.60 | 0.18  | 0.78  |
  | 15   |  6 | 0.60 | 1.00 | 0.60 | 0.72 | 0.22  | 0.94  |
  | 30.5 | 12 | 0.65 | 1.20 | 0.78 | 0.94 | 0.29  | 1.23  |
  | 38   | 15 | 0.70 | 1.30 | 0.91 | 1.10 | 0.34  | 1.44  | Below
  | 45.7 | 18 | 0.80 | 1.40 | 1.12 | 1.34 | 0.41  | 1.75  |
  | 61   | 24 | 1.00 | 1.50 | 1.50 | 1.80 | 0.55  | 2.35  |
  | 76   | 30 | 1.10 | 1.60 | 1.76 | 2.11 | 0.65  | 2.76  |
  +------+----+------+------+------+------+-------+-------+----

  --+----------------+--------+--------+--------+
    |  HAULING PER   |  Cost  | Total  | Total  |
    |                |  of    |hauling |excava- |
    |  LINEAR METER  | laying | and    |tion and|
    |                |  per   |laying  |laying, |
    +--------+-------+ linear | per    |labor,  |
    | Haul-  | Misc. | meter  |linear  |complete|
    |  ing   | Pesos |        | meter  |        |
    | Pesos  |       | Pesos  | Pesos  | Pesos  |
  --+--------+-------+--------+--------+--------+
    | 0.0275 | 0.005 | 0.06   | 0.0925 | 0.8725 |
    | 0.45   | 0.005 | 0.825  | 0.1325 | 1.0725 |
    | 0.18   | 0.0075| 0.1475 | 0.335  | 1.565  |
    | 0.2725 | 0.01  | 0.19   | 0.4775 | 1.9125 |
    | 0.2725 | 0.01  | 0.245  | 0.5275 | 2.2775 |
    | 0.825  | 0.08  | 0.41   | 1.315  | 3.665  |
    | 0.83   | 0.10  | 0.53   | 1.46   | 4.22   |
  --+--------+-------+--------+--------+--------+

NOTE.--The above costs of earthwork are based on the following rates and
percentages over the whole city:

              Earth, per cubic meter      | 0.35 pesos | 50%
              Soft sillar                 | 0.75   "   | 20%
              Hard sillar                 | 1.50   "   | 20%
              Rock (chiefly conglomerate) | 4.00   "   | 10%

                          SUMMARY OF TABLE 11.

   +------------------------+-------------+------------+------------+
   | DIAMETER               | Total labor | Materials. | Total cost |
   | OF PIPE :              | cost.       | Pesos.     | per linear |
   +--------------+---------+ In pesos.   |            | meter, in  |
   | Centimeters. | Inches. |             |            | pesos.     |
   +--------------+---------+-------------+------------+------------+
   | 10           |  4      | 0.8725      |  3.30      |  4.1725    |
   | 15           |  6      | 1.0725      |  4.51      |  5.5825    |
   | 30.5         | 12      | 1.565       | 21.35      | 22.915     |
   | 38           | 15      | 1.9125      | 22.30      | 24.2125    |
   | 45.7         | 18      | 2.2775      | 25.42      | 27.6975    |
   | 61           | 24      | 3.665       | 33.20      | 36.865     |
   | 76           | 30      | 4.22        | 55.77      | 59.99      |
   +--------------+---------+-------------+------------+------------+

The flood destroyed about 1,200 houses in the neighborhood of the river.
In a number of blocks the smaller mains were scoured away, but
considerable salvage was done afterward, and, as it is the intention of
the authorities not to permit rebuilding along the flood-path of the
river, these mains do not require reconstruction.




                          MAIN SEWERAGE SYSTEM.


The Company's obligations, as far as drainage is concerned, were limited
to the removal and disposal of sewage, no provision being required for
storm-water, which is allowed to find its way to the natural
watercourses. Apart from that fact, however, the best system for a city
like Monterrey, where rainfall for many months at a time is very scarce,
is the strictly "separate system." In the design advantage was taken of
the natural topography of the drainage district, which is almost an
ideal one for a gravitation system of sewers, the general fall in all
directions being northeast; it was also in this direction that the best
available land could be obtained for disposal purposes.

[Illustration: PLATE XX.--DIAGRAM OF THE MAIN SEWERS OF MONTERREY.]

Plate XX shows in skeleton form the general lay-out of the sewers. Two
drainage districts are arranged, divided by Calle de Washington, which may
be regarded as practically the center of the city, and each of these
districts has an independent main collector connecting to the outfall
sewer at the northeast extremity of the city.

The system has been designed so that extensions may be made and may cover
any part within the city limits; the main collectors are large enough for
the whole area when fully built up.

The sewers are designed on a very liberal basis, namely, on the assumption
that when flowing half full the quantity to be dealt with will be 380
liters per capita per day, with a maximum rate of flow of 200 per cent. It
was assumed that each house would be occupied by 7 persons and have a
frontage of 12-1/2 m. The minimum velocities in the sewers, when running
full, vary between 0.91 and 1.5 m. per sec., with the exception of a few
blocks.

The minimum size adopted was 24.3 cm. (8 in.) in internal diameter. The
sewers of diameters between 24.3 and 50 cm., are 0.91 m. (36 in.) long,
and are of salt-glazed vitrified clay, imported from San Antonio, Tex.

Table 12 gives the details of the length of the various sewers laid.

                      TABLE 12.--LENGTH OF SEWERS.

   +----------+------------------------------------------+-----------+
   |DIAMETER: |                                          |           |
   +-----+----+        Kind.                             | Length,   |
   |  cm | in.|                                          | in meters.|
   +-----+----+------------------------------------------+-----------+
   |24.3 |  8 |    Fire-clay                             | 38,332.85 |
   |25.4 | 10 |       "                                  | 16,400.69 |
   |30.5 | 12 |       "                                  |  7,953.15 |
   |38.1 | 15 |       "                                  |  4,850.56 |
   |45.7 | 18 |       "                                  |  2,023.40 |
   |50.8 | 20 |       "                                  |  1,450.53 |
   |55.9 | 22 | Reinforced concrete tubes, 6.9 cm. thick |  3,134.20 |
   |61.0 | 25 |     "         "       "    7.6 "     "   |    357.40 |
   |68.6 | 27 |       Brick and concrete                 |    484.05 |
   |76.2 | 30 |         "    "     "                     |    662.69 |
   |     |    |                                          |           |
   |     |    |                                 Total    | 75,649.15 |
   +-----+----+------------------------------------------+-----------+

The greater number of the manholes are of brickwork, 23 cm. thick, and
have concrete inverts. They have a diameter of 1.2 m., which is reduced to
0.61 m. at the top, and each is provided with a heavy cast-iron frame and
closed cover weighing about 190 kg. There are 521 manholes, and they are
placed at every block and on long lines about 80 m. apart.

[Illustration: FIG. 16.--STANDARD 300-GAL. FLUSH TANKS.]

The sewers are flushed with 15-cm. (6-in.) automatic flushing siphons of
the Miller pattern with 20-cm. (8-in.) discharge pipes. There are 278 of
these siphons, and they are placed in flush-tanks (Fig. 16) built of
brickwork and plastered with 1:1 cement mortar. Their capacity varies from
800 to 1,200 liters, and they discharge from 22-1/2 to 28-1/2 liters per
sec. They are timed to flush once in 24 hours.

The system is at present ventilated by 23-cm. (9-in.) steel ventilating
columns (Fig. 16), with ornamental cast-iron bases. There are 220 of these
columns. Most of them are 7.85 m. above the level of the edge of the
sidewalk, and are connected to special 15-cm. branch pipes leading from
the sewer on the outside of the flush-tanks. In the center of the city
they are provided with extension lengths, giving a total height of 12 m.

Table 13 gives the particulars of the average distributed cost of laying
the 75.6 km. of sewers.

        TABLE 13.--AVERAGE COST, PER LINEAR METER, FOR 75.6 KM.
            OF SEWERS, FOR MATERIALS AND LABOR COMPLETE.

  +----------+-----------+--------+-----------------------------+--------+
  |          | INTERNAL  |Cost of |    EARTHWORK AND LABOR:     | Total  |
  |          | DIAMETER  | mater- |-------+------------+--------| cost of|
  |          |   OF      | ials   |       | Cost of    |Cost of | sewer  |
  |          |  SEWERS.  |includ- |Average| excavation,|labor   |complete|
  |Kind of   +------+----+ ing    | depth | including  |  in    |  per   |
  |  Sewer.  |      |    |10-cm.  |  of   | back-      |laying  | linear |
  |          |      |    |(4-in.) | sewer | filling,   |(includ-| meter. |
  |          |  cm. | in.|branches|       | removing   | ing    |        |
  |          |      |    |every   |   m.  | surplus,   |hauling,|        |
  |          |      |    |4-1/2 m.|       | etc.       | etc.). |        |
  |          |      |    |Pesos.  |       | Pesos.     | Pesos. |        |
  +----------+------+----+--------+-------+------------+--------+--------+
  |Fire-clay | 24.3 |  8 |  2.00  |  2.10 |    3.46    | 0.21   | 5.67   |
  |    "     | 25.4 | 10 |  2.78  |  2.25 |    3.97    | 0.2625 | 7.0125 |
  |    "     | 30.5 | 12 |  3.64  |  2.50 |    4.705   | 0.305  | 8.65   |
  |    "     | 38.1 | 15 |  6.14  |  2.75 |    5.50    | 0.4375 |12.0775 |
  |    "     | 45.7 | 18 |  8.80  |  3.00 |    6.745   | 0.645  |16.19   |
  |    "     | 50.8 | 20 | 11.30  |  3.50 |    8.275   | 0.815  |20.39   |
  |Concrete  | 55.9 | 22 |  5.93  |  3.50 |    9.19    | 1.325  |16.445  |
  |    "     | 61.0 | 25 |  7.30  |  3.75 |   11.245   | 1.685  |20.23   |
  |One brick}|      |    |        |       |            |        |        |
  |thick on }| 68.6 | 27 |  7.17  |  3.75 |   11.735   | 3.93   |22.835  |
  |concrete }| 76.2 | 30 |  7.925 |  4.00 |    14.53   | 4.515  |26.97   |
  |founda-  }|      |    |        |       |            |        |        |
  |tions    }|      |    |        |       |            |        |        |
  +----------+------+----+--------+-------+------------+--------+--------+

[Illustration: FIG. 17.--SKETCH SHOWING DISCONNECTING TRAP ON HOUSE
DRAIN.]

The house connections are chiefly of 10-cm. (4-in.) pipes, laid on a
minimum gradient of 2-1/2%, from oblique branches on the sewer to siphon
intercepting traps near the house, as shown by Fig. 17. From this trap a
10-cm. fire-clay inspection pipe is carried up and capped at the sidewalk
level with a cast-iron box having a locked cover. From this inspection
pipe a branch is connected to a cast-iron fresh-air inlet, in most cases
set in the wall of the house, the inlet being 30 cm. above the level of
the pavement.

_Effect of the Flood on Sewers._--The flood of August 27th and 28th, 1909,
partly destroyed one of the main collectors, which was laid along the
banks of the river and encased in concrete. This has now been relaid
farther north, and out of the way of any future floods. The total length
of the new sewers replacing those damaged amounts to 1200 m., and they
vary in internal diameter from 20 to 55.9 cm. (8 to 22 in.).




                          MAIN OUTFALL SEWER.


The direction of the main outfall sewer was determined after a thorough
study of all the available land lying to the north and northeast of the
city, as it was the intention of the Company to utilize for irrigation
purposes the sewage and any surplus waters that might be developed. The
best available site was found to be about 12 km. north of the city, a
little northwest of the village of San Nicolas de los Garzas, as shown on
Plate II. The long length of outfall required was justified by the cheap
cost of the land and its excellent character for sewage irrigation. The
sewer was designed for a capacity of 90,000,000 liters a day (36.76 cu.
ft. per sec.) in order to allow for conveying surplus waters as well as
sewage.

[Illustration: PLATE XXII.--OUTFALL SEWER: PLAN OF GROUND SHOWING SEWER;
ALSO DETAILS OF VARIOUS SECTIONS.]

The outfall intercepts the two main branches of the city sewers at Calle
de Allende and Calle de Tapia, and its total length is approximately
11,900 m. The chief type adopted is shown on Plate XXII. It is formed
with an invert of radial bricks laid in 1:2 cement mortar, on a foundation
of 1:3:5 concrete approximately 7 cm. thick. As the ground was chiefly in
hard sillar, only a little concrete was required to mould the bottom to
the correct shape. The arch was formed of special radial bricks, 15 cm. (6
in.) deep, laid in cement mortar. These bricks were adopted in preference
to concrete, owing to the heavy cost of sand and rock, due to the long
haul, and for the purpose of obtaining rapid work. Plate XXI shows the
sewer arch, and one of the ventilating columns and manholes. The bricks
were obtained from the local brick plant, and form a very satisfactory
material for sewers, being well burnt, thoroughly hard, and absorbing not
more than 7-1/2% of their weight of water. The contract prices for the
labor on the brickwork were 1.25 pesos per sq. m., and 1.38 pesos for the
arch.

[Illustration: PLATE XXI, FIG. 1.--VIEW OF ARCH, OUTFALL SEWER.]

[Illustration: PLATE XXI, FIG. 2.--VENTILATING COLUMN AND MANHOLE, OUTFALL
SEWER.]

The general route of the sewer is very direct, long straight lines of
several kilometers being possible, and these were joined by curves of
approximately 30 m. radius. The gradient of the sewer invert is 0.2% (1 in
500) which is approximately the general fall of the ground northward from
Monterrey.

The total quantity of excavation was as follows:

                 No. 1, soft earth          8,960 cu. m.
                 No. 2, sillar             18,492  "  "
                 No. 3, conglomerate rock   9,822  "  "
                                           ------
                 Total                     37,274 cu. m.

The contract prices for this excavation were: for No. 1, 32 cents; No. 2,
85 cents; and No. 3, 2.17 pesos per cu. m.

All the excavation was in perfectly dry ground. Where the sewer was partly
out of the ground it had a foundation of concrete, 1.75 m. wide, from 15
to 23 cm. thick, below the bottom of the brickwork, and carried up to the
springing of the arch, and a well-tamped embankment, with slopes of 1-1/2
to 1, to protect the sewer to a height of 30 cm. (12 in.) above the arch.
For 342 m. at the Monterrey end of the line, the sewer was constructed in
tunnel, from, the open end and from two intermediate shafts. The tunnel
throughout was in sillar, and the contract price for excavation was 24.50
pesos per lin. m. This work was done without timbering of any kind, except
at the shaft lengths. Plate XXII shows the lining of the tunnel, which
was of concrete with a brick invert. At four places the sewer passes under
main railway tracks, which at these points were carried on steel girders
supported on concrete abutments, the sewer being carried under the tracks
in the ordinary way.

_Bridges._--At three points the sewer was carried over arroyos on
reinforced concrete girders. No. 1, at Station 5,600, consisted of four
10-m. spans; No. 2, at Station 8,365, over the Estanscia Arroyo, consisted
of nine 10-m. spans; and No. 3, at Station 8,960, over the Topo Chico
Arroyo, consisted of three 10-m. spans. One of these bridges is shown on
Plate XXIII. They were designed as two parallel continuous girders with
connecting top and bottom slabs. The concrete for the girders was a
1:2-1/2:3-1/2 mixture, the sand being from the crusher and the rock gauged
to pass a 19-mm. (3/4-in.) screen. The inside was rendered with a coat of
1:1 cement mortar, 7 mm. thick, for water-tightness.

[Illustration: PLATE XXIII, FIG. 1.--FORMS FOR MAIN GIRDERS, ESTANSCIA
BRIDGE, OUTFALL SEWER.]

[Illustration: PLATE XXIII, FIG. 2.--VIEW OF ESTANSCIA BRIDGE, COMPLETED.]

The piers of the Estanscia Bridge (Plate XXIII) were carried down through
soft earth to a stiff clay from 4-1/2 to 6 m. below the surface, and the
foundations were spread so that the pressure would not exceed 1 ton per
sq. ft. The ends of the bridges were protected by rubble wing-walls
supporting the embankment over the sewer. A 1:3:5 concrete was used for
the upper part of the piers, and the lower part was of the same mixture
with 30% of large boulders. There are 70 manholes (Fig. 19) along the line
of the sewer, and they vary from 150 to 230 m. apart. The sewer is
ventilated with 30 concrete towers (Fig. 18, and Fig. 2, Plate XXI), 2.9
m. high, having 20-cm. (8-in.) shafts.

[Illustration: FIG. 18.--DETAILS OF VENTILATORS ON OUTFALL SEWER.]

[Illustration: FIG. 19.--DETAILS OF MANHOLES ON OUTFALL SEWER.]

The works for the outfall sewer were carried out satisfactorily under a
contract with Mr. John Phillips, of Mexico City, the Company supplying the
greater part of the materials. The work was begun on March 16th, and
finished on November 12th, 1908.




                SEWAGE DISPOSAL WORKS AND IRRIGATION LANDS.


For the purpose of disposing of the sewage and using it profitably, the
Company purchased 909 hectares (2,246 acres) of land from the Community of
San Nicolas de los Garzas, the outfall sewer being carried to the
southwestern boundary of the land acquired. This area has a general fall
in all directions to the northeastern boundary, with a gradual fall of
about 25 m. across the diagonal of the land. The area purchased was
practically virgin land, only small portions having been cultivated. The
greater part was covered with a growth of mezquite trees and small shrubs.
The quality of the land is excellent, if properly irrigated, and capable
of yielding abundant crops of every description. The limits of this land
are shown on Plate II.

_Sewage Purification Tanks._--For the purpose of obtaining a satisfactory
effluent to discharge on the land without causing nuisance, the Company
built a system of detritus chambers and liquefying tanks at the end of the
outfall sewer. One difficulty to be faced, in designing these works, was
the fact that there were no data regarding the probable quantity of
dry-weather sewage, nor any particulars as to its general character;
there was also the probability that the outfall sewer would have to carry
large quantities of surplus water. Therefore, the system was designed so
as to be capable of extension if necessary, and the sizes of the various
tanks were limited at present, because of the septic processes which would
be set up in the long length of outfall sewer. The tanks were designed to
deal with 10,000,000 liters of sewage proper per day, and the channels,
etc., were proportioned to take the full flow of the sewer if necessary.
Provision was also made for discharging large volumes of surplus water
directly on the land, independent of the tanks. To do this a by-pass was
taken from the sewer a short distance before reaching the site of the
tanks. By properly timing the flow, arrangements could be made to
discharge these waters in the early hours of the morning, by allowing the
scour-pipes in the distribution system to be opened at night when the
domestic sewage flow was at its minimum. As the area of land available is
very great, the degree of purification in the tanks was relatively
unimportant; the object to be obtained consisted chiefly in distributing
on the land an effluent which would be innocuous and clear.

The general design of the works is shown on Plate XXIV, and they consist
essentially of a screen chamber, duplicate detritus tanks, and three
liquefying tanks. There is also a sludge-pit 629 m. from the tanks.

[Illustration: PLATE XXIV.--SEWAGE DISPOSAL WORKS AT SAN NICOLAS DE LOS
GARZAS; GENERAL PLAN OF DETRITUS AND LIQUEFYING TANKS, WITH DETAILS OF THE
LATTER.]

_Screen Chamber and Detritus Tanks._--Enlarged details of the screen
chamber are shown on Plate XXV. The invert, where the sewer enters the
screen chamber, is 489.45 m. above datum. This chamber has duplicate
screens which are fully detailed on Plate XXX. For cleaning purposes the
screens are raised by a steel-framed head-gear, which is arranged so that
they may be lowered to a small traveling bogie, out of the way of the
screen chamber.

[Illustration: PLATE XXV.--SEWAGE DISPOSAL WORKS AT SAN NICOLAS DE LOS
GARZAS. DETAILS OF DETRITUS CHAMBERS AND INLET CHANNELS.]

[Illustration: PLATE XXVI.--SEWAGE DISPOSAL WORKS AT SAN NICOLAS DE LOS
GARZAS DETRITUS AND LIQUEFYING TANKS; DETAILS OF DISTRIBUTING CHANNELS.]

[Illustration: PLATE XXX.--SEWAGE DISPOSAL WORKS AT SAN NICOLAS DE LOS
GARZAS. DETAILS OF SCREENING APPARATUS.]

From the screen chamber there are two main channels, 1.22 m. wide,
branching to the two concrete detritus chambers. Each channel has a square
penstock, so that the sewage can be diverted into either chamber when
necessary.

The detritus chambers are octagonal in plan, 4 m. in diameter, and each is
provided with an outlet weir 1.50 m. wide. At the weir level the chambers
have a depth of 1.75 m., with drainage channels below that level. The
coping is 1 m. above the outlet weir of the detritus tanks. To drain off
these chambers, each has a scour-out pipe, 30 cm. in diameter, controlled
from valves with spindles carried above the coping level. Each of these
pipes is connected to a central chamber, and leads to a 56-cm. (22-in.)
sludge-pipe. The chambers as designed are of smaller capacity than those
usually provided, but, as all surface water is strictly excluded from the
sewerage system, the quantity of detritus reaching the chambers may be
small. The velocity through them when both are in use will be
approximately 0.082 m. (0.27 ft.) per sec.

From these chambers the sewage is carried to the three liquefying tanks by
a main channel, 11.5 m. long and 1.50 m. wide.

[Illustration: PLATE XXVII, FIG. 1.--CAST CONCRETE BEAMS BEING PLACED IN
POSITION, LIQUEFYING TANKS.]

[Illustration: PLATE XXVII, FIG. 2.--INLET WEIRS TO LIQUEFYING TANKS,
DURING CONSTRUCTION.]

[Illustration: PLATE XXVIII, FIG. 1.--VIEW OF LIQUEFYING TANKS, FROM INLET
END.]

The tanks are of concrete and have reinforced concrete roofs. Each is 66
m. long and 6 m. wide; the minimum depth for the sewage is 1.50 m. at the
outlet end, and 2.25 m. at the inlet, increasing to a maximum depth of
2.75 m. at the lowest depth at the scour-out channel. Their combined
capacity is 2,500,000 liters, which is equivalent to 6 hours' flow of the
quantity of sewage for which they were designed. The sewage passes from
the main channel, through penstock-valves which control the flow, into one
or the other of the tanks. From these valve openings it flows over
concrete weirs, 5 m. long, and is deflected to the bottom of the tank by a
reinforced concrete scum-plate, extending across each tank, with a
clearance of 15 cm. at each end. This scum-plate is 1.5 m. deep and 10 cm.
thick, and is placed 40 cm. from the end walls.

[Illustration: PLATE XXIX.--SEWAGE DISPOSAL WORKS AT SAN NICOLAS DE LOS
GARZAS; DETAILS OF OUTLET CHANNELS AND WEIR BOX.]

The details of the concrete division and outside walls are shown on Plate
XXIX. The floor was constructed in two layers, and its surface is divided
into 6 channels formed by small walls, 20 cm. wide and 15 cm. deep, the
object of these channels being to facilitate the cleaning of the floor by
scouring it out to a specially arranged channel at the deepest point of
the tank, near the inlet end. Each scour-out channel has a 30-cm. (12-in.)
gate-valve, controlled from the roof of the tank, the three scour-pipes
meeting in a concrete chamber outside of the tanks, from which a 56-cm.
(22-in.) concrete pipe discharges the contents of the tanks to the
sludge-pit during cleaning operations. The velocity through the tanks,
when they are used in combination, is 0.0253 m. (0.083 ft.) per sec., the
tanks being made as long as economically possible, in order to obtain this
low velocity and thus permit the proper sedimentation of the suspended
matters. The roof of each tank is 1 m. above the weir level. Each tank has
four ventilating columns, 3.7 m. high and 30 cm. in diameter, vitrified
clay pipes, with an exterior casing of contrete, being used for the
shafts. The roof is enclosed within parapet walls, and is covered with a
layer of earth 25 cm. thick.

The outlet channel from the tanks leads to a measuring chamber, 3 m.
square, as shown on Plate XXIX. This chamber is fitted with penstocks,
1.83 m. wide, and measuring weirs. From this chamber the sewage is
delivered to two main irrigation ditches, which distribute the sewage in
two directions, one northward and the other to the western extremity of
the lands.

_Construction of Tanks._--The excavation for the tanks was in soft earth
for a depth of 1-1/2 m.; the lower depths were in a firm foundation of
sillar and calcareous clay. The total excavation in the tanks, channels,
etc., was 8,335 cu. m., and the actual cost was 45-3/4 cents per cu. m. To
facilitate the construction, about six-tenths of the concrete beams were
cast as single monoliths and placed in position by sliding them across the
tanks on temporary timbers. The remainder of the beams, the roof, and the
slab were placed in position in the ordinary way with timber forms. The
total quantity of concrete placed was 1,360 cu. m. A 1:2-1/2:4-1/2
concrete was used for the walls, channels, etc., and a 1:2:3 mixture for
the roof slab and beams.

Table 14 gives the average cost per cubic meter for all the concrete work.

    TABLE 14.--AVERAGE COST PER CUBIC METER FOR CONCRETE IN TANKS.

   +-----------------------------------------+-----------+-----------+
   |                                         | Pesos per | Pesos per |
   |                                         | cubic     | cubic     |
   |                                         | meter.    | meter.    |
   +-----------------------------------------+-----------+-----------+
   | LABOR :                                 |           |           |
   |  Mixing and placing                     |  5.20     |           |
   |  Carpenter work in forms, framing, etc. |  4.20     |           |
   |                                         |  _____    |           |
   | Total labor cost                        |           |  9.40     |
   |                                         |           |           |
   | MATERIALS :                             |           |           |
   | Screened gravel                         |  4.04     |           |
   | Sand (from neighboring arroyo)          |  4.98     |           |
   | Cement (including hauling)              | 15.19     |           |
   | Lumber, nails, and other supplies       |  1.90     | 26.11     |
   +-----------------------------------------+-----------+-----------+
   | Total cost of concrete per cubic meter                35.51     |
   +-----------------------------------------------------------------+

_Sludge-pit._--The sludge-pit, used when cleaning out the tanks, is
carried 639 m. northward, far enough to get the available fall to drain
the bottom of the detritus chambers and liquefying tanks. The drainage
pipe was formed of 56-cm. (22-in.) concrete tubes. The sludge-pit is
merely an excavation in the earth 20 m. square and 2 m. deep, the sides
having a slope of 1-1/2 to 1. An overflow drains the pit to an irrigation
ditch, the solid matter being allowed to settle and the liquid to drain
off. From time to time it is proposed to dig out the solids and plow them
into the land.

_General._--To the east of the tanks a 3-roomed house has been built for
the inspector.

In order to provide a good supply of water for cleaning operations, a well
22 m. deep has been sunk and is fitted with pumps operated by an Eclipse
windmill, 4 m. in diameter, on a tower 22 m. high, which delivers the pump
water to a circular wooden tank of 20,000 liters capacity.

The work in connection with the purification tanks was carried out by the
Company's own staff; it was begun on September 10th, 1908, and practically
completed by the first week in January, 1909.

At the time of writing, the tanks have to deal with the sewage from a
population of only 10,000 persons, as only from 15 to 20% of the
connections have been made. The sewage, therefore, has been diluted with
several times its volume of surplus water, and the necessary scum on the
top of the sewage in the tanks has not yet assumed the usual thick matty
condition observed in most systems. As there are no available means in
Monterrey of having proper determinations made of the degree of
purification which takes place in the passage of the sewage through the
liquefying tanks, a few simple tests have been made. These tests were
limited to the determination of the amount of oxygen absorbed in 4 hours,
and show a purification of 50% in passing from the detritus chambers to
the outlet. The sewage, although very black and full of suspended matter
as it enters the tanks, leaves them in a very clarified condition.

Of the total area of land acquired by the Company, 904 hectares (2,234
acres) have been leased to the Monterrey Railway, Light, and Power
Company, for 99 years, the Water-Works Company reserving 5 hectares (12
acres) absolutely for future extensions of the sewage works. By giving 12
months' notice, the Company also reserves the right to utilize any part of
145 hectares (358 acres) near the tanks, should it be required at any time
in the future for sewage purification purposes.




                    QUALITY OF AND RATES FOR LABOR.


All the work was practically under the direction of English-speaking
superintendents and general foremen. For the ordinary skilled and
low-skilled labor, Mexicans were employed exclusively, and, on the work,
which was quite new to them, they proved entirely efficient and
satisfactory; throughout the work, on which at some periods between 2,000
and 3,000 men were employed, chiefly under the Company's direct
administration, they were very tractable and willing to do their best, and
no trouble was experienced at any time. The Mexican "peon," and also the
ordinary skilled workman in the north of Mexico, is intelligent, and is
excellent for purely routine work, but he is not adaptable or resourceful
in cases of emergency. Under intelligent and careful supervision, however,
it is quite possible to get as good results as could be obtained anywhere.

The daily rates of wages for a 10-hour day were approximately as given in
Table 15, these rates being varied in special cases.

                       TABLE 15.--RATES OF WAGES

      +-----------------------------------+-------------------+
      |                                   | Pesos per day.    |
      +-----------------------------------+-------------------+
      | General foreman                   |  8.00  to 10.00   |
      | Foreman                           |  6.00  "   8.00   |
      | Cabos                             |  2.00  "   4.00   |
      | Masons                            |  3.00  "   4.00   |
      | Bricklayers                       |  3.00  "   4.00   |
      | Masons and bricklayers helpers    |       1.50        |
      | Cast-iron pipe jointers (foreman) |       4.50        |
      |  "   " caulkers                   |       3.00        |
      |  "   " helpers                    |  1.50  to  2.00   |
      | Fire-clay pipe layers             |       1.75        |
      |  "   " helpers                    |  1.25  to  1.50   |
      | Drillers                          |  1.25  "   1.50   |
      | Carpenters                        |  2.00  "   2.50   |
      | Blacksmiths                       |       2.50        |
      | Crane men                         |       6.00        |
      | Peons (laborers)                  |  1.00  to  1.25   |
      | Boys (watering concrete)          |  0.37-1/2 to 0.50 |
      | Watchman                          |       1.00        |
      | Timekeepers                       |  22.00 per week.  |
      +-----------------------------------+-------------------+




                             COST OF WORKS.


Table 16 gives the main items of the approximate expenditure. These
include all expenses for preliminary location, engineering,
superintendence, purchase of lands, water rights, etc., but do not include
other heavy expenditures chargeable to the concession, such, for example,
as general expenses, interest at the rate of 6% during the construction
period, preliminary expenses for investigations, etc., items which would
increase the total by nearly 25 per cent.

              TABLE 16.--PRINCIPAL ITEMS OF EXPENDITURE.

  +---------------------------------------------+--------------------+
  |                                             | Pesos,             |
  |                                             | Mexican currency.  |
  +---------------------------------------------+--------------------+
  | ESTANZUELA SUPPLY :                         |                    |
  |  Aqueduct and dam                           | 502,000            |
  |  South Reservoir                            | 429,000            |
  |                                             | -------    931,000 |
  |                                             |                    |
  | SAN GERONIMO GRAVITY SUPPLY :               |                    |
  |  Aqueduct, tunnel, and infiltration gallery | 223,000            |
  |  Obispado Reservoir                         | 436,000            |
  |                                             | -------    659,000 |
  |                                             |                    |
  | SAN GERONIMO PROVISIONAL SUPPLY ,           |                    |
  |  including boring operations, etc.          |            130,000 |
  |                                             |                    |
  | CITY WATER DISTRIBUTION SYSTEM              |          1,195,700 |
  |                                             |                    |
  | CITY SEWER SYSTEM                           |          1,036,000 |
  |                                             |                    |
  | OUTFALL :                                   |                    |
  |  Main outfall sewer                         | 425,000            |
  |  Sewage purification works                  |  75,000            |
  |                                             | -------    500,000 |
  +---------------------------------------------+--------------------+
  | Total                                                  4,451,700 |
  +---------------------------------------------+--------------------+

As a general statement, the actual cost of labor is about 33-1/3% of the
total cost of the construction work, including materials. Fig. 20 shows in
graphic form the amount of the labor pay-rolls and the progress of the
work during the whole construction period from 1906 to 1909, inclusive,
comprising also that done under contract.

[Illustration: FIG. 20.--PROGRESS DIAGRAM SHOWING MONTHLY LABOR PAY-ROLLS
DURING THE CONSTRUCTION PERIOD.]




                    TARIFFS AND SANITARY REGULATIONS.


_Tariffs._--The tariffs charged for the water and drainage service (Table
17) were approved by the State Government (which accepts the
responsibility for their collection), under a compulsory State law which
came into force on March 1st, 1910, for the southern portion of the city,
and on July 1st, for the northern half, the penalty for non-compliance
being a tax of 10% on the monthly rental value of the property, as
assessed by the State officials.

The basis of the tariffs (which were published on February 22d, 1909) is a
charge for water varying between 12 and 16 cents (Mexican) per 1,000
liters, with a minimum monthly rate for each different class of property
connected to the system. The rate for house drainage is fixed at 80% of
the minimum water rate levied on the consumer. The minimum rates have been
fixed so that the poorer classes of the community will not be overtaxed,
while at the same time the rate is actually levied on the quantity of
water used, as indicated by the meter. All the services at the present
time are metered, and the meter system will be used throughout.

                        TABLE 17.--THE TARIFFS.

  +-----+------------+---------+-----------+---------+----------+--------+
  |     | Monthly    | Liters  | Price for | Minimum | Rate for | Total  |
  |Class| property   |   of    | 1,000     | monthly | drainage | rate   |
  |     | rental.    |  water  | liters.   | rate.   | service. |payable.|
  |     | Pesos.     | allowed.| Cents.    | Pesos.  | Pesos.   | Pesos. |
  +-----+------------+---------+-----------+---------+----------+--------+
  |   I | Up to 20   |  7,800  |   16      | 1.25    |   1.09   |  2.25  |
  |  II | 21 to 40   | 12,500  |   16      | 2.00    |   1.60   |  3.60  |
  | III | 41 to 60   | 18,750  |   16      | 3.00    |   2.40   |  5.40  |
  |  IV | 61 to 120  | 23,350  |   15      | 3.50    |   2.80   |  6.30  |
  |   V | 121 to 300 | 30,000  |   15      | 4.50    |   3.60   |  8.10  |
  |  VI | 301 upward | 33,350  |   15      | 5.00    |   4.00   |  9.00  |
  +-----+------------+---------+-----------+---------+----------+--------+

    "Notes: (1st) The rental for the water meters 5/8-in. size
    (15-1/2 mm.), which shall always be considered the property
    of the Company, will be 20 cents per month. Houses of the
    first and second classes shall be exempt from paying such
    rental for one year's time, counting from this date.

    "(2d) All excess consumption of water over that allowed by the
    tariff will be charged for at 2 cents less than the price
    shown in the tariff per thousand liters.

    "(3d) Extra large houses, large establishments, such as
    colleges, hotels, etc., etc., having a consumption of 50,000
    to 60,000 liters of water per month, will pay at the rate of
    14 cents per thousand liters. The drainage rate for such
    buildings will be arranged in proportion to the water tariff,
    or 80% of the value of the water.

    "(4th) The laundry establishments, bath-houses, etc., when
    using 50,000 liters or upward, can arrive at some agreement so
    as to pay 12 cents per 1,000 liters.

    "(5th) Groups can be formed of two or more small houses so as
    to obtain a joint service under the proportion shown in the
    tariff.

    "(6th) Any other combination that cannot be entered into under
    the basis of this tariff, will be arranged by specially agreed
    upon prices, such agreement being as much as possible subject
    to the basis mentioned."

_Sanitary Regulations._--The State Government, on March 1st, 1909,
published regulations for the proper installation of the water and
drainage services within the houses.

At the Government's request, a draft of the proposed regulations was
submitted by the writer, who prepared it, after a study of American and
British sanitary by-laws, to suit the special conditions of Monterrey.
These regulations were afterward modified by him in collaboration with the
Government Technical Inspector and Financial Interventor, and, in their
final form, though not as stringent as those adopted in many northern
cities, are probably more complete than those in any other Mexican city.
Under these regulations only registered plumbers can undertake plumbing
installations, and they have to execute a bond to the satisfaction of the
_Alcalde Primero_ (City Mayor) for the sum of 2,000 pesos as a guaranty of
responsibility. For defective workmanship or any infraction of the
plumbing regulations, they are liable to heavy fines, and can be called on
to make good all defects in workmanship, without extra charge to the owner
of the property. The provisions of the regulations are carried out under
the supervision of the Government Technical Inspector, the Company's
obligations extending only to the sidewalk and to the meters placed within
the houses.




                             ENGINEERS, ETC.


G. S. Binckley, M. Am. Soc. C. E., was Chief Engineer of the Company from
February to December, 1906. The writer was Chief Engineer from May
1st, 1907, until April, 1910, and is responsible for the design and
construction of the works carried out during that period. Mr. J. D.
Schuyler advised the Company throughout all preliminary studies and
investigations, and acted as Consulting Engineer until February, 1908. The
Technical Inspector, on behalf of the Government, throughout the whole
progress of the works, has been Rudolf Meyer, M. Am. Soc. C. E., and the
writer wishes to record the valuable assistance the Company has received
from him.

In conclusion the writer may be permitted to pay a tribute to the devoted
public spirit shown by his Excellency, General Bernardo Reyes, the
Governor of the State of Nuevo Leon from 1885 to February, 1910, and who,
untiring in his devotion to the interests of the city, was primarily
responsible for the inception of the works and their successful
completion.




                               DISCUSSION.


JAMES D. SCHUYLER, M. AM. SOC. C. E. (by letter).--For completeness of
detail and wide range of subjects of general interest to engineers, this
paper is certainly one of the notable contributions to recent engineering
literature. It is a minute and painstaking record of the successful
accomplishment of construction work under unusual climatic conditions and
difficult circumstances, and reflects credit on the author, not only in
his capacity as an engineer, but as a faithful recorder of facts. It was
particularly fortunate that he was an eyewitness of the disastrous and
extraordinary flood which swept through Monterrey, destroying many lives
and much property, and has thus been able to give an intelligent estimate
of the maximum discharge of the river during the height of the flood wave
of August 27th-28th, 1909, when the rate of run-off per unit of area of
water-shed drained reached an amount which has seldom been equalled or
exceeded, as far as reliable records extend. It is worthy of note that
works deriving their water supply from the source of such torrential
floods should have survived with so little actual damage, and with
scarcely any interruption of service. The repair of all damages to the
system was estimated to have cost not more than $20,000.

As Mr. Conway did not assume charge of construction until May, 1907, he
was spared the responsibility of deciding on the general plan of securing
an abundant supply of pure water from sources permitting of delivery by
gravity under adequate pressure for fire protection--a responsibility
which devolved on the writer, assisted by G. S. Binckley, M. Am. Soc. C.
E., Mr. Conway's predecessor, as Chief Engineer. Not only the water-works,
but the system of sewerage and sewage disposal by broad irrigation were
subsequently carried out on the plans submitted to the State Government by
the writer in 1906, and given provisional acquiescence at that time.

There was no lack of water at hand for the supply of a city of that size,
as there are large perennial springs which flow out of the travertine of
the plain, and are used for irrigation in the valley below the city. One
of the largest of these, near the civic center, has a normal flow of
nearly 30 cu. ft. per sec.; another nearby, also within the city limits,
flows some 10 or 12 sec-ft., while both the Estanscia and Robalar springs,
but a few miles below (shown on Plate II), discharge more than 20 sec-ft.,
as nearly as memory serves. Besides this supply, the water to be developed
by sinking shafts in certain parts of the plain, as demonstrated at the
brewery and elsewhere, was apparently a reliable source of large volume.

To utilize these sources, however, would have involved condemnation of the
water-rights in the case of the springs, depriving present owners of the
use of the water, and this Governor Reyes wished to avoid. Besides, it
would have necessitated pumping the water for the city in perpetuity, an
expense which the Governor was equally anxious to save; hence a gravity
supply was made the prime requisite of the plans.

Until the concession was granted, and for a year or more afterward, it was
assumed that an adequate supply could only be obtained by the storage of
the flood-water of the Santa Catarina River in a large reservoir; and the
earlier plans of the concessionaires were based on the construction of a
high masonry storage dam at the upper end of the "narrows," where the
river turns from a western direction to a course almost due east, between
high vertical cliffs of limestone. The concession distinctly provided for
such a dam, and among the plans on file in the State Capitol is one
prepared by the late E. Sherman Gould, M. Am. Soc. C. E., for a masonry
weir across the gorge. Samuel M. Gray, M. Am. Soc. C. E., also filed a
plan and report proposing a capacious, shallow, storage reservoir near the
city, to be filled by a large flood-water canal from the Santa Catarina
Canon.

Although the writer could not have anticipated the occurrence of floods of
the magnitude of the one of August, 1909, which would surely have
destroyed any reservoir built in the Canon, he was unable to endorse the
storage plan of water development, chiefly because of the uncertainty of
the water-tightness of the reservoir in a cavernous limestone formation,
and also because of the probable impurity of water draining from such
extensive goat pastures. He, therefore, urged the development of the
underflow of the river, which was manifesting itself in the springs
referred to. Mr. Binckley secured two Keystone drilling machines and
proceeded to profile the bed-rock at Santa Catarina Canon and at San
Geronimo, the two places on the stream where the river flows between walls
of rock _in situ_. At both sites the strata were standing nearly vertical
across the channel, and, by careful sampling and testing, it was found
that in both locations there were thick strata of limestone so highly
silicious as to be insoluble, and hence free from caverns. From this
determination it was concluded that all the water which appeared in the
valley below must pass through the sections where the borings were made.
The results of this drilling, however, proved conclusively that the depth
to bed-rock at either place was too great to permit of a masonry dam being
considered as practical, and demonstrated the inadequacy of methods which
had been used in the earlier investigations when dams were regarded as
feasible.

The results have also shown that the subterranean supply at the lower
cross-section of the river, at San Geronimo, is abundant, and can probably
be increased to an indefinite degree by continuing the filtration gallery;
while at Santa Catarina the same type of development can be made for a
high-source supply, although requiring a long and expensive tunnel and
conduit.


DAVID T. PITKETHLY, ASSOC. M. AM. SOC. C. E. (by letter).--Having been
engaged on the design of sewerage systems for some years, the writer finds
this paper of peculiar interest, particularly the sewerage portion. There
are some points in the design, however, which do not appear to be clear.

The system is described as "strictly separate," and yet the sewers are
designed to run half-full, providing a capacity of 200%, the 100% basis,
or 380 liters per capita, being 90%, or 180 liters, in excess of the
calculated water supply of 200 liters per capita.

It has been the writer's practice to design sanitary sewer systems on the
basis of the water consumption, and to assume the whole daily amount to
reach the sewer in 16 hours, thus providing capacity sufficient to care
for the maximum or wash-day flow without causing the sewers to run above
the calculated hydraulic gradient, which should be placed within the pipe
so as to provide air space for ventilation under all circumstances.

The practice of calculating sanitary sewers to run half-full is a good one
when ground-water is expected in sufficient amount to fill the remaining
portion of the sewer, but when no ground-water, or roof-, or surface-water
is allowed to enter the system, or all precautions are taken to exclude
such, then the system may be designed so that the expected maximum, or
wash-day flow, will fill the sewer to the desired hydraulic gradient.

The method of ventilating the sewers does not seem practicable. The houses
are principally of one story, and yet the stand-pipes on the sewers have
openings 25 ft. 9 in. above the sidewalk. Are the ventilating or vent
pipes of the house plumbing carried to a height to balance this, or will
these chimneys draw the air from the house drains and fresh-air pipes,
breaking the seal in the so-called disconnecting traps, thus causing the
circulation of air in the house piping to be downward through the sewers
instead of upward through the fresh-air inlets and vents, as designed?

It is interesting to note that crude sewage, as well as the liquefying
(septic) tank effluent, is to be applied to land for irrigation purposes,
but the application of crude sewage without any attempt at removing the
suspended matter, or the effluent from the septic tanks where only a
partial removal occurs, seems to be bad practice.

The author states that:

"The degree of purification in the tanks was relatively unimportant; the
object to be obtained consisted chiefly in distributing on the land an
effluent which would be innocuous and clear."

How he expects to obtain such an effluent by passage through screens,
detritus tanks, and septic tanks only, is more than the writer can
understand.

The removal of suspended matter in a septic tank depends on the strength
of the sewage, the time of retention, the time elapsing between cleaning,
the presence of trade wastes, etc., and seldom exceeds 38 per cent.

The subject of septic tanks and their effect on sewage is discussed in the
"Fifth Report of the Royal Commission on Sewage Disposal" (England, 1908),
and the following extracts, relative to the application of crude sewage to
land and the effect of septic tanks on sewage, seem apropos:

    "23. * * * There are also many cases in which crude sewage has
    been passed over land, but the evidence shows that land treatment
    of crude sewage is liable to give rise to nuisance by the
    accumulation of solids on the surface of the land. Moreover, in
    some cases these solids are apt to form an impervious layer,
    which interferes with the aeration of the soil, and so impairs
    the efficiency of the treatment."

    "31. * * * At that time it was claimed that the septic tank
    possessed the following, among other, advantages:

    "That it solved the sludge difficulty, inasmuch as practically all
    the organic solid matter was digested in the tank.

    "That it destroyed any pathogenic organisms which there might be
    in the sewage."

    "32. As regards the first of these claims, it is now clearly
    established that, in practice, all the organic solids are not
    digested by septic tanks, and that the actual amount of digestion
    varies to some extent with the character of the sewage, the size
    of the tanks relative to the volume treated, and the frequency of
    cleansing."

    "At Huddersfield, Mr. Campbell estimated that about 38 per cent.
    of the solids were converted into gas or digested; * * * while at
    Birmingham, Messrs. Watson and O'Shaughnessy say that the figures
    available indicated a digestion of not more than 10 per cent. of
    the suspended matter entering the tanks."

    "33. As regards the second claim, we find as a result of a very
    large number of observations that the sewage issuing from the
    septic tanks is, bacteriologically, almost as impure as the sewage
    entering the tanks."

Messrs. Winslow and Phelps, in their interesting paper, "Investigations on
the Purification of Boston Sewage,"[8] quote a suggestion made by
Stoddart (1905):

[8] Water Supply and Irrigation Paper No. 185, p. 125.

    "He finds, in a septic tank of several compartments, a
    considerable deposit of sludge in the first compartment, giving
    a fairly clear supernatant liquid, which in the last chamber of
    all undergoes a secondary decomposition, leading to the
    throwing down of an additional precipitate of offensive
    sludge."

What took place in the case referred to by Stoddart corresponds to the
author's observations of the liquid leaving the tanks in a clarified
condition, but the secondary decomposition must take place in some manner,
and, when it does, a nuisance seems to be unavoidable where no provision
is made to care for it.

In view of the experience of others, some further treatment seems to be
necessary. Such treatment should include disinfection, as no method of
disposal yet devised has succeeded in reducing materially the pathogenic
germs usually to be found in sewage and tank effluents.

If the crops to be irrigated are to be eaten, uncooked, by mankind, then
disinfection at least is imperative.


GEORGE S. BINCKLEY, M. AM. SOC. C. E. (by letter).--Mr. Conway's admirable
paper is of special interest to the writer, as the entire general design
of the system, as well as the extensive hydrological studies and final
selection of the sources of water supply, was completed during 1906
through the joint labors of the writer, as Chief Engineer, and James D.
Schuyler, M. Am. Soc. C. E., as Consulting Engineer.

In this work, Mr. Schuyler and the writer had the rare privilege of
dealing from its inception with the problem of designing a complete and
somewhat extensive system of municipal water supply and drainage,
unhampered by any existing works to which the new systems would have to be
adapted. It would probably be difficult to find in the United States a
city of 85,000 inhabitants, previously totally lacking either a water
supply or sewerage system, which, under a consistent and harmonious
design, has been provided with both in the degree of completeness and
structural excellence exemplified in the works at Monterrey.

The few important changes or amplifications made in the original design,
and the manner in which its detail has been executed is naturally most
interesting to the writer, and this excellent paper should be of very
substantial value, particularly to engineers engaged on similar work in
Mexico or Spanish America.

The very novel construction method adopted by Mr. Conway in the roofing of
the South or Guadalupe Reservoir, seems to the writer rather to invite
criticism, and the fact that in the subsequent construction of the roof
over the rectangular Obispado Reservoir the customary monolithic concrete
construction was apparently reverted to after experience with the
separate-unit plan previously used, would indicate that Mr. Conway reached
the same conclusion.

The original design of the circular Guadalupe Reservoir contemplated just
about the same arrangement of columns and roof support as that actually
used, but the writer had expected that the columns would be cast in place,
and that the system of primary and secondary beams would be filled at the
same time as, and integral with, the roof slab, the reinforcement being
placed in accordance with what may be described as conventional practice.
The writer believes that the efficiency of the concrete and steel placed
in this manner would be notably higher than under the system actually
adopted, which, in effect, is pretty much the same as constructing the
supporting system of units of cut stone. If, with all the elements of
structural weakness involved in the multiplicity of mortised joints,
discontinuous reinforcement, etc., this construction is strong enough, it
would seem that an important reduction in the dimensions of the members
could have been effected by monolithic construction and continuous
reinforcement, without sacrifice of strength.

The comparison, in Table 7, of the costs of these two reservoirs, is
interesting, but very moderately illuminating, as the comparative unit
cost of the most important element in their construction--the concrete--is
not given. The total excavation cost for each reservoir is practically the
same, and the general expense, engineering, and cost of fittings and
accessories presumably so, but the total cost of the Guadalupe Reservoir
as given is $19,000 (pesos) in excess of that of the Obispado Reservoir,
while, in the latter, there were 756 cu. m. more concrete. This certainly
indicates a much higher cost of concrete per unit as laid in the South
(Guadalupe) Reservoir. An actual comparison of the cost per unit of
concrete laid under the two systems would be instructive.

The writer is interested to observe that the same system of sub-drainage
used by him in the construction of the reservoir for the provisional
supply of water from San Geronimo, has been used by the author in the
Obispado Reservoir. This arrangement of drains under the floor of the
reservoir at San Geronimo was devised as a safeguard against damage to the
lining through the accumulation of water inside the impervious bank
against its back.

It was realized that, in such a climate as that of Monterrey, perfect
water-tightness of the lining might be difficult to secure or maintain,
and, if leaks existed, a sudden draft on the contents of the reservoir
might result in serious damage through the static pressure exerted against
the lining of the sides or upward thrust against the floor. In the
writer's opinion, such a system of drains is an important element, as not
alone the fact but the quantity of leakage may be determined, and danger
of saturation of the supporting bank avoided--a matter of importance
where, as is sometimes the case, the material of such a bank is unfit to
resist the effects of saturation. The author does not state whether or not
this safeguard was omitted in the Guadalupe Reservoir. Incidentally,
however, the matter of saturation of the bank is not important in either
reservoir, as the material of which these banks are constructed is such
that settlement or failure through saturation is out of the question. It
may be remarked, however, that in fixing the angle of the sides of the
Guadalupe Reservoir at 60 deg. the writer contemplated the same system of
constructing the bank as he used in that of the San Geronimo Reservoir. In
this case, the bank was built up by spreading the material in thin layers,
wetting down, and rolling and puddling by the passage of the ox-carts used
for the transportation of the material, the wheels of the carts, and
especially the cloven hoofs of the animals, producing a most excellent
effect. The inside slope was built up in this fashion to a much lower
angle, and with a top width considerably in excess of the finished
dimensions. The excess material was then picked off to the line, and
exactly to the slope. Thus the finished slope presented a surface which
was compacted to a degree impossible to attain at or near the surface of
the bank as built, and presenting a support of the best possible character
for the concrete lining and coping.


V. SAUCEDO, ASSOC. M. AM. SOC. C. E. (by letter).--The author's
description of the water-works and sewerage of Monterrey, one of the most
extensive schemes in Mexico, will be of general interest to engineers,
especially those engaged in hydraulic and sanitary problems. The writer,
having been connected with the works for four years, knows the local
conditions well, and presents herewith some complementary data on what he
considers an important feature, the subject of floods, mentioned by the
author on different occasions, especially as certain developments in the
works show the importance of such occurrences as a factor in designing.

Abnormal rainfalls of long duration and high intensity are common in the
semi-arid region of Mexico. They come at irregular intervals, though
tending to coincide with the early fall. The floods of August, 1909, were
a repetition of similar occurrences in the past; and, though there are no
numerical records of previous cases, local traditions and historical state
documents describe them as having occurred since the foundation of the
city, at intervals of from 15 to 40 years. The graphic descriptions of the
places flooded are in accord with the character of the floods of August,
1909, and September, 1910.

The diagram, Fig. 21, is a record of the rainfall during the latter flood,
and was plotted from intermittent readings of standard gauges. It
demonstrates that the intensity increased toward the mountains on the
south, which form the tributary water-shed of the Santa Catarina River,
showing a difference of 10.54 in. between the city and the Estanzuela Dam,
which is not quite 12 miles to the southeast.

[Illustration: FIG. 21.--RAINFALL DURING FLOODS OF SEPTEMBER 14TH-16TH,
1910, IN MONTERREY.]

An estimate of the volume of discharge of the river at the time of maximum
flood is only a reasonable conjecture which (without special reference to
accuracy) aims to impress those who have not witnessed such occurrences
with the tremendous volume coming from barren steep surfaces previously
saturated.

The original computation, referred to by the author, was obtained from the
average of two different methods which gave results close to each other.
In one method the extent and nature of the water-shed were considered,
together with the maximum period of precipitation that occurred,
sufficient to gather a maximum volume of water in the river. In the other
method the volume was derived from a cross-section of the wetted perimeter
of the river at the time of maximum flow, in combination with velocity
approximations obtained by using rough floats. This gave 271,500 cu. ft.
per sec. The figure submitted by the author, 235,000 cu, ft. per sec., is
in accord with the proposed formula[9] for impervious surfaces by C. E.
Gregory, M. Am. Soc. C. E. In the first and last methods, the intensity, a
governing factor, is more or less of an assumption, and the
cross-sectional method is also unreliable, as the river-bed was greatly
disturbed, due to the high velocity of the water, which deepens the
channel to a considerable extent at times of maximum flood, the gravels
being redeposited during the period of subsidence. Such was the case
during the flood of September, 1910, when the depth of gravel above the
roof of the San Geronimo Infiltration Gallery was diminished to such an
extent that it was so inefficient as a filter for the flood as to permit
the percolation of turbid water into the underground supply.

[9] _Transactions_. Am. Soc. C. E., Vol. LVIII. p. 458.

During the floods of August, 1909, Shafts Nos. 2 and 3 were damaged beyond
repair, and sand and gravel, entering through them, blocked up the
gallery to within about 150 ft. of Shaft No. 1. The interior timbering
probably collapsed, due to cavings and disturbance in the river-bed during
the period of maximum flood, but no explorations have been possible on
account of the great quantity of water still coming through (at present
more than 650 liters per sec.). For this reason the work of driving the
gallery, as well as lining Shaft No. 1, has been suspended.

[Illustration: PLATE XXVIII, FIG. 2.--VIEW OF SANTA CATARINA RIVER IN
FLOOD, ON AUGUST 28TH, 1909.]

[Illustration: PLATE XXXI, FIG. 1.--FLUSH-TANK CARRIED DOWN BY FLOOD OF
AUGUST 27TH-28TH, 1909.]

[Illustration: PLATE XXXI, FIG. 2.--VIEW SHOWING SCOURING EFFECT OF FLOOD
ON SAN GERONIMO AQUEDUCT.]

[Illustration: PLATE XXXII, FIG. 1.--VIEW OF SANTA CATARINA RIVER AFTER
THE FLOOD.]

[Illustration: PLATE XXXII, FIG. 2.--VIEW OF SANTA CATARINA RIVER FLOWING
THROUGH LOW-LYING STREETS, 8 DAYS AFTER THE FLOOD.]

On reaching the city, the flood of August, 1909, swept away two streets
adjoining the river. These streets had been built on made ground, in what
was originally the river-bed. The sewers and water mains laid in them were
destroyed entirely, and some 460 ft. of the 24-in. cast-iron pipe, buried
under the river-bed at a depth of 8 ft., were carried away. In relaying
this portion of the main, and for protecting the remainder of it across
the river, it is now proposed to encase it in a solid rubble concrete
block, 8 ft. square, which will impart weight and stability against the
scouring effect of floods.

The South Reservoir is circular in shape, with an interior diameter of
165.68 ft. at the top, and is partly excavated in the ground and partly
completed by an embankment of vast proportions (Fig. 10). Right after the
flood of August, 1909, a wet spot appeared on the northeastern toe of the
embankment, and it was supposed for some time that it was the effect of
the saturation produced by the preceding rains, but, as it persisted for
several months, it was obvious that its origin was in the interior of the
reservoir, which was emptied when the writer took charge of the work. The
first inspection revealed a horizontal crack in the concrete lining, about
310 ft. long and extending about 153 deg. around the circumference on the
north side. Throughout its length it coincided with the line of cut and
fill. Vertical cracks, coinciding with the panel points in the lining, had
also developed, and extended from the main horizontal crack to the roof.
The circumstances originating this development can be conjectured by
considering the position of the main crack, its characteristic features,
and the conditions that preceded its formation. The coincidence of the
crack with the joint of cut and fill, points to this line as a source of
danger. An examination showed, besides, that the fracture was clean and
sharp, ranging in thickness from a hair line at the ends to 3/16 in. at
the center, and that its upper border projected over the lower one
perceptibly, a proof that horizontal motion had taken place. The vertical
cracks were a secondary effect, the consequence of the displacement
immediately after it was scoured. A fracture was discovered in the floor
of the reservoir. It started at the center and branched out into two
diverging lines in a radial direction.

The circumstance of two abnormal rainfalls, giving 35 in. in 9 days, the
precipitation being concentrated in two periods, not far apart, of 42
hours and 98 hours, respectively (Fig. 4), together with lack of provision
for shedding the water from the roof of the reservoir and from the
surrounding embankment, lead to the inference that the latter became
saturated, increasing thereby in weight and decreasing in stability,
especially in its steep inner face. A settlement and the consequent
horizontal displacement, under these conditions, was natural. The concrete
lining, only 16 in. thick at that height, was not sufficient to sustain
the resulting strain, and the main fracture developed, permitting the
stored-up water to leak into the bank. In time this seepage found its way
under the bottom of the reservoir, softening the ground and producing a
slight settlement which caused the crack in the floor. Had under-drainage
been provided, as at the Obispado Reservoir, the actual conditions would
have been noticed earlier. However, as the embankment is of vast
proportions, stable in itself to sustain with a large margin of safety the
weight of the stored-up water, there was no actual danger of failure,
except for the fact that the material forming the structure, on account of
its calcareous nature, is dissolved by water. Long exposure to this
condition would, in time, open passages in the embankment, and it is
certain that there would be cavings in its interior.

The necessary grouting has been done, and provision is being made for
water-proofing the interior of the reservoir and shedding the water from
the roof and from the embankment, thus relieving the structure of the
consequent strain.

Another place in the works where floods have had a damaging effect is the
Estanzuela intake basin, which, when the dam was completed, was filled to
the overflow level in order to test its water-tightness. As this basin,
when cleaned, was found to be slightly fissured on the north side, it was
decided to line it with concrete. As shown in Fig. 8, the lining does not
cover its entire area, but only the central portion, leaving a strip on
either side without protection. The flood of September, 1910, coming in
greater volume than the previous ones of August, 1909, in passing through
the narrow gorge at the entrance, undermined the lining in those places
where it was not founded on solid rock. Figs. 1, 2, and 3, Plate XXXIII,
show some of the damage caused by this flood. The buoyant effect of the
water and the impact of large rolling boulders caused fractures all over
the surface, and lifted the concrete lining bodily; but the dam proper,
being founded on rock bottom, did not suffer any injury. In the future, in
order to avoid the seepage of the ordinary supply, alluded to by the
author, the water will be carried to the valve-house in an open rubble
concrete channel, lined with cement mortar and built high up against the
western hillside. The remainder of the basin will be paved with large
boulders.

[Illustration: PLATE XXXIII, FIG. 1.--ESTANZUELA DAM: BROKEN CONCRETE
BASIN LINING.]

[Illustration: PLATE XXXIII, FIG. 2.--ESTANZUELA DAM: BROKEN CONCRETE
BASIN LINING, EAST SIDE.]

[Illustration: PLATE XXXIII, FIG. 3.--ESTANZUELA DAM SEPT. 26, 1910: VIEW
OF SHEARING FRACTURES OF WALL AND LINING AFTER FLOOD SEPT. 14-17, 1910.]

In conclusion, the writer wishes to emphasize the point that,
notwithstanding the severity of the test, relatively small damage was
inflicted on the extensive works carried out under the author's design and
direction. A test so severe that it caused serious damage and immense
losses in the entire region, washing away kilometers of railroad track and
destroying practically all the bridges within reach of the flood, is an
occurrence of paramount importance, and should be remembered as a leading
factor in the design of engineering works.


GEORGE T. HAMMOND, M. AM. SOC. C. E. (by letter).--In a country, such as
that described in this paper, where water is valuable, and a shortage is
at times possible, where the majority of the population is very poor, and
water and sewage discharge are both to be paid for on a basis of volume,
the question of the expected quantity of daily water supply and sewage
flow per capita is of primary importance. This question, notwithstanding
its difficulty, should be given a first place in the studies for
water-works and sewerage projects, and should never be lost sight of in
the design, which should be such that, while proper for the expected
future flow for a reasonable time, should also be proper and economical
for conditions which at present obtain and may change but slowly.

It is desirable, of course, to get as much capacity in works as one can
for the outlay, but there are instances where one can get too much for the
money, as where a larger pipe than is necessary is used for a sewer,
merely because it costs about the same as a smaller one, and as a result
the cost of maintenance is permanently increased.

The water-works were designed to supply 40,000,000 liters (10,582,000
gal.) daily, which it was assumed would be sufficient for all future
developments in Monterrey for a population of 200,000 at a per capita
consumption of 200 liters (about 53 gal.) per day. The present population
of the city is given as less than 90,000, there having been an increase of
22,000 in ten years (1891-1901), but it is evident that in the last ten
years (1901-1911) this rate of increase has not continued. Taking into
account all the data known to the writer, it does not seem that the city
will attain a population of 200,000 in a great many years, if it ever
does; but this is a matter of personal opinion, and is only stated as
such.

The present requirements of the city's population, assuming that each
person uses 200 liters (53 gal.) per day, would be, at that rate, which is
a very liberal one, only 18,000,000 liters (4,762,000 gal.) per day, or
less than half the amount which may be provided.

If the water were not to be metered and the sewage discharge paid for by
measure, it is possible that the free use of water might lead to the usual
waste with which all are fairly familiar; but the use of meters, and the
rates charged, will reduce the water consumption to a minimum. This end
will especially result from Section 5 of the Tariffs which provides that:

"Groups can be formed of two or more small houses so as to obtain a joint
service under the proportion shown in the tariff."

This provision will keep down the per capita supply, among the majority of
the people, to about 37-1/2 liters (10 gal.) per day. A similar provision
led to abuse in Santiago de Cuba, as well as in other Cuban cities, where
one householder, taking water, frequently delivers it to adjoining houses
and tenements through rubber hose. As many as ten or twelve families are
sometimes found to be supplied from one tap in this manner. Indeed, it may
be stated as a rule, having but few exceptions, that where water is paid
for by meter its use is always restricted.

The water mains and distribution system, however, are so well laid out,
and the whole design is so good, that the writer would not anticipate much
difficulty because it is on rather too liberal lines for the present or
probable future. It may, perhaps, be argued that it may cost more to keep
the mains in such a system clean; but this extra cost will scarcely be of
much moment, and will be offset by the greater lasting quality of the
larger pipes. There is another feature of the problem, however, which is
not affected favorably by a too liberal forecast of the per capita water
supply, namely, the sewerage system.

If it is assumed that, using 200 liters per capita per day, the total
water supply of the city for the present population will be 18,000,000
liters, and that this may double in fifty years, or even amount to
40,000,000 liters in that time, it would seem that a rather liberal
provision has been made for the water supply, and that this will scarcely
be exceeded by the sewage, for the latter must come from the water supply,
there being little or no ground-water and no storm-water taken into the
sewers. Designing the sewers to flow half full for all diameters less than
18 in., and seven-tenths full for all larger sizes, it would seem that
this would give ample capacity for all time to come in such a city, and
that good practice would not exceed these figures, it being more desirable
that the sewers should not be too large to work well, than that they
should be large enough in all places to meet every possible contingency.
If all the sewers of a system are too large, the condition is incurably
bad; while, if a few miles prove to be too small, on account of growth and
prosperity not anticipated by the designer, it will be easy enough to
relay such parts when this becomes necessary.

Mr. Conway states that:

"The sewers are designed on a very liberal basis, namely, on the
assumption that when flowing half full the quantity to be dealt with will
be 380 liters [100 gal.] per capita per day, with a maximum rate of flow
of 200 per cent."

If the writer understands this statement correctly, it means that the
sewers, flowing half full, will carry 380 liters per capita in 12 hours,
or are designed with 200% of the capacity required to take the assumed
flow in 24 hours.

It was assumed that each house would be occupied by 7 persons and have a
frontage of 12-1/2 m. (about 41 ft.), that is, about 700 gal. per day per
house, the maximum flow rate being 200%, or at the rate of 700 gal. per
house in 12 hours.

It is to be remembered that nearly all the houses are of one story, and
that, as a rule in tropical and sub-tropical countries, the per capita use
of water diminishes with some function of the increasing number of
inhabitants in one house. Most of the water is used in the kitchen, and
where there are 7 persons instead of 5, the quantity used by the smaller
number will generally serve the larger.

The writer is unable to understand how this quantity of sewage will be
produced, especially as the author states that, as far as the company is
concerned, it is limited to the removal and disposal of the sewage, and is
not required to provide for storm-water. He also states that:

"Apart from that fact, however, the best system for a city like Monterrey,
where rainfall for many months at a time is very scarce, is the strictly
'separate system'."

The minimum velocities in the sewers, when running full, vary between 0.91
and 1.5 m. (from 3 to 5 ft.) per sec., and will be the same flowing half
full.

From the foregoing data it will be observed that:

    (1) The water supply is the only source from which sewage flow
    is anticipated;

    (2) The water supply is very liberally estimated at 200 liters
    (53 gal.) per capita daily;

    (3) For purposes of sewer design, the daily flow of sewage
    expected (all of which is derived from the water supply of 200
    liters per capita) is estimated at 380 liters per capita, with a
    maximum rate of flow of 200% (or at the rate of 760 liters per
    capita), and with this quantity the sewers are designed to flow
    only half full;

    (4) The gradients are such that a velocity of from 3 to 5 ft.
    (0.91 to 1.5 m.) per sec. will be secured in the sewers flowing
    half full with the above quantity of flow per capita.

The writer does not agree with this method of computation, as he feels
sure that it will give sewers which are too large, with grades too steep
for the best obtainable results. His experience, extending over more than
twenty years in sewer design and hydraulic work, convinces him that the
method pursued is wrong in principle.

The principles involved in sewer design are first of all hydraulic. The
quantity of flow, in the nature of things, cannot be forecasted
accurately; success depends on getting the nearest possible approximation
to average conditions. If 200 liters per capita per day is a liberal
allowance, and 40,000,000 liters per day is a liberal expectation at this
rate for double the present population, and the sewers are designed to
flow half full only, why should this again be doubled?

The design of a sewer system for a city such as Monterrey is, in fact, a
very difficult problem, especially as the quantity of sewage will be very
limited, flush-water will have to be used in considerable quantities, and
water in that part of the world is precious at all times and often scarce.
Under these circumstances, the size or shape of the pipes selected for the
lateral sewers, should have been such as would more nearly agree with the
requirements than does the 8-in. circular.

A. P. Folwell, M. Am. Soc. C. E., writing of the 8-in. circular size,
states:[10]

[10] "Sewerage," by A. P. Folwell, M. Am, Soc. C. E.

    "To secure a flow in this pipe having an average depth of 4
    inches would require the sewage from a population of 6,500. In
    general it may be said that the ordinary depth of flow in any
    sewer should not be less than 2 inches, nor should it be less
    than 1/2 the radius of the invert, since if it is so there is
    much more danger of deposits forming along the edges and even in
    the center of the stream. It will sometimes be impossible to
    meet this requirement fully, but it should be kept in mind as
    extremely desirable."

Sewers of small size should be proportioned throughout the system so that
the depth of the minimum daily flow in the invert, and the velocity of
flow, will be the best possible to prevent deposits. The transporting
power of water is dependent mainly on the depth of flow, a minimum
velocity being selected rather than a minimum depth of flow. To those who
have had charge of the maintenance of sewers, as well as of their design
and construction, this principle seems so obvious that it is always a
surprise to see it disregarded by designers, who in these days seem
inclined to consider sewerage as a system of grades and sizes of pipes
installed for ideal, rather than for actual, conditions. Messrs. Staley
and Pierson have well stated the principle involved as follows:

"A stream having a depth of flow sufficient to immerse solid matter held
in suspension, to a certain extent lifts it and carries it forward. The
entire surface is also exposed to the action of the current. A stream
having an equal velocity but a less depth in proportion to the diameter of
the solid matters to be transported, evidently has less transporting
power. * * * An amount of sewage which can be properly transported by a
circular sewer of a given size, cannot be as efficiently transported by
one of larger diameter."

From some strange idea, which is apparently without foundation in logic or
based on any actual justification from experience, it has of late years
become the practice of designing engineers to make the 8-in. circular
pipe the smallest size for sewers; and it is not improbable that the
designer of the Monterrey system has merely followed this example. It has
also become the frequent practice of designers to give every length of
sewer all the grade possible, regardless of the fact, taught both by
hydraulics and experience, that the best grade is that which will give as
much depth of flow as is consistent with a scouring velocity.

Some years ago it was the standard practice, in the "strictly separate
system" of sewers, to use the 6-in. pipe as the minimum size, and, as far
as the writer has been able to discover, after giving the matter a rather
extensive investigation, the 6-in. size has given excellent results
wherever its use was proper. In places where it has not succeeded there
were excellent reasons why it should not have been selected, and these
could easily have been observed at the time the designs were made. The
best sizes for the sewers in a given system is always a matter to be
determined by local conditions; but there seems to be no reason why the
6-in. size should not be used where the flow is so slight that the 8-in.
will not work well; or where the velocity must of necessity be so great
that a flotation depth of flow cannot be maintained in the larger size. As
to likelihood of clogging and stoppage, the writer's opinion, based on the
maintenance of three rather extensive systems in different parts of the
United States, in each of which the 6-in. size comprises more than 75% of
the whole length of pipe, and of three other systems, one having 12-in.
and two having 8-in. as the minimum sizes, is that the 6-in. size, where
properly used, is less likely to become clogged than either of the others
used improperly. The cost of maintaining the 6-in. pipe lateral, under
these circumstances, is much less than that of maintaining the 8-in.
lateral.

The 6-in. pipe is not being used now as much as the 8-in., and in most
cases this is probably because the capacity of the latter is nearly double
that of the 6-in., and costs only a few cents more per foot. If there is a
sufficient population per acre, or if, within 30 or 40 years, such a
population is anticipated as will fill the 8-in. pipe half full, its use,
of course, is justified and necessary; but where it is quite evident that
this will never occur, its use is counter-indicated.

In Monterrey, where the building lots have a frontage of 41 ft., where the
houses, as a rule, are only one story high, where the water service is
metered and paid for, and the sewage flow is also paid for, there seems to
be no reason to justify the use of 8-in. pipe for the upper reaches of the
smallest sewers. The sewage flow to be anticipated will probably never be
sufficient to keep an 8-in. pipe sewer in a good clean condition at the
upper ends of the lines of sewers without excessive flushing; and the
sharper or steeper the grade on which it is placed, the worse will be the
result, because the sharper the grade, the thinner the flowing thread of
sewage will be drawn out in the invert; on the other hand, if the grades
are flat, the slight quantity of sewage flow will be spread out in a
sluggish stream, without sufficient depth, on the bottom of the 8-in.
pipe.

Where a wide surface is given to a small quantity of flowing sewage, it
stagnates slowly along the bottom of the sewer, leaving frequent deposits
to undergo decomposition and create foul air, if not to choke the sewer, a
result often produced; and where a circular sewer which is too large for
the ordinary flow is given a strong velocity by using steep grades, the
stream, though flowing rapidly, is drawn out to such a thin thread that it
will not effect the flotation of the solid masses in the sewage brought in
at house connections, and the shallow and thin stream simply flows around
such masses until a dam or obstruction forms and the sewage is backed up
sufficiently to force the obstruction farther down, to form another
obstruction in a larger pipe below. Flushing may possibly keep such a
sewer fairly clean; but, as usually practiced, it is effective only for a
few hundred feet from the flush-tank; and the quantity of flush-water
required by an 8-in. pipe is more than twice as much as that required to
keep the 6-in. pipe clean. Ventilation is better in the smaller sewer than
in the larger, as there is less air to move; but the elaborate ventilating
stacks provided at Monterrey may take care of this; and it is evidently a
place where ventilation will be needed.

The ideal size and shape of cross-section for a sewer is such as will give
the best flotation to moving solids which are being carried along by the
flow; and this means the sewer that, with the expected ordinary or average
flow, will give the best depth in the invert, when the velocity of flow is
sufficient to keep suspended solids, grit, etc., moving at a rate of from
2 to 3 ft. per sec. The size, however, is limited by practical
considerations. The circular pipes cannot well be less than 6 in. in
diameter, because the house connections cannot well be less than 4-in.
pipe, and the sewer should be larger than the house connections, for
various practical reasons; but, in order to secure flotation and a
scouring flow, the smallest pipe, or the pipe having the smallest invert
radius, that practical considerations permit, should be selected. The
grade should be such, and the collecting system so laid out, that the flow
may be conserved as far as possible, and the sewage flow should be kept of
as great a depth in the invert, or bottom of the sewer, as safety in
self-cleansing velocity will permit. This will save flush-water and
prevent stoppages, and thus reduce the cost of maintenance to a minimum.
For good sanitary practice, the sewers should be designed, first of all,
to comply with the requirements of the present, or immediately expected,
ordinary flow, with some reasonable allowance for the future. They should
be neither too large nor too small, and the grade should neither be too
great nor too little, to secure the best flotation and scouring effects
and the best flush-wave action under all circumstances.

The use of cement concrete pipe for sewers seems to be growing in favor;
nor is this surprising, in view of the many improvements made in their
design and manufacture. The excellence of the concrete pipe used in
Monterrey and its success, suggest the query: Why was it not used still
more extensively?

Table 13 shows that the cement pipe cost much less than the vitrified
tile, or "fire-clay" pipe. Thus, the 38.1 cm. (15-in.) fire-clay cost 6.14
pesos per lin. m., the 45.7 cm. (18-in.) cost 8.80 pesos, and the 50.8 cm.
(20-in.) cost 11.30 pesos. Compared with this, the concrete pipe was much
the cheaper; the 55.9 cm. (22-in.) cost 5.93 pesos, which is less than the
cost of the 38.1 cm. (15-in.) fire-clay; and the 61.0 cm. (25-in.)
concrete pipe cost 7.30 pesos, which is less than the 45.7 cm. (18-in.)
fire-clay.

The writer's experience with concrete pipe, derived mainly from a long
service in sewer design and construction in Brooklyn, N. Y., leads him to
believe that at Monterrey the whole sewer system might, with advantage,
have been built of concrete pipe, using an egg-shaped pipe with an area
slightly larger than an 8-in. circle, designed for a discharge equal to an
8-in. pipe for all the smaller sewers. The invert of such an egg-shaped
pipe would fulfill the present requirements in carrying a very small flow
with good flotation depth, better than would a 6-in. circular pipe, and
the reserve capacity of the 8-in. pipe would be secured without
interfering with good present service. Egg-shaped pipes, similar to those
used in Brooklyn, the writer believes, would have given far better
satisfaction throughout the Monterrey sewerage system than circular
fire-clay pipe, and would have cost no more, but probably less. The
egg-shaped pipe referred to is made with a flat base and a self-centering
joint, thus insuring perfect alignment, and a smoother interior surface
than can be obtained with fire-clay pipes.

Brooklyn has about 450 miles of concrete pipe sewers, of all sizes less
than 24 in., the greater part of which is egg-shaped. There are also about
250 miles of vitrified stoneware circular pipe sewers of similar sizes,
and the cost of repairs and replacing pipe, over a period of years is
about the same per mile for each kind. Incidentally, it may be stated that
the annual cost of repairs per mile on both kinds of pipe is very small,
and is only about one-fifth of the cost of repairs per mile on the brick
sewers, of which there are about 200 miles.

The principal advantages and disadvantages of cement concrete pipe sewers
may be summed up as follows:

                      ADVANTAGES OF CONCRETE PIPE.

  (a) Cement concrete pipe is usually less costly than vitrified
      pipe.

  (b) It can be formed in any shape desired.

  (c) It is not cracked by vibration, and resists impact better than
      vitrified pipe, for which reason it is a better material to
      lay near the surface of a street in which there is heavy
      traffic.

  (d) It is not affected by ordinary sewage.

  (e) The cost of repairing and maintaining is about the same as for
      a vitrified pipe sewer.

  (f) It can be made in the city or town where it is to be
      installed, thus giving the locality the advantage of having
      some of the money paid for labor in its manufacture spent in
      the place where the sewers are being put in, where it is
      raised as a tax, etc.; also saving freight charges, etc.

  (g) It can be made under the most careful local supervision and
      inspection, of selected material, by the engineer who is
      responsible for the success of the work. Vitrified pipe can
      seldom be made in this way.

                      DISADVANTAGES OF CONCRETE PIPE.

  (a) If not carefully made and of the best of materials, it is
      subject to failure by disintegration, etc.

  (b) It will not stand strong chemical action, and therefore the
      smaller sizes should not be used where they are likely to be
      exposed to trade wastes containing strong acids. In the larger
      sizes the quantity of flow mixes so quickly with the trade
      wastes that this danger is minimized, and it is very seldom
      that even the smaller sizes become affected; but vitrified
      pipe may be used in places where chemical action is
      anticipated.

  (c) If not properly made, it will be attacked by steam and hot
      vapor, and by animal fats in the sewage; but, if properly
      made, it is not affected by these.

  (d) Unless reinforced or made very thick, it will not stand as
      great a crushing load as the best vitrified stoneware pipe;
      but, as sewers are not intended to be used under very heavy
      pressure, this is not so very important. It is amply strong to
      withstand any internal pressure or any external crushing load
      to which it probably will be submitted.

  (e) Under a considerable head of ground-water, it may permit water
      to infiltrate through its walls for a considerable time after
      it is laid, thereby temporarily increasing the flow, which, if
      the sewage is to be pumped, will increase the cost of pumping.
      This difficulty can be met by using a carefully selected mix
      of materials in making the pipe, and by making the joints
      carefully. Infiltration through concrete diminishes rapidly
      after the sewer is in use; it occurs in vitrified pipe, also,
      to some extent.

The house connection drain adopted in Monterrey, with the disconnecting
trap, is very much like one which the writer has seen introduced with very
bad result. These are being removed as rapidly as possible by one of his
clients, a sewerage company, in the Southern States. It has been a
fruitful cause of stoppages and bad smells; the ordinary method now in
general use is much better. In the design shown, it would seem that there
may even be some danger that the ventilation of the sewer by the
stand-pipes in the streets may force the traps.

One is rather surprised to learn that the main outfall sewer is designed
with a capacity of 90,000,000 liters per day, the present sewage being
estimated as not more than 18,000,000 liters, and the far future being
thought to require only 40,000,000 liters. Why this excessive size?
Possibly the surplus water which it is to carry is to be discharged into
the sewers from the water supply system direct, and is intended for
irrigating the land at the disposal area, when the sewage is insufficient
for this purpose. The author states that all surface water is strictly
excluded.

The method of sewage disposal gives rise to several questions. It is
proposed to use an extensive area for growing crops, which are to be
irrigated with sewage. The paper states that the underlying strata at
Monterrey contain numerous caverns, and the first question is: What will
be the effect on the water supply of other towns lower down the valley?
The writer recollects a serious outbreak of typhoid fever in Bluefield, W.
Va., caused by the pollution of the water in similar strata finding its
way through unknown underground caverns and channels to the city's water
supply.

The next question is: What crops will be grown? It is a well-known fact
that vegetables grown by the use of sewage as a fertilizer, are unsafe in
a raw state for human consumption. This is well-known to European
travelers in China and Japan, where the use of fecal matter as fertilizer
renders the various water supplies (where not filtered and disinfected)
and all green vegetables, unsafe, on account of typhoid germs. Moreover,
crops not intended for human consumption, which are grown on lands
irrigated by sewage bearing typhoid germs, etc., are unsafe for men to
handle; even to store them may cause a dissemination of disease. It is
evident, therefore, that the whole sewage flow should be in some manner
disinfected at least, if not filtered, before it is used.

The method of sewage disposal and the use of merely settled septic sewage
for irrigation seem to be open to objection. The disposal plant is not
sufficiently effective to meet the present requirements of sanitary
science; and the sludge-pit will be certain to breed a pest of flies, if
it is not also an intolerable nuisance on account of foul smells.
Monterrey would seem to be a proper place for the introduction of the
Imhoff tank, with percolating filters, and a final settling tank, the
effluent being disinfected, before entering the latter tank. The flow
might then be used safely for irrigation purposes for crops not to be
eaten uncooked by man. The writer does not see how the method provided can
possibly fulfill the object stated, to distribute on the land an effluent
which will be "innocuous and clear," or how any consequential degree of
purification can be obtained in the tanks provided.

While there are described in this paper many things to find fault with,
there are also many things to commend. The water supply system, with its
reservoirs, etc., seems to be admirable; and the methods of construction
by which the expense for forms was reduced is very interesting. The
parking and ornamentation of the grounds over the reservoir roofs cannot
fail to benefit the people and popularize the work.


RUDOLF MEYER, M. AM. SOC. C. E. (by letter).--The writer, as Engineer for
the Government (guaranteeing the concessionaires a gross return of 10% per
annum on the capital invested), and as inspector of the various works has
had exceptional opportunities to become acquainted, not only with their
construction, but also with events leading up to the granting of the final
concession under which they were built and will be extended. In order to
judge of the extent to which the different engineers, in their turn
contributed toward the design of these works, the writer has thought it
desirable to submit a complete statement of all matters relating to the
inception, investigations, surveys, tests, etc., previous to the adoption
of the present plans.

Data regarding former investigations, plans, and concessions which have
since lapsed, have been obtained from the Government archives. These refer
to periods prior to Mr. Conway's engagement, and anterior to the retaining
of Mr. Schuyler by the concessionaires, and Mr. Binckley's connection with
the scheme, and they are presented here as complementary to the
information in the paper.

Samuel M. Gray, M. Am. Soc. C. E., acting in the interest of some American
capitalists (who had been induced by Col. J. A. Robertson, of Monterrey,
to look into the merits of a concession acquired by him, for building
these works), being guided by the Government's proposition to supply the
city with water by damming the flood-waters of the Santa Catarina River in
the narrow gorge through which the stream emerges from the Sierras, some
eight miles from the city, had several soundings made and reservoir sites
surveyed in the first two box canons up the river, and prepared and
presented to the Government several alternative projects, besides the one
mentioned by Mr. Schuyler. Several different dam sites were designated by
Mr. Gray, whose investigations extended over some two years, and were
finally abandoned after he had designed the general outlay for a complete
network of water mains and sewers for the city, on account of the
unwillingness of the Government at that time, about 1897, to grant any
guaranties as to bonds or income to the concessionaire or his assigns. Mr.
Gray did not favor the general scheme of storing flood-waters as a water
supply, but strongly recommended to the attention of the Government the
greater advantages of deriving the supply from subterranean flow in the
river, by an infiltration gallery driven into the water-bearing gravels in
the Santa Catarina Canon (only a short distance above the place where Mr.
Binckley afterward established his bore-holes across the river). He
proposed to take advantage of the steep slope of the river at a turn in
the canon, and from the lower end drive a tunnel through a projecting rock
spur, which tunnel, though starting well above the ordinary reach of
floods, would terminate in water-bearing gravel, at a sufficient depth
below the surface of the river-bed to intercept part of the underflow. Mr.
Gray, through investigations made under his direction, by Nathaniel
Turner, M. Am. Soc. C. E., had ascertained that there was an abundant
subterranean flow, and work had actually been started on the proposed
tunnel.

The results of Mr. Gray's investigations were put at the disposal of
Messrs. Mackenzie, Mann & Co. by Mr. Robertson, at whose offices Mr.
Binckley prepared the first plans submitted by him for the approval of the
Government.

After Mr. Gray's investigations, Messrs. Mackin and Dillon (F. H. Dillon,
Assoc. M. Am. Soc. C. E.), under contract with the Government, prepared
the following plans: For a dam in the Santa Catarina Canon; for a pipe
line, similar to the one proposed by Mr. Gray, to a reservoir and settling
basin on the left bank of the river (a short distance above where the
provisional pumping station was established afterward by Mr. Binckley),
but on the flat above the bluff skirting the river, practically at the
same elevation as the present high-pressure reservoirs; for a complete
network of water mains and sewers in the city, indicating the approximate
direction in which the sewage would be disposed of, either by turning it
into the river or by spreading it over suitable lands, the location of
which was to be determined later; and also a complete set of
specifications.

On these data bids were invited by publication, and inquiries were
received from several parties. Finally, Messrs. Stocker and Walker, of
Scranton, Pa., entered into negotiations with the Government, and the
present concession was agreed upon and granted.

Messrs. Stocker and Walker engaged the late E. Sherman Gould, M. Am. Soc.
C. E., to prepare a plan for a storage dam in the Santa Catarina Canon,
and submitted plans for water distribution and sewers in the city,
slightly modifying the original plans of Messrs. Mackin and Dillon.

In the fall of 1905, the concession was acquired by Messrs. Mackenzie,
Mann & Co., of Toronto, Canada, together with all plans, etc.,
presented by the original concessionaires. The new concessionaires stated
that they would examine the whole situation again, for the purpose of
presenting modified plans for works.

Mr. Schuyler, in the interest of the new owners, had paid one flying visit
to Monterrey when Mr. Gray's projects were brought to his notice, and the
writer had an opportunity to show him the tunnel which had been started.
Mr. Schuyler left for Brazil and did not return until February, 1906, when
he was accompanied by the Chief Engineer appointed by the concessionaires.
Messrs. Schuyler and Binckley then prepared plans for the water
distribution and sewer systems in the city and for a provisional water
supply to be pumped at San Geronimo, some two miles up the river. The new
plans for the city work followed closely the general disposition by Mr.
Gray, the principal difference being that the main reservoirs for the
permanent water supply were located to the south instead of to the west.
This change was due to the results of an investigation, made during Mr.
Schuyler's absence in Brazil, by Mr. F. S. Hyde, late Hydraulic Engineer
of the Necaxa Water Power plant, who, accompanied by the writer, visited
the whole water-shed of the Santa Catarina River in October, 1905, in
search of suitable dam sites and prospects of power development. Mr. Hyde
extended his studies to the Santiago Canon, southeast of the city,
recommending finally that the water be brought from that canon, and that
wells be dug in different points of the Santa Catarina River between San
Geronimo and the entrance of the canon, and tested by pumping, for the
purpose of establishing levels and ascertaining the available amount of
underflow, with a view of determining the location for an infiltration
gallery high enough up the river to permit of a gravity delivery and under
good pressure in the city.

In view of Mr. Hyde's report, and as the result of a visit to the Santiago
Canon, Mr. Schuyler decided to locate the reservoirs south of the town,
intending to bring in water from the southeast, from springs in the
Santiago Canon, and also by infiltration from Santa Catarina, his and Mr.
Binckley's scheme of water supply being for the same pressure throughout
the city.

To supply water during construction, and partly meet the demands of the
city, Mr. Binckley, on his arrival, decided to establish a provisional
pumping station at the well in the river nearest to town, started by
direction of Mr. Hyde at San Geronimo. This well was situated within the
bed of inundation of high floods, on a low bank, at the foot of a
conglomerate bluff some 20 ft. high, limiting a flat which was above the
reach of any flood. It was on the same side of the river as the city, and
there was plenty of good ground on the flat above for the establishment of
a reservoir.

A slightly shorter pipe line was secured by crossing the river, building
the reservoir (a substantial concrete-lined and vaulted-over structure) on
the opposite bank, laying out the pipe line to follow that bank nearly to
the city, and finally crossing back again; but the result has been that
since the flood of August, 1909, in which the river crossings were
destroyed, the reservoir remains isolated on the other side of the river
from town, though intended to form part of the permanent works and act as
a compensating reservoir for equalizing the pressure of the high-pressure
system. Fortunately, the pumping station, the larger pumps, and the
boilers, had been moved up the bank (after a rapid rise in the river on
August 10th, 1909) to the new wells established by Mr. Conway on the line
of the proposed prolongation of the infiltration gallery. The reservoir,
however, is left to stand alone on the other side of the river, and its
usefulness will not be restored until a new line is laid across the river,
re-establishing its connection with the new pump line and the new and
permanent pipe line to be laid along the north bank from the pumping
station to the city. This will free Monterrey from the constant menace of
a water famine. At present its two main water supplies may be cut off by
unexpected floods like those of 1909 and 1910, as both supplies are
carried across the river, and though only the cast-iron pipe connecting
with the water supply from Estanzuela was carried away by the flood, the
concrete conduit of the San Geronimo low-pressure supply was seriously
threatened. Such risks are too great to be carried for any length of time;
besides, a succession of dry years would cause such a reduction in the
Estanzuela supply as to require an additional reserve in the way of
pumping stations drawing on the under-flow of the river, such as already
exists in San Geronimo.

Afterward, Messrs. Schuyler and Binckley submitted preliminary plans and
profiles for the projected concrete gravity conduit from Estanzuela to the
reservoir south of the city, and Mr. Binckley submitted excavation plans
for two reservoirs, only one of which was built, and from designs by Mr.
Conway.

Stephen E. Kieffer, M. Am. Soc. C. E., was intrusted by Mr. Binckley with
the revision of the plans of the water distribution and sewers. The
southern half was approved by the Government and executed according to his
plans; the northern part was afterward revised by Mr. Conway and has been
partly built.

The final maturing of the project of an infiltration gallery in San
Geronimo as a low-pressure gravity supply, the division of the city into
high- and low-pressure districts corresponding to the two supplies, with
one reservoir, instead of two to the south of the city, and the other to
the west at the Obispado, the entire details of both these gravity
schemes, and of the whole sewage disposal scheme, as well as the
modification introduced into the city work for the northern half, are
unquestionably due to Mr. Conway, independently of the general views which
may have been held on those points by other engineers.

In March, 1910, Mr. Conway left Monterrey, all the principal works being
finished. Since that time Vicente Saucedo, Assoc. M. Am. Soc. C. E., has
put in many additional water mains and sewers in the northern part of the
city, and is finishing the _force majeure_ work caused by the destruction
wrought in the districts along the river banks by the extraordinary
floods.

The writer, having had an opportunity to watch the earnest efforts of the
several engineers connected with these works, in the course of their
design and construction, resulting without doubt in being the first of
their kind built in Mexico, has been induced to contribute this discussion
in order to bring out clearly the share of each.

Mr. Pitkethly's apprehensions as to the adequacy of the system of
ventilation adopted have not been realized, in part perhaps because the
houses, though generally of only one story, have such high ceilings that
the tops of their vent pipes are generally higher than the ventilating
columns at the heads of the branch sewers.


GEORGE ROBERT GRAHAM CONWAY, M. AM. SOC. C. E. (by letter).--The writer
regrets that some features of the works described in this paper have
failed to call forth the many useful criticisms which he expected, and his
remarks, therefore, are limited to the few points which have been raised.
He is particularly indebted to Messrs. Schuyler, Meyer, and Saucedo for
adding supplementary information of value to the paper, but regrets that
he cannot support Mr. Binckley in his claim that "the entire general
design of the system, as well as the extensive hydrological studies and
final selection of the sources of water supply, was completed in 1906,"
etc. On May 1st, 1907, when the writer assumed responsibility as Chief
Engineer, he was unfortunately confronted with the fact that very little
data and only a few preliminary and incomplete plans were available. His
first duty was to report upon the final sources of supply, and the
recommendations made in his report (dated July 12th), received Mr. (now
Sir William) Mackenzie's approval during the same month. The final plans,
upon which the approval of the State Government was definitely obtained,
were prepared by the writer during the summer of 1907, were submitted to
the Governor of the State, Gen. Bernard Reyes, on October 19th, and
received his approval on December 12th, 1907. No works, with a long
preliminary history, such as those at Monterrey, can rightly be said to be
due to any one individual; many engineers contributed to the final result,
and the writer willingly acknowledges his indebtedness to the able men,
who, for ten years prior to the construction of the works, investigated
the particular problems which were met--problems which were not only of an
engineering and physical nature, but racial and financial. The
responsibility of constructing the works in their present form, and
leaving them practically complete, did, however, fall on the writer's
shoulders.

Messrs. Pitkethly and Hammond have criticized the basis of the
calculations upon which the sewer system was laid down. In considering
this problem, it is necessary to remember that, in designing this system,
there was practically no information upon which to base the calculations;
and the writer believed that the wisest course was to anticipate a liberal
growth, and provide a large margin of safety. In designing a sewer system
in older and well-established communities, the engineer is generally able
to compile considerable information regarding the probable sewage flow for
which it is necessary to provide. In Monterrey this quantity was
absolutely unknown. The writer's practice in other places has been to
assume that about 8% of the total daily discharge of sewage will flow off
in one hour; and, from many curves which he has plotted regarding sewage
flow in British towns, this rate appears to him to be approximately
correct. In Monterrey, however, the old Mexican traditions are rapidly
changing, and the city is now becoming one of the most Americanized in
Mexico; the old one-story houses will give way in time to buildings of
several stories--a change, already noticeable, which has occurred during
the past few years, particularly in the business portion of the city.
Taking these facts into consideration, it is believed that it would be,
not only bad engineering, but bad business, for a company whose concession
lasts 99 years, to provide sewers as small as 6 in., as Mr. Hammond would
recommend, and then be called upon, under the terms of the concession, to
relay larger sewers at a future date, thus incurring further capital
expenditure upon which no Government guaranty would apply, and no further
revenue be obtained. In matters of this kind, not only the engineering,
but the commercial, aspect of the question must be kept in view, and this
point, the writer must frankly admit, he has always seriously considered.

The writer's experience with reference to the method of ventilating sewers
by tall columns extends over many years, and he still maintains that no
other system gives such satisfactory results. In this view he finds
considerable support in a recent paper on "Salisbury Drainage," by Mr. W.
J. E. Binnie,[11] written since the system at Monterrey was installed, in
which the result of a series of experiments carried on during 1906-07 are
given. At Salisbury, England, 68 ventilators, 6 in. in internal diameter,
30 ft. high, were connected to the main sewer by 6-in. stoneware pipes.
They were placed about 540 ft. apart, and, from careful anemometer
readings, the following conclusions were reached:

[11] _Minutes of Proceedings_, Inst. C. E., Vol. CLXXXI, p. 317.

  "(1) That four ventilators all lying in the lower portion of the
       town acted sometimes as air-inlets and sometimes as
       air-outlets, and that the other sixty-four acted as
       air-outlets.

  "(2) That the average velocity of the air escaping up these
       columns was 3.2 feet per second, representing the circulation
       of 3,600,000 cubic feet of air per diem, or sufficient to
       change the air in the sewers every 10 minutes.

  "(3) That the average velocity of the current of air in the
       ventilating-column increases with the size of the sewer to
       which it is connected, averaging 2.4 feet per second with the
       7-inch sewer, 3.6 feet per second with the 9-inch sewer, 3.7
       feet per second with the 12-inch sewer, and 4.1 feet per
       second with the 15-inch sewer in these experiments.

  "(4) That the draught in the column is very largely dependent on
       the wind, being at its minimum on a still day, and could
       therefore be readily increased by the use of a suitable cowl.

  "(5) That the draught is very little affected by the
       sewer-gradients. It was expected that, in ventilating-columns
       placed in connection with the upper end of a sewer laid at a
       steep gradient, a strong draught would have been obtained. No
       direct connection, however, was traceable."

As the result of these experiments, Mr. Binnie rightly came to the
conclusion that this system of ventilation was efficient.

Mr. Hammond anticipates that the house connection trap system at Monterrey
will lead to bad results, but the writer has seen the system at work in
many widely different cities with excellent results. He believes that it
is in accord with the best practice of the most eminent sanitarians during
the last 20 years, and has no apology to make for introducing that system
in Monterrey.

Regarding Mr. Hammond's summary of the advantages of concrete pipes for
sewer construction, the writer is in entire agreement, and would willingly
have introduced them throughout the whole of the Monterrey system, but for
the fact that it was an exceedingly difficult matter to obtain suitable
sand for their manufacture during the early days of construction, and
considerable delays would have arisen if a complete network of such pipes
had been used. His later experience at Monterrey, when the sand difficulty
had been solved, clearly showed that concrete pipe could be laid down at
much less expense than fire clay.

Both Mr. Pitkethly and Mr. Hammond refer to the system of liquefying tanks
used at Monterrey preparatory to turning the sewage on the irrigation
lands, and both express doubts as to their efficiency. The writer is now
separated from his library and notes by many thousands of miles, and
cannot quote "chapter and verse" as accurately as he would like, in order
to support his views that the system adopted was adequate for dealing
with a system such as that at Monterrey. It must be pointed out that not
only was it intended to prevent the sewage from becoming a nuisance, but
that the sewage flow plus a large quantity of surplus water was intended
to be used profitably for irrigation purposes. With that object, the
Company--or rather its allied Company, the Monterrey Railway, Light, and
Power Company--obtained the control of 2,246 acres of the very finest
arable land, with almost perfect natural drainage conditions, so that this
land could be utilized to create a profitable revenue from the use of the
sewage. The outfall sewer was accordingly designed to carry sufficient
water and sewage to irrigate about 2,500 acres of land, which area could
be considerably extended if necessary at any future time.

Most authorities now agree that before turning sewage upon land, a
preliminary treatment is required to remove as much as possible of the
suspended matter, and then reduce the latter by subsidence in liquefying
or septic tanks, so that the quantity remaining in the effluent is so
small and finely divided that it may be readily decomposed and oxidized by
bacterial action without risk of clogging the surface or interstices of
the land upon which it may discharge.[12]

[12] See Raikes, "Sewage Disposal Works," pages 97-98.

Mr. Pitkethly quotes Messrs. Watson and O'Shaughnessy as saying, in their
evidence before the Royal Commission on Sewage Disposal, that not more
than 10% of the solids are digested in septic tanks, but it must be
remembered that in many other places evidence was given before the same
Commission showing that from 25 to 30% was actually obtained.

Mr. J. D. Watson, in his paper, "Birmingham Sewage-Disposal Works,"[13]
read in March, 1910, points out that:

[13] _Minutes of Proceedings_, Inst. C. E., Vol. CLXXXI, p. 259.

    "The much-maligned sewage-farm still may be allowed (where the
    conditions are favourable) to rank as one of the best methods
    of sewage-disposal. Diverse opinions may be held as to what are
    favourable conditions, particularly as conditions are sure to
    vary widely with locality; but it may be assumed that where
    there is 1 acre of suitable land per 100 persons, as in Berlin
    and several other important cities, the efficiently-worked
    sewage-farm, when judged solely by the standard of the effluent
    produced, is still in the front rank. Effluents from such a
    farm are remarkable for their paucity of micro-organisms, their
    low albuminoid ammonia, and their unvarying character."

Assuming that not more than 2,000 acres of the irrigated land at Monterrey
were available for sewage purposes, this area would represent the sewage
treatment of the present population of not more than 45 persons per acre,
and on the basis of the design, that is, for a population of 200,000
persons, this represents not more than 100 persons per acre. In many
sewage farms on the continent of Europe, the number treated per acre
varies between 80 and 200 persons; for example, at Breslau it is 187, at
Berlin 105, at Brunswick 88, and at Steglitz 185.

Regarding the crops to be grown on the land, very satisfactory results
were obtained from growing Indian corn, and two excellent crops per annum
were taken from an area of 500 acres during the period in which the writer
was responsible for the works. It was also his intention to grow alfalfa,
and turn a part of the land into a pecan grove, and, although he does not
share the apprehensions of danger of either Mr. Pitkethly or Mr. Hammond
as to growing root crops, he believes the growth of alfalfa, Indian corn,
oats, barley, and pecan and fruit trees is eminently suitable for the
land, which is a deep rich loam, from 4 to 8 ft. deep, overlying the
"sillar" formation referred to in the paper. The writer has seen many
sewage farms during the last 18 years, upon which root crops of excellent
quality have been grown, and not the least suspicion has ever been raised
regarding their use.

In reference to the adoption of the monolithic form for constructing the
South Reservoir, the writer is so convinced as to its economy that had he
to build this reservoir again, he would adopt the same method. Mr.
Binckley, in drawing attention to the method of construction, has
overlooked the fact that the cost of forms for a reservoir 30 ft. deep was
a very serious item, and warranted the adoption of this new method, not
only on account of economy but because of rapidity of construction; while,
in the case of the Obispado Reservoir, which is very much shallower,
simpler forms could be and were adopted.

Mr. Saucedo's remarks regarding the repetition of the extraordinary floods
of August, 1909, in September, 1910, are particularly interesting, and
show how abnormal conditions are in so dry a section of Mexico as the
State of Nuevo Leon. These two floods, the writer believes, are among the
most instructive in North America, particularly when one remembers that
prior to 1909 the average rainfall during a period of 15 years, was less
than 22 in. per annum.

             TABLE 18.--COMPARISON OF VOLUME OF FLOODS, ETC.

  +------------------------------+-----------+----------+-------+--------+
  |                              |           | Maximum  |Cu. ft.| Annual |
  |                              | Drainage  | recorded | /sec. | amount |
  | River.                       | area, in  | flow, in | per   |   of   |
  |                              | square    |  cu. ft. |square |  rain- |
  |                              | miles.    | per sec. | mile. |  fall. |
  +------------------------------+-----------+----------+-------+--------+
  | Santa Catarina, Monterrey,   |           |          |       |        |
  |   August 27th, 1907          |      544  | 235,000  | 432   |  22    |
  | Estanzuela, near Monterrey,  |           |          |       |        |
  |   August 28th, 1909          |       3.5 |   2,900  | 825   |  25    |
  | Tansa, India                 |      52.5 |  35,000  | 666.7 | 101    |
  | Krishna, India               |     345   | 118,000  | 342.6 | 258    |
  | Coquitlam River, Vancouver   |     100   |  12,000  | 120   |147-189 |
  | Sweetwater, Cal.             |     186   |  18,150  |  99   |  ...   |
  | Delaware, Lambertville, N. J.|   6,820   | 250,000  |  36.5 |  45    |
  | Colorado, Austin, Tex.       |  37,000   | 123,000  |   3.3 |  24.5  |
  | Ohio, Cairo, Ill.            | 214,000   | 700,000  |   3.3 |  54.9  |
  +------------------------------+-----------+----------+-------+--------+

Table 18, compiled by the writer, shows how very extreme the floods of
1909 were compared with those on other rivers, while those of 1910,
referred to by Mr. Saucedo, although not so great, would appear to have
reached a rate of flow of about 300 cu. ft. per sec. per sq. mile of the
drainage area.

The writer agrees with Mr. Saucedo that in the semi-arid regions of Mexico
and the Southern States, and also in India, the possibility of these
abnormal floods is an important consideration in the design of hydraulic
works.

       *       *       *       *       *

                       Changes To This Document

Transcriber's Note: The table of contents has been added. Blank pages
have been deleted. Illustrations may have been moved. Discovered
publisher's punctuation errors have been corrected. Some wide tables
have been re-formatted to narrower equivalents with some words replaced
with commonly known abbreviations and possibly a key. Some ditto marks
have been replaced with the words represented. In addition, the
following changes or corrections were made:

 p. 501: but the tampers had had[del 2nd had] previous experience
 p. 508: shown on Plates VI to IX[VI, VII, VIII, IX[to accomodate links]]
 p. 516: at this place there is a considererable[considerable] area
 p. 538: based on the following rates and and[del 2nd and] percentages
 p. 579: by crossing the river, build-the[building the] reservoir
 p. 550: [For Table 14: added "Total materials cost"]
 p. 566: respectively (Fig. 5)[(Fig. 4)], together with lack of
 p. 584: [Table 17 renamed to Table 18 to avoid duplication.]
 p. 584: Table 17[18], compiled by the writer, shows how very extreme

       *       *       *       *       *





End of the Project Gutenberg EBook of ASCE 1193: The Water-Works and
Sewerage of Monterrey, N. L., Mexico, by George Robert Graham Conway

*** END OF THIS PROJECT GUTENBERG EBOOK ASCE 1193: THE WATER-WORKS ***

***** This file should be named 38455.txt or 38455.zip *****
This and all associated files of various formats will be found in:
        http://www.gutenberg.org/3/8/4/5/38455/

Produced by Juliet Sutherland, Henry Gardiner and the
Online Distributed Proofreading Team at http://www.pgdp.net


Updated editions will replace the previous one--the old editions
will be renamed.

Creating the works from public domain print editions means that no
one owns a United States copyright in these works, so the Foundation
(and you!) can copy and distribute it in the United States without
permission and without paying copyright royalties.  Special rules,
set forth in the General Terms of Use part of this license, apply to
copying and distributing Project Gutenberg-tm electronic works to
protect the PROJECT GUTENBERG-tm concept and trademark.  Project
Gutenberg is a registered trademark, and may not be used if you
charge for the eBooks, unless you receive specific permission.  If you
do not charge anything for copies of this eBook, complying with the
rules is very easy.  You may use this eBook for nearly any purpose
such as creation of derivative works, reports, performances and
research.  They may be modified and printed and given away--you may do
practically ANYTHING with public domain eBooks.  Redistribution is
subject to the trademark license, especially commercial
redistribution.



*** START: FULL LICENSE ***

THE FULL PROJECT GUTENBERG LICENSE
PLEASE READ THIS BEFORE YOU DISTRIBUTE OR USE THIS WORK

To protect the Project Gutenberg-tm mission of promoting the free
distribution of electronic works, by using or distributing this work
(or any other work associated in any way with the phrase "Project
Gutenberg"), you agree to comply with all the terms of the Full Project
Gutenberg-tm License (available with this file or online at
http://gutenberg.org/license).


Section 1.  General Terms of Use and Redistributing Project Gutenberg-tm
electronic works

1.A.  By reading or using any part of this Project Gutenberg-tm
electronic work, you indicate that you have read, understand, agree to
and accept all the terms of this license and intellectual property
(trademark/copyright) agreement.  If you do not agree to abide by all
the terms of this agreement, you must cease using and return or destroy
all copies of Project Gutenberg-tm electronic works in your possession.
If you paid a fee for obtaining a copy of or access to a Project
Gutenberg-tm electronic work and you do not agree to be bound by the
terms of this agreement, you may obtain a refund from the person or
entity to whom you paid the fee as set forth in paragraph 1.E.8.

1.B.  "Project Gutenberg" is a registered trademark.  It may only be
used on or associated in any way with an electronic work by people who
agree to be bound by the terms of this agreement.  There are a few
things that you can do with most Project Gutenberg-tm electronic works
even without complying with the full terms of this agreement.  See
paragraph 1.C below.  There are a lot of things you can do with Project
Gutenberg-tm electronic works if you follow the terms of this agreement
and help preserve free future access to Project Gutenberg-tm electronic
works.  See paragraph 1.E below.

1.C.  The Project Gutenberg Literary Archive Foundation ("the Foundation"
or PGLAF), owns a compilation copyright in the collection of Project
Gutenberg-tm electronic works.  Nearly all the individual works in the
collection are in the public domain in the United States.  If an
individual work is in the public domain in the United States and you are
located in the United States, we do not claim a right to prevent you from
copying, distributing, performing, displaying or creating derivative
works based on the work as long as all references to Project Gutenberg
are removed.  Of course, we hope that you will support the Project
Gutenberg-tm mission of promoting free access to electronic works by
freely sharing Project Gutenberg-tm works in compliance with the terms of
this agreement for keeping the Project Gutenberg-tm name associated with
the work.  You can easily comply with the terms of this agreement by
keeping this work in the same format with its attached full Project
Gutenberg-tm License when you share it without charge with others.

1.D.  The copyright laws of the place where you are located also govern
what you can do with this work.  Copyright laws in most countries are in
a constant state of change.  If you are outside the United States, check
the laws of your country in addition to the terms of this agreement
before downloading, copying, displaying, performing, distributing or
creating derivative works based on this work or any other Project
Gutenberg-tm work.  The Foundation makes no representations concerning
the copyright status of any work in any country outside the United
States.

1.E.  Unless you have removed all references to Project Gutenberg:

1.E.1.  The following sentence, with active links to, or other immediate
access to, the full Project Gutenberg-tm License must appear prominently
whenever any copy of a Project Gutenberg-tm work (any work on which the
phrase "Project Gutenberg" appears, or with which the phrase "Project
Gutenberg" is associated) is accessed, displayed, performed, viewed,
copied or distributed:

This eBook is for the use of anyone anywhere at no cost and with
almost no restrictions whatsoever.  You may copy it, give it away or
re-use it under the terms of the Project Gutenberg License included
with this eBook or online at www.gutenberg.org

1.E.2.  If an individual Project Gutenberg-tm electronic work is derived
from the public domain (does not contain a notice indicating that it is
posted with permission of the copyright holder), the work can be copied
and distributed to anyone in the United States without paying any fees
or charges.  If you are redistributing or providing access to a work
with the phrase "Project Gutenberg" associated with or appearing on the
work, you must comply either with the requirements of paragraphs 1.E.1
through 1.E.7 or obtain permission for the use of the work and the
Project Gutenberg-tm trademark as set forth in paragraphs 1.E.8 or
1.E.9.

1.E.3.  If an individual Project Gutenberg-tm electronic work is posted
with the permission of the copyright holder, your use and distribution
must comply with both paragraphs 1.E.1 through 1.E.7 and any additional
terms imposed by the copyright holder.  Additional terms will be linked
to the Project Gutenberg-tm License for all works posted with the
permission of the copyright holder found at the beginning of this work.

1.E.4.  Do not unlink or detach or remove the full Project Gutenberg-tm
License terms from this work, or any files containing a part of this
work or any other work associated with Project Gutenberg-tm.

1.E.5.  Do not copy, display, perform, distribute or redistribute this
electronic work, or any part of this electronic work, without
prominently displaying the sentence set forth in paragraph 1.E.1 with
active links or immediate access to the full terms of the Project
Gutenberg-tm License.

1.E.6.  You may convert to and distribute this work in any binary,
compressed, marked up, nonproprietary or proprietary form, including any
word processing or hypertext form.  However, if you provide access to or
distribute copies of a Project Gutenberg-tm work in a format other than
"Plain Vanilla ASCII" or other format used in the official version
posted on the official Project Gutenberg-tm web site (www.gutenberg.org),
you must, at no additional cost, fee or expense to the user, provide a
copy, a means of exporting a copy, or a means of obtaining a copy upon
request, of the work in its original "Plain Vanilla ASCII" or other
form.  Any alternate format must include the full Project Gutenberg-tm
License as specified in paragraph 1.E.1.

1.E.7.  Do not charge a fee for access to, viewing, displaying,
performing, copying or distributing any Project Gutenberg-tm works
unless you comply with paragraph 1.E.8 or 1.E.9.

1.E.8.  You may charge a reasonable fee for copies of or providing
access to or distributing Project Gutenberg-tm electronic works provided
that

- You pay a royalty fee of 20% of the gross profits you derive from
     the use of Project Gutenberg-tm works calculated using the method
     you already use to calculate your applicable taxes.  The fee is
     owed to the owner of the Project Gutenberg-tm trademark, but he
     has agreed to donate royalties under this paragraph to the
     Project Gutenberg Literary Archive Foundation.  Royalty payments
     must be paid within 60 days following each date on which you
     prepare (or are legally required to prepare) your periodic tax
     returns.  Royalty payments should be clearly marked as such and
     sent to the Project Gutenberg Literary Archive Foundation at the
     address specified in Section 4, "Information about donations to
     the Project Gutenberg Literary Archive Foundation."

- You provide a full refund of any money paid by a user who notifies
     you in writing (or by e-mail) within 30 days of receipt that s/he
     does not agree to the terms of the full Project Gutenberg-tm
     License.  You must require such a user to return or
     destroy all copies of the works possessed in a physical medium
     and discontinue all use of and all access to other copies of
     Project Gutenberg-tm works.

- You provide, in accordance with paragraph 1.F.3, a full refund of any
     money paid for a work or a replacement copy, if a defect in the
     electronic work is discovered and reported to you within 90 days
     of receipt of the work.

- You comply with all other terms of this agreement for free
     distribution of Project Gutenberg-tm works.

1.E.9.  If you wish to charge a fee or distribute a Project Gutenberg-tm
electronic work or group of works on different terms than are set
forth in this agreement, you must obtain permission in writing from
both the Project Gutenberg Literary Archive Foundation and Michael
Hart, the owner of the Project Gutenberg-tm trademark.  Contact the
Foundation as set forth in Section 3 below.

1.F.

1.F.1.  Project Gutenberg volunteers and employees expend considerable
effort to identify, do copyright research on, transcribe and proofread
public domain works in creating the Project Gutenberg-tm
collection.  Despite these efforts, Project Gutenberg-tm electronic
works, and the medium on which they may be stored, may contain
"Defects," such as, but not limited to, incomplete, inaccurate or
corrupt data, transcription errors, a copyright or other intellectual
property infringement, a defective or damaged disk or other medium, a
computer virus, or computer codes that damage or cannot be read by
your equipment.

1.F.2.  LIMITED WARRANTY, DISCLAIMER OF DAMAGES - Except for the "Right
of Replacement or Refund" described in paragraph 1.F.3, the Project
Gutenberg Literary Archive Foundation, the owner of the Project
Gutenberg-tm trademark, and any other party distributing a Project
Gutenberg-tm electronic work under this agreement, disclaim all
liability to you for damages, costs and expenses, including legal
fees.  YOU AGREE THAT YOU HAVE NO REMEDIES FOR NEGLIGENCE, STRICT
LIABILITY, BREACH OF WARRANTY OR BREACH OF CONTRACT EXCEPT THOSE
PROVIDED IN PARAGRAPH 1.F.3.  YOU AGREE THAT THE FOUNDATION, THE
TRADEMARK OWNER, AND ANY DISTRIBUTOR UNDER THIS AGREEMENT WILL NOT BE
LIABLE TO YOU FOR ACTUAL, DIRECT, INDIRECT, CONSEQUENTIAL, PUNITIVE OR
INCIDENTAL DAMAGES EVEN IF YOU GIVE NOTICE OF THE POSSIBILITY OF SUCH
DAMAGE.

1.F.3.  LIMITED RIGHT OF REPLACEMENT OR REFUND - If you discover a
defect in this electronic work within 90 days of receiving it, you can
receive a refund of the money (if any) you paid for it by sending a
written explanation to the person you received the work from.  If you
received the work on a physical medium, you must return the medium with
your written explanation.  The person or entity that provided you with
the defective work may elect to provide a replacement copy in lieu of a
refund.  If you received the work electronically, the person or entity
providing it to you may choose to give you a second opportunity to
receive the work electronically in lieu of a refund.  If the second copy
is also defective, you may demand a refund in writing without further
opportunities to fix the problem.

1.F.4.  Except for the limited right of replacement or refund set forth
in paragraph 1.F.3, this work is provided to you 'AS-IS' WITH NO OTHER
WARRANTIES OF ANY KIND, EXPRESS OR IMPLIED, INCLUDING BUT NOT LIMITED TO
WARRANTIES OF MERCHANTIBILITY OR FITNESS FOR ANY PURPOSE.

1.F.5.  Some states do not allow disclaimers of certain implied
warranties or the exclusion or limitation of certain types of damages.
If any disclaimer or limitation set forth in this agreement violates the
law of the state applicable to this agreement, the agreement shall be
interpreted to make the maximum disclaimer or limitation permitted by
the applicable state law.  The invalidity or unenforceability of any
provision of this agreement shall not void the remaining provisions.

1.F.6.  INDEMNITY - You agree to indemnify and hold the Foundation, the
trademark owner, any agent or employee of the Foundation, anyone
providing copies of Project Gutenberg-tm electronic works in accordance
with this agreement, and any volunteers associated with the production,
promotion and distribution of Project Gutenberg-tm electronic works,
harmless from all liability, costs and expenses, including legal fees,
that arise directly or indirectly from any of the following which you do
or cause to occur: (a) distribution of this or any Project Gutenberg-tm
work, (b) alteration, modification, or additions or deletions to any
Project Gutenberg-tm work, and (c) any Defect you cause.


Section  2.  Information about the Mission of Project Gutenberg-tm

Project Gutenberg-tm is synonymous with the free distribution of
electronic works in formats readable by the widest variety of computers
including obsolete, old, middle-aged and new computers.  It exists
because of the efforts of hundreds of volunteers and donations from
people in all walks of life.

Volunteers and financial support to provide volunteers with the
assistance they need, are critical to reaching Project Gutenberg-tm's
goals and ensuring that the Project Gutenberg-tm collection will
remain freely available for generations to come.  In 2001, the Project
Gutenberg Literary Archive Foundation was created to provide a secure
and permanent future for Project Gutenberg-tm and future generations.
To learn more about the Project Gutenberg Literary Archive Foundation
and how your efforts and donations can help, see Sections 3 and 4
and the Foundation web page at http://www.pglaf.org.


Section 3.  Information about the Project Gutenberg Literary Archive
Foundation

The Project Gutenberg Literary Archive Foundation is a non profit
501(c)(3) educational corporation organized under the laws of the
state of Mississippi and granted tax exempt status by the Internal
Revenue Service.  The Foundation's EIN or federal tax identification
number is 64-6221541.  Its 501(c)(3) letter is posted at
http://pglaf.org/fundraising.  Contributions to the Project Gutenberg
Literary Archive Foundation are tax deductible to the full extent
permitted by U.S. federal laws and your state's laws.

The Foundation's principal office is located at 4557 Melan Dr. S.
Fairbanks, AK, 99712., but its volunteers and employees are scattered
throughout numerous locations.  Its business office is located at
809 North 1500 West, Salt Lake City, UT 84116, (801) 596-1887, email
business@pglaf.org.  Email contact links and up to date contact
information can be found at the Foundation's web site and official
page at http://pglaf.org

For additional contact information:
     Dr. Gregory B. Newby
     Chief Executive and Director
     gbnewby@pglaf.org


Section 4.  Information about Donations to the Project Gutenberg
Literary Archive Foundation

Project Gutenberg-tm depends upon and cannot survive without wide
spread public support and donations to carry out its mission of
increasing the number of public domain and licensed works that can be
freely distributed in machine readable form accessible by the widest
array of equipment including outdated equipment.  Many small donations
($1 to $5,000) are particularly important to maintaining tax exempt
status with the IRS.

The Foundation is committed to complying with the laws regulating
charities and charitable donations in all 50 states of the United
States.  Compliance requirements are not uniform and it takes a
considerable effort, much paperwork and many fees to meet and keep up
with these requirements.  We do not solicit donations in locations
where we have not received written confirmation of compliance.  To
SEND DONATIONS or determine the status of compliance for any
particular state visit http://pglaf.org

While we cannot and do not solicit contributions from states where we
have not met the solicitation requirements, we know of no prohibition
against accepting unsolicited donations from donors in such states who
approach us with offers to donate.

International donations are gratefully accepted, but we cannot make
any statements concerning tax treatment of donations received from
outside the United States.  U.S. laws alone swamp our small staff.

Please check the Project Gutenberg Web pages for current donation
methods and addresses.  Donations are accepted in a number of other
ways including checks, online payments and credit card donations.
To donate, please visit: http://pglaf.org/donate


Section 5.  General Information About Project Gutenberg-tm electronic
works.

Professor Michael S. Hart is the originator of the Project Gutenberg-tm
concept of a library of electronic works that could be freely shared
with anyone.  For thirty years, he produced and distributed Project
Gutenberg-tm eBooks with only a loose network of volunteer support.


Project Gutenberg-tm eBooks are often created from several printed
editions, all of which are confirmed as Public Domain in the U.S.
unless a copyright notice is included.  Thus, we do not necessarily
keep eBooks in compliance with any particular paper edition.


Most people start at our Web site which has the main PG search facility:

     http://www.gutenberg.org

This Web site includes information about Project Gutenberg-tm,
including how to make donations to the Project Gutenberg Literary
Archive Foundation, how to help produce our new eBooks, and how to
subscribe to our email newsletter to hear about new eBooks.